SECTION 1 BILL NO. 1 PRELIMINARIES

The contract document is based on JBCC Minor Works Contract

PRELIMINARIES AND GENERAL (Applicable to the whole of the Works)

SUM Project director (G1) 1 SUM Contracts manager (G2) 2 SUM Cost controller (G3) 3 SUM

Supervisory staff other than those identified in items G1 to G3 (G4)

4

SUM

Support and staff not included in activities in the Activity Schedule or items G1 to G4 (G5)

5

SUM

Health and Safety compliance services (G6)

6

SUM

Site transport (G7)

7

SUM

Site accommodation and facilities (G8)

8 SUM Site toilets (G9) 9 SUM Site security (G10) 10 SUM

Clean site and removal rubble (G11)

11

SUM

Site survey (G12)

12

SUM

Health and Safety (G13)

13 SUM Water (G14) 14 SUM Power (G15) 15 Preliminaries Bill 1 Section 1

CJC - PARKTOWN CAMPUS - AIRCONS

(2)

Amount

Item Quantity Rate

SUM

Notice board (G16)

16

SUM

Site fence and gate (G17)

17 SUM Hoarding requirements (G18) 18 SUM Scaffolding (G19) 19 SUM

Equipment not included in the bills of quantities but included elsewhere in the Preliminaries and General items (specify) (G20)

20

(3)

Preliminaries Section 1 Bill 1 Amount Page No Collection 2 1 Preliminaries Bill 1 Section 1

CJC - PARKTOWN CAMPUS - AIRCONS

(4)

Amount

Item Quantity Rate

SECTION 2 BILL NO. 1

STRIPPING, REPAIRING AND RE-INSTALLATION (PROVISIONAL)

Item

The tenderer shall visit the site after carefully studying the drawings, and make himself thoroughly acquainted with the nature and extent of the work to be done and the value of any materials to become the property of the contractor. No claim for extras arising from his failure to do so will be entertained.

1

Note:

Item

The contractor will likewise be required to comply with the municipality's traffic requirements and the municipal traffic by-laws in regard to the periods during which he may cart away or do any loading or off loading of materials.

2

Item

In taking down and removing existing work, the utmost care is to be taken to avoid any structural or other damage to the remaining portions of the building. Supply and erect suitable and

substantial shoring, needling, strutting,

barricading, etc., that may be necessary whilst carrying out any portion of the alterations to ensure the stability of the premises during

alterations, all to the satisfaction of the architect, and remove when directed. The contractor must also protect all work not removed such as walls, floors, doors, windows, joinery, loose and fixed fittings, electrical appliances, etc., from damage during the progress of the work and provide all necessary materials for so doing.

3

(5)

Amount

Item Quantity Rate

Item

The contractor is to carry out the stripping at all times is such a way as will least inconvenience the adjoining building and the general public. If any work to be stripped is against or connected to adjoining floor area, he shall disconnect and strip in such a manner as to leave adjoining area intact and undamaged.

4

Item

The contractor shall provide, erect, maintain and afterwards remove all hoists, tarpaulins, fans, weatherproofing and dustproof screens and drop sheets or other methods of protection and provide any drains, trenches, etc., as directed or as may be necessary or as may be required by the authorities to properly -protect from damage to the works, materials and property whether of the employer, other owners or the general public, and secure the safety and freedom from injury of all persons. The contractor shall provide similar protection to protect the inside of existing structures during the progress of the work, taking particular care when existing roofs are altered. Any damage caused by storms, surface water or water from other causes or by inclement weather or by other causes shall be made good at the contractors expense.

5

Item

The contractor is to allow for watering the works with a jet or spray from a hose, sufficient to prevent any nuisance from dust.

6

Item

The contractor shall provide and erect all casings and protection for and cover up all existing fittings, doors, windows, joinery work, walls, floors, etc., not disturbed during the alterations and clear away and make good on completion.

7

Item

The contractor shall provide, erect and remove when directed all casings temporary roof coverings, tarpaulins, dust covers and

weatherproof screens and barriers that may be necessary as protection against inclement weather or other damage to the architect's satisfaction.

8

Repairing Works (Provisional) Bill 1

Section 2

CJC - PARKTOWN CAMPUS - AIRCONS

(6)

Amount

Item Quantity Rate

Item

The contractor shall provide, erect and remove when directed all incidental shoring, needling, strutting, etc., that may be necessary while carrying out any portion of the works to ensure stability of the premises with suitable and

substantial timber and other materials. Prices for all items of demolition to form openings shall include for the provision of such support.

9

Item

Allow for the giving of notice to the proper authorities to disconnect the existing water supply, drain pipes, fire mains or other piping that may be encountered and for sealing pipes as required during the course of the stripping, all to the satisfaction of the Principal Agent to whom due notice is to be given of all alterations to existing services. Pay all fees and costs in connection therewith. Allow for temporary work so that services to existing premises are

maintained.

10

Item

The contractor shall allow for liaison, co-ordinating, working with, programming and sequencing work to suit the programmes of the other direct contractors on site.

11

STRIPPING WORK

TEMPORARY BARRIERS, SCREENS, ETC

Item

Drywall barrier 3,00m high formed of galvanised steel channel section rails and studs covered on one side with 12,7mm gypsum board panels and finished with two coats interior quality PVA emulsion paint on one side including corners, ends, etc

12

Temporary barriers, screens, etc including removal

REMOVAL OF EXISTING UNITS

(7)

Amount

Item Quantity Rate

16 No

Split Aircon Unit 18000 BTU unit

13

Carefully taking out existing Air-Conditioning units and repaired to make new including all necessary sundries according to manufacturers specifications.

6 No

Split Aircon Unit 24000 BTU unit

14

1 No

Split Aircon Unit 36000 BTU unit

15

8 No

Split Aircon Unit 48000 BTU unit

16

MAKING GOOD OF SURFACE ETC

Item

Brickwall / Partitioning or Ceiling

17

Making good existing surface where existing aircon units were removed including repainting, etc:

RE-INSTALLATION OF REPAIRED UNITS

16 No

Split Aircon Unit 18000 BTU unit

18

Carefully re-installation of new refurbished Air-Conditioning including all necessary sundries according to manufacturers specifications.

6 No

Split Aircon Unit 24000 BTU unit

19

1 No

Split Aircon Unit 36000 BTU unit

20

8 No

Split Aircon Unit 48000 BTU unit

21

Repairing Works (Provisional) Bill 1

Section 2

CJC - PARKTOWN CAMPUS - AIRCONS

(8)

Repairing Works (Provisional) Section 2 Bill 1 Amount Page No Collection 7 6 5 4 Carried to Summary R

(9)

Amount

Item Quantity Rate

SECTION 2 BILL NO. 2

NOTE :

Unless otherwise stated herein, all items in this bill shall be deemed to fall into Work Group No. 104 for CPAP formula purposes

NEW AIRCONDITIONING UNITS (PROVISIONAL)

All Aircoditioning units shall be properly installed according to manufactures manuals and

specification. All necessary piping works and fittings shall be jointed and sealed with butyl rubber rings

SUPPLEMENTARY PREAMBLES

All new air-conditioning units to be installed shall be latest Sumsung brand or similarly approved brand of the same quality

AIRCONDITIONING UNITS

20 No

Split Aircon Unit 9000 BTU unit

1

3 No

Split Aircon Unit 12000 BTU unit

2

63 No

Split Aircon Unit 18000 BTU unit

3

20 No

Split Aircon Unit 24000 BTU unit

4

1 No

Split Aircon Unit 36000 BTU unit

5

New Installation Work Bill 2

Section 2

CJC - PARKTOWN CAMPUS - AIRCONS

(10)

Amount

Item Quantity Rate

SECTION 2 BILL NO. 3

Item

Operating and maintenance manuals for complete installation, inclusive of all

documentation, drawings, all as described in the manufacturers specification.

1

MISCELLANEOUS

Item

Supply spares for 36month maintenance usage and all other spares mentioned in the

specification on handover.

2

Item

Allow for items not specifically mentioned but deemed required to establish a complete installation

3

(11)

SECTION SUMMARY - Air-conditioning Works Bill

No PageNo Amount

8

Repairing Works (Provisional)

1

9

New Installation Work

2

10

Miscellaneous Work

3

Section 2

CJC - PARKTOWN CAMPUS - AIRCONS CENTRAL JOHANNESBURG COLLEGE

(12)

Amount

Item Quantity Rate

SECTION 3 BILL NO. 1

PROVISIONAL SUMS, BUDGETARY ALLOWANCES, ETC.

1. The following budgetary allowances are for work to be designed by the Architect, executed by the Contractor and measured and valued by the Quantity Surveyor in terms of Clause 28 of the Conditions of the Contract.

2. All Provisional Sums are nett and do not include a 5% cash discount to the

Contractor.

3. Under no circumstances may any Provisional Sum be extended at an amount lower than the amount stated. 4. Unless specific percentage mark-ups for

profit and attendance are indicated in the Rate column, the amount priced by the Contractor for profit and attendance against each Provisional Sum shall be deemed to be lump sum prices and shall not be adjusted unless the scope of the sub-contract varies significantly.

Note:

(13)

Amount

Item Quantity Rate

Building Works

Item

Provide the sum of R15 000.00 (Fifteen

Thousand Rand, zero cents) for Builders Works

1 Item Profit 2 Item Attendance 3 Electrical Works Item

Provide the sum of R25 000.00 (Twenty Five Thousand Rand, zero cents) for Electrical Works

4 Item Profit 5 Item Attendance 6 Provisional Sums Bill 1 Section 3

CJC - PARKTOWN CAMPUS - AIRCONS

(14)

Provisional Sums Section 3 Bill 1 Amount Page No Collection 13 12

(15)

Page FINAL SUMMARY Section No Amount 3 Preliminaries 1 11 Air-conditioning Works 2 14 Provisional Sums 3 R Sub total 400,000.00 Item Contingencies

Allow for contingencies to be used at the discretion and approval of the Principal Agent to be deducted in full if not used.

R

Sub total

R

Value Added Tax (15%)

R

Sub-total

CJC - PARKTOWN CAMPUS - AIRCONS CENTRAL JOHANNESBURG COLLEGE

References

Related documents

“The 2014 Chicago Auto Show Vine and Instagram Video Challenge will give social media influencers and media the opportunity to explore the show floor during the Chicago Auto

Therefore, to identify neuroimaging biomarkers predicting disease progression, we propose a nonlinear mixed effects model based on a sigmoid function to predict longitudinal clinical

the values of i and j are. From the ANN point of view, determining the appropriate architecture is important since the network topology directly affects the computational

Keywords: uncertainty quantification; stochastic partial differential equations; elastic wave equation; regularity; collocation method; error analysis.. AMS Subject

Figure 11: Leaching of pyrite grains by mixed cultures of moderately thermophilic leaching microorganisms- 37 - Figure 12: Attachment to and biofilm development of moderately

While computing co efficient of correlation by rank differential method of 9 items the difference in 2 ranks is taken 5 instead of 4 if computed r k is .78 compute correct r

Because [Your Church Name] has two (2) complimentary branches; the spiritual body of believers and the legal corporation, it is the senior pastor that administratively bridges the