WELL NAME
RKB-Seabed (ft)
Well Type
START DATE, TIME
SPUD DATE, TIME
BOP LANDED & LATCH
126
AFE TARGET FINISH
ACTUAL FINISH DATE
Actual Online Time (days)
125.94
84.17
66.83%
Dual Activity (DAT), days
5.85
4.15%
5.90%
20.12%
33.79%
11.04
8.77%
Total Offline Make Up (days)
9.26
6.57%
9.33%
1.21%
2.04%
29.10
23.11%
Total Time (for calculative purposes)
141.1
10.72%
15.22%
21.33%
35.82%
0.21
0.17%
on Time inc. offline+DAT (for calculative purposes)
99.3
1.42
1.12%
PERFECT DAYS
Achievable Perfect Days
CLIENT
COUNTRY
BLOCK
TIME SAVING
WELL TIMING
$0
Actual No. of Perfect Days
% COST SAVING AGAINST AFE
100.00%
% Time saving From Dual Activity
% Time saving From Offline Make-up
% Total Time svg From DAT &
Offline Facilities
Well Duration
(excl. NPT)
Contractor NPT
Well Duration
(incl. NPT)
Tophole, Start
to land BOP
(excl. NPT)
Tophole, Start
to land BOP
(incl. NPT)
TIMING BREAKDOWN
Operator NPT, inc change of scope
WOW
Actual Production Time
3rd Party
STENA DRILLMAX OPERATIONAL ANALYSIS - SUMMARY
2,196
Exploration
$190,000,000
AFE AMOUNT ($)
-33.98%
AFE TARGET DAYS
94.00
ACTUAL DAYS
125.94
% TIME SAVING AGAINST AFE
ACTUAL COST (S)
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
Move in / Rig Up
Spud and drill 36"
hole/Run 30" Conductor
Drill 26" Hole and 20"
casing
Run BOP & Riser
Drill 17 1/2"
Run 13 5/8-13 3/8"
casing
Drill 12 1/4" Hole
Run 9 7/8 csg and 10
3/4 csg
Drill 8 1/2" Hole
Logging
P & A
Pull BOP, Retrieve
Beacons
Actual Production Time
Contractor NPT
Operator NPT
3rd Party
WOW
CLIENT TARGET
Additional Logging Runs
9 days Operator NPT, unexpected low ROP
2 days Fishing Operations
2.5 days Stabiliser thru casing
STENA DRILLMAX OPERATIONAL ANALYSIS - DAYS Vs DEPTH CHART
m
Stena Drilling
0
1
000
2000
-
E
-
~
3000
co
"'C
·
-"'C
§
4000
~
0
...
c..
5000
6000
7000
0
1
0
I
I
13
3/8
"
:
20
---~---r---1
I
I
I
30
I
I
I
40
Tempo (d
50
~
ias)
60
--
~5/8"
--~---r---r--
~
---
---I
I
---l---~---
1
I
I
I
I
70
90
I
I
I
I
1
00
-~---~---1---
1
20
O
ffline +
DA
T
building
Stand-
Torque-
master
To
ta
l
O
nline
Offline (DA
T)
O
nline
Offline (DA
T)
O
ffline
Mak
e-up
O
ffline
Mak
e-up
Contr
ac
tor
NP
T
O
per
ator
NP
T
3r
d Par
ty
WO
W
Move in / Rig Up
1.17
1.17
1.17
0.00
0.08
0.08
1.17
0.00
0.00
0.00
0.00
0.08
0.00
0.00
0.00
0.00
Spud and drill 36" hole/Run 30" Conductor
2.00
2.15
1.73
1.67
0.06
1.73
1.02
0.67
1.13
1.00
0.00
0.06
0.42
0.00
0.00
0.00
Drill 26" Hole and 20" casing
2.00
2.35
2.31
2.06
0.10
2.17
1.13
1.00
1.23
1.06
0.02
0.08
0.04
0.00
0.00
0.00
Run BOP & Riser
5.00
10.73
2.85
0.42
0.00
0.42
10.73
0.00
0.00
0.42
0.00
0.00
6.35
0.10
0.00
1.42
Drill 17 1/2"
12.50
12.42
12.15
0.00
1.36
1.36
12.42
0.00
0.00
0.00
1.11
0.25
0.27
0.00
0.00
0.00
Run 13 5/8-13 3/8" casing
5.00
3.81
3.44
0.13
0.90
1.02
3.81
0.00
0.00
0.13
0.17
0.73
0.27
0.00
0.10
0.00
Drill 12 1/4" Hole
14.00
14.31
14.02
0.04
1.81
1.85
14.31
0.00
0.00
0.04
1.38
0.44
0.06
0.23
0.00
0.00
Run 9 7/8 csg and 10 3/4 csg
5.00
5.38
5.38
0.04
0.98
1.02
5.38
0.00
0.00
0.04
0.44
0.54
0.00
0.00
0.00
0.00
Drill 8 1/2" Hole
27.33
43.79
26.69
0.77
1.15
1.92
43.79
0.08
0.00
0.69
0.00
1.15
3.63
13.38
0.10
0.00
Logging
8.00
24.00
8.60
0.08
0.94
1.02
24.00
0.00
0.00
0.08
0.92
0.02
0.00
15.40
0.00
0.00
P & A
7.00
3.81
3.81
0.23
0.35
0.58
3.81
0.00
0.00
0.23
0.35
0.00
0.00
0.00
0.00
0.00
Pull BOP, Retrieve Beacons
5.00
2.02
2.02
0.42
1.52
1.94
1.98
0.00
0.04
0.42
1.50
0.02
0.00
0.00
0.00
0.00
Total Days (WELL DURATION)
94.00
125.94
84.17
5.85
9.26
15.11
123.54
1.75
2.40
4.10
5.89
3.38
11.04
29.10
0.21
1.42
Total Days (TOPHOLE - Start well to land
BOP)
10.17
16.40
8.06
4.15
0.25
4.40
14.04
1.67
2.35
2.48
0.02
0.23
6.81
0.10
0.00
1.42
Information below must automatically updates from "Well Data" sheet. Information must however be verified to ensure there are no equation errors occur during processing of "Well Data"
Well Centre 1
Well Centre 2
NPT
STENA DRILLMAX OPERATIONAL ANALYSIS - WELL TIMING BREAKDOWN
CASING MD (ft) CASING MD (ft) FINAL VARIANCE AGAINST AFE TIME -31.94 days 11.04 8.77% 30" 2,258 Forward Planner % TIME SAVING AGAINST AFE -33.98% 29.1023.11% 20" 2,647
0.21 0.17% 13 3/8 3,462
0.00 AFE AMOUNT ($) $190,000,000 1.42 1.12% 9 7/8 5,101 ACTUAL COST (S) 41.7733.17% % COST SAVING AGAINST AFE $190,000,000
days 84.1766.83%
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target (hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
28.00 28.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig floor waiting on arrival of conductor, whilst continue with maintenance on rig floor, and pump room. Unload boat of conductor and measure same.
Break out lifting nubbin off mud motor
and install on new motor. 7.50 0.50 N/A 7.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Caliburate beacons on new location. Rig floor waiting on arrival of conductor, whilst continue with maintenance on rig floor, and pump room.
Mak up Mule shoe,20 ft pup jt, RT, 6 5/8 pup jt , crossover with tourqu
master and place in pipe bay.
4.50 1.50 N/A 4.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig floor waiting on arrival of conductor, whilst continue with maintenance on rig floor, and pump room.
7.50 15.00 7.50 -7.50 5.00 0.00 -5.00 N/A 0.00 N/A
Rig floor waiting on arrival of conductor, whilst continue with maintenance on rig floor, and pump room. Unload boat of conductor and measure same.
8.50 N/A 8.50 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
48.00 24.5016.0027.0024.00 0.00 1.50 10.00 0.00 0.00 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont to run BHA f/44m t/281m AWC 21:30-00:00 Hold TBT. P/up
and run 30" conductor t/35m. 2.00 3.00 N/A 2.00 N/A 3.00 3.00 0.00 N/A 0.00 N/A
hange to PS21 autoslips. Shallow test MWD @ 350GPM
120psi and 600GPM 400psi. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Cont to RIH on 5 1/2DP f/281/
t/817m. 0000-0330hrs RIH w/ 30" f/ 38m t/ 87m. 1.00 3.50 N/A 1.00 N/A 4.00 3.50 -0.50 N/A 0.00 N/A
RIH w/ 36" BHA f/ 817m t/ 2176m, filling pipe every 15 stds.
0330-0400hrs Change out 30"
elevators for 6 5/8" dp. 3.00 0.50 N/A 3.00 N/A N/A 0.50 N/A N/A 0.00 N/A
M/U TD, fill pipe, perform motor and MWD tests as per direction driller (remove PS21's).
0400-0530hrs P/U & M/U 30" R/T as per Drill Quip instructions. Install bullseye.
RIH and test low pressure housing at water line.
1.00 1.50 N/A 1.00 N/A N/A 1.50 N/A N/A 0.00 N/A
On standby as per instructions until 30" in picked up
and run below water line. RIH w/ 30" f/ 87m t/ 2.50 3.50 N/A 2.50 N/A N/A 3.50 N/A N/A 0.00 N/A Position MWC over new location.
RIH w/ 36" BHA f/2176m and tag mud line @ 2195m (draft 11.65m).
0330-0400hrs Change out 30"
elevators for 6 5/8" dp. 0.50 0.50 N/A 0.50 N/A N/A 0.50 N/A N/A 0.00 N/A
P/U 10m above mud line and pump 110bbl hi vis @ 800gpm
900psi. P/U & M/U 30" R/T as per Drill Quip 0.50 1.50 N/A 0.50 N/A N/A 1.50 N/A N/A 0.00 N/A Drill 36" hole f/ 2195 t/ 2254m. 0530-1200hrs RIH w/ 30" t/ 1921m. make up 30" R/T 4.50 7.50 1.50 N/A 4.50 N/A N/A 7.50 N/A N/A 0.00 N/A
Drill 36" hole f/ 2254m t/ 2282m.
1200-1300 Con't t/ run in w/ 30" conductor on 6 5/8dp f/1921m
t/2156m 3.50 1.00 2,282 N/A 3.50 N/A N/A 1.00 N/A N/A 0.00 N/A Perform wiper trip f/2282m
t/2205m. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump Hi-Vis pill 300bbl @ 500GPM and displace with 100bbl sea water.
0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2282m t/2177m. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
2000-2030: Change over to PS21 autoslips.
Move rig over location and stab 30" conductor. Bulls eye before stabbing: 1.25° @345. 10m in: 1.25° @345. 1 Std: 1.25° @330. On btm: .75° @320. Tag btm and pump sea water @
2bpm.
0.50 2.50 N/A 2.50 N/A N/A 0.50 N/A N/A 0.00 N/A
MWC-2030-2300: POOH f/2177m t/281m
Cement mix water contaminated. Wait on new mix.
Offline Ops. 2.50 3.50 3.50 N/A 3.50 N/A N/A 2.50 N/A N/A 0.00 N/A 2300-2330: Change out Autoslips
and handling gear.
Cement mix water contaminated. Wait on new mix. Offline Ops.
0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 0.00 N/A
2330-0000: POOH BHA f/281m t/177m
Cement mix water contaminated. Wait on new mix.
Offline Ops. 1.00 N/A 0.00 N/A N/A 1.00 N/A N/A 0.00 N/A 000-0330hrs Con't lay out 26" x
36" bha f/ 177m.
Cement mix water contaminated. Wait on new mix.
Offline Ops. 3.50 6.50 6.50 N/A 6.50 N/A N/A 3.50 N/A N/A 0.00 N/A 0330-1000hrs P/U and RIH w/ 26"
bha t/ 51m.
Cement mix water contaminated. Wait on new mix.
Offline Ops. 6.50 N/A 0.00 N/A N/A 6.50 N/A N/A 0.00 N/A 1000-1130hrs Wait on cmt job to
finish before
Pump 50bbl tracer and disp @ 7bpm (60psi). Tracer visable back at
seabed w/ 502bbls pumped. 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A performing MWD shallow test. SW. Cmter flush line and perform line Pump 50bbls tracer & disp w/ 12 bbl
test.
0.50 0.50 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
1130-1200hrs Pull BHA back out and change bit.
BJ cmter mix & pump cmt as per program. Cmter disp w/ 377bbls of sw
@ 8.5bpm. 0.50 0.50 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A 1200-1230-MWC Pull back BHA
and change bit.
BJ cont to displace cement w/sea water @ 8.5. Set down casing 30K and w/head @
2.5m above sea bed. ROV check bullseye. 3/4° @ 320.
0.50 0.50 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
1230-1330-MWC Make up bit
and RIH t/51m Wait on cement curing. 1.00 9.50 N/A 9.50 N/A N/A 1.00 N/A N/A 0.00 N/A
1330-1400-MWC Shallow test
MWD @700GPM 460PSI Unlatch running tool as per Dril-Quip instructions and POOH t/2175m 0.50 0.50 N/A 0.50 N/A N/A 0.50 N/A N/A 0.00 N/A
RIH f/2143m t/2184m. Position rig over well and stab in 26" assembly.
2230-0000-AWC POOH f/2175m
t/2073m 1.00 1.50 N/A 1.00 N/A N/A 1.50 N/A N/A 0.00 N/A
Cont RIH t/ 2225m and make up
Top Drive for washing down. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
48.00 27.0024.0029.5025.50 0.50 2.00 1.00 0.00 0.00 0.00 Wash down f/ 2225m w/ 100gpm and tag cmt @ 2247m w/ 10k.
0000-0600hrs POOH w/ 30" R/T f/
2073m t/ 20m. 0.50 6.00 N/A 0.50 N/A N/A 6.00 N/A N/A 0.00 N/A Drill cmt f/ 2247m t/ 2282m w/ 650
gpm, 650psi, 30 rpm and max 5k WOB. Shoe @ 22852m.
600-0730hrs POOH w/ 30" R/T and lay out same. 0730-0900hrs P/U 18 3/4" W/H and M/U R/T as drill quip instructions. Lay out same.
2.50 3.00 N/A 2.50 N/A N/A 3.00 N/A N/A 0.00 N/A
Pump 850 bbls hi vis and drill ahead f/ 2282m t/ 2541m pumping 80bbl hi vis sweeps every 60m.
0900-1000hrs Rig up to run 20"
casing. 9.00 1.00 N/A 9.00 N/A N/A 1.00 N/A N/A 0.00 N/A
1000-1200hrs Hold TBT, RIH w/ 20" t/
48m. 2.00 N/A 0.00 N/A N/A 2.00 N/A N/A 0.00 N/A
Dril ahead 26" hole from 2541m to TD at 2660m pumping sweeps every 80m.
AWC Con't to rih with 20" csg f/ 59 m
t/ 455m filling every joint. 7.00 6.00 2,660 N/A 7.00 N/A N/A 6.00 N/A N/A 0.00 N/A
Dril ahead 26" hole from 2541m to TD at 2660m pumping sweeps every 80m.
1800-1830-AWC-Rig down casing elevators and rig up inner string false
rotary 0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 0.00 N/A Take survey and displace well as
r r rogram. Change out to PS21 auto slips in main well
1830-2200-AWC-RIH with 5"DP inner
string assembly t/395m 4.50 3.50 N/A 4.50 N/A N/A 3.50 N/A N/A 0.00 N/A
Take survey and displace well as r r rogram. Change out to PS21 auto slips in main well
2200-2330-AWC-Pick up housing assembly and make up same as per instruction. Weld connection.
1.50 N/A 0.00 N/A N/A 1.50 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online
TOTAL NPT 94.00
(i.e. Reason for not achieving KPI, NPT details)
DrillMAX KPI Incentive Contract
REV NUMBER PRODUCED BY APPROVED BY Contractural KPIs ONLINE Contractural KPIs OFFLINE (Well Centres) Standbuilding
Cells with blue border to be
completed Cells with Yellow hatching - Automatically update
SPUD DATE, TIME
ACTUAL FINISH DATE 125.94 2196.00
PERFORMANCE REVIEW STENA DRILLMAX (PM) OPERATOR, (including 3rd
party, & scope changes)
WOW WELL NAME
START DATE, TIME RKB-Seabed (ft)
AFE TARGET FINISH BOP LANDED & LATCH
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
ACTUAL PRODUCTION TIME
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party
3rd Party
Spud and drill 36" hole/Run 30" Conductor
WOW
Move in / Rig Up
Stena DrillMAX Operational Analysis
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Pull out of hole from 2660m to 2555m
2330-0000-AWC-Rig down Franks
equipment. 0.50 0.50 N/A 0.50 N/A N/A 0.50 N/A N/A 0.00 N/A Con't POOH w/ 26" BHA f/ 2555m
t/ 2141m. Work thru tight spot f/ 2540m t/ 2524m w/ 50rpm, no pump, max O/P 40k and max torque 20k, .
0000-0130hrs Con't rig down Franks
& install bullseye. 3.00 0.50 N/A 3.00 N/A N/A 0.50 N/A N/A 0.00 N/A
Con't POOH w/ 26" BHA f/ 2555m t/ 2141m. Work thru tight spot f/ 2540m t/ 2524m w/ 50rpm, no pump, max O/P 40k and max torque 20k, .
0130-0230hrs Change casing tong for
Hydra tong. 0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 0.00 N/A
Con't POOH w/ 26" BHA f/ 2555m t/ 2141m. Work thru tight spot f/ 2540m t/ 2524m w/ 50rpm, no pump, max O/P 40k and max torque 20k, .
0230-0300hrs Rig up to change saver
sub. 0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 0.00 N/A
0300-1200hrs On standby until 20" is landed.
Change out saver sub for precautionary reason's prior to
running 20" casing. 9.00 1.00 1.00 N/A 1.00 N/A N/A 9.00 N/A N/A 0.00 N/A On standby until 20" is landed.
Run 18 3/4" W/H down to water line and perform low pressure housing test w/ 7bpm, 70psi (shoe depth
488m).
Break down 30" Drill quip Running
tool 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
On standby until 20" is landed.488m t/ 2179m filling dp every 5 stds.Install PS30's and con't RIH w/ 20" f/
Change out sleeve on motor and
make up stabilizer (17.5" BHA). 4.00 1.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A
On standby until 20" is landed. Reposition AWC over new well
location. Chaange out damaged single 34ppf 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.50 N/A On standby until 20" is landed.
Onstandby, wait on ROV to repair camera problem, ROV return to surface at 1020hrs. ROV jumped again @ 1145hrs.
2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
On standby until 20" is landed. Wait on ROV to reach bottom. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
On standby until 20" is landed.Position rig over location and stab 20"
csg into w/head. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
On standby until 20" is landed. Run csg f/ 2192m t/2624m filling
every 5 stds. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
1630 -2000-MWC-POOH f/2143m t/288m with 26"assembly on 5 1/2"DP
Change out to master bushings. Pump @ 4 BPM and land csg whilst circulating. Set down 50K and confirm latch. Perform 50K o/pull. B/eye @
1/2
1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
1630-2000-MWC-POOH f/2143m t/288m with 26"assembly on 5 1/2"DP
-Increase flow rate to 8 BPM and
circulate. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A 1630 -2000-MWC-POOH f/2143m
t/288m with 26"assembly on 5 1/2"DP
Pump 50bbl black tracer and chase
with 12 bbl sea water. 3.50 0.50 N/A 0.50 N/A N/A 3.50 N/A N/A 0.00 N/A
2000 -2400-MWC-Continue to pooh with BHA from 288m to surface
BJ perform line test to 2000psi and carry out cement job as per
programme 4.00 4.00 N/A 4.00 N/A N/A 4.00 N/A N/A 0.00 N/A 2000 -2400-MWC-Continue to
pooh with BHA from 288m to
surface Waiting on cement curing 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A 0000-0300hrs Hold TBT and rig
to run BOP. Wait of cement. 3.00 8.00 N/A 8.00 N/A N/A 3.00 N/A N/A 0.00 N/A
0300-0330hrs Skid BOP under
MWC. Wait of cement. 0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 0.00 N/A
0330-0500hrs P/U boost jt & M/U
t/ BOP. Wait of cement. 1.50 N/A 0.00 N/A N/A 1.50 N/A N/A 0.00 N/A 0500-0530hrs P/U BOP of trolly &
skid trolly back to storage position. LWR BOP into under hull guide
Wait of cement. 0.50 N/A 0.00 N/A N/A 0.50 N/A N/A 3.00 N/A
0530-0630hrs Connect boost v/v control lines & fuction test same.
Install beacon. Wait of cement. 1.00 N/A 0.00 N/A N/A 1.00 N/A N/A 0.00 N/A 0630-0730hrs P/test chk, kill,
boost & conduit lines. Release 18 3/4" R/T as per drill quip
instructions. 1.00 0.50 N/A 0.50 N/A N/A 1.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
120.00 257.500.00 0.00 10.00 0.00 0.00152.502.50 0.00 34.00 Run BOP f/ 88m t/ 380m. POOH with 5" cement stinger 2600-1675m 3.50 3.50 N/A 3.50 N/A N/A 3.50 N/A N/A 0.00 N/A
Hold TBT with drill crew and marine crew for running BOPs.
1200-1530-Pooh with 18 3/4 "running tool and cmt stinger on 6 5/8dp from
1525m to 461m
0.50 3.50 N/A 0.50 N/A N/A 3.50 N/A N/A 0.00 N/A
Run BOP on marine riser f/380m t/576m.
1530-1630-Change out ps30 auto slips, remove bullseye and laydown
running tool 3.50 1.00 N/A 3.50 N/A N/A 1.00 N/A N/A 0.00 N/A Change out riser running tool and
test choke and kill lines 250psi low and 9000psi high, test conduit and booster lines 5000 psi.
1630-1730-Pooh from 386m to
surface with 5" dp stinger 2.00 1.00 2.00 2.00 0.00 N/A 1.00 N/A N/A 0.00 N/A
Run BOP on marine riser f/576m
t/673m. 1.00 1.16 1.00 -0.16 N/A 0.00 N/A N/A 0.00 N/A
On standby due to failure of
gantry crane. 15.00 15.00 N/A 15.00 N/A N/A 0.00 N/A N/A 0.00 N/A Gantry crane failure
Con't to run BOP f/ 673m t/ 722m. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A P/up riser on crane
Con't to run BOP f/ 722m
t/1088m. 12.00 N/A 12.00 N/A N/A 0.00 N/A N/A 0.00 N/A
P/test chk, kill, boost and conduit
lines. 2.00 2.00 2.00 0.00 N/A 0.00 N/A N/A 0.00 N/A
Run BOP f/ 1088m t/ 1429m. 10.00 N/A 10.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Run BOP f/ 1429m t/ 1649m. 3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/test chk, kill, boost and conduit lines. Perform hydrostatic test on
riser. 2.00 2.00 2.00 0.00 N/A 0.00 N/A N/A 0.00 N/A Run BOP f/ 1649m t/ 1728m. 4.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Run Fill Valve and install hoses in moonpool. Carry out hydrastatic
test on Fill Valve. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A Run BOP f/ 1728m t/ 1752m. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't run BOP f/ 1752m t/2142 9.00 4.80 9.00 4.20 N/A 0.00 N/A N/A 0.00 N/A
P/U 10' pup & run BOP t/ 2145m. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/U ROPS jt & rin BOP t/ 2152m. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/U slip jt & run BOP t/ 2177m. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Connect control linesto ROPS jt. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Connect ROPs head in moonpool
and pick up landing joint 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test choke & kill lines 250psi 5 mins 9000psi 10
mins.Conduit lines 5000psi. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Connect clamps in moonpool and
lower slip joint into load
ring.Install storm loops. 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A Position rig over well centre and
prepare to land BOP, latch BOP @18.30 on Blue pod A. Swap pods and perform 50k overpull. B/eye prior to landing 1° @325. After landing 1°@325.
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Perform slump test. 100K down b/eye 1°@345. 200K down b/eye 1°@320. 300K down b/eye 1°@325. 400K down b/eye 1°@325. 450K down b/eye
1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Connect hoses to slip joint in moonpool. Stroke open and lay out landing joint.
2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
BJ attempt to test riser connector. Prepare divertor for picking up. Offline Ops 1800-1900-AWC-Made up drill bit and sleeve to mud motor.
Make up bit to motor and torue up
sleeve stabilizer 1.50 1.00 1.50 N/A 1.50 N/A N/A 1.00 N/A N/A 0.00 N/A
Run BOP & Riser
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Con't trouble shoot BOP problems 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A NPT due to BOP problems
R/U & L/O diverter. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/U landing jt & M/U to slip jt. 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Turn rig heading to 90°. Close &
lock slip jt. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Prepare & unlatch BOP (BOP unlatched @ 0520hrs). Move rig 50m off location. Pull BOP t/ 2177m.
0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
R/U & remove load ring. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Remove mux cable storm loops &
install control lines on ROPS jt. 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
L/O landing jt and remove ROPS
jt heads. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP t/ 2152m & L/O slip jt. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP t/ 2145m & L/O ROPS
jt. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP t/ 2142m & L/O 10' pup
jt. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP f/ 2142m t/2045m. 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP f/ 2045m t/1703m. 8.00 8.00 N/A 8.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Disconnect Fill Valve. Pull BOP
t/1697 and l/out Fill Valve 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP f/ 1697m t/1453m. 3.00 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't to pull BOP f/ 1453m t/
722m. 12.00 12.00 N/A 12.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't to pull BOP f/ 722m t/32 m. 11.00 11.00 N/A 11.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BOP through splash zone and land on BOP transporter. Nipple down booster joint.
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Continue un-nipple booster joint from BOP, Pick up and lay out
booster joint on riser catwalk 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Skid BOP from under main well
rotary to setback location 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Subsea troubleshoot BOP, meanwhile remove riser running tool, spider and gimbal and install master bushings on main well rotary
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Subsea Continue troubleshoot BOP. Make up side entry test
assembly at aux well rotary. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Subsea Continue Repair BOP
(replace side packer on blind shear rams). Main well center - Rig up and pressure test mud hose, Lower and upper IBOP to 250/5000psi for 5/10mins, bleed off pressure and rig down test
3.00 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Subsea continue repair BOP. Main well center - Remove master bushings, install spider and gimbal and Riser running tool. Pick up booster joint
2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Subsea continue repair BOP 4.00 4.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont' T/shoot BOP, pressure & function test same. 250psi low -
7000psi high 5 mins each. 10.00 10.00 N/A 10.00 N/A N/A 0.00 N/A N/A 0.00 N/A Re-move test jnt f/BOP & C/out
well head gasket. 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT. P/up booster and 65ft
pup jt and run through rotary. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Skid BOP under w/centre and
stab booster joint. Nipple up same.
1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Lift BOP off transporter and skid back transporter. Run BOP down
to under hull guidance. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Connect booster hoses in
moonpool and rig up for pressure
testing. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Press test c+k lines 250psi 5mins
/ 9000 psi 10mins.Conduit lines
and booster 5000 psi 10mins. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Run BOPs f/40m t/454m 7.50 7.50 N/A 7.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run BOP's on marine riser f/454m t/551m inspecting low & high pressure seals every joint.
1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test choke & kill lines 250psi 5mins - 9000psi 10min each. Pressure test boost & conduit lines 5000psi 10 mins.
1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run BOP's on marine riser f/551m t/1088m inspecting low & high
pressure seals every joint. 9.00 9.00 N/A 9.00 N/A N/A 0.00 N/A N/A 0.00 N/A Pressure test C & K lines 250psi
5mins 9000psi 10mins. Conduit and booster lines 5000psi 10mins. Perform Hydrastatic test.
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Run BOP's on marine riser f/1088m t/1624m inspecting low & high pressure seals every joint.
10.00 10.00 N/A 10.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test C & K lines 250psi 5mins 9000psi 10mins. Conduit and booster lines 5000psi 10mins. Perform Hydrastatic test.
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Run BOP's on marine riser f/1624m t/1728m inspecting low &
high pressure seals every joint. 2.50 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A Connect fill valve hoses -test
same and fill with SW for
hydrostatic test 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Run BOP's on marine riser
f/1728m t/1850m inspecting low &
high pressure seals every joint. 2.50 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A Suspend operations WOW 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up and m/up landing joint,set in
spider 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Suspend operations WOW 31.00 31.00 N/A 31.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to run Riser f/1850-2146 5.00 5.00 N/A 5.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test C&K lines 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up ROPS ,joint damaged,lay
out 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pick up replacement ROPS 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up slip joint and m/up 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT with oncoming crew 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Lower slip jint and install terminal heads to ROPS joint and m/up
Landing joint 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Pressure test C&K lines and
conduit and booster 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Install mux cable storm loops 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Stena DrillMAX Operational Analysis
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Set slip joint in load ring 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Position rig over well centre land BOP, latch BOP on Blue pod A,SEM B Perform 50k overpull. B/eye prior to landing 1° . After landing 1.5°
1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test Well head
connector 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A Unlock slip joint and stroke out
inner barrl,l/out landing joint 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up and m/up diverter 1.50 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Install diverter manifold and
release running tool 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig down riser handling eqpt and
clean floor 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
300.00 298.000.00 0.00 0.00 26.75 6.00 6.50 0.00 0.00 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig up for drilling and change
saver sub 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up 17 1/2 BHA and RIH to
200m 2.50 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Shallow test MWD 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to RIH with BHA
f/200m-276m 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Change out slips 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to RIH f-276m-2557m 3.50 3.50 3.50 0.00 N/A 0.00 N/A N/A 0.00 N/A
Wash down from 2557-2614 to
TOC 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Line up and prepare to pressure test BOP's,problems with cmt.
Unit 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A Pressure test BOP's /250-1500psi 5.00 N/A 5.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Function test BOP from TP panel
and diverter function test 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill out cmt. f/2614-2637 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Troubleshoot electrical fault with
oil cooling fan. 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Ream f/2598-2637 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill cmt. f/2637-2647,drill out
shoe and rathole 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 10' new formation to 2670 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 90bbls hi-vis pill and
circulate hole clean 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A Space out and close upper
annular,pressure test lines,perform LOT.Max EMW,9.2ppg
1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Displace well ,C&K,booster to
9.3ppgSTA as per programme 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. And condition mud 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Take SCR's and CLF 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Test kick detection system as per
0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 17 1/2" hole f/2670-2679 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check at conection 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to drill 17 1/2" hole as per
2679-2966 26.00 2,966 N/A 26.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Observe total losses 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2966-2631 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check at connection-Losses
8bph,pump down kill/up choke 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. Down string monitoring
returns 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. Down string @ 190gpm,staging up,cut MW to
9.3ppg 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A Circ. And condition mud
observing for losses 4.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/2430-2927 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Wash down f/2927-2966 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. And condition ,monitoring for
losses,while staging up pumps 4.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A Take survey and observe total
losses with 1100gpm,monitor well on trip tank
1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 100bbls LCM and displace
well to 9.2ppgSTA 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Monitor losses @ 40BPH 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 100bbls of LCM and
displace 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2925-2637 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Monitor losses @ 160BPH 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Close Upper annular and open C&K lines to let volume drop.Close LPR and pump down kill line ,returns via choke
1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Open LPR's, close kill line,.Pump
down boost line, with 9ppg 3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Close LPR and pump down kill 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Boost riser and condition 5.00 N/A 5.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Open annular and monitor well 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Displace well ,C&K,booster to
8.9ppgSTA as per programme 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Displace string to 8.9ppg 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 17 1/2"
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
RIH f/2630-2930 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. And condition to 8.9ppg 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Take SCR's and CLF 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill ahead f/2966-3049 9.00 3,049 N/A 9.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Losses at 64bph,reduce flow rate 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 100bbls LCM Hols TBT and rig up to m/up 13 3/8"
csg 1.00 1.50 N/A 1.00 N/A N/A 0.00 N/A N/A 1.50 N/A
Cont. to drill f/3049-3336 M/up 75 jnts of 13 3/8" csg 68.50 15.25 3,325 N/A 68.50 N/A N/A 0.00 N/A 6.25 15.25 9.00 Casing building not continuous due to other ops and lack of personnel.
Take survey and flow check 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/3336-2638 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2638-2504 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2504-290 3.00 2.73 3.00 0.27 N/A 0.00 N/A N/A 0.00 N/A No boost
Hold TBT and change out PS-30 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pull BHA and break off bit 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up new bit and RIH to 19m 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up new power pulse but X/O no
good,l/out same and p/up original 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Download MWD 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH with 17 1/2" BHA f/19m-304m 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Shallow test MWD 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/304-2640m,filling pipe 4.50 3.59 4.50 0.91 N/A 0.00 N/A N/A 0.00 N/A No boost
RIH f/shoe to 3287m 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Wash down f/3287-3336m 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 17 1/2" hole f/3372m -3467 Rig up and M/up 13 5/8 shoe Change out casing collars 47.00 3.00 2.00 3,372 N/A 47.00 N/A N/A 0.00 N/A N/A 3.00 N/A
Start to pump and displace
hi-vis,losses incurred,430bph Attempt to m/up 13 5/8 FC M/up 13 3/8 hangar 0.50 5.00 2.00 N/A 0.50 N/A N/A 0.00 N/A N/A 5.00 N/A
Flow check on trip tank,losses
300bph M/up cmt. Head and rack back M/up cmt.head 2.00 2.00 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 2.00 N/A
Troubleshoot losses 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/3460-3326 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to troubleshoot losses 13.50 N/A 13.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check and RIH f/3326-3467 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/3467-2640 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2640-2500 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Flow check at BOP's 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2500-1129,while
boosting riser ,at controlled rate M/up stand of 5" to jetting tool 2.50 2.00 N/A 2.50 N/A N/A 2.00 N/A N/A 0.00 N/A POOH at controlled rate,as per
Flow check 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/1129-304 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Remove PS 30's,Rack back and
lay out BHA to surface 3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up jetting and WBRT assy. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH with WBRT at controlled
speed f/48-2178 4.00 3.28 4.00 0.72 N/A 0.00 N/A N/A 0.00 N/A Controlled speed due to full bore tool Jet BOP's 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Retrieve wear bushing 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 100bbls hi-vis 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drop 2 3/4" rabbit,POOH
f/2219-48m 4.00 3.28 4.00 0.72 N/A 0.00 N/A N/A 0.00 N/A Controlled speed due to full bore tool
Lay out WBRT and jet sub 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig down drilling eqpt. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
120.0091.50 0.00 0.00 3.00 4.00 17.50 6.50 0.00 2.50 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT to rig up 13 3/8 csg
eqpt and rig up 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT to run csg 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up and bakerlock shoe joint and 9 joints to 208m,using lifting nubbin.
6.00 N/A 6.00 N/A N/A 0.00 N/A N/A 0.00 N/A Slick casing ,lifting nubbins used on each joint
Rig down 13 5/8 handling eqpt.
and rig up to run stands of 13 3/8 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run 13 /8 csg from fingerboard,rabbiting every stand
,f/208-443 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A Drift every stand in TC,tight protectors. Hold TBT for crew change over 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run 13 3/8 f/443-1264m drifting
every stand 6.00 3.60 6.00 2.40 N/A 0.00 N/A N/A 0.00 N/A Drift every stand in TC,tight protectors.
Stena DrillMAX Operational Analysis
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Change handling eqpt. and p/up
csg hangar r/Tool assy 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Cont. to RIH with Landing string
f/1269-,filling every 5 stands 8.00 N/A 8.00 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up cmt. Stand and start to circ. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Leak on cmt. Head,lay out and
repair. Repair cmt. Head 3.00 2.00 2.50 N/A 3.00 N/A N/A 0.00 N/A N/A 2.00 N/A
P/up cmt. Stand wash down and land hangar in well head with 50k
down,take 50k o/pull 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Hold TBT prior to cmt. Job,while
circulating 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A Pressure test cmt. Hose and
perfrom cmt. Job. M/up mill and flush assy 4.50 2.00 N/A 4.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig down cmt. hose 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Release Running tool 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. C&K lines while rack cmt.
Stand 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2173 to surface No boost B/out cmt. Head 4.00 2.00 3.34 4.00 0.66 N/A 0.00 N/A N/A 0.00 N/A No boost
B/out and l/out Running tool 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up Mill and flush tool 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH with Mill and flush tool to
2162m M/up seal assy running tool ,X/O's and PJ's 3.50 3.00 3.32 3.50 0.18 N/A 0.00 N/A N/A 0.00 N/A No boost
Hold TBT and install electric
cable for TDS L/out cmt. Head M/up ARC,MWD,Sonic,Power
drive,x/O's and pup joints 5.00 2.00 7.00 5.00 N/A 5.00 N/A N/A 0.00 N/A N/A 2.00 N/A
RIH to 2192 and land out milling
tool on hangar,and start flushing.M/up seal assy to Running tool and jet sub to stand B/out cmt. head 1.00 1.00 2.00 N/A 1.00 N/A N/A 1.00 N/A N/A 0.00 N/A
POOH to 2172m 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. And boost riser until hi-vis at
surface 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 100bbls slug 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2172-surface 4.00 3.32 4.00 0.68 N/A 0.00 N/A N/A 0.00 N/A No boost
L/out mill and flush,p/up jetting
tool 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up seal assy 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH with seal assy to 2195m at
controlled speed 4.50 N/A 4.50 N/A N/A 0.00 N/A N/A 0.00 N/A Jet wellhead 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Land seal assy at hangar and set 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Troubleshoot cmt. Unit problems 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Flush and test lines M/up powerdrive to bit and test 0.50 2.00 N/A 0.50 N/A N/A 2.00 N/A N/A 0.00 N/A
Test seal assy to 300psi and take
100k o/pull test 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Test seal assy to 7000psi against
MPR's Break out mill and flush tool 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Start BOP test Break off powerdrive test assy 5.00 1.00 N/A 5.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Release running tool,pump slug 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f2191-2132 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Repair torque wrench die retainer 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2132-387 2.50 2.68 2.50 -0.18 N/A 0.00 N/A N/A 0.00 N/A
Remove PS-30 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/387-30 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
L/down seal assy and m/up
WBRT B/down seal assy running tool 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Test BSR's with acoustics 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH with wear bushing 3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Land and set W/bushing 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH with WBRT 3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
L/out WBRT 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
336.00 343.500.00 0.00 1.00 33.0010.50 1.50 5.50 0.00 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up pressure test assy Load batteries in MWD,ARC,Sonic
and m/up lifting nubbins. 0.50 3.00 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Test IBOP's and mud hose 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
L/out pressure test assy and
change Saver sub 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up 12 1/4 BHA 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Load MWD data while testing
cag. Against BSR's to 3000psi 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Shallow test MWD 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont. to run BHA to 278 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/278 to 2150,filling pipe
every 15 stands 3.50 2.88 3.50 0.62 N/A 0.00 N/A N/A 0.00 N/A No boost
RIH f/2150-3348 at controlled
speed 3.50 1.84 3.50 1.66 N/A 0.00 N/A N/A 0.00 N/A
Wash down f/3348 to TOC at
3370 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill cmt. f/3370-3387,while
displacing to OBM 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 12 1/4" Hole
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
OBM at surface ,shut in circuit
and circ. Out interface 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Drill cmt. f/3387-3457 4.50 N/A 4.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ. And condition mud while
performing kick detection test 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill cmt. f/3457-3472 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Drill 12 1/4 hole f/3472-3482 2.00 3,472 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Line up BJ ,pump 50 bbls through
standpipe. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Circ. And condition to 9.7ppg 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Perform MWD survey ,pump 50
bbls down kill line 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Space out for MPR's and line test
to 3000psi Break out cmt. Head into 3 parts 0.50 2.00 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Close MPR's and perform LOT with 9.7ppg,1954psi
@surfaec,EMW of 12.9ppg 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Open MPR's and take SCR's and
CLF 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Wash down to bottom
f/3456-3482 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Drill f/3482-4374 125.50 4,374 N/A 125.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH wet f/ 4374m t/ 3969m. 2.00 4.56 2.00 -2.56 N/A 0.00 N/A N/A 0.00 N/A
pump slug (failed) 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/3969m t/3454m, (wet). 1.50 2.56 1.50 -1.06 N/A 0.00 N/A N/A 0.00 N/A
Flow check @ 3454m, (static). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 2nd slug 50bbls. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/3454m t/2752m. 1.00 0.90 1.00 0.10 N/A 0.00 N/A N/A 0.00 N/A
Change inserts on ps 30s &
elevators, to 5 1/2inch. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2752m t/2504m. 0.50 0.30 0.50 0.20 N/A 0.00 N/A N/A 0.00 N/A
Flow check, BHA @ BOP (static). M/up Power Drive, Arc, and Reciever sub at Torquemaster. 0.50 1.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f2504m t/279m. 3.00 2.70 3.00 0.30 N/A 0.00 N/A N/A 0.00 N/A No boost
Change out ps 30s to manuals. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH, BHA f/279m t/164m 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Stand 6 5/8" HWDP inadvertently released from Hydraracker. Carry out RA hold TBT prior to recovering stand.
0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT & con't to retrieve stand
from setback w/ stbd fwd crane. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, POOH w/ 12.25" BHA f/ 164m break off bit & tidy rig
floor. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A Reload MWD tools, mean while
service TD and change out wash pipe.
3.50 N/A 3.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/U & RIH w/ 12.25" BHA t/ 40 m, M/U bit to 35k, MWD plug to
verify comms. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A Shallow test power drive as per
DD (700gpm, 840psi). 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't RIH w/ 12.25" BHA f/ 40m t/ 277m. Wt below jars 45k and
BHA wt 78k. 2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A Fill BHA, M/U X/O & change
handling equip to 5.5" dp. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Held t/box talk. RIH 5 1/2" dp, filling pipe every 15 stds f/277m t/2752m (install ps 30s on first fill of pipe)
4.50 3.80 4.50 0.70 N/A 0.00 N/A N/A 0.00 N/A No boost
Change over to 6 5/8" 34 pound
handling equip. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/2752m t/3348m, filling pipe
every 15stds. Break down power drive and arc assembly 1.50 1.50 0.92 1.50 0.58 N/A 0.00 N/A N/A 0.00 N/A
Fill pipe (whilst removing ps 30s
prior to open hole). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/3348m t/4324m. ( open hole
speed restricted) 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A Speed restricted
Wash down to btm, f/4324m t/4374m @ 300gpm 1,000psi, tag
btm @ 4374m (no hole fill). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Drill 12-1/4" hole f/4374m t/4666m
per DD. Lay out 5 1/2" DP 38.00 11.00 N/A 38.00 N/A N/A 0.00 N/A N/A 11.00 N/A Drill 12-1/4" hole f/4666m to
4905m per DD. lay down 5 1/2 DP (4hours) and pick up 43 stands of 5 " (18hours) 24.00 22.00 N/A 24.00 N/A N/A 0.00 N/A N/A 22.00 N/A
Drill 12-1/4" hole f/5110m to m per
DD. 21.50 5,110 N/A 21.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Circ btms up f/ 5110m whilst reciporcating string @ 900gpm 4650psi & 40rpm (mean while take survey and perform downlink). Boosting riser w/ 70spm 500psi.
2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Cont to circ hole clean whilst reciporcating string, 1300gpm
4700psi. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Flow check (static). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/5103m t/4968m, (wet). 0.50 0.68 0.50 -0.18 N/A 0.00 N/A N/A 0.00 N/A
RIH f/4968m t/5050m. Speed
restricted 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Wash down f/5050m t/5110m @
120rpm, 900gpm, 4500psi. (work
tight spot f/5060m t/5076m). 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A POOH f/5110m t/4572m, (wet). 2.50 2.69 2.50 -0.19 N/A 0.00 N/A N/A 0.00 N/A
Pump 90bbl slug & chase, (whilst
installing ps 30s). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/4572m t/3427m. 3.00 3.80 3.00 -0.80 N/A 0.00 N/A N/A 0.00 N/A
Flow check @ 13 5/8 shoe
(static). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A POOH f/3427m t/2751m. 1.00 0.85 1.00 0.16 N/A 0.00 N/A N/A 0.00 N/A
Change out handling equip to 5
1/2 inch. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f2751m t/ L/out top
Stena DrillMAX Operational Analysis
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Hold TBT. Con't POOH w/ 12 1/4"Bha on 5 1/2" DP f/ 2408m t/ 278m.
3.00 2.63 3.00 0.37 N/A 0.00 N/A N/A 0.00 N/A
Remove PS30's and change
handling equip. for BHA. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH w/ 12 1/4" BHA f/ 278 t/
RKB. 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Clear rig floor and prepare wire
line. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, rig up for wire line ops, M/U toolstring #1 and verify communication with tools.
AWC - B/ down sonic, stab,power
pulse. 2.50 1.00 N/A 2.50 N/A N/A 1.00 N/A N/A 0.00 N/A
RIH w/ wireline run #1, PEX. Torq Master - B/ down arc, reciever
sub, power drive. 2.50 0.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A RIH w/ wireline run #1, PEX. @
surface 06.00hrs. 6.00 N/A 6.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT remove sources. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
R/down run 1. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run 2 verify tools @ surface.No
go t/shoot fault on tool. 4.50 4.50 N/A 4.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Schlum con't troubleshoot
problems with tools. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ toolstring #2 MSCT. 11.50 N/A 11.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Continue with logging run #2
MSCT. 10.50 N/A 10.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run 2 @ surface commence
r/down all wireline equip. M/up 9 7/8" shoe jt. 1.00 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
geologist analysing recoverd samples. (meanwhile
flush C&K lines). M/up float & pup jt. 0.50 1.00 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A geologist analyzing
recoverd samples (meanwhile prepare Frank's casing equip). 38 cores recovered out of 50.
2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, Rig down wire line. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
120.00 129.000.00 0.00 1.00 10.5013.00 0.00 0.00 0.00 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, P/U and RIH w/ WBRT
assy t/ 54m. make up 10 3/4 casing hanger R/T assy 0.50 3.00 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ WBRT (full bore tool) on 6
5/8" dp f/ 54m t/ 730m. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Install PS30's. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ WBRT (full bore tool) on 6 5/8" dp f/ 730m t/ 2178m filling
pipe every 20stds. 2.50 2.22 2.50 0.28 N/A 0.00 N/A N/A 0.00 N/A No boost L/O slg, M/U TD & jet BOP and
W/H w/ 500gpm 850psi. Boost riser w/ 70spm 500psi.
1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH t/ 2191m (eff l/n) and latch into WB w/ 20k down. Index line measured 2194.5m w/ 20k down and 8.7m stroke on slip jt. Oberserved 150k O/P when retreiving WB.
1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 50bbl 13.5ppg slug. Drop a 3 3/8" drift down string and POOH w/ WB (full bore tool) f/ 2219m t/ 1206m @ 1 1/2 min/std.
2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH WBRRT (full bore tool) f/ 1206m t/ 203m @ 1.5 min/std.
(Drift recoverd). 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A Change ps 30s to manuals. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/203m t/surface laying out
WBRRT & p/joints. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Rig up for casing 4.00 N/A 4.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold further TBT 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/ up 9 7/8 casing shoe, RIH 3 jnts m/ up to float. ( baker lock
first 6 jnts) - Slick casing 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Slick casing ,lifting nubbins used on each joint Run 9 7/8 slick casing f/56m t/
179m. 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Held TBT, con't RIH w/ 9 7/8"
casing f/ 179m t/ 1436m. 12.00 N/A 12.00 N/A N/A 0.00 N/A N/A 0.00 N/A Hold TBT, con't RIH w/ 9 7/8"
casing f/ 1436m t/ 1544m. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Change f/9 7/8 casing to 10
3/4inch, m/up x-over. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold further TBT. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH 10 3/4inch casing f/1545m
t/2041m. 8.50 N/A 8.50 N/A N/A 0.00 N/A N/A 0.00 N/A Inexperienced casing crews
Hold TBT, con't run 10 3/4"
casing f/ 2041m t/ 2902m. 11.00 9.50 11.00 1.50 N/A 0.00 N/A N/A 0.00 N/A Inexperienced casing crews
Hold TBT, rig down casing
elevators and fill up tool. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Hold TBT r/down Frank,s casing
equip, r/up to run on 6 5/8 d/p. 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
R/down Frank,s slips install
manuals. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
B/out casing running tool m/up
plugs & m/up hanger. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run casing on 6 5/8 d/p f/2915m t2955m. Filling pipe every 5stds.Observed back flow, m/up t/drive pump @ 650gpm 700psi, close auto fill shoe.
0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run casing on 6 5/8 d/p f/2955m
t????m. Filling pipe every 5stds. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run casing on 6 5/8 d/p f/2955m
t/5080m. Filling pipe every 5stds. 7.50 N/A 7.50 N/A N/A 0.00 N/A N/A 0.00 N/A
L/O slg & P/U cmt std.Q4320.5 Make up mill and flush assy w
t/master 0.50 2.00 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A M/U cmt hose, install cmt head
control lines and circ staging pumps to 500gpm 1350psi. Whilst holding 10k O/P.
M/u 3 stands 6 1/2 dc w/standbuild. 2.50 4.00 N/A 2.50 N/A N/A 0.00 N/A N/A 4.00 N/A
Cmter flush line and perform line
test. S/Build Brk off cmt head. 0.50 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.50 N/A
Cmter mix and pump 152bbls of
cmt. T/master Brk down cmt head. 1.50 2.00 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Schlum drop ball and release dart. Cmter disp dart w/ 240bbl
shearing plug at 2700psi. S/build make up top sgl std 1 of 40ppf 0.50 1.00 N/A 0.50 N/A N/A 0.00 N/A N/A 1.00 N/A Con't to disp w/ rig pumps @
750gpm 1600psi. Bump plug w/ 5010stks. Pressured up to 2500psi for 5min. Bled off with no flow back.
1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Run 9 7/8 csg and 10 3/4 csg
SBD TM SBD TM
Comments
WELL CENTRE 1 WELL CENTRE 2 Standbuilding Torquemaster Target
(hrs) Actual (hrs) Variance Target
(hrs) Actual (hrs) Variance Target (hrs) Actual (hrs) Variance
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Contractural KPIs WC2 ONLINE NPT WOW Drilling Depth (ft) Operator
Offline m/up Offline m/up
Contractor
WC1
Online (i.e. Reason for not achieving KPI, NPT details)
Contractural KPIs ONLINE
Contractural KPIs OFFLINE (Well Centres) Standbuilding
3rd Party NPT Date ACTUAL TIME, finish WC2 WC1 Operator Offline (DAT)
CLIENT TARGET Online Offline (DAT) Offline m/up Offline m/up Offline (DAT)
Contractor
Online
Description
Online Offline (DAT) 3rd Party WOW
Move in / Rig Up
Rig down cmt hose and cmt head controls. Release 10 3/4" R/T as per r r instuctions.
0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Rack cmt std. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/U slg and pump 50bbl 13.5ppg
slug. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Install PS30's. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH w/ 10 3/4" R/T (full bore
tool) f/ 2180m t/ 195m., 3.00 3.05 3.00 -0.05 N/A 0.00 N/A N/A 0.00 N/A
Change to ps 30s to manuals. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/195 t/surface, l/out
running tool. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up mill & flush assy & m/up, RIH
f/6m t/205m. T/ Master - M/ up seal assy r/ tool. 0.50 2.00 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Install ps 30s. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/205m t/2170m @ 1.5mins
per std (full bore tool). 3.00 3.05 3.00 -0.05 N/A 0.00 N/A N/A 0.00 N/A
L/out single, m/up t/drive land/out @ w/head with 10k down, 5rpm,200gpm,700psi.Wash casing hanger.Whilst boosting riser @ 900gpm.
2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pump 50bbl slug. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/2170m t/1979m. S/ Build - B/ down 2 stds 8"dc. 0.50 2.00 N/A 0.50 N/A N/A 0.00 N/A N/A 2.00 N/A
Pump a further 25bbl slug. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/1979m t/205m.@ 1.5mins
per std (full bore tool). 3.00 2.72 3.00 0.28 N/A 0.00 N/A N/A 0.00 N/A No boost
Change ps 30s to manuals. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't POOH w/ mill & flush assy f/ 205m. Lay out same. Whilst boosting riser w/ 500gpm 650psi.
1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, P/U & RIH w/ 10 3/4"
seal assy t/ 64m. T / master brk down mill and flush assembly. 0.50 1.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ seal assy on 6 5/8" dp f/ 64m t/ 262m @ 2 min/std. Whilst
boosting riser w/ 500gpm 650psi. S/build L/O 1 std 8" DC. 0.50 1.00 N/A 0.50 N/A N/A 0.00 N/A N/A 1.00 N/A Install PS30's. S/build L/O 1 std 8" DC. 0.50 1.00 N/A 0.50 N/A N/A 0.00 N/A N/A 1.00 N/A
Con't RIH w/ seal assy on 6 5/8" dp f/ 262m t/ 2163m @ 2 min/std. Whilst boosting riser w/ 500gpm 650psi.
S/ build P/U 5" HWDP 2 X std's 4.50 1.00 N/A 4.50 N/A N/A 0.00 N/A N/A 1.00 N/A
Remove PS30's, M/U TD RIH and jet W/H @ 2191.6m w/ 120gpm
200psi for 5 min. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A Set and test 10 3/4" seal assy as
r r instructions (test pressure 7k).
2.00 N/A 2.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test BOP f/ DCP, yellow
pod sem A. 2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Pressure test BOP f/ DCP, yellow
pod sem A. 3.00 N/A 3.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Slack off to neutral wt= 350k, release running tool, pump 75bbl
slug, (whilst installing ps 30s). 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A POOH f/2170m t/252m, (full bore
tool). Whilst boosting riser to reduce mud wt to 10ppg, @ 500gpm 700psi.
3.50 2.95 3.50 0.55 N/A 0.00 N/A N/A 0.00 N/A
Remove ps 30s. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
POOH f/252m t/surface, l/out seal
assy running tool. T/ Master - M/ up 8.5" BHA. 1.00 2.50 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up t/drive pressure test
assy.Flush lines. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/test surface equip. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
R/down pressure test assy. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/up WBRRT assy & m/up. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ W/B t/ 254m @ 2min/std. Whilst boosting riser w/ 500gpm 600psi reducing mud wt t/ 10ppg.
0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Install PS30's. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH w/ W/B f/ 254m t/ 2141m @ 2min/std. Whilst boosting riser w/ 500gpm 600psi reducing mud wt t/ 10ppg.
3.00 2.90 3.00 0.10 N/A 0.00 N/A N/A 0.00 N/A No boost
L/O slg, M/U TD RIH and jet W/H w/350gpm 500psi for 5 min. Set
W/B as per t instructions 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A P/test LPR f/ DCP yellow pod
sem A (250/7000psi). Function
test bop f/ TCP bule pod sem A. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A Release R/T as per t
instructions. Pump 50bbl slug. 1.00 N/A 1.00 N/A N/A 0.00 N/A N/A 0.00 N/A POOH w/ R/T f/ 2180m t/ 204m.
Whilst disp C&K lines to 10ppg. 2.50 3.04 2.50 -0.54 N/A 0.00 N/A N/A 0.00 N/A
Remove PS30's & POOH w/ R/T
t/ 54m. Make up 8.5" 0.50 1.00 N/A 0.50 N/A N/A 1.00 N/A N/A 0.00 N/A
Con't POOH w/ R/T f/ 54m and
L/O same. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
P/test casing against blind shear
rams 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
655.92 ######2.00 0.00 16.50 0.00 27.5087.00 321.002.50 0.00 N/A 0.00 N/A N/A 0.00 N/A N/A 0.00 N/A
Hold TBT, RIH BHA f/surface
t/70m. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
M/up t/drive perform MWD
shallow test 300gpm, 250psi. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH, BHA f/70m t/277m. Wt below
jars=38k.Wt of BHA=55k. 1.50 N/A 1.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Install ps 30s. 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
RIH f/277 to 2961m filling pipe 4.00 4.13 4.00 -0.13 N/A 0.00 N/A N/A 0.00 N/A
Change handling equip to 5.5". 0.50 N/A 0.50 N/A N/A 0.00 N/A N/A 0.00 N/A
Con't RIH 5.5" dp f/ 2961m, bit stood up @ 3567m (casing X/O).
Pulled free with 120k O/P. Attempt to pass thru with 20rpm
100gpm, no go. POOH.
2.50 N/A 2.50 N/A N/A 0.00 N/A N/A 0.00 N/A