• No results found

Effective Contract Management

N/A
N/A
Protected

Academic year: 2021

Share "Effective Contract Management"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

Effective Contract Management

How can we do the right things at the right time if we do not know the contents of our contracts?

ProcessWorld 2011

Berlin, June 1st 2011 Michael Neumann

(2)

Agenda

 Background of the Contract Management study  Contract Management – Our understanding

 Study results

(3)

BearingPoint is a European company with

global reach

Partnership with the

consulting firm West

Monroe Partners for all

projects in North America of our main clients

Partnership with the

BearingPoint Australia

Location of BearingPoint in 14 countries

with 23 offices in Europe

Business Unit

Central Europe for all projects of our main clients

BearingPoint in the world

3 200 consultants in Europe

(4)

Agenda

Background of the Contract Management study

 Contract Management – Our understanding  Study results

(5)

Every four years BearingPoint conducts an

international survey

 850 enterprises

 29 issues-questionnaire  18 countries

 Very different lines of businesses  Different enterprise sizes

 English and German

 Added 2010:

- Self-assessment - Expert interviews

(6)

The study can help you to find answers to the

following questions

Should my enterprise or department improve its Contract

Management?

What should be the objectives of good Contract Management?How do other companies organize their Contract Management?On which Maturity Level is my enterprise/department?

What can I learn from Contract Management experts?

We want to

 Identify “best practices” of Contract Management

(7)

Agenda

 Background of the Contract Management study

Contract Management – Our understanding

 Study results

(8)

Contracts can be found in almost every

department of a company.

(9)

Contract Management Helps to Improve

Transparency and to Minimise Risks.

(10)

The BearingPoint Contract Management

Maturity Model uses an holistic approach

REACTIVE

REACTIVE” :

Awareness and action occur in response to issues. Action is either system- or department-specific. Enterprises use storage systems for data and documents and introduce low-level regulation for processes concerning contracts. “PROACTIVE” :

The organization places much greater importance on contracts. Enterprises start to centralize action. Central archiving and basic search capabilities are provided. Partial existence of enterprise-wide rules.

PROACTIVE

OPTIMIZED

MANAGED

MANAGED” :

Contracts are managed as an enterprise asset, well-developed processes for capturing, classifying, verifying and storing exist. Organizations provide detailed rules and internal control systems.

OPTIMIZED” :

Contract Management is a strategic initiative. Focus is on continuous improvement of rules and

(11)

Agenda

 Background of the Contract Management study  Contract Management – Our understanding

Study results

(12)

 Keep it simple!

 Define the objectives!

 Management support is crucial!

 Define clear regulations and standard

processes!

 Talk to all stakeholders!

 Don’t underestimate change management!

We have got Expert Recommendations for

Contract Management Projects

(13)

Key aspects of contract management are

related to contract controlling

(14)

Enterprises demand more centralisation of the

Contract Management tasks.

(15)

Most of the enterprises consider contract

(16)

Enterprises see the need for improvements within contract reporting capabilities, IT tools and audit trail

(17)

The most important task of IT systems in Contract

Management is the electronic filing and archiving

(18)

The most important interface is the Enterprise

Ressource Planning (ERP) System.

(19)

Customers want:

 Compliance with terms and conditions or

legal requirements

 Monitoring

 Risk management

 Process improvement and mapping to IT tools

 Consistent information

 Reporting, analysis, tracking

 Interfaces to Enterprise Resource Planing (ERP-) systems

Customers expect strategic, process

organisation, IT and research support

(20)

Agenda

 Background of the Contract Management study  Contract Management – Our understanding

 Study results

(21)

Which areas of Contract Management are

covered by Software AG solutions?

Contract Management area Solution from Software AG

Content

 Definition of contract templates  Definition of standard conditions,

 Filing (structured, complete, secure, central)  Versioning, audit trail

 Fast search and retrieval of documents  Definition of search criteria

Controlling

 Compliance  Monitoring

 Risk Management

 Approval, Signing, Workflow  Reporting

Process

 Definition of standard processes for certain contract types or

departments

 Definition of rules and regulations,

 Support of each single phase of the contract lifecycle

 Interfaces to other processes, e.g. payment or order processes.

Organization

SOA Governance

Application Integration

Comprehensive Integration Solutions BPMS

Business Process Analysis Enterprise Architecture Tools

(22)

We are looking forward to support you in your Contract Management initiative! BearingPoint GmbH Ganghoferstr. 29 D-80933 München Michael Neumann

Senior Technology Consultant

BearingPoint GmbH Kurfürstendamm 207-208 10719 Berlin Germany Tel: +49.174.3273529 Michael.Neumann@bearingpointconsulting.com

(23)

IN TEG R A TION P R O CES S MS Word, e-Mail U SERS ¬ Authentification

¬ Security und Data Protection ¬ Reporting

¬ Central User Interface etc…

EVALUATE EXECUTE

References

Related documents

On-chip surface-enahnced Raman spectroscopy (SERS)-linked immunosensor assay (SLISA) for rapid environmental surveillance of chemical toxins. The GrenScreen Genotoxicity Assay:

 35 y/o female at 12 weeks gestation presents for genetic counseling and wants non-. invasive screening for fetal trisomy

(societies with ancient roots) Extractive institutions (entrenched interest groups, rent-seeking) Inefficient allocation of savings (capture of banks, corruption in lending)

citeva zile tot ar fi dormit. Numai covo- rul pe care stdtea intins nu-i dddea liniqte,. parcd ii era

Alternatively, water resistant concrete can be used but as car parks are large open structures subject to movement and vibration, it is dicult to ensure the decks are

With respect to recovery of Appalachian Power’s electric power service after the 2012 derecho, the data shows that the state of Virginia exhibited more resilience than West

Express the final energy of the block in terms of given quantities (excluding ) and the unknown final angular velocity of the wheel,.. ANSWER:

Over time the role of management in medical practice has grown and expanded to take on all aspects of medical and health businesses (outside of treating patients) to become what