CHAPTER- C
Scope & Specifications of
Electrical & Mechanical Works
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Scope & Specifications of Electrical Works
INDEX
Sub-Head
Description
A - 1 Internal & External Electrical Installations & LAN System A – 2 Sub-Station
A – 3 DG set with AMF Panel A – 4 Fire Fighting System
A – 5 Automatic Fire Alarm & Public Address System A – 6 Lifts ( Passenger and bed)
A – 7 Heating, Ventilation, Pressurisation & Air-Conditioning System (HVAC System)
A – 8 CCTV Surveillance System A – 9 Access Control System A – 10 IP based EPABX system
A – 11 Audio Visual / Conference System
A – 12 Water Supply system & Solar Water Heating A – 13 Sewerage Treatment Plant
Schedule of Payments
a. List of Approved Makes ( Annexure-B) b. List of Approved Makes ( Annexure-II) c. List of Approved Makes
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Specifications to be followed for execution of work
1. CPWD General Specification for Electrical Works Part I Internal -2013.2. CPWD General Specification for Electrical Works (Part II External)-1994.
3. CPWD General Specification for Electrical Works (Part III Lifts &Escalators)-2003 4. CPWD General Specification for Electrical Works Part IV Substation -2013.
5. CPWD General Specification for Electrical Works Part V Wet riser & sprinkler system - 2020. 6. CPWD General Specifications for Electrical Works Part VI Fire Detection and Alarm System –2018. 7. CPWD General Specification for Electrical Works Part VII DG Sets -2013.
8. CPWD General Specification for Electrical Works Part VIII Gas Based Fire Extinguishing System -2013.
9. CPWD General Specification for Heating Ventilation & Air-Conditioning-2017. Note :
I. All above specifications shall be applicable with corrections slips/amendments up to the last date of submission/uploading of bid
II. Wherever the CPWD Specification are not given, the works shall be executed as per the additional Specification & terms & conditions mentioned in the NIT.
III. The direction of the Engineer-in-Charge shall be followed in absence of the above two at Serial No. I & II
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Terms & Conditions for Association of specialised firms for E&M Works
I. Following packages for Electrical and Mechanical work to be involvedS. No Description Work Includes in brief (ref general conditions for detailed work)
1.
Internal & External Electrical Installations &
LAN System
Internal & External EI, Street Light / Compound/parking light, Power Wiring & Plugs, LT panel Boards, LT Cables, Lightening Conductors , Bus ducts, Rising Mains, Self illuminated Signage Occupancy Sensors, UPS system with 30 Min Backup, Split type AC Units & LAN System with Net switches, Rack Patch Panel, Patch cord etc) etc
2 Sub-Station
Sub-Station with minimum capacity of individual transformer as 2 x 630 KVA, 11KV/433 or 415 V including all RMG / HT / LT substation equipments / Switchgears & earthing
3 DG-Set
DG set with minimum capacity of DG sets as 500 KVA, AMF Panel with bypass arrangement, UG Cabling, Earthing foundation etc
4 Fire Fighting System Water based wet riser and Sprinkler system work 5 Automatic Fire Alarm &
Public Address System Intelligent automatic fire alarm system work with PA system 6 Lifts (Passenger & Bed) Lifts by the Lift Manufacturer as per eligibility condition given in the NIT
7
Heating, Ventilation, Pressurisation & Air-Conditioning System
(HVAC System)
HVAC (Central AC Plant) system
8 CCTV Surveillance System
CCTV system with Min-5MP Dome, Bullet type Camera with motorized Zoom, NVR with min 30 Days Recording (Storage), Minimum 55” 24x7 LED display, PoE Switches, LIU, OFC, Cat-6 Cable, Racks, media converter, fiber terminal box, uplink module etc.
9 Access Control System
Access Control system with bio-metric /NFC / card reader. The system includes cards for 500 persons and a visitor management system.
10 IP-based EPABX System IP based EPABX system with Telephone Instruments and programming etc
11 Audio Visual / Conference System
Audio Visual / Conference System – Digital Interactive Board, Wired / Wireless microphones, Mixer, Power Amplifier, Speakers, Lapel Microphones, LCD Projectors, Motorised Screens, gooseneck microphones & Software based Video conferencing system etc
12
Water Supply system & Solar Water Heating
system
Water Supply Pumps, RO Plant, Water Coolers & Solar water heating etc
13 Sewerage treatment plant STP not less than 50000 LPD Capacity including all necessary accessories etc
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) S.
No Description Similar Works Definition
1.
Internal Electrical Installations
Supplying, Installation, testing & commissioning of “ IEI, Street Light / Compound light, Power Wiring & Plugs, Lightening Conductors, Occupancy Sensors, UPS & LAN System”
2 Sub-Station
Supplying, Installation, testing & commissioning of “Sub-Station with minimum capacity of individual transformer as 2 x 500/ 1000 KVA,
11KV/433 or 415 V including all HT/LT substation equipments / Switchgears”
3 DG-Set
Supplying, Installation, testing & commissioning of “DG set with minimum capacity of DG sets as 400 KVA with AMF Panel & bypass arrangement”
4 Fire Fighting System
Supplying, Installation, testing & commissioning of “water based wet riser and Sprinkler system work”
5
Automatic Fire Alarm & Public Address System
Supplying, Installation, testing & commissioning of “intelligent automatic fire alarm system work with PA system”
6 Lifts (Passenger & Bed)
Supplying, Installation, testing & commissioning of Lifts by the Lift Manufacturer as per eligibility condition given in the NIT
7 HVAC (Central AC Plant)
Supplying, Installation, testing & commissioning of HVAC (Central AC Plant) system with minimum capacity 150 TR
8
CCTV Surveillance System
Supplying, Installation, testing & commissioning of “CCTV system”
9 Access Control System
Supplying, Installation, testing & commissioning of “Access Control system”
10 IP-based EPABX System
Supplying, Installation, testing & commissioning of “IP based EPABX system”
11
Audio Visual / Conference System
Supplying, Installation, testing & commissioning of “Audio Visual /PA / Conference System”
12 Water Supply system
Supplying, Installation, testing & commissioning of “Water Supply Pumps, RO Plant, Water Coolers & Solar water Heaters”
13 Sewerage treatment plant
Supplying, Installation, testing & commissioning of “STP 50000 LPD Capacity”
a. The EPC contractor shall have to associate other agency /agencies for the work of above-mentioned E&M sub-heads that fulfils the following requirements. Joint ventures are not accepted.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Should have satisfactorily completed the works as mentioned below during the last seven years ending last date of the month previous to the one in which tenders are invited:-
(i) Three similar works each of value not less than 40% of estimated cost. Or
(ii) Two similar works each of value not less than 60% of estimated cost. Or
(iii) One similar work of value not less than 80% of estimated cost.
However, the EPC contractor shall also be allowed to carry out the following works included in the enlistment provisions as per the eligibility and the category of the enlistment, without associating any specialized agency provided they satisfy any of the below stipulation.
Work(s) of DG Sets, HVAC (Central AC Plant), Sub-Station, Fire Fighting & Fire Alarm System forming part of the tender, they fulfils the eligibility criteria for these works(s) duly taking prior approval from the department. The EPC contractor shall also be eligible to carry out himself any or all of these works without associating any specialized agency provided:
(a) He fulfils the prescribed eligibility criteria respectively for these work(s). OR
(b) He directly procures the equipment of approved make from manufacturer and get it installed from authorised agency/service provider of the manufacturer or specialized agency as per criteria mentioned in NIT.
Eligibility criteria of each such agency to be associated as set out in the tender documents shall be met by the associated agencies satisfactory proof of eligibility with documentary proof similar to the ones stipulated for main agency shall be submitted to the Engineer-in-Charge of E & M works. The EPC Contractor and the associated specialized agencies shall give required affidavit to confirm their association.
Note. The main contractor/agency has to submit details of such agency to be associated to the Engineer- in-charge (of E&M Work) within 30 days from date of start of work. The associated agency shall be approved by Engineer-in-charge (of E&M Work). In case the main contractor intends to change associated agency/agencies during the operation of the contract, he shall obtain prior approval of Engineer-in-charge of E&M Work. The new agency/agencies shall also have to satisfy the laid down eligibility criteria mentioned above. In case Engineer-in-charge is not satisfied with the performance of any agency, he can direct the main contractor to change the agency executing such items of work and this shall be binding on the contractor.
a. Approval of the specialized agencies for each specialized work shall be obtained from the Engineer- in-Charge (E&M works) within 30 days of award of work. Even if, such specialized items of work shall be executed by the specialized agencies at later date the work shall be deemed to be executed by the tenderer for all purposes and the responsibility of the quality of items of works executed etc. shall continue to be that of the tenderer only.
b. The applicant should submit the willingness from eligible electrical contractors to get associated with the applicant for execution of the electrical component of works in wholesome manner and as per the conditions set out in the MOU to be entered into, between the one who is awarded the work and the associated eligible electrical contractor. (Format of willingness and MOU is given below)
c. In support of the eligibility conditions of the proposed associated electrical contractor, copy of their registration documents, Electrical Contractor’s License, GST documents, eligibility documents duly attested by the applicants (Main Contractor) shall be submitted to the EE(E). Submit affidavit for non block listing in any department as for non back to back execution in respect of eligible
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
works.
d. In the event of the concerned E&M agency not performing satisfactorily or failure of associate/ sub- contractor to complete the E&M work, the main contractor on the written direction of the department, shall remove the Associate/sub-contractor deployed on the work and shall submit name of new associate who fulfils the conditions mentioned in NIT to execute the leftover work without any loss of time or variation in cost to the department in this regard. Such associates shall also enter into Agreement with the main tenderer shall meet all the guarantee for the equipments already supplied for which payment has been released by the department in part. If any equipment supplied for the work, during the currency of the earlier Associate/sub-contractor and paid partly by the department becomes redundant /not in a position to be installed and commissioned and put to beneficial use due to change in agency for execution of E&M work, the main contractor shall be liable for replacement of the equipment(s) at no cost to Department. No change of Electrical Contractor will be allowed without prior approval of the competent authority.
e. Executive Engineer (E) shall be the Engineer-in-charge as far as electrical works are concerned. Special Conditions for each of electrical work subhead are appended with this tender. It will be obligatory on the part of the contractor/tenderer to sign the tender documents for all the component parts.
f. The main contractor shall be responsible and liable for proper and complete execution of the Electrical work and ensure coordination and completion of both Civil and Electrical work.
g. The main contractor has to enter into agreement with contractor(s) associated by him for execution of E&M subheads. Copy of such agreement shall be submitted to EE(E) in charge as well as to EE(C).
h. The associate or sub-contractor shall attend the inspection of the work by the Engineer-in-Charge of E&M works as and when required.
i. The agencies executing the Electrical work should have valid license for LT/HT as applicable.
MEMORANDUM OF UNDERSTANDING [M.O.U] BETWEEN
1. M/S [Name of the firm with full address] Enlistment Status Valid Upto: [Henceforth called the main contractor] And
2. M/S [Name of the firm with full address] Enlistment Status Valid Upto:
[Henceforth, called Associated Contractor]
Name of Work: - Specify the E&M Services.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) Contract Act (amended up to date) and the department (CPWD) can enforce all the terms and conditions of the agreement for execution of the above work. Both of us shall be
responsible for the execution of work as per the agreement to the extent of this MOU allows. Both the parties shall be paid consequent to the execution as per agreement to the extent this MOU permits.
We have agreed as under:
1- The associated contractor shall be liable for disciplinary action if he failed to discharge the action(s) and other legal action as per agreement besides forfeiture of the security deposit. 2- All the material, machinery and equipments, tools and tackles required for execution of the
electrical works as per agreement shall be the responsibility of the associated contractor. 3- The site staff required for the electrical work shall be arranged by the associated contractor
as per terms and conditions of the agreement.
Signature of main contractor Signature of associate contractor
Date: date:
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
WILLINGNESS CERTIFICATE
Name of Work: Refer page No.1.
SH : Electrical works i/c internal and external electrical installations , Substation, DG sets, fire-fighting system, automatic fire alarm and PA system, lifts , air-conditioning (HVAC), UPS System, IP Based CCTV, Access control system, IP based EPABX system, Audio Visual / Conference System, water supply system, Street/Compound Lighting, STP and other Misc., works.
Sub-work :-……… I hereby give my willingness to work as associated contractor for the above-mentioned sub work. I will execute the work as per specifications and conditions for the agreement and as per direction of the Engineer-in-charge. Also, I will employee full time technically qualified supervisor for the works. I will attend inspection of officers of the department as and when required.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
GENERAL CONDITIONS
(Electrical & Mechanical Services) Name of Work: Refer page No.1
SH : Refer page No.160
Scope of work covers planning, designing, supply, installation, testing and commissioning of all Electrical & Mechanical services required to be provided in the said scheme & as detailed in the NIT. The work shall be executed as per scope & specifications of E & M works given hereafter in respective head / part of the scheme or sub-head. If any services/work required to make the building / scheme habitable & functional, including the statutory compliance, is not specifically mentioned in the scope of services, the same is deemed to be included within the scope of this tender and nothing extra shall be paid on this account.
The scope of works also covers the preparation of layout plans, drawings for E & M schemes, Inventories of Fittings, Fixtures, Equipments etc and approval of the same from the Engineer-in- Charge, before commencement of work.
The tenderer is advised to read and examine the tender documents for the work and the set of drawings in Part – F of the tender document and also available in office of Engineer-in-charge. He should himself inspect and examine the site and its surroundings before submitting his tender.
Separate conditions & specification and scope are included in this tender for each of the sub-head/Sub-works. The contractor shall quote the amount/rates lump-sum in figures/percentage accurately in schedule of financial quote, as prescribed there.
The contractor(s) shall submit a detailed program of execution in accordance with the master Programme/milestone within Fifteen days from the date of issue of award letter. Quality of the project is of utmost importance. This shall be adhered to in accordance with the provisions of CPWD specifications and guidelines given in the relevant paras. All Materials shall only be brought at site as per programme finalized with the Engineer-in-charge. Any pre-delivery of the material not required for immediate consumption shall not be accepted and thus not paid for.
Detailed scope of various E&M services is asunder:
1. Internal EI & External Electrical WorksScope of this sub head covers planning, designing, supply, installation, testing and commissioning of complete Internal and External Electrical Works which includes all copper wiring in PVC conduit, LED energy efficient luminaries, ceiling and exhaust fans, modular switches, sockets, DBs, MCBs, MCCBs, RCCBs, Sandwich type rising mains, end feed units , tap off boxes, distribution of normal, UPS and UPS Power, AHUs low side power, Power supply to smoke extraction fans etc, cable trays raceways, lighting control, day light(photo) and occupancy sensors, earthing, lightening arrestor (all of the above) as per NBC-2016, cable TV wiring in PVC conduit, networking wiring (CAT 6A) in PVC conduit, wiring for voice communication system, call bell system, lightning arrester, street light, compound light and landscape lights, contour & facia light, Electrical signage’s (including photo luminescent) and display systems etc., as required.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
(2W+1S) for lighting and data networking in parallel redundant mode with 30 min. battery backup with individual UPS. The complete system with all switches, cabling, safety devices, batteries, earthing including the UPS system of capacity so calculated shall be in the scope of work. All UPS shall be in 1Working + 1Stand by.
If any item required to make the building / scheme habitable and functional, is not specifically mentioned in the scope of services, the same is deemed to be included within the scope of this tender and nothing extra shall be paid on this account.
LAN:- Planning, designing, supplying, installation, testing & commissioning of LAN with minimum 2 data outlets in all rooms of all floors 3 or more data outlets where ever specified with 12/24/48 Port Managed Gigabit Net Switches, patch card and patch panel, suitable Racks with power manager and cooling fans. Wi-Fi modems for conference/lecture hall.
2. Sub-station equipment’s
Design, Supply, installation, testing and commissioning of power supply to the building which includes indoor Cast Resin Dry type transformer (2 x 630KVA minimum) , HT Panels minimum one incomer and Two outgoing panels, LT Panels, APFC Panels (1 for Each Transformer), sandwich bus trunking , HT cables , power distribution through out the building with Copper / aluminium conductor XLPE insulated, PVC inner and outer sheathed armoured UG Cable, Fire Survival Cables as per provisions of NBC-2016, sub-panels, Feeder Pillars etc. as per specifications given. The work includes supplying and laying of two number HT Cable from meter board of Supply Company to the HT Panels inside the building. The work also includes earthing and all safety equipment as per specifications. All panels shall have minimum 25% out going MCCBs as spare.
3. D.G. set
The work shall cover complete design, supply, transportation, foundation, installation, testing and commissioning of ‘Silent Type' DG Set (1x 500 KVA Minimum, capacity) including AMF Panel with by-pass arrangement, Neutral earthing and body earthing as per specification . All minor civil works including Foundation, electrical work (UG cabling / bus trunking and control cabling) and other works such as extending exhaust pipe of suitable dia duly insulated and cladded with aluminium sheet up to above the building as per CPCB norms, testing, installation and commissioning of the sets shall be carried out by the tenderer as per specification. The tender should quote for complete job to be executed under the works contract. The DG Set shall be installed in substation / nearby substation.
4. Firefighting System (Fire hydrant, Sprinkler, Extinguisher & Pumps)
Design, Supply, Installation, testing & commissioning of firefighting system shall be as per the provision of NBC-2016 or as per local bylaws whichever is higher or stringer and as per clearance issued by Local fire Service. It shall consist of Wet Risers, Internal & External Hydrants, sprinkler in the entire building, compartmentation of basements with water curtains, UG & OH Tanks, Pumps i.e main Fire, Diesel Pump as standby, Jockey Pump, priming pump (if required)
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
The work shall consist of planning, designing, supplying, installation, testing & commissioning of Automatic Intelligent Addressable Fire alarm system and Public Address System. The system shall be as per CPWD specifications, NBC 2016 and Local bylaws and as per clearance issued by Tamil Nadu Fire Service. Scope work also includes integration of Fire alarm system with Smoke Extraction System, Fire Fighting System, AHUs, Ventilation system etc, as per NBC 2016, requirements of the main control room, etc.
6. LIFTS (Passenger & Bed)
Providing, Installation, Testing and Commissioning & putting into operation of 02 nos. 13 Passenger Lift and 1 No. Bed Lift (20 Passenger) , serving as per Annexure – I in Sub Head A-6 with all control equipments & accessories for the required nos. of landings /openings and capacity as per architectural plans and speed of lifts in accordance with NBC 2016 as amended up to the date.
All electrical works including interconnections from MCCB (including SITC of MCCB) and separate earthing (double earthing) from the earth pit provided in the machine room.
Lift licence from Tamilnadu Electrical Inspectorate and Lift Insurance
Provision of adequate lighting in the lift shafts and all landings. Provision of hoisting beam or hook above the lift well and trap door. Architrave work at lift entrance.
Temporary barricades with caution boards at each landing to prevent accident during execution of work. Electric supply to individual lift shall be given from the dedicated lift panel. Lifts shall comply with accessibility guidelines.
7. Heating, Ventilation and Air-conditioning (HVAC) system
The scope of work under this sub-head will consists of Design, Supply, Installation, testing & commissioning of
a) Water Cooled Chilled Water Central Plant for office building
i.e the areas required during normal working hours. The work will include high efficiency water cooled/Air cooled chillers ( There shall be multiple units with minimum 50% of standby design capacity) (2W+1S), Variable speed Chilled water pumps with VFD condenser water pumps, cooling towers , AHUs / Ceiling suspended AHUs, FCUs , VAVs, TFA, plumbing, ducting air terminations as per RCP, Fire Dampers, motorized dampers, electrical work, VFDs etc. complete in all respect as per specifications. Separate AHU’s for auditorium and conference halls. The work will also include ventilation in toilets with ducts and in line fans.
b) Chillers to be energy efficient as per Latest Guidelines
c) Ventilation, smoke extraction in basement parking and other areas, smoke extraction at upper floors, corridors, office spaces etc including Lift Shaft, Lift lobbies, and stair case pressurization system as per NBC-2016 and as approval issued by Tamil Nadu Fire Service.
The work shall also include planning, designing, preparing drawings and getting the drawings approved from the Engineer-in-Charge and its subsequent execution. If any item required to make the system functional, is not specifically mentioned in the scope of services, the same is deemed to be included within the scope of this tender and nothing extra shall be paid on this account.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
STP’s treated water shall be used for Chiller by providing suitable RO Filters with additional bypass arrangement for normal well/bore well/sump/metro water
8. IP Based CCTV
Design, Supply, Installation, testing & commissioning of IP based CCTV system to monitor & supervise the entire area (internal and external) for security purpose, as well as record and inform officials on unwanted, untoward incidents. It is also essential to have recorded images to be stored at least for min 30 days of all critical areas to facilitate investigations of a reported incidents. The cameras will cover entire boundary, Internal and external areas. The system will be designed to cover the entire building keeping in view the security requirement of ICMR School Building.
The hardware required for the system including Servers VMS & Recording, Workstations, Monitors, CAT-6 Patch Cable to connect the camera to nearest PoE enabled LAN point, Cables, connectors, conduits, power supplies etc., is in the scope of work. The complete LAN networking, for the CCTV should be separate and exclusive for CCTV system only
For indoor areas dome type and for outdoor areas bullet type cameras shall be used. 9. Access Control System
Design, Supply, Installation, testing & commissioning of Access control system comprising of bio-metric /NFC / card reader. The system includes cards for 500 persons and a visitor management system. The attendance monitoring system and as mentioned in the specifications below. Access control shall be provided at all building entrances /exits, campus entrance / exits and as required by the client based on threat perception and analysis.
It will be the responsibility of the vendor/bidder to make the entire system fully functional as per the specifications. Vendor/ bidder shall consider any equipment/devices required to make the system functional if not mentioned herewith.
10. IP BASED EPBAX
Planning, designing, supply, installation, testing and commissioning of complete of IP based voice communication system of minimum 256 lines expandable to 512 lines with 4 no. PRI Trunks lines (30 channels) with clip facility for IP users license for lifetime. The outlets are as described in Sub Head A-1. The scope of work also includes the provision of the IP based telephones as per requirement but minimum Type-1-40 Nos and Type-II-60 Nos.
The wiring shall be in the scope of the work of the firm and shall be IP based LAN networking, as described in the Internal EI subhead. LAN networking shall be covered in the LAN subhead. The complete system has to be supplied, installed, tested and commissioned in complete manner to have a fully functional system, as required.
The Scope and purpose are to provide the voice communication with latest Pure IP at core with a 10G backbone. Server based Voice communication system in (1+1) High Availability mode shall be provided to all the users within the campus including IP based operator console, In-skin Voice mail for all the users & access to call outside the campus through analog trunks or PRI trunks via local service provider (e.g BSNL etc.). The system shall have redundancy at the level of core switch as well for the backbone.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) 11. Audio Visual / Conference System
Planning, designing, supply, installation, testing and commissioning of AV and conference system to Conference hall, Lecturer hall, Video conference room and multipurpose hall by providing AV Equipments as follows :-
S. No Room/Hall Minimum Requirements
1. Lecture Hall (each hall should have minimum)
a. wireless lapel microphone b. wireless handheld microphone c. wired microphone
e. wall mounted type Loudspeakers d. Power Amplifier
f. DSP
g. LCD Projector (with motorized ceiling mounting kit-Remote) and Motorized Screen with remote
h. Suitable floor mounted type Racks i. Lecture recording and live streaming
2. Conference Hall
a. Wall mounted type Loudspeakers b. Digital Conference System
c. LCD Projector (with motorized ceiling mounting kit-Remote) and Motorized Screen with remote
d. Suitable floor mounted type Racks e. Sound reinforcement for conference f. LED Display of Min 55 inches
3. Board Room
a. Wall mounted type Loudspeakers b. Digital Conference System
c. LCD Projector (with motorized ceiling mounting kit-Remote) and Motorized Screen with remote
d. Software based Video Conferencing System including LED Display of minimum 55 inches e. Sound reinforcement
4. Multi-Purpose Hall
a. wireless lapel microphone b. wireless handheld microphone c. Condenser gooseneck microphone e. wall mounted type Loudspeakers d. Power Amplifier
f. DSP
g. LCD Projector (with motorized ceiling mounting kit-Remote) and Motorized Screen with remote
h. Suitable floor mounted type Racks
12. Water Supply & Solar water heating System etc.
The scope of work will include the following complete with planning, designing, supplying, installation, testing & commissioning all system & equipment as mentioned below:
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
All pumps, valves, piping, cabling, protection and safety devices, electrical control panels, double earthing etc as required for the building for all the water based services to collect the water in the underground/ on ground/ overhead tanks and to pump them to the required tanks, as required to ensure the availability of the water for different type of utilities. This will include the water being received from local body, bore wells, STP treated water etc besides others, if any, as applicable. Water softening plant for air-conditioning requirements based on the requirement of the water for AC on daily basis.
Complete Water Supply Pumping, Water Storage and Dewatering of Basement System. Water treatment plant of adequate capacity for the treatment of the water from the bore well to make it potable. Pumping arrangement along with piping for the irrigation purpose for the complex.
Water Cooler with RO – storage type water cooler of capacity of 120 ltr with complete stainless-steel body with inbuilt stabilizer are to be provided for drinking water –for Dining/Common Areas. (Minimum 4 Nos. to be provided at various locations).
All pumps shall be in 1W+1S combination. Pump operations shall be automatic with required level sensor, solenoid controlled valves and VFD driven pumps.
13. Sewerage Treatment Plant
The Scope of work includes designing, Planning, supplying, Installation, testing & commissioning of the STP plant for the building and complex based on the norms of the local body, State Pollution control board, NBC- 2016. The plant has to be installed based on the same but with minimum capacity 50000 LPD.
All pumps shall be in 1W+1S combination.
Organic Waste Decomposer of minimum 500 Kg per day will be installed. The capacity will be worked out to meet the requirement of waste generated in the building
The contractor (s) shall make his own arrangements for electricity and water required for the execution of work.
Contractor has to deploy required T&P on the project as per Annexure-B
The contractor shall ensure quality control measures on different aspects of construction including materials, workmanship and correct construction methodologies to be adopted. The quality assurance programme should include method statement for various items of work to be executed along with check lists to enforce quality control. After attending the initial observations by the department, design of all E&M packages shall be got vetted by the external agency authorized by the department. Fees payable for Vetter of the design shall be paid by the contractor.
The contractor shall submit technical data sheet of various equipment and machinery and shop drawings of various E&M services mentioned in the tender as per requirement of sites before execution of work for approval.
Frequency and type of tests of various Materials/items/ article shall be conducted as per specifications and relevant BIS-Codes. The test results confirm to the specification/codes.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
The Scope of various E&M services/works covering the complete complex and building is as under, described briefly. The scope of work shall include the systems as described below and in the respective subheads, in complete respect with full functionality, compliances to the NIT, local body requirements, drawings etc as required:-
Layout Plans / Drawings/details to be submitted for approval/acceptance of design. The layout plans / drawings / other documents pertaining to E&M services and information in the following format shall have to be submitted for evaluation & approval, within 60 days of award of work
E&M Work Information to be furnished by the successful bidder
1 Internal & External
Layout drawings duly marked locations of Light (with lighting level calculation) / ceiling/wall Fans Points, Power points, Fans & Fixtures switch board, telephone outlet, data outlet, MCB& MCCB DB’s, floor panels, floor / ceiling race way, details of specification and model proposed for UPS and occupancy sensors etc.
Local Area Networking and
Wi-Fi
Complete design details based on layout drawings of LAN outlets prepared under sub head Internal EI, Wiring, and details specification for each component of like switches patch panel’s racks, wires, cords etc. Details of licenses of various equipments and software for LAN system.
2 Substation
Capacity calculations with load details, Complete design details Schematic drawings, equipments specification of HT Panels, Transformers, MV Panels, APFC panels etc.
3 DG Set
Capacity calculations, Complete design details schematic drawings, equipments specification Engine, Alternator, Enclosure, Exhaust Gas Pipeline, Synchronization panel etc.
4 sprinkler system. Fire-fighting&
Design of firefighting and sprinkler system as per NBC 2016, IS code, Detailed Layout drawing duly marked with number &size of risers / down comer / sprinkler heads, FBC, Fire Fighting Pumps etc. as per NBC 2016, Schematic diagram of Pumps, Calculation of size of pipes in sprinkler system, layout of Pipelines, valve chambers in ring main Hydrants, ring mains in basement, in ground Sprinklers etc, wiring Diagram of MV Panels.
5
Automatic Fire Alarm & PA
System
Design of addressable fire alarm system as per latest IS code, NBC 2016, UBBL. Detailed Layout drawing duly marked with different type of detectors, manual call box, directional Sounders, Talk Back System, public address system, speaker in corridor in rooms, exist sign boards, main Control Panel, repeater panel, High intensity hooters. Specifications of all fire alarm instruments. Integration with various systems.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
6 Lift Traffic calculation including RTT based on standard assumptions and rules. Detailed drawings from OEM of lift
7
Heating, Ventilation and Air-conditioning (HVAC) system
Design basis report based on given outdoor and indoor condition and various para meter of envelop of the building. Heat Load Calculation of complete building, details specifications of central AC plant Equipments, double skin AHU’s , Fans, Plumbing, Ducting and other associated works
8 CCTV
Complete design details. Wiring, details specification for each component of CCTV system. Details of licenses of various equipments and software for CCTV system.
9 Access Control System
Complete design details. Wiring, detailed specification for each Component of Access Control system. Details of licenses of various equipments and software.
10 IP based EPABX
Complete design details based on layout drawings of telephone outlets prepared under sub head internal EI, Wiring, details specification for each component of EPABX system. Details of licenses of various equipments and software for EPABX system.
11
Audio Visual / Conference
System
Complete design details based on layout drawings of Digital Conference system, LCD Projector and Screens for conference hall , board rooms & Multipurpose Hall. Digital Interactive Boards for lecturer halls with speaker arrangements
12
Water supply & Solar water heating
system
Design basis reports of complete water supply system of the building for taking care of different type of water supply and uses as per NBC 2016. Capacity calculation of different type of work filtration of softening plant, water cooler, storage type electrical water heater, Solar water heating system and detail specifications and design of electrical panels and controls.
13
Sewerage treatment plant and Solid Waste de-composter
Design basis report for capacity calculation, sizing of different type of tanks and pumps, filters, secondary and tertiary. Details specification of each item. Design details and specifications of Organic Waste de-composter.
In addition to above any data and detail asked by Engineer in charge to finalize and accept the scheme shall be provided on the established standard/guidelines/codes etc.
Clearances to be taken by the firm before start of work. The above schemes of all the E&M works shall have to meet all the requirements of local bodies / CEA/ NBC norms as applicable & also meet the technical specifications of various relevant CPWD specifications for electrical & mechanical services.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Qualified consultants with prior approval of the Engineer in charge shall be engaged for preparation of DBR detailed design and preparation of drawings.
All the above schemes shall be got approved by respective local bodies etc. As applicable before commencement of execution of work at site. During execution, if the local bodies etc. require a modification, the same shall be executed without any extra cost. Finally, after execution, obtaining clearances from CEA (central electrical authority), local fire authorities, TNPCB, TNEB and any other local body, shall be the responsibility of the contractor. All statutory fees / charges required for obtaining clearances from CEA/TNEB shall be paid by the contractor.
Climatic Conditions
All electrical equipment, accessories and fittings employed in electrical installation shall be specified, designed and derated for continuous and trouble free operation in the climatic conditions of the equipment location which are summarized as follows:
a) Maximum ambient air temperature : 45º C
b) Minimum ambient air temperature : 10º C
c) Maximum relative humidity : 85 %
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
GENERAL AND COMMERCIAL WORK
GENERAL
The works shall be executed as per CPWD’s General specification for Electrical Works amended up to the date of opening of eligibility bid, Part-I (Internal- 2013); Part-II (External)-1994; Part-III (Lifts and Escalators) 2003, Part-IV (Substation) 2013, Part-V (Wet Riser and Sprinkler System for Fire Fighting Installation)-2020, Part-VI (Fire Detection and Alarm System) 2018, Part-VII DG Set 2013, Part-VIII Gas based Fire Extinguishing System 2013, HVAC 2017, IE Rules, Indian Standards amended up to date and as per direction of Engineer-in-Charge. The additional specifications are to be read with above and in case of any variations; specifications given along with the tender shall apply.
In
case
of
any
discrepancy
of
specifications/conditions in the tender document the
following order of preference will be observed:
• Drawings
• CPWD General specifications
• NBC-2016
• IS/IEC/International Codes
• The Provision with higher specifications • Decision of Engineer in Charge
• Best engineering practice being followed in such works
Note:- The firm is to execute the works using materials of makes specified. However, if the make of same items is mentioned in more than one sub head/make list, then firm may if so desire, submit its request for the approval for using that make. The department reserves the right to approve the same, if so considered fit. The decision of the department shall be final & binding on the firm. No T & P shall be issued by the Department and nothing extra shall be paid on account of this.
However, following minimum T&P shall be maintained at site during the execution of work:
S.No. T & P Items Quantity
1. Tong Tester 2 Nos.
2. Megger 500/1000 Volt. 1/1 No.
3. Earth Tester 2 Nos.
4. Ladder of different size 1 Lot
5. Multi-meter 2 Nos.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
7. Wrench 2 Nos.
8. Megger 5000 Volt. 1 Nos.
9. Crimping Tools 2 Nos.
10. Hydraulic Crimping Tool 1 Nos.
11. Electrically operated chase cutting machine 4 Nos.
12. Lux meter 2 Nos.
13.
Any other machine/tool required for completion of work as per direction of Engineer-in-Charge
As per actual requirement.
Type of Contract: The work to be awarded by this tender shall be treated as indivisible works contract.
TERMS OF PAYMENTS As given in Schedule of Payment.
Works to be done by the contractor
In addition to supply, installation, testing and commissioning of all the equipments, as per schedule of work, and specifications, the following works shall be deemed to be included within the scope of work to be executed by the contractor. Nothing will be paid extra on this account.
I. Tools and tackles required for handling and installation of equipments.
II. Protection required for the equipments from rain, dust storm etc. during transportation i.e. polythene cover and tarpaulin till completion & handing over to department. III. Necessary equipments for commissioning/site testing.
IV. Supplying, Installation and testing commissioning of E&M services as per the scope and specification given in the respective sub head.
V. Making arrangement of electricity and water required for installation.
VI. Providing cement & concrete foundation as per manufacturer standard and approved drawing by the department.
VII. Minor/Major building work i/c repairing/ closing of all holes for cable entry etc. complete as required.
RATES
No foreign exchange shall be made available by the Department for importing (purchase) of equipments, plants, machinery, materials of any kind or any other items required to be carried out during execution of the work. No delay and no claim of any kind shall be entertained from the Contractor, on account of variation in the foreign exchange rate.
The rates quoted by the tenderer, shall be firm and inclusive of all taxes (including works contract tax), GST, octroi, entry tax, duties and levies and all charges for packing forwarding, insurance, freight and delivery, installation, testing, commissioning etc at site i/c temporary
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) constructional storage, risks, overhead charges, general liabilities/obligations and clearance from local authorities. The fee for the inspection of installation by government authorities shall be reimbursed by the department on production of receipts. The contractor has to, however, initially make the payment.
COMPLETENESS OF TENDER
All sundry equipments, fittings, unit assemblies, accessories, hardware items, foundation, foundation bolts, painting, termination lugs for electrical connections, and all other items which are useful and necessary for efficient assembly and installation of equipment and components of the work shall be deemed to have been included in the tender irrespective of the fact whether such items are specifically mentioned in the tender documents or not.
STORAGE AND CUSTODY OFMATERIALS
The Sub Station room/ or space as allowed, may be used for storage of sundry materials and erection equipments or else the agency has to make its own arrangements. No separate storage accommodation shall be provided by the department. Watch and ward of the stores and their safe custody shall be the responsibility of the contractor till the final taking over of the installation by the department.
CARE OF THE BUILDING
Care shall be taken by the contractor while handling and installing the various equipments and components of the work to avoid damage to the building. He shall be responsible for repairing all damages and restoring the same to their original finish at his cost. He shall also remove at his cost all unwanted and waste materials arising out of the installation from the site of work. COMPLETION PERIOD
The completion period indicated in the tender documents is for the entire work of planning, designing, approval of drawings etc., arrangement of materials &equipments, delivery at site including transportation, installation, testing, commissioning and handing over of the entire system to the satisfaction of the Engineer-in-charge.
GUARANTEE
All equipments shall be guaranteed for a period of minimum 12 months, from the date of taking over the installation by the user department i.e. Central GST, against unsatisfactory performance and/or break down due to defective design, workmanship or material. The equipments or components, or any part thereof, so found defective during guarantee period shall be forthwith repaired or replaced free of cost, to the satisfaction of the Engineer-in- Charge. In case it is felt by the department that undue delay is being caused by the contractor in doing this, the same will be got done by the department at the risk and cost of the contractor. The decision of the Engineer-in- charge in this regard shall be final & building on the contractor.
The tenderer shall guarantee among other things, the following:
(a) Quality, strength and performance of the materials used as per manufacturers standards. (b) Safe mechanical and electrical stress on all parts under all specified conditions of operation. (c) Satisfactory operation during the maintenance period.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) POWER SUPPLY/ WATER SUPPLY
Power and water supply will be arranged by the contractor at the site for installation purpose. However, for testing purpose after complete installation of the electrical items, electricity supply will be made available free of cost to the contractor. Contractor will take due care to ensure safety of electrical installation during execution of work.
ACCEPTABLE MAKES OF VARIOUSEQUIPMENTS
The acceptable makes of various equipments/components/accessories have been indicated in the List of Acceptable Makes of equipments/ materials”. In case any material is not indicated in the list of materials, then the agency shall propose appropriate makes. However the decision of Engineer- in-Charge shall be final on this aspect.
DATA MANUAL AND DRAWINGS TO BE FURNISHED BY THE TENDERER
After award of work, the tenderer shall furnish the design and drawings as per the details given. The successful tenderer should furnish well in advance three copies of detailed instructions and manuals of manufacturers for all items of equipments regarding installation, adjustments, operation and maintenance including preventive maintenance & trouble shooting together with all the relevant data sheets, spare parts catalogue etc. all in triplicate.
EXTENT OFWORK
The work shall comprise of entire labour including supervision and all materials necessary to make a complete installation and such tests and adjustments and commissioning, as may be required by the department. The term complete installation shall not only mean major items of the plant and equipments covered by specifications but all incidental sundry components necessary for complete execution and satisfactory performance of installation with all layout charts whether or not those have been specifically mentioned in the tender document.
INSPECTION AND TESTING
Copies of all manufacturers’ routine and type test, certificates of the equipments shall be furnished to the inspecting officer at the time of inspection at the factory.
1.0 COMPLIANCE WITH REGULATIONS AND INDIAN STANDARDS
All works shall be carried out in accordance with relevant regulation, both statutory and those specified by the Indian Standards related to the works covered by this specification. In particular, the equipment and installation will comply with the following:(i) Factories Act.
(ii) Indian Electricity Rules.
(iii) B.I.S. & other standards as applicable. (iv) Workmen’s compensation Act.
(v) Statutory norms prescribed by local bodies like CEA, Power Supply Co., CPCB as amended up to date etc.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) Nothing in this specification shall be construed to relieve the successful tenderer of his responsibility for the design, manufacture and installation of the equipment with all accessories in accordance with currently applicable statutory regulations and safety codes.
Successful tenderer shall arrange for compliance with statutory provisions of safety regulations and departmental requirements of safety codes in respect of labour employed on the work by the tenderer. Failure to provide such safety requirement would make the tenderer
liable for fine of Rs 5000/- (Rs Five Thousand only) for each default. In addition, the
department will be at liberty to make arrangement for the safety requirements at the cost of tenderer and recover the cost thereof from him.
2.0
INDEMNITY
The successful tenderer shall at all times indemnify the department, consequent on this works contract. The successful tenderer shall be liable, in accordance with the Indian law and regulations for any accident occurring due to any cause and the contractor shall be responsible for any accident or damage incurred or claims arising there from during the period of erection, construction and putting into operation the equipments and ancillary equipment under the supervision of the successful tenderer in so far as the latter is responsible. The successful tenderer shall also provide all insurance including third party insurance as may be necessary to cover the risk. No extra payment would be made to the successful tenderer on account of the above.
3.0
ERECTION TOOLS
No tools and tackles either for unloading or for shifting the equipments for erection purposes would be made available by the department. The successful tenderer shall make his own arrangement for all these facilities.
4.0
COOPERATION WITH OTHER AGENCIES
The successful tenderer shall ensure proper coordination between various associate contractors executing the work of different E&M services in the construction of buildings, if any, and exchange freely all technical information so as to make the execution of this work/contract smooth. No remuneration should be claimed from the department for such technical cooperation. If any unreasonable hindrance is caused to other agencies and any completed portion of the work has to be dismantled and re-done for want of cooperation and coordination by the tenderer during the course of work, such expenditure incurred will be recovered from the successful tenderer if the restoration work to the original condition or specification of the dismantled portion of the work was not undertaken by the tenderer himself.
5.0 The work will be carried out with least disturbance during shifting & shutdown taken in consultation with the client department. 6.0 MOBILIZATIONADVANCE
The same shall be applicable as per clause 10B.
7.0 INSURANCE AND STORAGE
All consignments are to be duly insured up to the destination from warehouse at the cost of the contractor. The insurance covers shall be valid till the equipment is handed over to the
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) user department duly installed, tested and commissioned.
8.0 VERIFICATION OF CORRECTNESS OF EQUIPMENT AT DESTINATION The contractor shall have to produce all the relevant records to certify that the genuine equipments from the manufacturers has been supplied and erected.
9.0 PAINTING
The work shall include cost of painting of the entire installation. The major equipments shall be factory final finish painted. The agency shall be required to do only touching to the damages caused to the painting during transportation, handling & installation at site, if there is no major damage to the painting. However hangers, supports etc. of bus trunking shall be painted with required shade including painting with two coats of anticorrosive primer paint at site.
10.0 TRAINING
The scope of works includes the on job technical training of two persons of department at site. Nothing extra shall be payable on this account.
11.0 Quality Assurance:
The technical data sheet and manufacturing drawing of all equipments and materials as per contract specifications shall be prepared by the respective manufacturer’s and will be submitted by contractor duly signed before placing the order or manufacturing the material. The engineer-in-charge shall approve as per contract conditions.
All the materials to be used in the work shall be new and of good quality and shall be got approved from the Engineer-in-Charge before use at site. The equipment shall be not older more than 6 months from the date of receipt at site or year of manufacturing should be current. The equipment shall be procured directly from the manufacturer or authorized dealer and delivery challan/invoice/ proof of dispatch of material of the Agency from where the material is purchased in support of genuineness of material shall be submitted along with bill for verification.
Manufacturer test certificates of all the equipment and material shall be submitted along with supply. The sub head wise General Guidelines for quality assurance of different materials will be as per table given below. Engineer in charge may extend the testing criteria as per the requirement of IS code or any other standard available. The firm has to arrange the inspection for which nothing extra will be paid.
12.0 General guidelines for Quality Assurance
Quality to be ensured at the execution stage and works to be executed as per contract conditions and CPWD General Specification for Electrical Works.
All the materials, equipments and work shall conform to the Agreement. Makes of all the material and equipments etc. shall be strictly as per agreement.
The model numbers of various equipments and work approved by Engineer-in-charge shall be checked for their conformity to the agreement.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) lots. However, engineer-in-charge can decide number of lots in which quantities to be supplied as per site requirements.
The materials shall be tested from 3rd party laboratories. The laboratories shall preferably be Government Labs/ Government Autonomous bodies or as approved by competent authority. The testing at manufacturer’s works shall be clearly specified in the tender documents.
For the tests to be conducted at manufacture’s works, the tests shall be conducted in the presence of engineer-in-charge or his authorized representative. The dispatch note shall be issued only after satisfactory completion of the test.
The layout/ working drawings/ shop drawings etc., shall be prepared in Auto CAD or equivalent software by the contractor for all the services as defined in CPWD Specifications and agreement conditions. The engineer-in-charge shall approve all the drawings before start of execution of work. All the drawings of various equipments and works approved by Engineer –in-charge shall be checked for their conformity to the agreement.
The delivery challans of the materials may be checked for ascertaining the genuineness of the material.
The QA plan/ testing etc. for the other works, if required, shall be decided by Engineer-in-charge to ensure quality of materials, equipments and work etc. as per Agreement.
TESTING PLANS
The testing plan for quality control for major E&M services is attached as Annexure-A. These plans are to be read along with following guiding notes:-
The material to be supplied against the contract shall be not older more than 6 months from date of receipt at site.
To procure the genuine material from suppliers/ authorized dealer etc shall be the responsibility of contractor who shall preserve copies of invoice/ excise gate pass/ proof of dispatch and the same shall be made available for specially to engineer-in-charge for examination/ scrutiny/ verification as deemed fit by him.
As per guideline only routine test as prescribed in IS/ CPWD specifications shall be carried at manufacture works/ third party labs.
All items to be used and workmanship shall be thoroughly checked physically and for their performance as per agreement.
All items to be used and workmanship shall be thoroughly checked physically and for their performance as per agreement.
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P)
Annexure-A
S L .N o M a te r ia l/ P r o c e ss S ta n d a r d A p p li ca b le /T es t R e q u ir e d t o b e D o n e T o ta l Q ty ( E a c h t y p e ) r e q d . in a g r e e m e n t o r lo t si z e w h ic h e v e r i s le ss W h et h er p r o o f o f D is p a tc h r e q u ir e d W h e th e r M a n u fa ct u re r' s te st c e r ti fi c a te s r e q u ir e d S a m p le S iz e Location of Test A t m a n u fa ct u re W o r k s A t th ir d p a r ty L a b1. Sub-Station, DG set, UPS
1 HT Panel
CPWD specs part IV/QA Plan: CT ratio and accuracy class should be
invariably checked Any Y Y 1 Y N 2 HT Panel: metering and protection devices
Check CT ratio and accuracy class, Relays
and Meters
Any Y Y 1 Y N
3 with ACB LT Panels
CPWD specs part IV/QA Plan: Construction, Ratings of SWG, air gaps
between phases, phase to body, IP rating short
circuit ratings etc.
Any Y Y 1 Y N 4 LT Panels with incomer of 200 A or more
CPWD specs part IV/QA Plan: Construction, Ratings of SWG, air gaps
between phases, phase to body, IP rating short
circuit ratings etc.
Up to 2 Y Y 0 Y N
2 and <
10 Y Y 1 Y N
>10 Y Y 2 Y N
5 Capacitor Panel
CPWD specs part IV/QA Plan: Check for type of capacitors used, operation
of relay, settings. Change the load and its type and
check Functionality Any Y Y 1 Y N 6 Rising Main and Bus Trunking
CPWD specs part IV/QA Plan: Length Upto 500 Mtrs Y Y Length & 75% Fittings Y N Length > 500 Mtrs Y Y 10% Length & Fittings Y N
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) I/II : Check for
perforation area, paint/Galvanising thickness and Material Composition. Upto 500 mtr Length > 500 mtr Y Y One piece for every 500 Mtr N Y 8 DWC/ Corrugated HDPE Pipe
IS14930, Check for thickness, material. Length Upto 500 mtr Y N N N N 9 Transformer
CPWD Specs. Part IV/QA Plan: Physical verification of accessories as per agreement and Routine testes as per IS: 2026/IS 11171:1985
(Whichever applicable), with particular attention to losses meeting ECBC norms/as per agreement, Type test certificate for exact same design for impulse withstand and short circuit withstand shall be made available by Manufacturer, Temperature rise test of one transformer of each design shall be done. Copies of the certificate for pressure test, test for bushings shall be supplied to The department.
Any Y Y 100% Y N
10 DG set Load testing as per CPWD Specs. Any Y Y 100% Y N
11 UPS
Load testing and operation logic as per CPWD specs, Check for
input and output power quality as per
agreement. Any Y Y 100% Y N 12 HT Cable IS 1554 Part II Up to 100 mtr Y Y 1 N N 100 mtr Y Y 1 Piece for every 500 mtr N Y 13 LT cable IS 1554 Part I Up to 1000 mtr Y Y N N N > 1000 mtr Y Y 1 Piece for every 1000 mtr N Y
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) 2- Air Conditioning 1 Chiller CPWD Specs Part VI/ECBC Code/Agreement/QA Plan: COP, Capacity,
IKW/TR, IPLV/NPLV Any Y Y 1 Y* N 2 Packaged AC Unit CPWD Specs Part VI/ECBC Code/Agreement/QA Plan: COP, Capacity, IKW/TR
Any Y Y 1 Y* N 3 Radiant Cooling & Heating Module As per tender specifications capacity Any Y Y 1 4 VRV Units CPWD Specs Part VI/ECBC Code/Agreement/QA Plan: COP, Capacity Any Y Y 1 5 Precise Air Conditioning Units CPWD Specs Part VI/ECBC Code/Agreement/QAPlan : COP, Capacity, IKW/TR, IPLV/NPLV Any Y Y 1 6 Split/WT AC As per tender specifications and BEE
ratings Upto 50 Y Y NA N N >50 Y Y 1 for every 50 Y* N
7 Pumps As per tender specs. capacity Any Y Y 100% N N
8 MS pipes
To be tested for thickness and weight as per
applicable IS Any Y Y 1 for every 100 mtr N N 9 Insulation /Acoustics material
To be tested for Density and K value as per tender
spec. Up to 1000 Sqmtr Y Y NA N N >1000 Sqmtr Y Y 1 sample for every 1000 Sqmtr N Y 10 Fans for AHU ventilation and Pressurizatio n
CPWD specs part IV/QA Plan: Fans to be tested
for Db level, static pressure, CFM and leaving velocity Up to 20 fans Y Y NA N N >20 fans Y Y 1 for every 20 Y N
Addition: NIL Correction: NIL Overwriting: NIL Deletion: NIL AE (E)(P) AE(P) EE (P) fans
11 AHU's
CPWD specs part IV/QA Plan: To be tested for capacity in assembled condition, Fabrication, Cooling Coil and filters material & workmanship
to be Inspected critically. Up to 10 AHU's Y Y NA N N >10 Y Y Y N 12 Ducting
material As per relevant BIS
upto 500 Sqmtr N N NA N N 500 Sqmtr Y Y 1 sample for every 500 Sqmtr N Y
13 Valves Flow and controls as per data sheet Upto 20 Y N NA N N >20 Y Y 1 for every 20 N Y
14 LT Panels with ACB
CPWD Specs. Part IV/QA Plan: Construction, Ratings of SWG, Air Gaps between phases, phase to body, IP rating short circuit ratings
etc. Any Y Y 1 Y N 15 LT Panels with incomer of more that 200 A
CPWD specs part IV/QA Plan: Construction, Ratings of SWG, air gaps
between phases, phase to body, IP rating short
circuit ratings etc.
Up to 2 Y Y 0 N N
> 2 and <
10 Y Y 1 Y N
>10 Y Y 1 Y N
16 Cable Tray
CPWD specs. Part I/II: Check for perforation area, paint/Galvanising
thickness and Material composition Length Upto 500 mtr Y Y N N N Length > 500 mtr Y Y One piece for every 500 Mtr N Y
Y* Tested for its capacity at AHRI certified test bed (either at manufacturer's work or at IIIrd Party)
3- Fire Fighting
1 Pumps As per tender specs. Any
capacity Y Y 100% N N
2 MS pipes
To be tested for thickness and weight as per
applicable IS Any Y Y 1 for every 100 mtr N N