PROJECT : SM LIGHT RESIDENCES

LOCATION : BONI AVE. EDSA MANDALUYONG CITY SUBJECT : PRODUCTIVITY RATE

SCOPE OF WORK : INTERIOR PAINTING OF UNITS FINISH : SEMI-GLOSS (2 COATS)

PROCEDURE

1. SURFACE PREPARATION - Putty Works

- Sanding 2. PRIMER

- Application of Flat Latex

- Spot putty and reapply Flat Latex 3. FIRST COAT

- Application of Semi-Gloss 4. FINAL COAT

- Application of Semi-Gloss

PAINTING TO MASONRY WALL FLOOR : 17TH FLOOR UNIT NO. : 18 AREA : UNIT 46.9 m2 CR 8.86 m2 55.76 m2

DATE MANPOWER ACTIVITY MANHOUR

6-Nov Painter Surface Preparation - Putty Works 5 Man-Hrs 7-Nov Painter Surface Preparation - Putty Works 7.5 Man-Hrs

7-Nov Painter Surface Preparation - Sanding 5 Man-Hrs

7-Nov Painter Primer - Application of Flat Latex 1 Man-Hrs 8-Nov Painter Primer - Application of Flat Latex 3.25 Man-Hrs 8-Nov Painter Primer - Spot Putty & Reapply Flat Latex 6.75 Man-Hrs 8-Nov Painter 1st Coat - Application of Semigloss 4.75 Man-Hrs 8-Nov Painter Final Coat - Application of Semigloss 4.5 Man-Hrs TOTAL 37.75 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.6770 FLOOR : 17TH FLOOR UNIT NO. : 19 AREA : UNIT 46.9 m2 CR 8.86 m2 55.76 m2

(2)

6-Nov Painter Surface Preparation - Putty Works 5 Man-Hrs 7-Nov Painter Surface Preparation - Putty Works 7.5 Man-Hrs

7-Nov Painter Surface Preparation - Sanding 5 Man-Hrs

7-Nov Painter Primer - Application of Flat Latex 1 Man-Hrs 8-Nov Painter Primer - Application of Flat Latex 4.25 Man-Hrs 8-Nov Painter Primer - Spot Putty & Reapply Flat Latex 6.75 Man-Hrs 8-Nov Painter 1st Coat - Application of Semigloss 3.75 Man-Hrs 8-Nov Painter Final Coat - Application of Semigloss 4.5 Man-Hrs TOTAL 37.75 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.6770

PAINTING TO MASONRY WALL FLOOR : 17TH FLOOR UNIT NO. : 37-38 AREA : UNIT 93.8 m2 CR 17.72 m2 111.52 m2

DATE MANPOWER ACTIVITY MANHOUR

7-Nov Painter Surface Preparation - Putty Works 22 Man-Hrs 8-Nov Painter Surface Preparation - Sanding 8.5 Man-Hrs 8-Nov Painter Primer - Application of Flat Latex 4 Man-Hrs 9-Nov Painter Primer - Application of Flat Latex 3 Man-Hrs 10-Nov Painter Primer - Spot Putty & Reapply Flat Latex 5.5 Man-Hrs 10-Nov Painter 1st Coat - Application of Semigloss 6 Man-Hrs 13-Nov Painter Final Coat - Application of Semigloss 12 Man-Hrs

TOTAL 61 Man-Hrs

PRODUCTIVITY (Man-hr/m2) 0.5470

PAINTING TO MASONRY WALL FLOOR : 8TH FLOOR UNIT NO. : 21-22 AREA : UNIT 93.8 m2 CR 17.72 m2 111.52 m2

DATE MANPOWER ACTIVITY MANHOUR

7-Nov Painter Surface Preparation - Putty Works 14 Man-Hrs 8-Nov Painter Surface Preparation - Putty Works 10 Man-Hrs 8-Nov Painter Surface Preparation - Sanding 7.5 Man-Hrs 9-Nov Painter Primer - Application of Flat Latex 6 Man-Hrs 10-Nov Painter Primer - Spot Putty & Reapply Flat Latex 13 Man-Hrs

(3)

10-Nov Painter 1st Coat - Application of Semigloss 6 Man-Hrs Painter Final Coat - Application of Semigloss 12 Man-Hrs TOTAL 68.5 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.6142

AVERAGE PRODUCTIVITY (Man-hr/m2) 0.6288

FINISH : FLAT FINISH PROCEDURE

1. SURFACE PREPARATION - Putty Works

- Sanding 2. PRIMER

- Application of Flat Latex

- Spot putty and reapply Flat Latex 3. FINAL COAT

- Final application of flat latex PAINTING TO CONCRETE CEILING FLOOR : 17TH FLOOR

UNIT NO. : 18 AREA :

UNIT 12.8 m2

12.8 m2

DATE MANPOWER ACTIVITY MANHOUR

6-Nov Painter Surface Preparation - Putty Works 3 Man-Hrs 7-Nov Painter Surface Preparation - Putty Works 3 Man-Hrs

7-Nov Painter Surface Preparation - Sanding 2 Man-Hrs

8-Nov Painter Primer - Application of Flat Latex 0.75 Man-Hrs 7-Nov Painter Primer - Application of Flat Latex 1 Man-Hrs 8-Nov Painter Primer - Spot Putty & Reapply Flat Latex 0.5 Man-Hrs 8-Nov Painter Final Coat - Application of flat latex 1.25 Man-Hrs TOTAL 11.5 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.8984 FLOOR : 17TH FLOOR UNIT NO. : 19 AREA : UNIT 12.8 m2 12.8 m2

DATE MANPOWER ACTIVITY MANHOUR

6-Nov Painter 1 Surface Preparation - Putty Works 3 Man-Hrs 7-Nov Painter 1 Surface Preparation - Putty Works 3 Man-Hrs 7-Nov Painter 1 Surface Preparation - Sanding 2 Man-Hrs

(4)

7-Nov Painter 1 Primer - Application of Flat Latex 1 Man-Hrs 8-Nov Painter 2 Primer - Application of Flat Latex 0.75 Man-Hrs 8-Nov Painter 1 Primer - Spot Putty & Reapply Flat Latex 0.5 Man-Hrs 8-Nov Painter 1 Final Coat - Application of flat latex 1.25 Man-Hrs TOTAL 11.5 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.8984 FLOOR : 17TH FLOOR UNIT NO. : 37-38 AREA : UNIT 25.6 m2 25.6 m2

DATE MANPOWER ACTIVITY MANHOUR

7-Nov Painter 1 Surface Preparation - Putty Works 5.5 Man-Hrs 8-Nov Painter 1 Surface Preparation - Sanding 6 Man-Hrs 9-Nov Painter 1 Primer - Application of Flat Latex 2.5 Man-Hrs 9-Nov Painter 1 Primer - Spot Putty & Reapply Flat Latex 2.5 Man-Hrs 10-Nov Painter 1 Final Coat - Application of flat latex 3 Man-Hrs TOTAL 19.5 Man-Hrs PRODUCTIVITY (Man-hr/m2) 0.7617 FLOOR : 8TH FLOOR UNIT NO. : 21-22 AREA : UNIT 25.6 m2 25.6 m2

DATE MANPOWER ACTIVITY MANHOUR

7-Nov Painter 1 Surface Preparation - Putty Works 9 Man-Hrs 8-Nov Painter 1 Surface Preparation - Sanding 4 Man-Hrs 9-Nov Painter 1 Primer - Application of Flat Latex 2.5 Man-Hrs 9-Nov Painter 1 Primer - Spot Putty & Reapply Flat Latex 2.5 Man-Hrs 10-Nov Painter 1 Final Coat - Application of flat latex 3 Man-Hrs

TOTAL 21 Man-Hrs

PRODUCTIVITY (Man-hr/m2) 0.8203

(5)

210 972.625 105 69.47321 0.330825 5 1 43.69 6 2 7 2 8 3 9 4 10 5 11 6

References

Related documents

• The estimated life expectancy of Aboriginal and Torres Strait Islander males and females was much lower than that reported for Maori people in New Zealand and First Nation

There’s no need to use the Xcode feature to add the source code at the same time as establishing a connection; you can add the property and method declarations to the header

Interior Semi-Gloss Latex Enamel: Semi-gloss, latex enamel used over a primer on concrete, masonry (including concrete masonry block), wood and hardboard, ferrous and

B u sin ess P roc es se s O rg an iza tion Technological Infrastructure Development Infrastructure Applicative Infrastructure Technological Infrastructure Development

shapes of the AGN and star formation IR SEDs (see blue dashed and red solid curves in Fig. 2 ), which results in sources with a signif- icant contribution from the AGN component

The aims of the research conducted within this thesis were to (1) explore the influence of social factors (mother, father, sibling and friend smoking) on preadolescent

This document attached with our research project title “ONLINE PURCHASE INTENTION AMONG GRADUATES” to fulfil requirement as needed by Faculty Of Business Management

We concentrate on posterior summaries and we measure the impact of perturbations of prior or sampling models in different direction by local influence measures.. Such impact is