PROJECT PLANNING

SCOPE, ROLE, RESPONSIBILITIES

(2)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

3

Summary

What is a WBS?

What is a OBS?

What is a RAM?

www.isipm.org

What is a WBS?

(3)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

5

What is a WBS?

• Definition:

“A

WBS

is the primary tool used to define

“what to do” in the project …

in a few words, it describes project scope

(ISIPM)

“A

WBS

is a deliverable-oriented hierarchical

decomposition of the work to be executed

by the project team to accomplish the project objectives

and create the required deliverables.

It organizes and defines the total scope of the project

(PMI)

The planned work is contained within the lowest level

WBS components, which are called work packages

www.isipm.org

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

6

WBS … the “magic tree”

ICT PROJECT (an example)

FEASIBILITY ANALYSIS NEEDS ANALYSIS SOFTWARE ANALYSIS HARDWARE ANALYSIS REQUIREMENTS ANALYSIS MODULE 1 MODULE 2 MOULE N MODULES HELP TECHNICAL DOC USER MANUAL TRAINING MANUAL DOCUMENT DEVELOPMENT HARDWARE TEST SOFTWARE TEST TESTING HARDARE DEPLOY SOFTWARE DEPLOY DEPLOY ROLL-OUT

ICT

PROJECT

16 work packages

A work package can be

scheduled,

cost estimated,

(4)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

7

WBS & Decomposition Criteria

(1/4)

• Decomposition

is the

subdivision of project deliverables into

smaller, more manageable components

until the work and

deliverables are defined to the work package level

• The

work package level

is the

lowest level in the WBS

, and is the

point at which the cost and activity durations for the work can be

reliably estimated and managed

• Steps

– Identifying and analyzing the deliverables and related work

– Structuring and organizing the WBS

– Decomposing the upper WBS levels into lower level detailed

components (

measurable/controllable, assignable to a single resp.)

– Developing and assigning identification codes to the WBS components

– Verifying that the degree of decomposition of the work is necessary

and sufficient

www.isipm.org

WBS & Decomposition Criteria

(2/4)

• The WBS structure can be created in a number of forms

– Using phases of the project life cycle as the first level of

decomposition, with the product and project deliverables inserted

at the second level (see slide 9)

– Using major deliverables as the first level of decomposition (see

slide 10)

– Using subprojects which may be developed by Organizations

outside the project team, such as contracted work

• As the work is decomposed to greater levels of detail, the

ability to plan, manage, and control the work is enhanced

• The total of the work at the lowest levels must roll up to the

higher levels so that nothing is left out and no extra work is

(5)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

9

WBS & Decomposition Criteria

(3/4)

FEASIBILITY ANALYSIS NEEDS ANALYSIS MODULE 1 FUNCTIONAL ANALYSIS MODULE 2 FUNCTIONAL ANALYSIS FUNCTIONAL ANALYSIS MODULE 1 TECHNICAL ANALYSIS MODULE 2 TECHNICAL ANALYSIS HARDWARE TECHNICAL ANALYSIS TECHNICAL ANALYSIS REQUIREMENTS ANALYSIS MODULE 1 DEVELOPMENT MODULE 2 DEVELOPMENT MODULE DEVELOPMENT HELP TECHNICAL DOCUMENTS

USER MANUAL TRAINING MANUAL DOCUMENTS DEVELOPMENT HARDWARE TEST MODULE 1 TEST MODULE 2 TEST MODULE TEST TESTING HARDWARE DEPLOY SOFTWARE DEPLOY

DEPLOY ROLL OUT

ICT

PROJECT

19 work packages

www.isipm.org

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

10

WBS & Decomposition Criteria

(4/4)

19 work packages

FEASIBILITY ANALYSIS NEEDS ANALYSIS ANALYSIS MODULE 1 FUNCTIONAL ANALYSIS MODULE 1 TECHNICAL ANALYSIS NODULE 1

DEVELOPMENT MODULE 1TEST

MODULE 1 MODULE 2 FUNCTIONAL ANALYSIS MODULE 2 TECHNICAL ANALYSIS MODULE 2

DEVELOPMENT MODULE 2TEST

MODULE 2 MODULES HELP SOFTWARE DEPLOY ROLL OUT SOFTWARE HARDWARE TECHNICAL ANALYSIS HARDWARE TEST HARDWARE DEPLOY HARDWARE TECHNICAL DOCUMENTS USER MANUAL TRAINING MANUAL DOCUMENTS ICT PROJECT

(6)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

11

WBS … a roll-up aggregation

FEASIBILITY ANALYSIS . (3 days) NEEDS ANALYSIS . (2 days) ANALYSIS . (5 days) MODULES . . (35 days) HELP . . (4 days) SOFTWARE DEPLOY . (1 day) ROLL OUT . . (2 days) SOFTWARE . (42 days) HARDWARE TECHNICAL ANALYSIS (4 days) HARDWARE TEST . (1 days) HARDWARE DEPLOY . (1 day) HARDWARE . (6 days) TECHNICAL DOCUMENTS . (3 days) USER MANUAL . . (4 days) TRAINING MANUAL . (2 days) DOCUMENTS . (9 days) ICT PROJECT (62 days)

”B

o

tt

o

m

U

p

P

ro

ce

ss

www.isipm.org

WBS … a drill-down control

FEASIBILITY ANALYSIS . (3 days) NEEDS ANALYSIS . (2 days) ANALYSIS . (5 days) MODULES . . (35 days) HELP . . (4 days) SOFTWARE DEPLOY . (1 day) ROLL OUT . . (2 days) SOFTWARE . (42 days) HARDWARE TECHNICAL ANALYSIS (4 days) HARDWARE TEST . (1 day) HARDWARE DEPLOY . (1 day) HARDWARE . (6 days) TECHNICAL DOCUMENTS . (3 days) USER MANUAL . . (4 days) TRAINING MANUAL . (2 days) DOCUMENTS . (9 days) ICT PROJECT (62 days)

Description: Documents

Responsibility: Mr. Rossi

Duration: 9 days

Start: 06-04-2012 End: 06-14-2012

Budget: € 2.000

Effort : 15 man/days

Resources: 2

Attività X Attività Y Attività Z MARZO 1999

Time Baseline

Cost Baseline

(7)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

13

Work Package Description

(1/2)

• A WP Description

is a “card” which should contain

– Responsible/Actors – who responds?

– Basic Activities – what to do?

– Requirements/Deliverable – what should be produced?

– Deadine – by when?

– Budget – how much?

– Resources Commitment – with whom?

– Inputs

– Outputs

– ……..

www.isipm.org

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

14

Work Package Description

(2/2)

WP Title:

NA – Needs Analysis

WP Description:

Customer Needs & Expectations Analysis

Responsible:

Mr. Viola

Business Analyst

Budget:

€ 1,000

Inputs:

Initial Idea (Concept)

Feasibility Analysis/Business Plan

………

Outputs:

Requirements Analysis

Requirements Traceability Matrix

…….

Deadlines:

Within 1 week

(8)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

15

WBS … a Summary

• Define the “boundaries”

of the scope of project work (the

work to be done and what should not be done)

• Decompose

the work in modular elements of small entity

… more

manageable, measurable, controllable

• Describe

project products/services/results (

deliverables

)

• Create a rational and rigorous basis

for Project Planning &

Control in terms of time, cost, quality

• Identify the project

without depending on involved actors

• Constitute

the basic reference for Project Communication

Management

www.isipm.org

(9)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

17

What is a OBS?

• Definition:

“A

OBS

is the organizational structure

of the project …

it is independent of the Enterprise Organization

(ISIPM)

“A

OBS

is a hierarchically organized depiction

of the project organization arranged so as to

relate the work packages to the performing

organizational units

(PMI)

www.isipm.org

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

18

(10)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

What is a RAM?

19

www.isipm.org

What is a RAM?

• Definition:

“A

RAM

is the tool (matrix chart) used to facilitate the

assignment of project responsibilities …

it is obtained by crossing WBS (what) & OBS (who does)

(ISIPM)

“A

RAM

is a structure that relates the project

organizational breakdown structure to the work breakdown

structure to help ensure that each component of the

scope of work is assigned to a person/ team

(PMI)

A particular version of RAM ia a

RACI (responsible,

(11)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

21

WBS, OBS, RACI … an example

(1/2)

WBS for "Charity Dinner"

Invitation € 100 Room € 700 Menù € 100 Staff € 200 Organization € 1,100 Food € 3,000 Beverage € 1,000 Provision € 800 Flower/Flowerpot € 400 Procurement € 5,200 Room € 200 Kitchen € 200 Appetizer € 100 First Course € 300 Main Course € 500 Dessert € 100 Cooking € 1,000 Appetizer € 50 First Course € 80 Main Course € 120 Dessert € 50 Service € 300 Preparation € 1,700 Charity Dinner € 8,000

OBS for "Charity Dinner"

Secretary Mrs. Bruni € 1,500 P.R. Mrs. Paoli € 800 Chef Team Mr. Marini € 5,000 Carriage € 100 Waiter € 600 Service Team Mr. Ulivi € 700 Project Manager Mr. Verdi € 8,000

WBS - Cost Aggregation

OBS – Cost Aggregation

InvitiScelta sala Scelta menùPersonale Org anizzazio ne

C ibiBevandeV ett ovaglieFior i Acq uisti

Sala CucinaCotturaS er vizio Preparazione WBS - Cena di gala Segreteri a Sig.a Salvi Uffi ci o P. R. D.ssa Paoli Sq uadra Cuci na 1° Chef

Impres a di Tras porto Squadra Ca me rie ri Uffici o S ervizi Sig. Ulivi Resp. Progetto Dott. Galante RACI MATRIX www.isipm.org

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

22

WBS, OBS, RACI … an example

(2/2)

Secretary Mrs. Bruni P.R. Mrs. Paoli Cheaf Team Mr. Marini Carriage Waiter Service Team Mr. Ulivi Project Manager Mr. Verdi

OBS

Invitation Room Menù Staff

Organization

Food Beverage Provision Flower/ Flowerpot

Procurement

Room Kitchen Cooking Service

Preparation

Charity Dinner

WBS

R = Responsible, A = Accountable, C = Consult, I = Inform

R

A

C

(12)

© ISIPM – Istituto Italiano di Project Management – Via Vallombrosa , 47/a – 00135 Roma

23

Thanks for

your attention!

References

Related documents

The JMA physicians’ liability insurance covered the liability of individual Class-A members, but payments for the liability of non-member physi- cians were cut, and there was a rush

By analysing four types of district heating plants, ranging from fully integrated with an electricity system (combined heat and power and electric boiler) to no integration with

Leptin and TNF- a mRNA expression were altered in the subcutaneous adipose tissue from cachectic (cancer and non-cancer) patients (p = 0.005 and p = 0.009; 2-way ANOVA effect

Considering the high employee turnover in the hospitality industry and the severe unemployment rate among persons with disabilities in India, this study was undertaken to

Change the dNTP solution (very sensitive to cycles of thawing and freezing, especially in multiplex PCR) If you just bought new primers, check for their reliability (bad

For 90% powered trials with a small standardised effect size of 0.2 (using the NCT approach) the existing rules of thumb could lead to an extra 48 participants over the

The fourth step of the Profile Matching method is the calculation of the total value of each aspect performed on file selection and final selection by

18a and 18b show the reachability and power consumption, respectively, for a probabilistic forwarding model using rateless coding at the source at well as