• No results found

OEC 9900 Service Manual

N/A
N/A
Protected

Academic year: 2021

Share "OEC 9900 Service Manual"

Copied!
140
0
0

Loading.... (view fulltext now)

Full text

(1)GE Healthcare. OEC® 9900 Elite Service Manual Supplement. 5198697-100 Rev 6 © 2007 GE OEC Medical Systems, Inc All Rights Reserved Made in the USA.

(2) GE OEC 9900 Elite Service Manual Supplement. Revision History Rev # 5 6. Effective Date Nov 2007 Nov 2007. DCN # 02417 02635. Description of Change Manufacturing Release Manufacturing Release. Author T Pyle T. Pyle. This manual may not be reproduced, in whole or in part, without the written permission of GE OEC Medical Systems, Inc. OEC is a registered trademark of GE OEC Medical Systems, Inc. Other product and company names mentioned herein are the property of their respective owners. The contents of this document are accurate at the time of publication. However, changes in design and additional features can, at any time, be incorporated in the hardware and software and may not be reflected in this version of the document. Contact GE OEC Technical Support for clarification, if discrepancies arise. The OEC 9900 Elite is manufactured under the following U.S. Patents: 5283808, 5426683, 5503416, 5506882, 5583909, 5596228, 5619261, 5661775, 5802719, 6142667, 6175614, 6310982, 6330299, 6574307. GE OEC Medical Systems, Inc. a General Electric Company, going to market as GE Healthcare. GE OEC Medical Systems, Inc. 384 Wright Brothers Drive Salt Lake City, Utah 84116 U.S.A. (801) 328-9300. ii.

(3) GE OEC 9900 Elite Service Manual Supplement. 警告 (ZH-CN). • 本维修手册仅提供英文版本。 • 如果维修服务提供商需要非英文版本,客户需自行提供翻译服务。 • 未详细阅读和完全理解本维修手册之前,不得进行维修。 • 忽略本警告可能对维修人员,操作员或患者造成触电、机械伤害或其他 形式的伤害。. VÝSTRAHA (CS). • TENTO PROVOZNÍ NÁVOD EXISTUJE POUZE V ANGLICKÉM JAZYCE. • V PŘÍPADĚ, ŽE EXTERNÍ SLUŽBA ZÁKAZNÍKŮM POTŘEBUJE NÁVOD V JINÉM JAZYCE, JE ZAJIŠTĚNÍ PŘEKLADU DO ODPOVÍDAJÍCÍHO JAZYKA ÚKOLEM ZÁKAZNÍKA. • NESNAŽTE SE O ÚDRŽBU TOHOTO ZAŘÍZENÍ, ANIŽ BYSTE SI PŘEČETLI TENTO PROVOZNÍ NÁVOD A POCHOPILI JEHO OBSAH. • V PŘÍPADĚ NEDODRŽOVÁNÍ TÉTO VÝSTRAHY MŮŽE DOJÍT K PORANĚNÍ PRACOVNÍKA PRODEJNÍHO SERVISU, OBSLUŽNÉHO PERSONÁLU NEBO PACIENTŮ VLIVEM ELEKTRICKÉHOP PROUDU, RESPEKTIVE VLIVEM MECHANICKÝCH ČI JINÝCH RIZIK.. ADVARSEL (DA). • DENNE SERVICEMANUAL FINDES KUN PÅ ENGELSK. • HVIS EN KUNDES TEKNIKER HAR BRUG FOR ET ANDET SPROG END ENGELSK, ER DET KUNDENS ANSVAR AT SØRGE FOR OVERSÆTTELSE. • FORSØG IKKE AT SERVICERE UDSTYRET MEDMINDRE DENNE SERVICEMANUAL HAR VÆRET KONSULTERET OG ER FORSTÅET. • MANGLENDE OVERHOLDELSE AF DENNE ADVARSEL KAN MEDFØRE SKADE PÅ GRUND AF ELEKTRISK, MEKANISK ELLER ANDEN FARE FOR TEKNIKEREN, OPERATØREN ELLER PATIENTEN.. iii.

(4) GE OEC 9900 Elite Service Manual Supplement. WAARSCHUWING (NL). • DEZE ONDERHOUDSHANDLEIDING IS ENKEL IN HET ENGELS VERKRIJGBAAR. • ALS HET ONDERHOUDSPERSONEEL EEN ANDERE TAAL VEREIST, DAN IS DE KLANT VERANTWOORDELIJK VOOR DE VERTALING ERVAN. • PROBEER DE APPARATUUR NIET TE ONDERHOUDEN VOORDAT DEZE ONDERHOUDSHANDLEIDING WERD GERAADPLEEGD EN BEGREPEN IS. • INDIEN DEZE WAARSCHUWING NIET WORDT OPGEVOLGD, ZOU HET ONDERHOUDSPERSONEEL, DE OPERATOR OF EEN PATIËNT GEWOND KUNNEN RAKEN ALS GEVOLG VAN EEN ELEKTRISCHE SCHOK, MECHANISCHE OF ANDERE GEVAREN.. WARNING (EN). • THIS SERVICE MANUAL IS AVAILABLE IN ENGLISH ONLY. • IF A CUSTOMER'S SERVICE PROVIDER REQUIRES A LANGUAGE OTHER THAN ENGLISH, IT IS THE CUSTOMER'S RESPONSIBILITY TO PROVIDE TRANSLATION SERVICES. • DO NOT ATTEMPT TO SERVICE THE EQUIPMENT UNLESS THIS SERVICE MANUAL HAS BEEN CONSULTED AND IS UNDERSTOOD. • FAILURE TO HEED THIS WARNING MAY RESULT IN INJURY TO THE SERVICE PROVIDER, OPERATOR, OR PATIENT FROM ELECTRIC SHOCK, OR FROM MECHANICAL OR OTHER HAZARDS.. HOIATUS (ET). • KÄESOLEV TEENINDUSJUHEND ON SAADAVAL AINULT INGLISE KEELES. • KUI KLIENDITEENINDUSE OSUTAJA NÕUAB JUHENDIT INGLISE KEELEST ERINEVAS KEELES, VASTUTAB KLIENT TÕLKETEENUSE OSUTAMISE EEST. • ÄRGE ÜRITAGE SEADMEID TEENINDADA ENNE EELNEVALT KÄESOLEVA TEENINDUSJUHENDIGA TUTVUMIST JA SELLEST ARU SAAMIST. • KÄESOLEVA HOIATUSE EIRAMINE VÕIB PÕHJUSTADA TEENUSEOSUTAJA, OPERAATORI VÕI PATSIENDI VIGASTAMIST ELEKTRILÖÖGI, MEHAANILISE VÕI MUU OHU TAGAJÄRJEL.. VAROITUS (FI). • TÄMÄ HUOLTO-OHJE ON SAATAVILLA VAIN ENGLANNIKSI. • JOS ASIAKKAAN HUOLTOHENKILÖSTÖ VAATII MUUTA KUIN ENGLANNINKIELISTÄ MATERIAALIA, TARVITTAVAN KÄÄNNÖKSEN HANKKIMINEN ON ASIAKKAAN VASTUULLA. • ÄLÄ YRITÄ KORJATA LAITTEISTOA ENNEN KUIN OLET VARMASTI LUKENUT JA YMMÄRTÄNYT TÄMÄN HUOLTO-OHJEEN. • MIKÄLI TÄTÄ VAROITUSTA EI NOUDATETA, SEURAUKSENA VOI OLLA HUOLTOHENKILÖSTÖN, LAITTEISTON KÄYTTÄJÄN TAI POTILAAN VAHINGOITTUMINEN SÄHKÖISKUN, MEKAANISEN VIAN TAI MUUN VAARATILANTEEN VUOKSI.. iv.

(5) GE OEC 9900 Elite Service Manual Supplement. ATTENTION (FR). • CE MANUEL DE MAINTENANCE N’EST DISPONIBLE QU’EN ANGLAIS. • SI LE TECHNICIEN DU CLIENT A BESOIN DE CE MANUEL DANS UNE AUTRE LANGUE QUE L’ANGLAIS, C’EST AU CLIENT QU’IL INCOMBE DE LE FAIRE TRADUIRE. • NE PAS TENTER D’INTERVENTION SUR LES ÉQUIPEMENTS TANT QUE LE MANUEL SERVICE N’A PAS ÉTÉ CONSULTÉ ET COMPRIS. • LE NON-RESPECT DE CET AVERTISSEMENT PEUT ENTRAÍNER CHEZ LE TECHNICIEN, L’OPÉRATEUR, OU LE PATIENT DES BLESSURES DUES À DES DANGERS ÉLECTRIQUES, MÉCANIQUES OU AUTRES.. WARNUNG (DE). • DIESE SERVICEANLEITUNG EXISTIERT NUR IN ENGLISCHER SPRACHE. • FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT, IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG ZU SORGEN. • VERSUCHEN SIE NICHT DIESE ANLAGE ZU WARTEN, OHNE DIESE SERVICEANLEITUNG GELESEN UND VERSTANDEN ZU HABEN. • WIRD DIESE WARNUNG NICHT BEACHTET, SO KANN ES ZU VERLETZUNGEN DES KUNDENDIENSTTECHNIKERS, DES BEDIENERS ODER DES PATIENTEN DURCH STROMSCHLÄGE, MECHANISCHE ODER SONSTIGE GEFAHREN KOMMEN.. ΠΡΟΕΙΔΟΠΟΙΗΣΗ (EL). • ΤΟ ΠΑΡΟΝ ΕΓΧΕΙΡΙΔΙΟ ΣΕΡΒΙΣ ΔΙΑΤΙΘΕΤΑΙ ΣΤΑ ΑΓΓΛΙΚΑ ΜΟΝΟ. • ΕΑΝ ΤΟ ΑΤΟΜΟ ΠΑΡΟΧΗΣ ΣΕΡΒΙΣ ΕΝΟΣ ΠΕΛΑΤΗ ΑΠΑΙΤΕΙ ΤΟ ΠΑΡΟΝ ΕΓΧΕΙΡΙΔΙΟ ΣΕ ΓΛΩΣΣΑ ΕΚΤΟΣ ΤΩΝ ΑΓΓΛΙΚΩΝ, ΑΠΟΤΕΛΕΙ ΕΥΘΥΝΗ ΤΟΥ ΠΕΛΑΤΗ ΝΑ ΠΑΡΕΧΕΙ ΥΠΗΡΕΣΙΕΣ ΜΕΤΑΦΡΑΣΗΣ. • ΜΗΝ ΕΠΙΧΕΙΡΗΣΕΤΕ ΤΗΝ ΕΚΤΕΛΕΣΗ ΕΡΓΑΣΙΩΝ ΣΕΡΒΙΣ ΣΤΟΝ ΕΞΟΠΛΙΣΜΟ ΕΚΤΟΣ ΕΑΝ ΕΧΕΤΕ ΣΥΜΒΟΥΛΕΥΤΕΙ ΚΑΙ ΕΧΕΤΕ ΚΑΤΑΝΟΗΣΕΙ ΤΟ ΠΑΡΟΝ ΕΓΧΕΙΡΙΔΙΟ ΣΕΡΒΙΣ. • ΕΑΝ ΔΕ ΛΑΒΕΤΕ ΥΠΟΨΗ ΤΗΝ ΠΡΟΕΙΔΟΠΟΙΗΣΗ ΑΥΤΗ, ΕΝΔΕΧΕΤΑΙ ΝΑ ΠΡΟΚΛΗΘΕΙ ΤΡΑΥΜΑΤΙΣΜΟΣ ΣΤΟ ΑΤΟΜΟ ΠΑΡΟΧΗΣ ΣΕΡΒΙΣ, ΣΤΟ ΧΕΙΡΙΣΤΗ Ή ΣΤΟΝ ΑΣΘΕΝΗ ΑΠΟ ΗΛΕΚΤΡΟΠΛΗΞΙΑ, ΜΗΧΑΝΙΚΟΥΣ Ή ΑΛΛΟΥΣ ΚΙΝΔΥΝΟΥΣ.. FIGYELMEZTETÉS (HU). • EZEN KARBANTARTÁSI KÉZIKÖNYV KIZÁRÓLAG ANGOL NYELVEN ÉRHETŐ EL. • HA A VEVŐ SZOLGÁLTATÓJA ANGOLTÓL ELTÉRŐ NYELVRE TART IGÉNYT, AKKOR A VEVŐ FELELŐSSÉGE A FORDÍTÁS ELKÉSZÍTTETÉSE. • NE PRÓBÁLJA ELKEZDENI HASZNÁLNI A BERENDEZÉST, AMÍG A KARBANTARTÁSI KÉZIKÖNYVBEN LEÍRTAKAT NEM ÉRTELMEZTÉK. • EZEN FIGYELMEZTETÉS FIGYELMEN KÍVÜL HAGYÁSA A SZOLGÁLTATÓ, MŰKÖDTETŐ VAGY A BETEG ÁRAMÜTÉS, MECHANIKAI VAGY EGYÉB VESZÉLYHELYZET MIATTI SÉRÜLÉSÉT EREDMÉNYEZHETI.. v.

(6) GE OEC 9900 Elite Service Manual Supplement. AÐVÖRUN (IS). • ÞESSI ÞJÓNUSTUHANDBÓK ER EINGÖNGU FÁANLEG Á ENSKU. • EF AÐ ÞJÓNUSTUVEITANDI VIÐSKIPTAMANNS ÞARFNAST ANNAS TUNGUMÁLS EN ENSKU, ER ÞAÐ SKYLDA VIÐSKIPTAMANNS AÐ SKAFFA TUNGUMÁLAÞJÓNUSTU. • REYNIÐ EKKI AÐ AFGREIÐA TÆKIÐ NEMA AÐ ÞESSI ÞJÓNUSTUHANDBÓK HEFUR VERIÐ SKOÐUÐ OG SKILIN. • BROT Á SINNA ÞESSARI AÐVÖRUN GETUR LEITT TIL MEIÐSLA Á ÞJÓNUSTUVEITANDA, STJÓRNANDA EÐA SJÚKLINGS FRÁ RAFLOSTI, VÉLRÆNU EÐA ÖÐRUM ÁHÆTTUM.. AVVERTENZA (IT). • IL PRESENTE MANUALE DI MANUTENZIONE É DISPONIBILE SOLTANTO IN INGLESE. • SE UN ADDETTO ALL MANUTENZIONE ESTERNO ALLA GEMS CHIEDE IL MANUALE IN UNA LINGUA DIVERSA, IL CLIENTE É TENUTO A PROVVEDERE DIRETTAMENTE ALLA TRADUZIONE. • SI PROCEDA ALL MANUTENZIONE DELL’APPARECCHIATURA SOLO DOPO AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL CONTENUTO. • NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE CAUSARE LESIONI ALL’ADDETTO ALLA MANUTENZIONE, ALL’UTILIZZATORE ED ALL'ASSISTITO PER FOLGORAZIONE ELETTRICA, PER URTI MECCANICI OD ALTRI RISCHI. • このサービスマニュアルには英語版しかありません。. (JA). • サービスを担当される業者が英語以外の言語を要求される場合、 翻訳作業はその業者の責任で行うものとさせていただきます。 • このサービスマニュアルを熟読し理解せずに、装置のサービスを行 わないでください。 • この警告に従わない場合、サービスを担当される方、 操作員あるいは患者さんが、感電や機械的又はその他の危険により負 傷する可能性があります。. 경고 (KO). • 본 서비스 지침서는 영어로만 이용하실 수 있습니다. • 고객의 서비스 제공자가 영어 이외의 언어를 요구할 경우, 번역 서비스를 제공하는 것은 고객의 책임입니다. • 본 서비스 지침서를 참고했고 이해하지 않는 한은 해당 장비를 수리하려고 시도하지 마십시오. • 이 경고에 유의하지 않으면 전기 쇼크, 기계상의 혹은 다른 위험으로부터 서비스 제공자, 운영자 혹은 환자에게 위해를 가할 수 있습니다.. vi.

(7) GE OEC 9900 Elite Service Manual Supplement. BRĪDINĀJUMS (LV). • ŠĪ APKALPES ROKASGRĀMATA IR PIEEJAMA TIKAI ANGĻU VALODĀ. • JA KLIENTA APKALPES SNIEDZĒJAM NEPIECIEŠAMA INFORMĀCIJA CITĀ VALODĀ, NEVIS ANGĻU, KLIENTA PIENĀKUMS IR NODROŠINĀT TULKOŠANU. • NEVEICIET APRĪKOJUMA APKALPI BEZ APKALPES ROKASGRĀMATAS IZLASĪŠANAS UN SAPRAŠANAS. • ŠĪ BRĪDINĀJUMA NEIEVĒROŠANA VAR RADĪT ELEKTRISKĀS STRĀVAS TRIECIENA, MEHĀNISKU VAI CITU RISKU IZRAISĪTU TRAUMU APKALPES SNIEDZĒJAM, OPERATORAM VAI PACIENTAM.. ĮSPĖJIMAS (LT). • ŠIS EKSPLOATAVIMO VADOVAS YRA PRIEINAMAS TIK ANGLŲ KALBA. • JEI KLIENTO PASLAUGŲ TIEKĖJAS REIKALAUJA VADOVO KITA KALBA – NE ANGLŲ, NUMATYTI VERTIMO PASLAUGAS YRA KLIENTO ATSAKOMYBĖ. • NEMĖGINKITE ATLIKTI ĮRANGOS TECHNINĖS PRIEŽIŪROS, NEBENT ATSIŽVELGĖTE Į ŠĮ EKSPLOATAVIMO VADOVĄ IR JĮ SUPRATOTE. • JEI NEATKREIPSITE DĖMESIO Į ŠĮ PERSPĖJIMĄ, GALIMI SUŽALOJIMAI DĖL ELEKTROS ŠOKO, • MECHANINIŲ AR KITŲ PAVOJŲ PASLAUGŲ TIEKĖJUI, OPERATORIUI AR PACIENTUI.. ADVARSEL (NO). • DENNE SERVICEHÅNDBOKEN FINNES BARE PÅ ENGELSK. • HVIS KUNDENS SERVICELEVERANDØR TRENGER ET ANNET SPRÅK, ER DET KUNDENS ANSVAR Å SØRGE FOR OVERSETTELSE. • IKKE FORSØK Å REPARERE UTSTYRET UTEN AT DENNE SERVICEHÅNDBOKEN ER LEST OG FORSTÅTT. • MANGLENDE HENSYN TIL DENNE ADVARSELEN KAN FØRE TIL AT SERVICELEVERANDØREN, OPERATØREN ELLER PASIENTEN SKADES PÅ GRUNN AV ELEKTRISK STØT, MEKANISKE ELLER ANDRE FARER.. OSTRZEŻENIE (PL). • NINIEJSZY PODRĘCZNIK SERWISOWY DOSTĘPNY JEST JEDYNIE W JĘZYKU ANGIELSKIM. • JEŚLI DOSTAWCA USŁUG KLIENTA WYMAGA JĘZYKA INNEGO NIŻ ANGIELSKI, ZAPEWNIENIE USŁUGI TŁUMACZENIA JEST OBOWIĄZKIEM KLIENTA. • NIE PRÓBOWAĆ SERWISOWAĆ WYPOSAŻENIA BEZ ZAPOZNANIA SIĘ I ZROZUMIENIA NINIEJSZEGO PODRĘCZNIKA SERWISOWEGO. • NIEZASTOSOWANIE SIĘ DO TEGO OSTRZEŻENIA MOŻE SPOWODOWAĆ URAZY DOSTAWCY USŁUG, OPERATORA LUB PACJENTA W WYNIKU PORAŻENIA ELEKTRYCZNEGO, ZAGROŻENIA MECHANICZNEGO BĄDŹ INNEGO.. vii.

(8) GE OEC 9900 Elite Service Manual Supplement. ATENÇÃO (PT). • ESTE MANUAL DE ASSISTÊNCIA TÉCNICA SÓ SE ENCONTRA DISPONÍVEL EM INGLÊS. • SE QUALQUER OUTRO SERVIÇO DE ASSISTÊNCIA TÉCNICA QUE NÃO SEJA A GEMS SOLICITAR ESTES MANUALS NOUTRO IDIOMA, É DA RESPONSABILIDADE DO CLIENTE FORNECER OS SERVIÇOS DE TRADUÇÃO. • NÃO TENTE REPARAR O EQUIPAMENTO SEM TER CONSULTADO E COMPREENDIDO ESTE MANUAL DE ASSISTÊNCIA TÉNICA. • O NÃO CUMPRIMENTO DESTE AVISO PODE PÔR EM PERIGO A SEGURANÇA DO TÉCNICO, DO OPERADOR OU DO PACIENTE DEVIDO A CHOQUES ELÉCTRICOS, MECÂNICOS OU OUTROS.. ATENŢIE (RO). • ACEST MANUAL DE SERVICE ESTE DISPONIBIL NUMAI ÎN LIMBA ENGLEZĂ. • DACĂ UN FURNIZOR DE SERVICII PENTRU CLIENŢI NECESITĂ O ALTĂ LIMBĂ DECÂT CEA ENGLEZĂ, ESTE DE DATORIA CLIENTULUI SĂ FURNIZEZE O TRADUCERE. • NU ÎNCERCAŢI SĂ REPARAŢI ECHIPAMENTUL DECÂT ULTERIOR CONSULTĂRII ŞI ÎNŢELEGERII ACESTUI MANUAL DE SERVICE. • IGNORAREA ACESTUI AVERTISMENT AR PUTEA DUCE LA RĂNIREA DEPANATORULUI, OPERATORULUI SAU PACIENTULUI ÎN URMA PERICOLELOR DE ELECTROCUTARE, MECANICE SAU DE ALTĂ NATURĂ.. ОСТОРОЖНО! (RU). • ДАННОЕ РУКОВОДСТВО ПО ОБСЛУЖИВАНИЮ ПРЕДЛАГАЕТСЯ ТОЛЬКО НА АНГЛИЙСКОМ ЯЗЫКЕ. • ЕСЛИ СЕРВИСНОМУ ПЕРСОНАЛУ КЛИЕНТА НЕОБХОДИМО РУКОВОДСТВО НЕ НА АНГЛИЙСКОМ, А НА КАКОМ-ТО ДРУГОМ ЯЗЫКЕ, КЛИЕНТУ СЛЕДУЕТ САМОСТОЯТЕЛЬНО ОБЕСПЕЧИТЬ ПЕРЕВОД. • ПЕРЕД ОБСЛУЖИВАНИЕМ ОБОРУДОВАНИЯ ОБЯЗАТЕЛЬНО ОБРАТИТЕСЬ К ДАННОМУ РУКОВОДСТВУ И ПОЙМИТЕ ИЗЛОЖЕННЫЕ В НЕМ СВЕДЕНИЯ. • НЕСОБЛЮДЕНИЕ ТРЕБОВАНИЙ ДАННОГО ПРЕДУПРЕЖДЕНИЯ МОЖЕТ ПРИВЕСТИ К ТОМУ, ЧТО СПЕЦИАЛИСТ ПО ОБСЛУЖИВАНИЮ, ОПЕРАТОР ИЛИ ПАЦИЕНТ ПОЛУЧАТ УДАР ЭЛЕКТРИЧЕСКИМ ТОКОМ, МЕХАНИЧЕСКУЮ ТРАВМУ ИЛИ ДРУГОЕ ПОВРЕЖДЕНИЕ.. UPOZORNENIE. • TENTO NÁVOD NA OBSLUHU JE K DISPOZÍCII LEN V ANGLIČTINE.. (SK). • AK ZÁKAZNÍKOV POSKYTOVATEĽ SLUŽIEB VYŽADUJE INÝ JAZYK AKO ANGLIČTINU, POSKYTNUTIE PREKLADATEĽSKÝCH SLUŽIEB JE ZODPOVEDNOSŤOU ZÁKAZNÍKA. • NEPOKÚŠAJTE SA O OBSLUHU ZARIADENIA SKÔR, AKO SI NEPREČÍTATE NÁVOD NA OBLUHU A NEPOROZUMIETE MU. • ZANEDBANIE TOHTO UPOZORNENIA MÔŽE VYÚSTIŤ DO ZRANENIA POSKYTOVATEĽA SLUŽIEB, OBSLUHUJÚCEJ OSOBY ALEBO PACIENTA ELEKTRICKÝM PRÚDOM, DO MECHANICKÉHO ALEBO INÉHO NEBEZPEČENSTVA.. viii.

(9) GE OEC 9900 Elite Service Manual Supplement. ¡ATENCIÓN! (ES). • ESTE MANUAL DE SERVICIO SÓLO EXISTE EN INGLÉS. • SI ALGÚN PROVEEDOR DE SERVICIOS AJENO A GEMS SOLICITA UN IDIOMA QUE NO SEA EL INGLÉS, ES LA RESPONSABILIDAD DEL CLIENTE DE OFRECER EL SERVICIO DE TRADUCCIÓN. • NO SE DEBE DAR SERVICIO TÉCNICO AL EQUIPO SIN HABER CONSULTADO Y COMPRENDIDO ESTE MANUAL DE SERVICIO. • LA NO OBSERVANCIA DEL PRESENTE AVISO PUEDE DAR LUGAR A QUE EL PROVEEDOR DE SERVICIOS, EL OPERADOR O EL PACIENTE SUFRA LESIONES PROVOCADAS POR CAUSAS ELÉCTRICAS, MECÁNICAS O DE OTRA NATURALEZA.. VARNING (SV). • DEN HÄR SERVICEHANDBOKEN FINNS BARA TILLGÄNGLIG PÅ ENGELSKA. • OM EN KUNDS SERVICETEKNIKER HAR BEHOV AV ETT ANNAT SPRÅK ÄN ENGELSKA ANSVARAR KUNDEN FÖR ATT TILLHANDAHÅLLA ÖVERSÄTTNINGSTJÄNSTER. • FÖRSÖK INTE UTFÖRA SERVICE PÅ UTRUSTNINGEN OM DU INTE HAR LÄST OCH FÖRSTÅR DEN HÄR SERVICEHANDBOKEN. • OM DU INTE TAR HÄNSYN TILL DEN HÄR VARNINGEN KAN DET RESULTERA I SKADOR PÅ SERVICETEKNIKERN, OPERATÖREN ELLER PATIENTEN TILL FÖLJD AV ELEKTRISKA STÖTAR, MEKANISKA FAROR ELLER ANDRA FAROR.. DİKKAT. • BU SERVİS KILAVUZUNUN SADECE İNGİLİZCESİ MEVCUTTUR.. (TR). • EĞER MÜŞTERİ TEKNİSYENİ BU KILAVUZU İNGİLİZCE DIŞINDA BİR BAŞKA LİSANDAN TALEP EDERSE, BUNU TERCÜME ETTİRMEK MÜŞTERİYE DÜŞER. • SERVİS KILAVUZUNU OKUYUP ANLAMADAN EKİPMANLARA MÜDAHALE ETMEYİNİZ. • BU UYARIYA UYULMAMASI, ELEKTRİK, MEKANİK VEYA DİĞER TEHLİKELERDEN DOLAYI TEKNİSYEN, OPERATÖR VEYA HASTANIN YARALANMASINA YOL AÇABİLİR.. ix.

(10) GE OEC 9900 Elite Service Manual Update. 9900 Elite Service Manual Update NOTE:. The information in this Service Manual Update supersedes any information in the OEC 9900 Elite Service Manual.. Safety ............................................................................................................................................................................................5 Energized Electrical Work Procedure ............................................................................................................................................................5 Definitions .........................................................................................................................................................................................................5 Purpose...............................................................................................................................................................................................................5 Training Requirements................................................................................................................................................................................5 Special Precautions ......................................................................................................................................................................................6 Emergency Procedures: In case of an accident..............................................................................................................................6 Application of Energized Work Procedure: ........................................................................................................................................6 Electrical Hazards and Hazard Classes:..............................................................................................................................................6 Voltage 0v – 50v.............................................................................................................................................................................................7 Voltage 50v – 120v........................................................................................................................................................................................7 Voltage 120v – 240v.....................................................................................................................................................................................8 Voltage 240v – 480v.....................................................................................................................................................................................8 Lock-Out, Tag-Out ..................................................................................................................................................................................................9 Specific Sources of Energy ........................................................................................................................................................................9 Energy Control Procedures .......................................................................................................................................................................9 Testing and Positioning During Service............................................................................................................................................12 Restore Power After Service ..................................................................................................................................................................13 Subsystem..................................................................................................................................................................................15 Workstation Block Diagram with UPS........................................................................................................................................................15 Power Distribution and Control.............................................................................................................................................16 Intelligent Shutdown Power Control PCB (ISD-PC2 PCB) ...................................................................................................................16 Uninterruptible Power Supply ........................................................................................................................................................................17 Front-Panel Controls and Indicators .................................................................................................................................................18 Rear-Panel Devices....................................................................................................................................................................................19 UPS Functional Tests..........................................................................................................................................................................................23 Uninterruptible Power Supply Self-Test............................................................................................................................................23 Uninterruptible Power Supply Battery Test ....................................................................................................................................23 UPS Troubleshooting..........................................................................................................................................................................................25 Adjustment and Calibration ...................................................................................................................................................27 Stability Pot (R83) Overshoot Adjustment.................................................................................................................................................27 Adjustment and Calibration...................................................................................................................................................................27 Camera Iris..............................................................................................................................................................................................................29 Iris Stop Verification...................................................................................................................................................................................29 Iris Stop Calibration....................................................................................................................................................................................30 Direct Connect Procedure ...............................................................................................................................................................................32 Brightness and Contrast Defaults Adjustments for Customizing Profiles.................................................................................36 Calibrate Touch Screen.....................................................................................................................................................................................38 Diagnostics ................................................................................................................................................................................39 Workstation Messages......................................................................................................................................................................................39 Right Monitor Messages ..........................................................................................................................................................................39 Left Monitor Messages .............................................................................................................................................................................51 C-Arm Messages ..................................................................................................................................................................................................53 Replacement..............................................................................................................................................................................60 Torque Specifications.........................................................................................................................................................................................60 FRU Replacement Test and Calibration Table........................................................................................................................................61 System Software ..................................................................................................................................................................................................69. 1.

(11) GE OEC 9900 Elite Service Manual Update Uninterruptible Power Supply Replacement...........................................................................................................................................71 Proper PCB Insertion on C-Arm Backplane..............................................................................................................................................75 Intelligent Shutdown Power Control PCB .................................................................................................................................................76 CCD Camera...........................................................................................................................................................................................................78 Manpower Requirements .......................................................................................................................................................................78 Special Tools..................................................................................................................................................................................................78 Removal of CCD Camera and Cooler ................................................................................................................................................79 Replacement of CCD Camera and Coolerif TEC is Installed....................................................................................................83 Test and Calibration...................................................................................................................................................................................83 Collimator Assembly...........................................................................................................................................................................................84 Manpower Requirements .......................................................................................................................................................................84 Tools and Test Equipment Needed.....................................................................................................................................................84 Removal of the Collimator ......................................................................................................................................................................85 Replacement of the Collimator.............................................................................................................................................................85 Test and Calibration...................................................................................................................................................................................86 Filament Driver PCB ............................................................................................................................................................................................86 Manpower Requirements .......................................................................................................................................................................87 Special Tools..................................................................................................................................................................................................87 Removal of the Filament Driver PCB..................................................................................................................................................87 Replacement of the Filament Driver PCB ........................................................................................................................................87 Test and Calibration...................................................................................................................................................................................88 High Voltage Supply Regulator PCB............................................................................................................................................................88 Manpower Requirements .......................................................................................................................................................................89 Special Tools..................................................................................................................................................................................................89 Removal of High Voltage Supply Regulator PCB..........................................................................................................................89 Replacement of High Voltage Supply Regulator PCB ................................................................................................................89 Test and Calibration...................................................................................................................................................................................90 High Voltage Tank ...............................................................................................................................................................................................90 Manpower Requirements .......................................................................................................................................................................91 Special Tools..................................................................................................................................................................................................91 Removal of High Voltage Tank .............................................................................................................................................................91 Replacement of High Voltage Tank....................................................................................................................................................93 Test and Calibration...................................................................................................................................................................................93 IGBT Snubber PCB................................................................................................................................................................................................93 Manpower Requirements .......................................................................................................................................................................94 Special Tools..................................................................................................................................................................................................94 Removal of the IGBT Snubber PCB .....................................................................................................................................................94 Replacement of the IGBT Snubber PCB............................................................................................................................................95 Test and Calibration...................................................................................................................................................................................95 Image Intensifier ..................................................................................................................................................................................................95 Manpower Requirements .......................................................................................................................................................................95 Special Tools..................................................................................................................................................................................................96 Removal of Image Intensifier, Standard C-Arm............................................................................................................................96 Replacement of Image Intensifier, Standard C-Arm ..................................................................................................................98 Test and Calibration...................................................................................................................................................................................98 Removal of Image Intensifier, Super C-Arm................................................................................................................................ 100 Replacement of Image Intensifier, Super C-Arm ...................................................................................................................... 102 Test and Calibration................................................................................................................................................................................ 102 Image Intensifier Power Supply ................................................................................................................................................................. 103 Manpower Requirements .................................................................................................................................................................... 103 Special Tools............................................................................................................................................................................................... 103 Removal of Image Intensifier Power Supply, Standard C-Arm........................................................................................... 104 Replacement of Image Intensifier Power Supply, Standard C-Arm ................................................................................. 105 Test and Calibration................................................................................................................................................................................ 105 Removal of Image Intensifier Power Supply, Super C-Arm.................................................................................................. 106. 2.

(12) GE OEC 9900 Elite Service Manual Update Replacement of Image Intensifier Power Supply, Super C-Arm ........................................................................................ 107 Test and Calibration ............................................................................................................................................................................... 107 Functional Tests ....................................................................................................................................................................................... 107 C-Arm Power Supply PS1 (+5/+12/±15 VDC)........................................................................................................................................ 108 Manpower Requirements .................................................................................................................................................................... 108 Special Tools............................................................................................................................................................................................... 108 Removal of PS1......................................................................................................................................................................................... 108 Replacement of PS1 ............................................................................................................................................................................... 109 Test and Calibration ............................................................................................................................................................................... 109 C-Arm Power Supply PS2 (Multi-output)................................................................................................................................................. 110 Manpower Requirements .................................................................................................................................................................... 110 Special Tools............................................................................................................................................................................................... 110 Removal of PS2......................................................................................................................................................................................... 110 Replacement of PS2 ............................................................................................................................................................................... 111 Test and Calibration ............................................................................................................................................................................... 111 Generator Interface PCB ............................................................................................................................................................................... 112 Manpower Requirements .................................................................................................................................................................... 112 Special Tools............................................................................................................................................................................................... 112 Removal of Generator Interface PCB ............................................................................................................................................. 113 Replacement of Generator Interface PCB.................................................................................................................................... 113 Test and Calibration ............................................................................................................................................................................... 114 X-ray Tube............................................................................................................................................................................................................ 114 Manpower Requirements .................................................................................................................................................................... 115 Special Tools............................................................................................................................................................................................... 115 Removal and Replacement................................................................................................................................................................. 115 Test and Calibration ............................................................................................................................................................................... 117 GPOS Single Board Computer PCB ........................................................................................................................................................... 117 Manpower Requirements .................................................................................................................................................................... 118 Special Tools............................................................................................................................................................................................... 118 Removal of GPOS Single Board Computer PCB ......................................................................................................................... 119 Replacement of GPOS Single Board Computer PCB ............................................................................................................... 119 Test and Calibration ............................................................................................................................................................................... 120 RTOS Single Board Computer PCB............................................................................................................................................................ 120 Manpower Requirements .................................................................................................................................................................... 121 Special Tools............................................................................................................................................................................................... 121 Removal of RTOS Single Board Computer PCB.......................................................................................................................... 121 Replacement of RTOS Single Board Computer PCB ................................................................................................................ 121 Test and Calibration ............................................................................................................................................................................... 122 Video Control PCB............................................................................................................................................................................................. 122 Manpower Requirements .................................................................................................................................................................... 123 Special Tools............................................................................................................................................................................................... 123 Removal of Video Control PCB........................................................................................................................................................... 123 Replacement of Video Control PCB ................................................................................................................................................. 123 Test and Calibration ............................................................................................................................................................................... 124 Functional Tests..................................................................................................................................................................... 125 mA Test.................................................................................................................................................................................................................. 125 Isolation Transformer Output Check ....................................................................................................................................................... 126 High Voltage Arc Test...................................................................................................................................................................................... 126 Auto Technique Tracking............................................................................................................................................................................... 127 Film Mode Test ................................................................................................................................................................................................... 128 Pre-arm Exposure Function................................................................................................................................................................ 128 0.3 mm Spot Radiographic Range Tests....................................................................................................................................... 128 0.6 mm Spot Radiographic Range Tests....................................................................................................................................... 128 UPS Shutdown Test.......................................................................................................................................................................................... 129. 3.

(13) GE OEC 9900 Elite Service Manual Update Video Processing and Display..............................................................................................................................................130 Monitors................................................................................................................................................................................................................. 130. 4.

(14) Safety. Safety NOTE:. Safety glasses and safety shoes are required when performing any installation, servicing or maintenance of equipment. See the hazard matrix in the following Energized Electrical Work Procedure for specific PPE relative to energized electrical work.. Energized Electrical Work Procedure Note:. All electrical circuits or energized parts shall be de-energized and rendered safe using the appropriate Lockout/Tagout (LOTO) procedure, unless energized system testing, positioning, or adjustment is required. When energized work is required, this procedure must be used – inconvenience is never acceptable.. Definitions NFPA 70E – is a national consensus standard that forms a “Standard for Electrical Safety in the Workplace.” It is also a part of the National Electrical Code, which has been adopted by OSHA as an enforcement standard. Arc-flash – an explosion of electrical energy that can cause burns and other injuries. An arc-flash is essentially a short circuit through the air. Qualified Individual – an authorized employee who has been properly trained and certified (verified) to work on energized equipment. Anyone not meeting these requirements is an un-authorized individual.. Purpose To mitigate the electrical safety hazards (arc-flash) associated with energized system testing, positioning, or adjustment (calibration) of GEHC/OEC equipment - in accordance with the NFPA 70E consensus standard.. Training Requirements It is the obligation of each GE Field Service Engineer to follow this procedure and understand that failing to do so can cause serious injury or death. Only Field Service Engineers who have completed: • LOTO Authorized [LOTOAth] • Electrical Safety Authorized [GE-EHS-280-a] and • Hands-On Demo [CEP-38] … … training will be considered a “Qualified” employee and permitted to work on energized GEHC/OEC equipment. All other non-authorized personnel will be considered “Affected” individuals..

(15) Safety. In addition, “Qualified” Personnel must be trained on the proper use of voltage testing equipment. The training must include: •. How to apply the test instrument to the circuit or energized part. •. How to interpret meter readings. •. How to test to confirm the absence of voltage.. •. The need to test equipment prior to and after use.. Special Precautions Conductive articles of jewelry shall be removed from the hands, wrists, and shirt pockets. Tools and test equipment shall be visually inspected prior to use. Individuals shall be aware of their surroundings and take precautions to prevent accidental contact with the energized electrical circuits. Each “Qualified” person is responsible for ensuring that non-authorized individuals remain outside the “Default Approach Boundary.” When ever possible, protective barriers should be erected around the flash protection boundary as means to protect “Unqualified” personnel from the effects of an arc blast. Insulated tools used within the restricted boundary must be rated for the nominal voltage of the system being worked on. Only ladders possessing non-conductive side rails (e.g. fiber glass) shall be allowed within the “Limited Approach Boundary.”. Emergency Procedures: In case of an accident 1) De-energize the system. 2) Immediately call 911 or summon hospital staff. 3) Check the victim for injuries. 4) Care for victim until help arrives. 5) Report incident to manager and/or EHS staff.. Application of Energized Work Procedure: 1) Plan for energized work. 2) Locate energized work procedures. 3) Notify customer of energized work and associated hazards. 4) Inspect and apply proper PPE for hazard class (see Hazard class section). 5) Determine arc-flash boundaries (see Hazard class section).. Electrical Hazards and Hazard Classes: Hazard: Accidental contact with exposed energized circuits resulting in electrical shock or arc-flash.. 6.

(16) Safety. GEHC/OEC equipment contains one or more of the following voltage ranges: 0v – 50v, 50v – 120v, 120v – 240v, and 240v – 480v. The appropriate section of this energized work procedure will apply based on the voltage range to which the authorized employee may be exposed.. Voltage 0v – 50v Task: System testing, positioning, or adjustment (calibration) with exposed and energized conductors. Minimum Number of Qualified Individuals. 1. Limited Approach Boundary. Not Specified. Restricted Approach Boundary. Not Specified. Prohibited Approach Boundary. Not Specified. Default Flash Protection Boundary. 4 feet. Hazard/Risk Category. None. Required PPE/Equipment: No significant arc-flash risk. Only general safe electrical work practices and standard PPE needs to be used – safety glasses (w/side shields) and safety shoes.. Voltage 50v – 120v Task: System testing, positioning, or adjustment (calibration) with exposed and energized conductors. Minimum Number of Qualified Individuals. 1. Limited Approach Boundary. 3’ 6” (1.07 m). Restricted Approach Boundary. Avoid Contact. Prohibited Approach Boundary. Avoid Contact. Default Flash Protection Boundary Hazard/Risk Category Energized Work Permit Required Pre-job Briefing Required. 4 feet 0 No No - notify affected persons. Required PPE/Equipment: Long sleeve shirt (natural fiber, i.e. cotton), Long Pants (natural fiber, i.e. cotton), Safety glasses (w/ side shields), safety shoes, and voltage rated gloves (1000v) and insulated tools. Possible Tools: Digital multi-meter, Digital scope-meter, insulated screwdriver, and/or insulated “tweeker.”. 7.

(17) Safety. Voltage 120v – 240v Task: System testing, positioning, or adjustment (calibration) with exposed and energized conductors. Minimum Number of Qualified Individuals. 1. Limited Approach Boundary. 3’ 6” (1.07 m). Restricted Approach Boundary. Avoid Contact. Prohibited Approach Boundary. Avoid Contact. Default Flash Protection Boundary Hazard/Risk Category Energized Work Permit Required Pre-job Briefing Required. 4 feet 0 No No -notify affected persons. Required PPE/Equipment: Long sleeve shirt (natural fiber, i.e. cotton), Long Pants (natural fiber, i.e. cotton), Safety glasses (w/ side shields), safety shoes, and voltage rated gloves (1000v) and insulated tools. Possible Tools: Digital multi-meter, Digital scope-meter, insulated screwdriver, and/or insulated “tweeker.”. Voltage 240v – 480v Task: System testing, positioning, or adjustment (calibration) with exposed and energized conductors. Minimum Number of Qualified Individuals Limited Approach Boundary. 2 3’ 6” (1.07 m). Restricted Approach Boundary. 1’ 0” (304.8 mm). Prohibited Approach Boundary. 0’ 1” (25.4 mm). Default Flash Protection Boundary Hazard/Risk Category Energized Work Permit Required Pre-job Briefing Required. 4 feet 1 No Yes*. Required PPE/Equipment: FR Long sleeve shirt, FR Long Pants (or coveralls), Hardhat, Safety glasses (w/ side shields), safety shoes, voltage rated gloves (1000v) and insulated tools. Possible Tools: Digital multi-meter, Digital scope-meter, insulated screwdriver, and/or insulated “tweeker.” *When working with 480v, job assignments are to be discussed prior to work beginning. One individual will perform the energized work tasks, while the other remains ready to act in case of an emergency.. 8.

(18) Safety. Lock-Out, Tag-Out This procedure meets the basic LOTO requirements established by OSHA and follows the policy of GE Healthcare for energy-isolation during the service/maintenance of this equipment. It is designed to insure that each employee involved in servicing this equipment has exclusive control over when the equipment is reenergized (i.e. each employee maintains a personal lock with a unique key). It is the obligation of each employee to follow this procedure and understand that failing to do so can cause serious injury or death. Only Field Service Engineers who have complete LOTO Authorized and initial LOTO Verification training will be permitted to execute Lockout/Tagout on this system. All other non-authorized individuals will be considered “affected” individuals.. Specific Sources of Energy TYPE. SOURCE. MAGNITUDE. STORED. Electrical. Facility. 120 VAC. NO. Electrical. Batteries. 225 VDC. YES. Electrical. Capacitors. 225 VDC. YES. Gravitational. Potential (C-arm). ~ 50 lbs.. YES. Mechanical. Potential (L-arm). NOTE:. ~ 1100 lbs.. YES. When servicing the Workstation alone, the system is considered a single energy source if and only if the C-Arm is disconnected (by removing the Main Interconnect Cable) and the power cord is under the exclusive control of the authorized employee performing service. As long as the authorized employee can retain exclusive control over the power cord, the 120 VAC electrical energy source can be considered controlled and service can proceed. If at any time service involves maintenance of the C-Arm, the following “Energy Control Procedures” are mandatory and must be implemented by authorized Employees.. Energy Control Procedures 1. Notify all affected individuals of a shutdown. 2. Verify safety of work area. 3. Identify all electrical sources. 4. Position C-Arm for service. 5. Shut down system via green main power switch. 6. Remove A/C plug from wall power.. 9.

(19) Safety. 7. Remove interconnect cable from C-Arm. 8. Apply the red lock and tag to the AC plug as shown in the figure below.. 9. Remove workstation rear and side panels. Disconnect J10 from the ISD board. (This isolates AC power coming from the UPS). 10. In the workstation verify zero volts AC at TB1 between the brown and blue wires. 11. On the C-Arm turn off battery circuit breaker CB1 located under the front right side below the power cap module.. 10.

(20) Safety. 12. Remove C-Arm covers.. 11.

(21) Safety. 13. At the top of the power cap module disconnect red and black battery connectors. Verify zero volts DC across previously removed red and black battery connectors. 14. Power is now locked out. NOTE:. In the event service will continue into another day, and/or the machine will cause a hazard if reenergized after the authorized employee leaves the location, leave the A/C cord cover installed with a “transition” lock and yellow tag attached. If more than one authorized employee is going to conduct service on the same system, at the same time, multiple locking devices must be employed and each authorized employee must adhere to the entire LOTO procedure.. Testing and Positioning During Service In the event that lockout/tagout devices must be temporarily removed from the energy isolating devices, for testing or positioning purposes, the following sequence shall be followed:. 1. Clear the machine of tools and materials. 2. Ensure that all employees/individuals in area are safely positioned or removed. 12.

(22) Safety. 3. Remove energy control measures. 4. Energize system and proceed with testing or positioning. 5. De-energize system and reapply energy control measures.. Restore Power After Service 1. Re-inspect work area for hazards. 2. Reconnect red and black battery connectors to the power cap module 3. Reinstall C-Arm covers. 4. Turn on CB1 on the C-Arm. 5. Install workstation covers. 6. Connect main interconnect cable to the C-Arm. 7. Notify all affected personnel that power is being restored. 8. Remove red lock and tag 9. Energize the system. 10. Verify proper system operation. 11. Inform customer that system is ready to be returned to service.. WARNING:. High voltage cables, electrolytic capacitors, and CRTs can retain a dangerous static charge for long periods after power has been removed. Some devices can acquire a charge spontaneously without direct contact with other circuitry. Do not touch these components unless power has been completely removed and they have been discharged. Equipment that contains high power electrical components must be serviced only by personnel familiar with proper safety procedures for working near these components. Disconnect AC power (and battery packs if used) before discharging static electricity in components such as electrolytic capacitors and high voltage cables. Failure to heed this message will result in death or severe personal injury. Allow adequate time for static charges to discharge through bleeder resistors. Use a high wattage resistor when discharging circuits to avoid burns. Have someone watch while you work near high voltages. This person must remain clear of all circuitry and be prepared to turn off the power to the system and render aid in an emergency.. WARNING:. Systems with battery packs can deliver high currents at high voltage. Electric shock from batteries can cause death or personal injury, including severe burns. Use extreme caution when working on circuits energized by or located near the batteries. Batteries are dangerous at all times. Setting the battery pack circuit breaker to off removes battery current from other circuitry, but does not render the batteries harmless.. 13.

(23) Safety. CAUTION:. Never operate the system unless all potential equalization conductors (green wire with a yellow stripe) and related components are fastened in place. Dangerous electrical shock and improper equipment operation can result.. CAUTION:. Remove all metal rings and watchbands before working on system circuitry. Skin burns and damage from involuntary muscle contractions can result if metal jewelry shorts electrical circuits.. 14.

(24) Subsystem. Subsystem All Workstations, including non-NAV Workstations, should now be fitted with an uninterruptible power supply (UPS) as standard equipment. The block diagram below, as well as the following sections, reflects this change.. Workstation Block Diagram with UPS The following block diagram shows how the Workstation SBCs interface with the other Workstation devices over the dual passive backplane. Everything inside the rectangle resides inside the Workstation. Devices that touch the rectangle reside in the EMI box but communicate directly with devices outside the Workstation. External Video Source (Endoscope) External Video Out. Touchscreen. Cine Disk. Left LCD Monitor. Right LCD Monitor NAV Footswitch. Cine Bridge PCB. IFB. PCI Interface. Video from CCD Camera. Surge Suppressor. ARCNET. Ambient Light Sensor. Video Controller PCB. Image Processor PCB. Display Adapter PCB. ISA Interface VGA. RTOS CPU (ThreadX). System Interface PCB COM. Infrared Receiver. LPT. VGA. 1 Gbps Ethernet. COM1. NAV Sensors. Partitioned SATA Hard Disk. NAV Tools. SATA. Speaker. GPOS CPU (Linux) 10/100 Ethernet. NAV Tracker. DVD/RW Drive. USB. PCI Interface. USB Hub. Power Control PCB. Isolated External Interface. Thermal Film/Paper Printer. UPS. Workstation Touchpad/ Keyboard. DICOM Remote Connectivity. Workstation Functional Block Diagram. 15.

(25) Power Distribution and Control. Power Distribution and Control Intelligent Shutdown Power Control PCB (ISD-PC2 PCB) The Intelligent Shutdown (ISD2) Power Control PCB prevents the system from powering up if the AC line power is faulty or if applying AC power to the system would create a condition that is dangerous to the operator or the equipment. For example, if the Lemo connector is disconnected from the C-arm Lemo jack, it is not possible to power up the C-arm because AC power in the Interconnect cable is disabled to prevent electric shock. Through the uninterruptible power supply (UPS), the ISD Power Control PCB can also prevent premature shutdown of the system and data loss during a power failure or accidental shutdown. The ISD protects the Workstation in the following ways: • Controls the application of AC power to the Workstation electronics and accessory outlet strip. • Controls the application of AC power through the Interconnect cable to the C-arm. • Prevents the application of AC power to the C-arm when the Lemo connector is unplugged from the C-arm. • Senses AC mains applied voltage at power-up. Inhibits power-up if line voltage is out of range and sounds an on-board alarm to alert the operator or field service engineer. Operates LEDs that display power condition. Green LED DS1 glows when AC line voltage is OK. Amber LED DS2 glows when line voltage is too low. Red LED DS3 glows when line voltage is too high. • If you press the Workstation power switch to turn it off, and main AC power is still available to the Workstation, the system will not shut down until system software determines that all data-preservation steps are complete and it is OK to shut down. • Under software control, K9 on the ISD2 selects either unprotected AC from the AC line or battery-protected AC from the UPS to power the Workstation. • Provides status information to the Workstation software through the System Interface PCB and receives power-control commands over the same path. • Causes Workstation power switch to flash when you turn the Workstation off. The flashing continues until shutdown is complete, at which point the switch lamp turns off. • Interfaces with the UPS Off switch, which operates relay K9 to disconnect the UPS output from the Workstation. • Generates the UPS Off signal through K10 to turn the UPS AC output off.. 16.

(26) Power Distribution and Control. Uninterruptible Power Supply Workstations have a 230 VAC-operated uninterruptible power supply (UPS), which generates modified sine wave 230 VAC from an internal battery-powered inverter if the AC line fails. This enables orderly system shutdown during a power failure so that no important patient data or images are lost. The UPS also protects the Workstation from power sags, power surges, brownouts, and line noise. Other important features of the UPS include the following: • Battery-management software that effectively doubles the battery service life. The software optimizes battery charging and provides advance warning of impending battery failure. • Buck and boost voltage regulation that corrects AC line voltage fluctuations. • Start-on-battery capability that allows you to turn on the UPS even if the AC line power is not available. • Accepts control signals from external equipment. The Workstation UPS mounts inside the Workstation just above the transformer pan and has a capacity of 1400 VA. It appears as follows:. Workstation UPS. 17.

(27) Power Distribution and Control. Front-Panel Controls and Indicators The UPS front-panel controls and indicators shown below are accessible behind the right Workstation cover (viewed from the front of the Workstation). The UPS external circuitry appears on sheets 4 and 5 of Interconnect Diagram 885899. When the Workstation is on, the ISD-PCB supplies a low on P12-2- to pin 3 of the UPS communication port, turning the UPS on. When the UPS is on, it supplies AC power to its rear-panel receptacles by switching AC power from its input connector. The AC power at the input connector comes from the ISD PCB. After the UPS is on it conducts a self-test, and if all is well it enters Normal mode. The green Power On indicator glows, indicating that power is available from the UPS rear-panel receptacles. If the AC mains power fails, the UPS supplies power to the system using its internal battery and inverter. The green Power On indicator goes out and the yellow On Battery indicator comes on. An audible alarm sounds. The UPS receives AC power whenever the system power switch is on. The battery recharges if necessary. Refer to the UPS Fault Indicators table at the end of this section for more information on how the UPS front-panel controls and indicators behave in various error conditions.. UPS Front-Panel Controls and Indicators. 18.

(28) Power Distribution and Control. Rear-Panel Devices The following illustration shows the rear panel of the UPS. You must remove the Workstation front cover, the two screws securing the strap, the UPS corner bracket and slide the UPS out to the right to gain access to this panel.. UPS Rear Panel Devices. Communication Port The ISD board connects to the UPS communication port. This enables the system to turn the UPS on or off. The pinout for the 9-pin D-sub connector appears below.. Communication Port. 19.

(29) Power Distribution and Control. Communication Port Pinout Information Pin Number. Signal Name. Function. Signal Direction from the UPS. 1. LOB (low battery). Low battery relay contact rated at 20 mA, 30 VDC.. Out. 2. RxD (not used). Transmit to external device. Out. 3. UPS OFF (TxD). Turns UPS off. In. 4. DTR (not used). PnP (plug and play) from external device (tied to pin 6). In. 5. GND. Signal common (tied to chassis). —. 6. DSR (not used). Tied to pin 4. 7. —. No connection. 8. AC Fail. AC Fail relay contact rated at 20 mA, 30 VDC. Out. 9. Power Source. +V (8–24VDC power). Out. Out —. USB Port The GPOS CPU connects to the UPS USB port. This enables the system to monitor the UPS.. DIP Switches The two DIP switches next to the communication port configure the UPS for the proper input voltage range. A switch in the up position is on and in the down position is off. Normally, you will not have to adjust these switches unless you are replacing the UPS. Verify output voltage setting is 220V UPS Rear-Panel DIP Switches Output Voltage. Input Voltage Range. DIP Switch 2. DIP Switch 1. 220*. 198–233. Off. On. 230. 207–243*. Off or On. Off. 240. 216–254. On. On. *Factory setting. Network Transient Protector (Not used) The network transient protector is not used in the Workstation UPS.. 10A Receptacles The six IEC-320 230 VAC receptacles together have a maximum current capacity of 10A. WARNING:. 20. Do not connect any other devices to the UPS receptacles..

(30) Power Distribution and Control. Input Connector Supplies 230 VAC to the UPS.. Cooling Fan The UPS fan and Workstation cooling fans must operate at all times the system is on, or the Workstation will overheat.. UPS OFF Switch The Workstation has a UPS OFF switch, which enables you to turn the system off manually even if the UPS is currently powering it. CAUTION:. This switch turns the system off immediately without the protection of software controlled shutdown. Because there is risk of data loss or corruption, use this switch to turn off the system only when absolutely necessary.. The UPS OFF switch is located on the rear panel of the Workstation. There is a clear plastic protective panel over the switch, that you must lift before operating the switch. If AC line power is available, an LED behind the switch lights when you press the switch. If the Workstation is being powered by UPS battery power, the LED lights and the ISD -PC2 alarm sounds until power is removed. The LED and alarm serve as reminders if the UPS Off switch is still engaged when AC power returns.. 21.

(31) Power Distribution and Control. UPS Off Switch Refer to sheets 4 and 5 of Interconnect Diagram 885899 and to sheet 3 of ISD PC2 Schematic 887456 when reading the following description of the UPS Off switch. After the system boots completely, the system routes AC line power through the UPS to the Workstation. This permits a rapid switchover from AC line power to UPS power in the event of a power failure. K9 energizes after bootup and remains energized if AC power fails. CAUTION:. When the system operates on UPS battery power it may become necessary to shut the system down immediately to prevent equipment damage, even though some loss of data may occur.. Press the normally closed UPS Off switch on the back of the Workstation to accomplish this. Pressing the UPS switch causes P11-5 to go high. This turns on transistor Q10, pulling the UPS_SEL line (U8-7) low and de-energizing relay K9. This shuts off power from the UPS. When P11-5 goes high, it also lights the UPS Off lamp if battery power from the UPS is still available.. 22.

(32) Power Distribution and Control. UPS Functional Tests Uninterruptible Power Supply Self-Test. CAUTION:. Removing the Workstation's covers in the following step exposes high-voltage points within the Workstation. Avoid contact with these points as you perform the following procedure.. 1.. Remove the front, side, and rear Workstation covers as described in the Replacement section of this manual.. 2.. With the workstation plugged in and not powered up, press and hold the Test/Alarm Reset button for three seconds to initiate a self test. The UPS automatically distributes the load to the batteries for 15 seconds and tests the battery’s performance. If there is a problem with the battery, the On Battery indicator glows and the Service indicator flashes. Check the battery connections and be sure that the battery is fully charged.. Uninterruptible Power Supply Battery Test The UPS inside the Workstation can power the Workstation for a limited amount of time when the system loses AC power. This allows the operator to shut down system operation in an orderly way to avoid the loss of patient images and data. The UPS uses an internal sealed lead acid (SLA) battery as the primary source of power during power outage emergencies. The SLA battery powers an inverter inside the UPS, which generates AC power for the Workstation. Note:. The C-arm shuts down immediately when the Workstation loses AC power. It is not possible to generate X-rays during a power outage.. The AC line supplies charging power to the UPS internal battery charger as long as the Workstation's AC line plug connects to an active AC outlet. Circuitry inside the UPS turns the charger on and off as necessary to keep the UPS SLA battery charged. The following procedure tests the UPS battery only. It does not test any other circuitry inside the UPS or elsewhere. 1.. Make sure that the Workstation has been plugged into an active AC outlet for at least 3 hours. If not, plug the Workstation into an active outlet and wait at least 3 hours before performing step 2.. Note:. If the system has been in long-term storage, you should charge the UPS batteries for 6–24 hours.. 2.. Power up system as described in Workstation Operator Manual.. 3.. Disconnect the USB connector J22 from the top of the electronics box at the rear of the workstation.. 23.

References

Related documents

Electronic calibration and adjustment of data logger, issue of calibration certificate traceable to national standards and full functional test of data logger, including battery

V empiričnem delu naloge so prikazana mnenja in odgovori učiteljev naravoslovnih predmetov o tem, kdaj so se prvič srečali s timskim delom, kakšna je njihova ocena

Simple calibration – manual or automatic ❙The right calibration method for every test application ❙TSM (Through, Short, Match) – full calibration in

21 For computational reasons, we did not consider individual voting for all policy areas, but some explorative calculations suggest no qualitative differences compared with the

Nuance Document Finance Solutions enable banks to instantly capture loan documents from any input source, connect branch activity with centralized bank operations, ensure accurate

region, the study includes an in-depth scientific analysis of earth and lime- based buildings materials utilised in the rural settlement. The analytical results

Instruction in language arts and/or mathematics provided to adults who are incarcerated or are institutionalized to advance their education and completion of a high school

• external or extrinsic (pose) parameters including rotation and translation:.. where is