• No results found

Qualified Maintenance - An Approach for Cutting Costs in Power Plants (O434)

N/A
N/A
Protected

Academic year: 2020

Share "Qualified Maintenance - An Approach for Cutting Costs in Power Plants (O434)"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 Availability of KKP and GKN plants
Fig. 2 Number of activities in different maintenance periods
Fig. 4 Total cost for the fifty most expensive systems in boiling water reactor
Fig. 6 Different diagnostic systems installed in NPP
+4

References

Related documents

Article 10 of the Horizon 2020 Rules for Participation provide that the following participants are eligible for funding from the Union: (a) any legal entity established in a

Evaluators will use the student results of DDMs to determine educator Student Impact Ratings, measuring whether an educator’s impact on student learning is low, moderate, or

The player concerned will only be accepted by the FIVB to play in his/her next event if the amount due is received and officially acknowledged by the FIVB (in advance) or the

in terms of professional support, the Chief Nursing officer’s recent review of mental health nursing recommended that the key principles and values of the recovery approach

Note:   We  cannot  add  any  instruments,  but  re‐focusing  the  instruments  can  happen  as  long  as  we  know  well  in . advance. Please be 

To drive and evaluate our research into using rationale for software maintenance, we will develop a system that supports the maintainer. This system will present the relevant DR

• To compare the turnaround time of the GeneXpert with culture DST for detection of Rifampin resistance • NAAT result was reported within an average of 2.4. days from the

Through exploring the career path of 6 early childhood education leaders, this study gives an insight into the ideas, opinions and explanations of how the participant has come to