M.I.T APPARELS LTD

PATHANTULY, GODNAIL, SHIDDIRGONJ,

NARAYANGONJ

OTHER FACTORIES: NONE

(2)

SUMMARY

M.I.T Apparels Ltd was surveyed for fire safety on 6/4/2014 by Hughes Associates, Inc. This summary identifies the major deficiencies that were identified during the inspection.

The purpose of this survey was to identify significant fire safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial fire safety inspection was limited to the review and identification of major fire safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections.

Tables 1 - 3 summarizes the major fire safety issues identified during the inspection. Recommendations have been provided to address each issue.

(3)

No. Category Finding Recommendation

Remediation Timeframe Table 1. Findings And Recommendations - Sewing Shed

Fire Rated Construction

Store room used for combustible storage are not separated by fire-rated construction.

Provide dedicated storage rooms separated by minimum 1-hr fire-rated construction.

Within 3 months F-1

Egress Egress doors with locking features are provided at building exits.

Remove locking features from all egress doors.

If locks are required for security reasons, utilize special door locking features complying with NFPA 101.

(4)

Fire Protection The fire alarm system is antiquated, not a listed system, and does not provide alarm and notification features consistent with

acceptable standards.

Replace the fire alarm system with a new, listed addressable fire alarm system in

accordance with NFPA 72.

Design within 4 months, install within 9 months F-3

Fire Protection Inspection, testing, and maintenance for the fire alarm system were not in accordance with NFPA72.

Inspect, test and maintain the fire alarm system, and keep written records on-site, in accordance with NFPA 72.

Within 3 months F-4

Fire Protection The building is equipped with single-station

smoke alarms. Smoke alarm activation sounds only a local alarm and does not provide automatic fire alarm notification of

occupants.

Replace the single-station smoke alarms. Provide automatic smoke detectors throughout the building in accordance with NFAP72.

(5)

Egress Lighting

Inspection, testing, and maintenance for the emergency lighting system were not in accordance with The ACCORD standard.

Inspect, test and maintain the emergency lighting system in accordance with The

ACCORD standard. Keep written records on-site.

(6)

No. Category Finding Recommendation

Remediation Timeframe Table 2. Findings And Recommendations - Knitting Shed

Fire Rated Construction

Store room used for combustible storage are not separated by fire-rated construction.

Provide dedicated storage rooms separated by minimum 1-hr fire-rated construction.

Within 3 months F-1

Egress Egress doors with locking features are provided at building exits.

Remove locking features from all egress doors.

If locks are required for security reasons, utilize special door locking features complying with NFPA 101.

(7)

Fire Protection The fire alarm system is antiquated, not a listed system, and does not provide alarm and notification features consistent with

acceptable standards.

Replace the fire alarm system with a new, listed addressable fire alarm system in

accordance with NFPA 72.

Design within 4 months, install within 9 months F-3

Fire Protection Inspection, testing, and maintenance for the fire alarm system were not in accordance with NFPA72.

Inspect, test and maintain the fire alarm system, and keep written records on-site, in accordance with NFPA 72.

Within 3 months F-4

Fire Protection The building is equipped with single-station

smoke alarms. Smoke alarm activation sounds only a local alarm and does not provide automatic fire alarm notification of

occupants.

Replace the single-station smoke alarms. Provide automatic smoke detectors throughout the building in accordance with NFAP72.

(8)

Egress Lighting

Inspection, testing, and maintenance for the emergency lighting system were not in accordance with The ACCORD standard.

Inspect, test and maintain the emergency lighting system in accordance with The

ACCORD standard. Keep written records on-site.

(9)

No. Category Finding Recommendation

Remediation Timeframe Table 3. Findings And Recommendations - Finishing Shed

Fire Rated Construction

Store room used for combustible storage are not separated by fire-rated construction.

Provide dedicated storage rooms separated by minimum 1-hr fire-rated construction. Within 3 months F-1 Fire Rated Construction

The boiler room is not separated by fire-rated construction (openings, non-rated doors,

penetrations).

Separate the boiler room by a minimum 2-hr fire-rated construction. Seal and/or protected all openings to maintain the required fire separations

(10)

Egress Egress doors with locking features are provided at building exits.

Remove locking features from all egress doors.

If locks are required for security reasons, utilize special door locking features complying with NFPA 101.

(11)

Fire Protection The fire alarm system is antiquated, not a listed system, and does not provide alarm and notification features consistent with

acceptable standards.

Replace the fire alarm system with a new, listed addressable fire alarm system in

accordance with NFPA 72.

Design within 4 months, install within 9 months F-4

Fire Protection Inspection, testing, and maintenance for the fire alarm system were not in accordance with NFPA72.

Inspect, test and maintain the fire alarm system, and keep written records on-site, in accordance with NFPA 72.

Within 3 months F-5

Fire Protection The building is equipped with single-station

smoke alarms. Smoke alarm activation sounds only a local alarm and does not provide automatic fire alarm notification of

occupants.

Replace the single-station smoke alarms. Provide automatic smoke detectors throughout the building in accordance with NFAP72.

(12)

Egress Lighting

Inspection, testing, and maintenance for the emergency lighting system were not in accordance with The ACCORD standard.

Inspect, test and maintain the emergency lighting system in accordance with The

ACCORD standard. Keep written records on-site.

References

Related documents

Though situational barriers were a ubiquitous presence in their lives as well, Open Gate participants deferred the importance of the program’s incentives in favor of more

Simplex Intrinsically Safe Modules are for use with FM Approved Simplex control panels to make initiating device circuit wiring safe for use in locations where

Aquellos casos para los que disponemos de información sobre el lugar de origen del clérigo y los centros en los se había formado nos permiten concretar un poco más: el 53,51% de

a. Inspect for physical damage, defects alignment and fit. Perform mechanical operational tests in accordance with manufacturer's instructions. Compare nameplate information

Waterflow Detection: An alarm from a waterflow detection device shall activate the appropriate alarm message on the main panel display; turn on all programmed notification

Dry pipe valves shall be tripped annually by means of the system test pipe, to ensure that they operate satisfactorily and that the sprinkler alarms are in operating condition. A

Individual statements mailed directly to

This thesis brings the community in Barcelona, and the people and locations that foster it, into focus as a case study of aesthetic communitas and details my ethnographic fieldwork

When a second-stage alarm occurs, the FM-200 fire alarm and suppression system activates the Simplex fire alarm system located throughout the building; the Simplex fire alarm

1) The emergency fire alarm inspection fee is for response to fire alarms where the inspection/investigation of the fire alarm reveals that the fire alarm was caused by a

Figure 4.14: The distribution of Von Mises stress in the base part obtained from Hypermesh analysis from the top

of a commercial Fire Alarm System prior to the Fire Alarm System being put into operation. It shall be the responsibility of the installing Fire Alarm Business to.. provide the

The steps below can help UNICEF develop tools and materials for local demand creation and product marketing for the demand creation objectives (see above) relevant to your situation

In the original version of NOSACQ-50, management issues of safety climate were distributed in three dimensions including “Management safety priority and ability,” “Management

Companies should maintain proper records to segregate private expenses of its shareholders / directors / employees from business expenses and exclude such private and

Ficus hispida leaves of dose 400 mg per kg -1 body weight produced significant reduction in elevated body temperature compared to that of.. standard Paracetamol 150

Mitogen-activated protein kinase (MAPK) phosphatase 1 (MKP-1) is a protein with anti-inflammatory properties and the archetypal member of the dual-specificity phosphatases

High-Risk Avonex Multiple Sclerosis Prevention Study In Ongoing Neurological Surveillance (CHAMPIONS) was conducted to determine whether patients in CHAMPS who initiated therapy

• • A fire alarm system required for life safety shall be installed, A fire alarm system required for life safety shall be installed, tested, and maintained in accordance with

Fire Protection The fire alarm system is antiquated, not a listed system, and does not provide alarm and notification features consistent with..

Static PNRs with local large atomic displacements were revealed for the relaxor-forming compounds above the freezing temperature for the first time, while a structure with

(2) This section does not relieve the driver of the public transit bus from the duty to drive with due regard for the safety of all persons using the roadway. The driver of a