• No results found

SELECT PROJECT CREDITS:

N/A
N/A
Protected

Academic year: 2021

Share "SELECT PROJECT CREDITS:"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

BKM Engineering Services Inc.

395 Harry Walker Parkway N., Unit #10, Newmarket, Ontario L3Y 7B3 Telephone (866) 769-7693, Fax: (866) 806-3170

SELECT PROJECT CREDITS

:

FIRE ALARM SYSTEMS

Project management of fire alarm system installations for institutional, commercial, industrial, and residential buildings. This work generally included review of existing installations, design of retrofit systems, construction review, contract administration, and verification of installed systems.

642 Sheppard Avenue East, Toronto – 19 Storey Residential Building

Design and tender documents for fire alarm panel replacement. Construction review services.

Brampton Towers, Brampton – Four 17 and 18 Storey Residential Buildings.

Design and tender documents for fire alarm panel replacements. Construction review services.

1035 Eglinton Avenue East, Toronto – 4 Storey Retirement Residence

Design and permit documents for fire alarm panel replacement. Construction review services.

4300 Bathurst Street, Toronto – 11 Storey Residential Building

Design and permit documents for fire alarm panel replacement. Construction review services.

43 and 47 Thorncliffe Park Drive, Toronto – 23 and 27 Storey Residential Buildings

Design and permit documents for fire alarm panel replacement. Construction review services.

100 Sheppard Avenue East, Toronto – 13 Storey Commercial Office Tower

Design and tender documents for fire alarm panel replacement. Construction review services.

525 University Avenue, Toronto – 15 Storey Commercial Office Tower

Design and tender documents for fire alarm panel replacement. Construction review services.

1 Adelaide Street East, Toronto – 31 Storey Commercial Office Tower

Design and tender documents for fire alarm panel replacement. Construction review services.

121 King Street West, Toronto – 26 Storey Commercial Office Tower

Design and tender documents for fire alarm panel replacement. Construction review services.

60 Yonge Street, Toronto – 13 Storey Commercial Office Tower

Design and tender documents for fire alarm panel replacement. Construction review services.

Burlington Square, Burlington – 20 Storey Res., 3 Storey Medical Centre & 2 Storey Retail

Design and tender documents for fire alarm upgrades. Construction review services.

St. Joseph's Health Centre, Toronto – Hospital, Institutional Facility

Third party verification of fire alarm system installation.

50 Eagle Street, Newmarket – Newmarket Courthouse.

Design and tender documents for fire alarm upgrades. Third party verification.

530 Adelaide Street West, Toronto – 6 Storey Office and Self-Storage Facility.

Design and tender documents for fire alarm upgrades. BKM

(2)

234 King Street East – 3 Storey Office and Restaurant.

Design and tender documents for fire alarm upgrades.

8000 Jane Street, Concord – 4 and 5 Storey Office Buildings

Design documents for new fire alarm system for two new office towers.

1 Toronto Street, Toronto (Standard Life) – 16 Storey Office Building and 17 Storey Residential

Building.

Assessment of existing fire alarm systems, with recommendations for repairs and upgrades.

77/99 Harbour Square, Toronto – Two 40 Storey Res. Building, 10 Storey Parkade/Recreational

Facility.

Design and tender documents, and project management for fire alarm upgrades.

6 Silver Maple Court, Brampton (GWL) – 24 Storey Residential Building.

Design and tender documents, and project management for fire alarm upgrades.

114 Dundas Street East, Whitby – Retail Strip Mall

Design drawings for fire alarm upgrades.

980 Elgin Mills Road, Markham – 2 Storey Retirement Residence

Design drawings and construction review for fire alarm system retrofit.

2250 Islington Avenue, Toronto, Quebecor Printing Press Facility

Design drawings and construction review for fire alarm system retrofit.

105 Gordon Baker Road, Morguard – 8 Storey Office Building

Design drawings and construction review for fire alarm system retrofit

1551 & 1591 Riverside Drive, Ottawa – GWL Realty Advisors – Two 16 Storey Residential Towers

Design and tender documents, and project management for fire alarm system retrofit.

609, 8th Street SW, Calgary – Two 36 Storey Residential Towers and 5 Storey Parkade

Design and tender documents, and project management for fire alarm system retrofit.

4637 Macleod Trail South, Calgary – Realstar Management - 18 Storey Commercial/Residential

Tower

Design and tender documents, and project management for fire alarm system retrofit.

414 Dawes Road, Toronto – Mixed occupancy Residential & Library

Design and tender documents for fire alarm upgrades required to meet Fire Code requirements.

5875 Whittle Road, Mississauga, Motorola – 1 Storey Production Facility

Design drawings and construction review for fire alarm system upgrades and access control installation.

2328 Keele Street – 3 Storey Retirement Residence

Design drawings for fire alarm upgrades.

St. Noel Chabel Catholic School, Wasaga Beach – Institutional

Third party verification of fire alarm system installation.

Daimler Chrysler, Brampton Production Plant – Industrial

Design drawings and construction review for fire alarm system installation.

(3)

Daimler Chrysler, Mississauga Parts Plant – Industrial

Design drawings and construction review for fire alarm system installation.

Daimler Chrysler, Ajax Production Plant – Industrial

Design drawings and construction review for fire alarm system installation.

Nouvelle Alliance, Catholic School, Barrie – Institutional

Third party verification of fire alarm system installation.

20 Grosvenor Street, Toronto, YMCA

Design drawings for fire alarm upgrades.

567 Sheppard Avenue, Toronto, YMCA

Design drawings for fire alarm upgrades.

6010 Bathurst Street, Toronto – 12 Storey Residential

Design drawings for fire alarm system retrofit.

939 Lawrence Avenue East, Toronto, Sears – Retail Store

Design drawings for fire alarm system retrofit.

284/286 King Street West, Toronto, Mirvish Productions – 5 Storey Office Building

Design drawings for fire alarm system retrofit.

95 Prince Arthur Avenue, Toronto – 8 Storey Residential

Design drawings and project management for fire alarm system retrofit.

1235 Bay Street, Toronto – 10 Storey Office Building

Design drawings for fire alarm system retrofit.

25 Grosvenor Street, Toronto, Ontario Realty Corporation – 20 Storey Provincial Offices

Design drawings for fire alarm system retrofit.

105 Adelaide Street, Toronto – 12 Storey Office Building

Design drawings for fire alarm system retrofit.

40 Sylvan Valley, 1555 Avenue Road, Toronto, Bedford Glen – 6 & 7 Storey Residential

Design drawings and project management for fire alarm system retrofit.

90 Eglinton Avenue West, Toronto, Pilot Insurance – 6 Storey Office Building

Design drawings and project management for fire alarm system retrofit.

66 Falby Court, Ajax – 20 Storey Residential

Third party verification of fire alarm system installation.

(4)

SPRINKLER SYSTEMS

This work generally included preparation and/or review of sprinkler installation working drawings including sprinkler hydraulics. Site review for compliance with permit documents and applicable Codes and Standards was also completed.

Credit Valley Hospital, Mississauga

Design, tender documents, project management and verification services for new Marioff "HI-FOG" sprinkler mist fire suppression system.

300 Antibes Drive, Toronto – 21 Storey Residential Building

Hydraulic and visual analysis of existing sprinkler systems for Fire Code compliance.

229 Yonge Street, Toronto – Office Tower

Review of sprinkler drawings and hydraulic calculations for office building renovations.

494 Avenue Road, Toronto – 8 Storey Residential Building

Hydraulic and visual analysis of existing sprinkler systems for Fire Code compliance.

31 Broadcast Lane, Toronto – 8 Storey Residential Building

Preparation of sprinkler design and working drawings for new townhouse complex.

300 Middlefield Road, Toronto, Honda Canada – Industrial

Review of sprinkler drawings and hydraulic calculations for industrial renovations.

Oshawa General Hospital

Review of sprinkler drawings and hydraulic calculations for new parking garage construction.

Onyx Warehouse, Toronto– Industrial

Review of sprinkler drawings and hydraulic calculations for industrial renovations.

83 Commerce Valley Drive, Markham – Industrial

Review of sprinkler drawings and hydraulic calculations for industrial renovations.

LIFE SAFETY STUDIES & CODE COMPLIANCE INVESTIGATIONS

Existing buildings were reviewed for compliance with Building and Fire Code requirements. Items reviewed included means of egress, fire separations, suppression systems and fire alarm and detection systems. Compliance alternatives were developed and implemented following review and approval by the Local Authority Having Jurisdiction.

Ontario Power Generation, General Services Facilities, Bruce Heavy Water Plant, Tiverton, Ontario – Life Safety Assessment:

Review of existing fire alarm, emergency lighting and suppression systems for compliance with Building and Fire Code requirements.

700 Kerr Street, Oakville – 3 Storey Office Building

Building Code and Life Safety Audit of existing commercial office building to address Fire Department Notice of Violation.

3 Lisa Street, Brampton – 15 Storey Residential

(5)

2515 Bathurst Street, Toronto – 11 Storey Residential

OFC Part 9 Fire Code Retrofit audit.

178/ 182 Front Street, Toronto – 3 Storey Industrial

Complete building Life Safety Study.

1700 The Collegeway, Mississauga – High-Rise Residential

OFC Part 9 Fire Code Retrofit audit.

7 St. Dennis Drive, Toronto – High-Rise Residential

OFC Part 9 Fire Code Retrofit audit

5 DuFresne Drive, Toronto – High-Rise Residential

OFC Part 9 Fire Code Retrofit audit.

10 Grenoble Drive, Toronto – High-Rise Residential

OFC Part 9 Fire Code Retrofit audit.

2645 Jane Street, Toronto – High-Rise Residential

OFC Part 9 Fire Code Retrofit audit..

398 Nash Road North, Hamilton – Commercial

Fire separation review.

FIRE SAFETY PLANS

Fire Safety Plans have been completed for institutional, commercial, industrial, and residential buildings. These plans included procedures in the event of a fire emergency, fire/ life safety duties for the designated supervisory staff, maintenance procedures for fire/life safety systems, and instructions describing the type, location and operation of building fire emergency systems.

Quebecor PE & E, 2250 Islington Avenue, Toronto – 1,000,000+ ft2 Industrial

Seneca College, King Campus – Institutional

90 Eglinton Avenue West, Toronto, Pilot Insurance – 6 Storey Office Building 8688 Woodbine Avenue, Trimark, Markham – Industrial

1315 Bough Beeches Boulevard, Toronto – 20 Storey Residential 1555 Avenue Road, Toronto – 6 Storey Residential

40 Sylvan Valleyway, Toronto – 7 Storey Residential 1875 Steeles Avenue West, Toronto – Residential 1580 Sandhurst Circle, Toronto - Residential

667 King Street West, Toronto – 3 Storey Heritage Commercial Building 55 Elm Drive – 24 Storey Residential

(6)

530 Lolita Gardens, Mississauga – 20 Storey Residential 580 Christie Street, Toronto – 20 Storey Residential 4961 King Street East, Beamsville Plaza – Retail Plaza 287 West Side Road, Port Colbourne Mall – Retail Plaza

286 Bunting Road, Briarfield Plaza, St. Catherines – Retail Plaza

MISCELLANEOUS

Toronto Fire Department Burn Cell Structure

Design of Toronto Fire Department concrete burn cell structure utilized for Fire Department training purposes.

References

Related documents

Recommendation #7: Facilitate fora of CSO and Regional Negotiating Machinery, (CRNM).. CRNM has recently prepared a private sector outreach strategy. Although there is no

7.01 Walls & Ceilings: The walls and ceilings are largely finished in original plaster with updated drywall present primarily in the kitchen.. Overall, the walls and ceilings

stochastic synthetic weather time-series representative of the climatic conditions in the area.. If the crop model is correctly calibrated and validated, this would

Toronto and East York Community Council authorize the installation of speed bumps in the east-west public lane north of Millicent Street, between Emerson Avenue and Dufferin

Our objective was to evaluate the effect of partial substitution of Na with K on sur- vival of lactic acid bacteria (LAB) and nonstarter LAB (NSLAB), pH, organic acid production,

The recording of financial transactions in manual accounting systems at Ama- nano Rural Bank Limited is through books of original entries but under the computerized

The bathroom exhaust fans located in the basement and on the second floor are also operable and are vented to the exterior. The dryer in the basement is vented to

The west grading should be set up to direct water to flow south and north (diverting away from the house) as much as possible.. Nevertheless, some dampness and wall efflorescence