(1)

Procurement Name of Awarded

Consultant Contract Price

Duration of

the Services Addendum Summary of the Scope of Contract

Services for the Transportation Project Manager

The Louis Berger Group USD 2,955,000.00

January 22, 2007 to December 31,

2009

Increase of USD 584,580 for additional services related to the original contract

Transportation Project Management services to assist MCA-Honduras with the implementation of the Transportation Project and the Farm to Market Roads Project Activity of the Rural Development Project, including the following:

• Supporting Monitoring and Compliance of Compact Terms • Finalization of Designs for Project Works

• Management of Procurement Processes • Monitor Project Implementation

• Financial Management

• Environmental Impact Management

• Resettlement and Social Impact Management Rural Roads Selection Tool Centro de Investigaciones Económicas y Sociales (CIES) / Consejo Hondureño de la Empresa Privada (COHEP) USD 29,850.00 February 12, 2007 to May 31, 2007

Finalization of services July 18, 2007

Develop and populate a Geographical Information System (GIS) to inform MCA-Honduras in its selection of investments for the

improvement or construction of rural roads in the Farm to Market Roads Activity of the Rural Development Project.

Preparation of a Resettlement Policy Framework, Resettlement Plans, and Complementary Social Impact Reports for the CA-5 North Highway

ASP Consultores /

Giraldo Calle & Cia. USD 348,813.82

April 30, 2007 to November 16, 2007 Finalization of Phase II (Implementation of RAPs): October 31, 2008

Preparation of a Resettlement Policy Framework (RPF) for two urban segments of CA-5 where the technical designs are not yet developed and to prepare a Resettlement Action Plan (RAP) for each of the four sectors of CA-5 North Highway projects for which technical designs already exist. Specifically, the Consultant will prepare an RFP for those sections of CA-5 of which technical designs have yet to be decided (i.e., Zambrano and Las Flores). Preparation of a RAP for each of the four sections of CA-5 where the technical designs are now available (1. Tegucigalpa – Río Del Hombre; 2 Río Del Hombre – Inicio Valle de Comayagua (except Las Flores and Zambrano); 3. Final Valle de Comayagua – Siguatepeque; 4 Siguatepeque – Taulabe). Field work for the RAP will entail a census of the affected population and asset

inventories, as well as socio-economic studies and the engineering design and drafting of replacement structures where necessary.

Audit Services PriceWaterhouseCoopers USD 38,005.00 May 22, 2007 to

August 15, 2007 ---

Financial auditing of the MCC resources managed by MCA-Honduras under the Compact in accordance with U.S. Government Auditing Standards issued by the Comptroller General of the United States and the “Millennium Challenge Corporation Guidelines for Financial Audits Contracted by Foreign Recipients” (MCC Audit Guidelines) issued by the MCC Inspector General (IG).

(2)

Design and Implementation of the MCA Honduras Program Evaluation

National Opinion

Research Center (NORC) USD 1,610, 253.00

May 25, 2007 to September 1,

2010

---

Coordination and execution of the Evaluation Component of the M&E Plan. Drafting of the terms of reference for any survey work required to execute the M&E Plan. Services under the following four categories:

• Evaluation Design • Evaluation Planning

• Technical Support for Procurement • Implementation of Evaluation Farmer Access To

Credit Technical

Assistance ACDI VOCA

USD 3,689,420.00 June 1, 2007 to

January 31, 2010 ---

The Consultant will assist financial institutions interested in expanding services to farmers, value chain enterprises and other rural enterprises and will assist MCA Honduras in establishing the Program Farmer Loan Fund. The Consultant will work with banks, credit unions and

microfinance institutions to help them improve their supply of services to the agriculture sector and to strengthen value chain financing.

Topographic Surveying of the Ca-5 Segment I, Sections I and II, including the Section from Las Flores – Interchange to San Antonio, Comayagua (CA-5, under the Transportation project) Técnica de Ingeniería (Tecnisa) / Consultores en Ingeniería (Cinsa) USD 123,064.41 July 2, 2007 to August 21, 2007 ---

Topographic works will be developed along Sections I and II of the Project, in accordance to the following definitions (see the location map at the end of this ToR). Section I runs from Tegucigalpa to Rio del Hombre with a length by 25.5 km. Section II runs from Rio del Hombre until the interchange to the Villa San Antonio with an approximate length by 38 km. This section also comprises a section of 3.3 Kms alongside of the new alignment between stations 43+300 to 46+600. The total length of Section II is approximately of 41.3 Kms.

Cirilo Reyes USD 14,462.94 Increase of USD 1,000.00 and

finalization November 5, 2007

Yoro, Atlántida, Islas de la Bahía

Jorge Pagoaga USD 12,500.00 Increase of USD 4,845.00 and

finalization November 12, 2007

Tegucigalpa

Manuel Sosa USD 13,000.00 Increase of USD 1,000.00 and

finalization November 5, 2007

Juticalpa, Colón

Marco Flores USD 12,595.86 Increase of USD 4,191.18 and

finalization November 12, 2007

Lempira, Intibucá, La Paz

Said Rodríguez USD 12,020.00 Increase of USD 4,814.00 and

finalization November 12, 2007 Choluteca Servicios para la Socialización y Formulación de Proyectos de Caminos Rurales (under Rural Roads of the Rural

Development Project)

Irma Escobar USD 13,305.04

June 26, 2007 to September 27,

2007

Increase of USD 1,000.00 and finalization November 5, 2007

(3)

Preparation of Environmental Management Plan for Improvement of CA-5 North Highway under the Transportation Project ESA Consultores / Gatesa USD 39,381.00 August 27th, 2007 to October 8th, 2007 ---

The purpose of these Terms of Reference (TOR) is to define the scope of work for the services of a consultant to prepare the Environmental Management Plan (EMP) for the Improvement of the CA-5 North Highway Project. Specifically, the Consultant will prepare EMPs for Sections I and II of southern segment and for sections III and IV for the northern segments of the CA-5 North Highway. Each EMP will include detailed mitigation measures, risks and contingencies prevention, monitoring and restoring activities to be implemented along project execution stages. Field work for the RAP will entail verifying and identifying in situ, the potential environmental impacts as well as their corresponding mitigation and relief measures.

Fiscal Oversight Services for MCA Honduras DPK Consulting USD 471,752.00 September 13, 2007 to December 31, 2009 ---

The FOA shall Review all relevant documentation in order to gain a sound understanding of Compact agreements, policies, procedures and reporting mechanisms as they relate to financial management and control, at a minimum:

• MCC Compact with the Government of Honduras

• Memorandum of Agreement Regarding Fiscal Agent Services • Disbursement Agreement

• Bank Agreement • Fiscal Accountability Plan

• Other relevant financial documents Contrato de Mantenimiento de Aires Acondicionados AYRE L. 48,000.00 August 1st, 2007 to July 31st, 2008 ---

Maintenance of all air conditioning units of the MCA - Honduras office

Contrato para la Compra de Bombas de Mochila para usos agrícola SEAGRO USD 39,790.00 September 26th,2007 to December 14th, 2007 ---

Supply of backpack sprayers for agricultural use for the FTDA program beneficiaries for the period (Sept/2007- May/2008)

Contrato para la compra de Bandejas para Plántulas SEAGRO USD 103,700.00 October 30th, 2007 to December 14Th,2007 ---

Supply of seedling trays for agricultural use for the FTDA program beneficiaries for the period (October/2007- May/2008)

Contrato para la compra de Canastas Plásticas para uso agrícola NEW MARK REPRESENTACIONES USD 124,099.20 September 30, 2007 to December 14th,2007 ---

Supply of plastic crates for agricultural use for the FTDA program beneficiaries for the period (September/2007- May/2008)

(4)

Contrato para la compra e instalación de Sistemas de Riego

Agropecuaria del Campo,

S. de R.L. USD 586,390.48

December 2007

to May/2008 ---

Supply and installation of drip irrigation systems for the FTDA program beneficiaries for the period (December/2007- May/2008)

Contrato para la compra de Filtros de Arena para uso agrícola

DICOSA L. 5,400,00.00 December/2007

to May/2008 ---

Supply of sand filters for the FTDA program beneficiaries for the period (December/2007- May/2008) Contrato para la compra de árboles frutales FHIA L. 3,650,000.00 August 2007 to June 2008 ---

Supply of three species of fruit trees to be distributed among the FTDA beneficiaries.

Contrato para los servicios de Administración del Fondo de Fideicomiso BAMER ** December 6th, 2007 to December 31st, 2009 ---

Services for the Trust Fund administration to facilitate Access to Agricultural Credit.

Contrato para la implementación de la Ley de Garantías Mobiliarias

National Law Center for Inter-American Free Trade (NLCIFT) USD 1,915,000.00 October 9th ,2007 to December 31,2009 ---

Consultant Services for the implementation of the Movable Guarantee Law, their regulations and operation.

Contrato para la Compra de Bombas de Mochila para usos agrícola SEAGRO L. 186,750 December 13th,2007 ---

Supply of backpack sprayers for agricultural use for the FTDA program beneficiaries for the period (January/2007- June/2007)

Contrato para la compra de Bandejas para Plántulas

REMAGRO L. 630,00.00 December

13th,2006 ---

Supply of seedling trays for agricultural use for the FTDA program beneficiaries for the period (January/2007- June/2007)

Contrato para la compra de Canastas Plásticas para uso agrícola

REMAGRO L. 1,102,500.00 December

13th,2006 ---

Supply of plastic crates for agricultural use for the FTDA program beneficiaries for the period (January/2007- June/2007)

Contrato para la compra e instalación de Sistemas de Riego DICOSA L. 2,866,185.00 January 15th, 2007 ---

Supply and installation of drip irrigation systems for the FTDA program beneficiaries for the period (January/2007 – June/2007)

Contrato para la compra de Filtros de Arena para uso agrícola

Adalid Vásquez L. 2,277,186.75 January 22nd to

April 13th/ 2007 ---

Supply of sand filters for the FTDA program beneficiaries for the period (January/2007- April/2007)

(5)

Desarrollo del Sistema de Información Gerencial (SIG)

Eraldo Ventura USD 18,0000.00

October 18th, 2007 to February

18, 2008

---

Development of the MCA Honduras MIS.

Servicios de

Monitoreo de Prensa SEPROC L. 204,000.00

July 1st, 2007 to

June 30th, 2008 ---

Monitoring and reporting of all MCA Honduras related activities that appear in national communications media.

Mantenimiento de Jardines oficinas de MCA Honduras Jardines Modernos, S. de R.L. L. 54,000.00 July 30th, 2007 to July 29th, 2008 ---

Maintenance of MCA Honduras’ gardens.

Preparación de documentos Estándar para la adquisición de equipo para perforación de pozos de agua.

David Lardizabal USD 641.00 Jun 05th,2007 to

July 04th, 2007 ---

Assistance and preparation of technical specifications and bidding document for the procurement of a drill rig and equipment.

Asistencia a MCA Honduras para la implementación del Programa de Acceso a Crédito Agrícola

Daniel Meza USD 20,000.00

January 8th, 2007 to April 30th, 2007

---

• Preparation of a plan for the implementation of the National Movable Property Registry.

• Technical assistance in the selection of an implementing firm for the FACA.

• Elaboration of a financial instrument to facilitate MCA Honduras with the implementation of the loans fund for the FTDA

beneficiaries. Elaboración del diseño y desarrollo de imagen corporativa de MCA Honduras Liliana Villeda L. 39,365.00 August 21st, 2007 to October 4th, 2007 ---

Design of MCA Honduras’s corporate image, including stationary, logos, and media plan.

Servicios de Consultoría para la elaboración de elementos previos a la implementación de la actividad de Acceso al Crédito Agrícola

Daniel Meza USD 7,500.00

October 23rd, 2006 to December 05th,

2006

---

• Evaluation of the current rural credit in Honduras.

• Preparation of an strategy for MCA Honduras and the basic principles for the FACA program.

(6)

Diseño conceptual del Sistema de Información Gerencial (SIG)

María de los Ángeles

Ponce USD 7,000.00

February 05th, 2007 to April

02nd, 2007

---

Define the requirements for the MCA Honduras’ SIG based on MCA Honduras’ requirements of information, their clients and users.

Asistencia técnica para el sector agrícola FINTRAC USD 22,392,600.00 August 07,2006 to December 31, 2009 ---

• Market identification and development • Farmer selection and activity promotion • FTDA promotion

• Agri-business skills development • Facilitate Access to Credit

• Production and post-harvest skills development • Ensuring sustainability of FTDA’s services • Environmental and social assessment Desarrollo del

prototipo y especificaciones técnicas del Sistema de Información Gerencial

Eraldo Ventura USD 3,000.00 June 06th, 2007 to July 06th,

2007

---

Develop a SIG prototype and its technical specifications.

Cortinas de radio para información del MCA-H

HRN L. 43,200.00 January 7 to

March 7, 2008 ---

Radio spots, nation-wide for the MCA-Honduras activities and information related to its projects: Transport and Rural Development.