• No results found

5 RENEWABLE ENERGY. Contact: T F

N/A
N/A
Protected

Academic year: 2021

Share "5 RENEWABLE ENERGY. Contact: T F"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

(1)

Contact:

T 051 702277 - F 051 700825

Eng. Pierpaolo Semproli

mobile 348 2717927

pierpaolo.semproli@teleios-ing.it

Teleios is in a position to provide specific

services in the field of large plants for

the production of solar energy.

The specialty operations begin with the

preliminary design and architecture of

a station along with presiding over the

authorization processes, supporting

customers from the initial authorisation

stages through to connection to the

national grid and final verification and

testing.

(2)

analysis of the system.

• Communication with the local and

provincial municipalities and authorities

[Municipal

government,

provincial

superintendent, ARPA, AUSL, often

within the Services

• Conferences arranged under Legislative

Decree 387/03].

• Electrical installation project and

specialized systems for large and small

plants.

• Geological, geotechnical, geophysical

and seismic analysis.

• Project executive plans, construction and

related reports calculation of structural

steel [according to the latest national

and international standards].

• Construction supervision - Certification

of works.

• Practices for Enel and GSE for connection

to electricity distribution and admission

to the incentive rates (Enel/Terna, GSE

and managers and local authorities

of other countries such as Electrica,

Transelectica, Cez, Enel, Anre for

Romania, ecc.).

• Due diligence on projects, works and

plants.

• Specifications and contract for the

preparation of projects.

I numeri di Teleios nel fotovoltaico

Teleios has carried out technical and

consultancy of various kinds of PV systems

for over 500 MWp of total power, including

more than 100 MWp of plants installed and

connected.

Teleios took care of business directly for

technical installations of any type (on roofs,

on bus shelters, on greenhouses of former

quarries, fixed on the ground, on single and

dual axis trackers, stand alone, etc..) And

various power (2 kWp to 14 MWp made , up

to 40 MWp designed).

Teleios has been active in Italy since 2007,

where he gained experience in all phases

authorization, design and construction,

before moving independently or in

patnership with leading companies in other

European countries, such as Romania,

Croatia, England, or in other continents,

such as Africa (Eritrea) and South America

(Brazil and Mexico).

Teleios, has developed and is developing

in many plants, all the technical and

administrative. In particular, and was

developed for the facility which was until

recently the largest in Italy for its installation

characteristics (integrated on roofs).

Teleios provides the following services in

Italy and also in other European countries

(Romania, Croatia, UK, etc..) and in the

500 MWp total power

100 MWp installed and

(3)

• n.

2

in Puglia [IT] of 1 MWp/cad

[connected in 2009]

• n.

1

in Puglia [IT] of 1 MWp [connected

inl 2010]

• n.

1

in Campania [IT] of 1.5 MWp

[connected in june 2011]

• n.

1

in Campania [IT] of 1.15 MWp

[connected in june 2011]

• n.

2

in Sicilia [IT] of 0.5 + 0.25 MWp

[connected in 2010]

• n.

1

in Emilia Romagna [IT] of 12 MWp

[connected in 1° Q 2011]

• n.

2

in Puglia [IT] of 6.5 MWp/cad

[connected in 1° Q 2011]

• n.

1

in Emilia Romagna [IT] of 4.7 MWp/

cad [connected in 1° Q 2011]

• n.

1

in Emilia Romagna [IT] of 0.2 MWp/

cad [connected in 1° Q 2011]

• n.

1

in Emilia Romagna [IT] of 3,3 MWp/

cad [connected in 2011]

• n.

2

in Abruzzo [IT] of 1 MWp/cad

[connected in 2010]

• n.

1

in Abruzzo [IT] of 2.4 MWp

[connected in 2010]

• n.

3

in Abruzzo [IT] of 1 MWp/cad

[connected in june 2011]

• n.

1

in Abruzzo [IT] of 1.8 MWp

[connected in june 2011]

• n.

1

in Abruzzo [IT] of 1 MWp [connected

in june 2011]

• n.

1

in Abruzzo [IT] of 0,7 MWp

[connected in 2011]

• n.

1

in Abruzzo [IT] of 0,8 MWp

[connected in 2011]

• n.

1

in Abruzzo [IT] of 2,4 MWp

[connected in 2011]

• n.

1

in Abruzzo [IT] of 1 MWp

[connected in 2011]

• n.

2

in Puglia [IT] of 1 MWp/cad

[connected in 2012]

• n.

1

in Emilia Romagna [IT] of 14 MWp

[connected in december 2013]

• n.1 in ROMANIA Constanta of 2,5 MWp

[connected in april 2014]

(4)

Installation with sun-tracking system

• n.

1

in Piemonte [IT] of 1.4 MWp

[connected in 2010]

• n.

1

in Piemonte [IT] of 1.3 MWp

[connected in 2010]

• n.

1

in Piemonte [IT] of 5.0 MWp

[connected in 1° Q 2011]

• n.

1

in Piemonte [IT] of 0.9 MWp

[connected in 1° Q 2011]

Installation on roof

• n.

1

in Piemonte [IT] of 4.7 MWp

[connected in 2008-2009]

• n.

2

in Emilia Romagna [IT] of 0.13 + 0.25

MWp [connected in 2010 and 1° Q 2011]

• n.

1

in Emilia Romagna [IT] of 1.3 MWp

[connected in 2010]

• n.

1

in Abruzzo [IT] of 1.6 MWp

[connected in 1° Q 2011]

• n.

1

in Abruzzo [IT] of 1.3 MWp

[connected in 1° Q 2011]

• n.

1

in Lombardia [IT] of 0.37 MWp

[connected in 1° Q 2011]

• n.

1

in Calabria [IT] of 1.18 MWp

[connected in june 2011]

• n.

1

in Calabria [IT] of 0.5 MWp

[connected in june 2011]

• n.

1

in Lazio [IT] of 1 MWp [connected in

2012]

• n.

1

in Lombardia [IT] of 1 MWp

[connected in 2012]

• n.

1

in Lombardia [IT] of 0,15 MWp

[connected in 2011]

• n.

1

in Lombardia [IT] of 0,78 MWp

[connected in 2011]

• n.

1

in Sardegna [VILLACIDRO] of 0,92

MWp [connected in 2011]

• n.

10

in Emilia Romagna [IT] of 0,5 MWp

total [connected in 2012]

• n.

12

in Emilia Romagna [IT] of totali 0,75

MWp total [connected in 2012]

500 MWp total power

100 MWp installed and

(5)

INTERPORTO CAMPANO S.p.A. Nola (NA)

CONCEPT PROJECTS AND PRE-FINAL PROJECTS FOR THE CONSTRUCTION OF PV PLANTS ON THE CIS AND IC PLANTS WITH MODULES “Si-POLY - THIN FILM CdTe - MICROMORPH (MCPH)” 2010 - X X X X

ENERGETICA

SOLARE S.p.A.

Roma

PV PLANTS 2008 2011 - X X X X X X X X X

ICOT

ENGINEERING

s.r.l. - Roma

PV PLANTS 2010 - X X

TERRAFIX

ANLAGEBAU 

GmbH

ESSENBACH

ALTHEIM

Germany

PV PLANTS 2009 2011 - X X X

SEMITEC s.r.l.

Terni

PV PLANTS 2010 2011 - X X X X X X X X X X

PVB SOLUTIONS

S.p.A. - Trento

PV PLANTS 2010 2011 - X X X X X X X X

MONTEALTO

Project

Management

Italia s.r.l. ROMA

Italian seat

MONTEALTO

SPAGNA

PV PLANTS 2010 2011 - X X X X X X X

SOCIETY OF

ERGYCAPITAL

GROUP Milano

PV PLANTS

2008

(6)

CLIENTS

DENOMINATION

PERIOD

AMOUNT

TOTAL

PROJECT

STATE OF WORK

PROJ.

PRELIM. PROJ.DEF. PROJ.ESEC. PROJ. ES.STRUCT. ELECTRICALPROJ. ES. PLANTS

PROJ.

FINISHED SAFETYPROJ. WORK IN DL PROGRESS

DL WORK FINISHES

SAFETY

WORK FINISHEDWORK

INTERPORTO CAMPANO S.p.A. Nola (NA)

CONCEPT PROJECTS AND PRE-FINAL PROJECTS FOR THE CONSTRUCTION OF PV PLANTS ON THE CIS AND IC PLANTS WITH MODULES “Si-POLY - THIN FILM CdTe - MICROMORPH (MCPH)” 2010 - X X X X

ENERGETICA

SOLARE S.p.A.

Roma

PV PLANTS 2008 2011 - X X X X X X X X X

ICOT

ENGINEERING

s.r.l. - Roma

PV PLANTS 2010 - X X

TERRAFIX

ANLAGEBAU 

GmbH

ESSENBACH

ALTHEIM

Germany

PV PLANTS 2009 2011 - X X X

SEMITEC s.r.l.

Terni

PV PLANTS 2010 2011 - X X X X X X X X X X

PVB SOLUTIONS

S.p.A. - Trento

PV PLANTS 2010 2011 - X X X X X X X X

MONTEALTO

Project

Management

Italia s.r.l. ROMA

Italian seat

MONTEALTO

SPAGNA

PV PLANTS 2010 2011 - X X X X X X X

SOCIETY OF

ERGYCAPITAL

GROUP Milano

PV PLANTS

2008

2013 - X X X X X X X X X X

ITALY

TOTAL PLANTS 250 MWp

ACTIVITIES: PROJECT - TESTING - EXPERT SURVEYING DUE DILIGENCE - CONSULTING...

(7)

OPDE ITALY Torino - IT Seat OPDE SPAGNA (Teleios in ATP with FAROGB) PV PLANTS 2009 2011 - X X X X X X X X X X

SOCIETY OF

TERNA GROUP

S.p.A. Roma

PV PLANTS

2010 2011 - X X X X X X X

UNIVERSAL SUN

s.r.l. Milano

PV PLANTS 2010 2011 - X X X X X X X

LEASINT S.p.A.

Milano

PV PLANTS 2010 2011 - X X

JUWI Verona

IT Seat JUWI

GERMANIA

(Teleios with

E&ngi)

PV PLANTS 2010 2011 - X X

Punto Green

Energy Italy

PV PLANTS 2012 - X X X X X X X X X X

ENERRAY S.r.l.

Zola Predosa BO

PV PLANTS 2011 2012 - X X X X X X X X X X

TOZZI GROUP

SPA Ravenna

PV PLANTS 2013 - X X

DOMUS s.r.l. Pistoia

N° 5 OFFSHORE WIND FARM ON THE COAST OF TUSCANY

PREPARATION OF DOCUMENTATION TO FUNCTIONAL SCOOPING PRELIMINARY 2008 2009 not defined X X

BIO-CONSTRUCT

ITALIA s.r.l. BO

BIOGAS PLANTS IN FINALE

EMILIA (MO) 2010 2011 € 400.000,00 X X X

BIOGAS PLANTS IN CASTELLONE (CR)

2012

2013 € 400.000,00 X X X

BIOGAS PLANTS IN FIESCO (CR) 2012

(8)

CLIENTS

DENOMINATION

PERIOD

AMOUNT

TOTAL

PROJECT

STATE OF WORK

PROJ.

PRELIM. PROJ.DEF. PROJ.ESEC. PROJ. ES.STRUCT. ELECTRICALPROJ. ES. PLANTS

PROJ.

FINISHED SAFETYPROJ. WORK IN DL PROGRESS

DL WORK FINISHES

SAFETY

WORK FINISHEDWORK OPDE ITALY Torino - IT Seat OPDE SPAGNA (Teleios in ATP with FAROGB) PV PLANTS 2009 2011 - X X X X X X X X X X

SOCIETY OF

TERNA GROUP

S.p.A. Roma

PV PLANTS

2010 2011 - X X X X X X X

UNIVERSAL SUN

s.r.l. Milano

PV PLANTS 2010 2011 - X X X X X X X

LEASINT S.p.A.

Milano

PV PLANTS 2010 2011 - X X

JUWI Verona

IT Seat JUWI

GERMANIA

(Teleios with

E&ngi)

PV PLANTS 2010 2011 - X X

Punto Green

Energy Italy

PV PLANTS 2012 - X X X X X X X X X X

ENERRAY S.r.l.

Zola Predosa BO

PV PLANTS 2011 2012 - X X X X X X X X X X

TOZZI GROUP

SPA Ravenna

PV PLANTS 2013 - X X

DOMUS s.r.l. Pistoia

N° 5 OFFSHORE WIND FARM ON THE COAST OF TUSCANY

PREPARATION OF DOCUMENTATION TO FUNCTIONAL SCOOPING PRELIMINARY 2008 2009 not defined X X

BIO-CONSTRUCT

ITALIA s.r.l. BO

BIOGAS PLANTS IN FINALE

EMILIA (MO) 2010 2011 € 400.000,00 X X X BIOGAS PLANTS IN CASTELLONE (CR) 2012 2013 € 400.000,00 X X X

ITALY

TOTAL PLANTS 250 MWp

ACTIVITIES: PROJECT - TESTING - EXPERT SURVEYING DUE DILIGENCE - CONSULTING...

(9)

Punto Green Energy Romania PV PLANTS METRO - 704 kWp 2012 - X PV PLANTS CAPRIOARA 2012 - X PV PLANTS AUTOSTRADA - 39,6 MWp 2012 - X PV PLANTS CLUJI 1 - 1,55 MWp 2012 - X PV PLANTS ELCIU - 28 MWp 2012 - X PV PLANTS ELCIU-CERNUC - 43,41 MWp 2012 - X PV PLANTS PANCIU - 6,72 MWp 2012 - X PV PLANTS BANEASA - 7 MWp 2012 - X PV PLANTS CLUJI NAPOCA - 1 MWP 2012 - X PV PLANTS VISINA - 968 kWp 2012 - X PV PLANTS OLT - 19,8 MWp 2012 - X

PV PLANTS -TEASC ENEL GREEN

POWER - 3,819 MWp 2012 - X PV PLANTS CARACAL - 7 MWp 2012 - X X X PV PLANTS SFANTU GHEORGHE - 2,49 MWp 2012 - X PV PLANTS OVIDIU - 1,5 MWp 2012 - X X X PV PLANTS OVIDIU - 2,5 MWp 2013 - X X X X X X X X X X PV PLANTS ARC PARC - 4,198 MWp 2013 - X X X

(10)

CLIENTS

DENOMINATION

PERIOD

AMOUNT

TOTAL

PROJECT

STATE OF WORK

PROJ.

PRELIM. PROJ.DEF. PROJ.ESEC. PROJ. ES.STRUCT. ELECTRICALPROJ. ES. PLANTS

PROJ.

FINISHED SAFETYPROJ. WORK IN DL PROGRESS

DL WORK FINISHES

SAFETY

WORK FINISHEDWORK

Punto Green Energy Romania PV PLANTS METRO - 704 kWp 2012 - X PV PLANTS CAPRIOARA 2012 - X PV PLANTS AUTOSTRADA - 39,6 MWp 2012 - X PV PLANTS CLUJI 1 - 1,55 MWp 2012 - X PV PLANTS ELCIU - 28 MWp 2012 - X PV PLANTS ELCIU-CERNUC - 43,41 MWp 2012 - X PV PLANTS PANCIU - 6,72 MWp 2012 - X PV PLANTS BANEASA - 7 MWp 2012 - X PV PLANTS CLUJI NAPOCA - 1 MWP 2012 - X PV PLANTS VISINA - 968 kWp 2012 - X PV PLANTS OLT - 19,8 MWp 2012 - X

PV PLANTS -TEASC ENEL GREEN

POWER - 3,819 MWp 2012 - X PV PLANTS CARACAL - 7 MWp 2012 - X X X PV PLANTS SFANTU GHEORGHE - 2,49 MWp 2012 - X PV PLANTS OVIDIU - 1,5 MWp 2012 - X X X PV PLANTS OVIDIU - 2,5 MWp 2013 - X X X X X X X X X X

ROMANIA

TOTAL PLANTS 170 MWp

ACTIVITIES: PROJECT - TESTING - EXPERT SURVEYING DUE DILIGENCE - CONSULTING...

(11)

Punto Green Energy Romania PV PLANTS PLENITA SOLAR 1-9 MWp 2013 - X PV PLANTS PLENITA SOLAR 2-5 MWp 2013 - X PV PLANTS PLENITA SOLAR 3-9 MWp 2013 - X PV PLANTS PLENITA SOLAR 4-5 MWp 2013 - X PV PLANTS CLUJI 2 - FELEACU - 4,873 MWp 2013 - X X PV PLANTS ZIMANDU NOU - 9,93 MWp 2013 - X X PV PLANTS SAGU - 2,5 MWp 2013 - X X PV PLANTS TURDA - 11,56 MWp 2013 - X X PV PLANTS APAHIDA - 5 MWp 2013 - X X PV PLANTS CECCHINI COVACI - 692 kWp 2013 - X X PV PLANTS

PALAS MALL IASI - 1,013 MWp 2013 - X

PV PLANTS AIR LIQUIDE - 506 kWp 2013 - X PV PLANTS COMELF BISTRITA - 1,094 MWp 2013 - X PV PLANTS AGROSERVICE - 501 kWp 2013 - X PV PLANTS SANDULESTI - 1,18 MWp 2013 - X PV PLANTS BRAMAL - 100 kWp 2013 - X PV PLANTS EUROTECROM -2,5 MWp 2013 - X

(12)

CLIENTS

DENOMINATION

PERIOD

AMOUNT

TOTAL

PROJECT

STATE OF WORK

PROJ.

PRELIM. PROJ.DEF. PROJ.ESEC. PROJ. ES.STRUCT. ELECTRICALPROJ. ES. PLANTS

PROJ.

FINISHED SAFETYPROJ. WORK IN DL PROGRESS

DL WORK FINISHES

SAFETY

WORK FINISHEDWORK

Punto Green Energy Romania PV PLANTS PLENITA SOLAR 1-9 MWp 2013 - X PV PLANTS PLENITA SOLAR 2-5 MWp 2013 - X PV PLANTS PLENITA SOLAR 3-9 MWp 2013 - X PV PLANTS PLENITA SOLAR 4-5 MWp 2013 - X PV PLANTS CLUJI 2 - FELEACU - 4,873 MWp 2013 - X X PV PLANTS ZIMANDU NOU - 9,93 MWp 2013 - X X PV PLANTS SAGU - 2,5 MWp 2013 - X X PV PLANTS TURDA - 11,56 MWp 2013 - X X PV PLANTS APAHIDA - 5 MWp 2013 - X X PV PLANTS CECCHINI COVACI - 692 kWp 2013 - X X PV PLANTS

PALAS MALL IASI - 1,013 MWp 2013 - X

PV PLANTS AIR LIQUIDE - 506 kWp 2013 - X PV PLANTS COMELF BISTRITA - 1,094 MWp 2013 - X PV PLANTS AGROSERVICE - 501 kWp 2013 - X PV PLANTS SANDULESTI - 1,18 MWp 2013 - X PV PLANTS 2013 - X

ROMANIA

TOTAL PLANTS 170 MWp

ACTIVITIES: PROJECT - TESTING - EXPERT SURVEYING DUE DILIGENCE - CONSULTING...

(13)

FAROGB srl Torino

AFRICA - ERITREA: PV PLANTS

STAND ALONE - 250 Kw 2013 2014 - X X X X X

Punto Green

Energy EUROPE - CROATIA: PV PLANTS ON ROOF - 1 MW 2012 - X X X

SITE spa Bologna EUROPE - ENGLAND: PV PLANTS ON GROUND - 15 MW 2014 - PROJECT EVALUATION FOR APPROVAL SITE spa Bologna EUROPA - INGHILTERRA:

PV PLANTS ON GROUND - 40 MW 2014 - DUE DILIGENCE AND PROJECT EVALUATION

ENERRAY S.r.l.

Zola Predosa (BO) CENTRAL AMERICA - MEXICO: PV PLANTS ON ROOF - 250 kW 2014 - X X ITALIAN

SOCIETIES SOUTH AMERICA - BRAZIL: PV PLANTS ON ROOF - SAO PAULO - 3,3 MW

2014 - X X

ITALIAN

SOCIETIES SOUTH AMERICA - BRAZIL: PV SYSTEM PLANT FOR LIGHTING SALVADOR DE BAHIA - 0,5 MW

(14)

CLIENTS

DENOMINATION

PERIOD

AMOUNT

TOTAL

PROJECT

STATE OF WORK

PROJ.

PRELIM. PROJ.DEF. PROJ.ESEC. PROJ. ES.STRUCT. ELECTRICALPROJ. ES. PLANTS

PROJ.

FINISHED SAFETYPROJ. WORK IN DL PROGRESS

DL WORK FINISHES

SAFETY

WORK FINISHEDWORK FAROGB srl

Torino

AFRICA - ERITREA: PV PLANTS

STAND ALONE - 250 Kw 2013 2014 - X X X X X

Punto Green

Energy EUROPE - CROATIA: PV PLANTS ON ROOF - 1 MW 2012 - X X X

SITE spa Bologna EUROPE - ENGLAND: PV PLANTS ON GROUND - 15 MW 2014 - PROJECT EVALUATION FOR APPROVAL SITE spa Bologna EUROPA - INGHILTERRA:

PV PLANTS ON GROUND - 40 MW 2014 - DUE DILIGENCE AND PROJECT EVALUATION

ENERRAY S.r.l.

Zola Predosa (BO) CENTRAL AMERICA - MEXICO: PV PLANTS ON ROOF - 250 kW 2014 - X X ITALIAN

SOCIETIES SOUTH AMERICA - BRAZIL: PV PLANTS ON ROOF - SAO PAULO - 3,3 MW

2014 - X X

ITALIAN

SOCIETIES SOUTH AMERICA - BRAZIL: PV SYSTEM PLANT FOR LIGHTING SALVADOR DE BAHIA - 0,5 MW

2014 - X

AFRICA & SOUTH-CENTRAL AMERICA

(15)

THE LARGEST PLANT IN ITALY FOR ITS INSTALLATION CHARACTERISTICS (integrated on roofs)

The purpose making the object of this present contract is the realization of no. 2 photovoltaic installations on premises at the Company KME Italia S.p.A. of Novi Ligure (AL):

- no. 1 photovoltaic installation (PV) realized on the new and existing parking lots on premises of the above-mentioned company, for a total nominal peak power equal to 1801.8 kWp;

- no. 1 photovoltaic installation (PV) consisting of no. 12 subfields, installed on the roofs (small towers) of buildings identified by: Body A, B, C, D and E of the company buildings, for a total nominal peak power equal to 2704.8 kWp.

The photovoltaic modules, which constitute the system on roofs, are installed on support structures coplanar with the roof surface(s), in order to guarantee total integration of architecture.

The photovoltaic fields on the parking lots consist of photovoltaic modules installed on support structures as roofing of the said parking lots, arranged in parallel rows.

(16)

Images

01

View project area. 02

Panel integrated on roof. Detail. 03

Panel integrated on roof. Detail. 04

Panels in the parking area. Detail.

01

02

03

References

Related documents

As no questionnaires are available in the Dutch lan- guage to determine preoperative expectations of patients on a waiting list for total hip or knee arthroplasty, the first aim of

The article had to report the prevalence or incidence of musculoskeletal disorders, complaints, injuries, pain or other description of complaints in the upper and/or lower

We concluded that after a displaced extraarticular or intraarticular distal radius fracture, treated with closed reduction and cast or with external or percutaneous pin

Regardless whether the children reported pain or no pain in a specific spinal area, they were more likely to report no pain than pain in that region in the subsequent survey (Table

Similarly, no consistent hierarchies were found for neigh- bourhood effect on target adult total performance, the com- bined measure of adult survival and growth (Table 1a);

Thus reports for 1937, composed in July, did not capture the war around Shanghai in the late summer or the Japanese military advance in the fall or the occupation of Hangzhou at

Next we develop a local case control cluster test, and then extend it to create global, local and focused tests at specific time points, and then for entire residential

Figure 3 Weekly mean low back pain intensity (scale from 0 to 9, with 0 as no pain within the last 7 days and 9 as worst pain imaginable) and mean hours of leisure time