• No results found

The interaction of protein disulfide isomerase with a substrate protein at different stages along its folding pathway

N/A
N/A
Protected

Academic year: 2020

Share "The interaction of protein disulfide isomerase with a substrate protein at different stages along its folding pathway"

Copied!
315
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.1: Schematic representation of a protein folding funnel energy landscape,modified from (Bartlett and Radford 2009)
Figure 1.2: Schematic of protein folding and degradation pathways in the endoplasmicreticulum (Ma and Hendershot 2004)
Figure 1.4: Schematics of the thiol-disulfide exchange reactions catalysed by PDI,modified from (Hatahet and Ruddock 2009)
Figure 1.5: The thioredoxin fold in the protein thioredoxin. A) structure of the thioredoxinfold, illustrating its βαβαββα configuration, modified from (Gruber, Cemazar et al
+7

References

Related documents

• Follow up with your employer each reporting period to ensure your hours are reported on a regular basis?. • Discuss your progress with

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

In summary, we have presented an infant with jaundice complicating plorie stenosis. The jaundice reflected a marked increase in indirect- reacting bilirubin in the serum. However,

19% serve a county. Fourteen per cent of the centers provide service for adjoining states in addition to the states in which they are located; usually these adjoining states have

Field experiments were conducted at Ebonyi State University Research Farm during 2009 and 2010 farming seasons to evaluate the effect of intercropping maize with

On the Saudi Gulf coast the major environmental effects of coastal and marine use.. are concentrated in and around, Jubayl and

This group structure provides all students in the group (i.e., not just the student assigned as the project manager) the opportunity to practice leadership skills and to

Therefore, many efforts have been devoted to solve most optimal Job Shop Scheduling Problems (JSSP), as most of the researches aimed at minimizing the maximum completion time. JSSP