• No results found

Selected heuristic algorithms for solving job shop and flow shop scheduling problems

N/A
N/A
Protected

Academic year: 2021

Share "Selected heuristic algorithms for solving job shop and flow shop scheduling problems"

Copied!
36
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

We attribute our success in managing this patient to prompt surgical management and appropriate antifungal therapy, and cannot overstate the importance of collab- oration between

Cervical and breast cancer screening uptake among women with serious mental illness: A data1.

So, it is expedient to estimate not only total quantity of surface mucus glycoproteins, but also qualitative composition of their carbohydrate residues, in particular, the content

To provide for the compensated nonpatient care time that each FTE includes, additional FTEs of pa- tient care time must be added to provide for the total calcu- lated patient care

Associations between nutrition attitudes, socioeconomic status, and vitamin E intake on blood pressure among elderly with hypertension in Klaten, Central

Waterlow criteria = [(height of patient) / (height of a normal child of the same age)] x100 Cole criteria = z-scores of BMI for age Gross motor function of children was assessed

C.: The natural history of pulmonary hypertension in chil- dren with ventricular septal defects assessed. by serial