Annual Update on Water Quality

Annual Update on Water Quality

for the Rio Grande

for the Rio Grande

and the Clean Rivers Program

and the Clean Rivers Program

USIBWC Citizens

USIBWC Citizens

Forum

Forum

and Upper Rio Grande Basin Advisory Meeting

and Upper Rio Grande Basin Advisory Meeting

September 29, 2009

September 29, 2009

Elizabeth

Elizabeth VerdecchiaVerdecchia and Leslie and Leslie GrijalvaGrijalva Texas Clean Rivers Program

Texas Clean Rivers Program

U.S. Section, U.S. Section,

International Boundary and Water Commission International Boundary and Water Commission

(2)

Texas Clean Rivers Program

Texas Clean Rivers Program

History

History

¾

¾

1991 Texas Clean Rivers Act

1991 Texas Clean Rivers Act

¾

¾

1998 TCEQ

1998 TCEQ

-

-

USIBWC partnership

USIBWC partnership

¾

¾

2009 monitoring sites on Rio Grande:

2009 monitoring sites on Rio Grande:

z

z

CRP

CRP

48 sites

48 sites

z

(3)

What is the Clean Rivers Program?

What is the Clean Rivers Program?

¾ A state fee-funded program

¾ A group of federal, state and local organizations that have an interest in the health of our states streams, rivers and lakes.

¾ The USIBWC Clean Rivers Program collects water quality data from the Rio Grande and Pecos Rivers.

¾ We then use that data to:

z identify and evaluate water quality issues z establish priorities for corrective actions z work to implement those actions.

(4)

CRP Activities

CRP Activities

¾

¾ Water Quality MonitoringWater Quality Monitoring

z

z Routine monitoringRoutine monitoring

z

z Special studiesSpecial studies

¾

¾ Water Quality AssessmentWater Quality Assessment

¾

¾ PublicationsPublications

z

z Annual Basin Highlight ReportAnnual Basin Highlight Report

z

z 55--year Basin Summary Reportyear Basin Summary Report

¾

¾ Outreach and EducationOutreach and Education

¾

(5)

FY09 CRP Accomplishments

FY09 CRP Accomplishments

¾

¾ Submitted all data through Nov Submitted all data through Nov 2008 for TCEQ 2010 Assessment

2008 for TCEQ 2010 Assessment

¾

¾ Laboratory accredited for bacteriaLaboratory accredited for bacteria

¾

¾ More outreach activitiesMore outreach activities ¾

¾ Participation in projects such as Participation in projects such as Big Bend workshops &

Big Bend workshops & saltcedarsaltcedar biological control meetings

biological control meetings

¾

¾ Funded 5 water quality/education Funded 5 water quality/education

projects

projects

¾

¾ CRP in charge of USIBWC CRP in charge of USIBWC Adopt

Adopt--aa--River ProgramRiver Program ¾

(6)

Funded Projects in the Upper RG

Funded Projects in the Upper RG

¾

¾ EPCC Early College Program EPCC Early College Program - -Supplies/equipment research in

Supplies/equipment research in

salinity in water and riparian

salinity in water and riparian

plants

plants

¾

¾ RiGoRiGo –– supplies for river supplies for river

cleanups with community groups

cleanups with community groups

¾

¾ UTEP UTEP -- Equipment for Equipment for

continuous water quality station

continuous water quality station

in Forgotten Stretch

in Forgotten Stretch

¾

¾ EPCC RISE Program EPCC RISE Program –– supplies supplies for bacteria source

for bacteria source--tracking ontracking on- -going research

(7)

Other funded projects throughout

Other funded projects throughout

the Basin

the Basin

¾

¾

Printed manuals

Printed manuals

and brochures for

and brochures for

soil erosion

soil erosion

training in Lower

training in Lower

Rio Grande

Rio Grande

Valley

Valley

(8)

Interested in Monitoring?

Interested in Monitoring?

¾

¾

Texas Stream Team

Texas Stream Team

-

-

Volunteer WQ

Volunteer WQ

Monitoring Program

Monitoring Program

¾

¾

Great for teachers

Great for teachers

¾

¾

http://txstreamteam.rivers.txstate.edu/

http://txstreamteam.rivers.txstate.edu/

¾

(9)

Local Partnerships

Local Partnerships

¾

¾

7 partners in the Upper Rio Grande help

7 partners in the Upper Rio Grande help

monitor, collect, & analyze samples:

monitor, collect, & analyze samples:

z

z USIBWC Field Offices at El Paso and PresidioUSIBWC Field Offices at El Paso and Presidio

z

z University of Texas at El PasoUniversity of Texas at El Paso z

z El Paso Community CollegeEl Paso Community College

z

z University of Texas at BrownsvilleUniversity of Texas at Brownsville z

z TCEQ El Paso Field OfficeTCEQ El Paso Field Office

z

z Big Bend National Park Big Bend National Park

z

z TCEQ Continuous Water Quality MonitoringTCEQ Continuous Water Quality Monitoring

¾

¾

Use TCEQ sampling procedures and an

Use TCEQ sampling procedures and an

accredited laboratory for analysis

(10)

2009 Monitoring Sites

(11)

2009 Upper RG Monitoring Sites

31 Upper RG Sites:

17 - IBWC CRP 14 - TCEQ

(12)

Water Quality Uses and Standards

Water Quality Uses and Standards

¾

¾ TCEQ uses these standards to assess the river and TCEQ uses these standards to assess the river and determine if any segments are impaired (303d List)

determine if any segments are impaired (303d List)

¾

¾ 2308 Non2308 Non--contact usecontact use

¾

(13)

Bacteria Bacteria Chloride TDS Chloride TDS

Impairments on the 2008-10 Texas

Water Quality Inventory and 303(d) List

(14)

Chloride TDS

Bacteria

13232

Impairments on the 2008-10 Texas Water

Quality Inventory and 303(d) List

(15)

Concerns on the 2008-10 Texas Water

Quality Inventory and 303(d) List

Total phosphorus Orthophosphorus Total phosphorus Ammonia Nitrate Nitrate Chlorophyll-a

(16)

Salinity Study

Salinity Study

¾

¾

Will begin planning phase for salinity

Will begin planning phase for salinity

special study this fall

special study this fall

¾

¾

EPCC and UTEP

EPCC and UTEP

¾

¾

Intensive monitoring in the Upper Rio

Intensive monitoring in the Upper Rio

Grande

(17)

Metals Study

Metals Study

¾

¾

CRP will collect total and dissolved metals

CRP will collect total and dissolved metals

at 5 sites in El Paso

at 5 sites in El Paso

¾

¾

Under TCEQ quality assurance plan

Under TCEQ quality assurance plan

¾

(18)

Pesticides Study

Pesticides Study

¾

¾

Pesticides/Organics in sediment analyzed for 3 years

Pesticides/Organics in sediment analyzed for 3 years

from 2007 to 2009 semiannually at all CRP stations

from 2007 to 2009 semiannually at all CRP stations

¾

¾

23 chemicals tested

23 chemicals tested

¾

¾

Most stations did not detect any organics

Most stations did not detect any organics

¾

¾

Upper Rio Grande had 1 station that detected

Upper Rio Grande had 1 station that detected

DDE/DDT (Alamo Grade upstream of Ft Hancock) in

DDE/DDT (Alamo Grade upstream of Ft Hancock) in

2008

2008

¾

¾

EPWU collects monthly organics in water

EPWU collects monthly organics in water

Æ

Æ

no

no

detects

(19)

Clean Water Restoration Act

Clean Water Restoration Act

S

S

-

-

787

787

¾

¾

Currently in Congress, introduced April 09;

Currently in Congress, introduced April 09;

June passed committee

June passed committee

¾

¾

Amends the Federal Water Pollution

Amends the Federal Water Pollution

Control Act (the Clean Water Act) to

Control Act (the Clean Water Act) to

replace the term "navigable waters" that

replace the term "navigable waters" that

are subject to such Act with the term

are subject to such Act with the term

"waters of the United States"

(20)

Request for Info: Vehicles

Request for Info: Vehicles

¾

¾

Motorized vehicles prohibited on levee and

Motorized vehicles prohibited on levee and

in river

in river

¾

(21)

CRP Website has changed

CRP Website has changed

www.ibwc.gov/CRP/Index.htm

(22)

Information

Information

on Website

(23)

~International Boundary and Water Commission (IBWC) Viewer -Moz1lla FirefoK I

Ejle ~dit 'ijew Hi:;tory ~ookmarl<s Iools t!elp

~ jii!J http://gisdata.usgs.gov/website/ibwc/viewer.htm?Box=·107.052:25.39:-96.147:33.23B

D Envl D gls D html D lBWC Info "(' Hotmall D Links D NMSU Geog D personal D training opp 0 lBWC Home D CRP D UTEP

International Boundary and Water Commission (IBWC) CRetumto•t.rt••••> Tutorial

..-· . ...... New Mexico \. , Texas 1 Scale Informati ~ Out Scale- 1:5. ~Water Qualit ~ Real-time ar Monitoring ~ Hydrograph1 ~ Places (Nam ~ Anthropoger ~Transport at I ~ Hydrogeolo~ ~Biology ~Geology ~Census ~ Boundaries ~ Ortholmager ~land Cover ~Elevation

(24)

IBWC Viewer» Site Page

Site Description

Photos Graphs

Complete S1te List

~Water Bul etins ~ Go to Site Data Page:

I enter site number !...§£...J

Also Identified As:

08-4 750.00 (IB WC ID)

13177 (TCEQ ID)

084 75000 (USGS ID)

~ print friendly version

r

08-4750.00 RIO GRANDE AT El JARDIN PUMP Stream Site Description

Location

Latitude 25"52'35", longitude 97 "72'15.01 ", Cameron County, Texas, United States.

Description

Drainage area: not available; Contributing drainage area: not available, Datum of gage: 0 feet above sea level.

Cableway, bubbler gage, water-stage recorders (graphic and digital), and DCP with GOES high data rate telemetry located on the left bank at river kilometer 78.3, 0.3 river kilometer downstream from El Jardin pumping plant, and 11 .2 river kilometers downstream from the international highway bridge (Gateway) between Brownsville, Texas and Matamoros, Tamaulipas. The zero of the gage is at mean sea level, U. S. C.

a G. S. datum.

Available Data

Data Type Be~in Date End Date Count

I Real-Time Data

212812007

I Historical Flow Data 1/1/1934

3014

II Field/lab Water-Quality Samples 1/24/1995 2/21/2007

Photos, Maps, and Graphs

>>Click on an image to view more

(25)

Photo Gallery

(26)

¾

¾

Community groups

Community groups

adopt a 2

adopt a 2

-

-

mile

mile

section of river for 2

section of river for 2

years

years

¾

¾

Commit to 2

Commit to 2

-

-

3

3

cleanups per year

cleanups per year

USIBWC

USIBWC

s

s

Adopt

Adopt

-

-

a

a

-

-

River

River

Program

(27)

Adopt

Adopt

-

-

a

a

-

-

River

River

¾

¾

Community groups

Community groups

leave

leave

trashbags

trashbags

on

on

levee

levee

¾

¾

IBWC picks up and

IBWC picks up and

disposes of trash

disposes of trash

¾

¾

Sign acknowledging

Sign acknowledging

group posted

(28)

Adopt

Adopt

-

-

a

a

-

-

River

River

¾

¾

Many sections available

Many sections available

for adoption

for adoption

¾

(29)

2010 Calendars

2010 Calendars

¾

¾

Please sign sheet if

Please sign sheet if

you are interested

you are interested

in a calendar

(30)

Questions?

Questions?

USIBWC

USIBWC

-

-

CRP

CRP

Elizabeth

Elizabeth

Verdecchia

Verdecchia

, 915

, 915

-

-

832

832

-

-

4701

4701

elizabethverdecchia@ibwc.gov

elizabethverdecchia@ibwc.gov

Leslie

Leslie

Grijalva

Grijalva

, 915

, 915

-

-

832

832

-

-

4770

4770

legrijal@ibwc.gov

legrijal@ibwc.gov

CRP Website

CRP Website

www.ibwc.gov/CRP/Index.htm

www.ibwc.gov/CRP/Index.htm

References

Related documents

We are a vibrant local network of passionate change management professionals coming together to share knowledge and expand their reach by helping people and organizations

Students will submit a total of eight (8) system assessments and will complete a total integrated assessment to meet course requirements. Guidelines for collecting this data will

Figure 1-13 Zoom of European transport graph in Barcelona, Madrid, Milan, Frankfurt and Scotland showing interconnection of networks (road, rail, air)

Pada pengujian ini sistem akan diberikan 12 sampel pola aksara Jawa, masing-masing aksara diberikan sampel 4 pola aksara. Untuk masing-masing aksara Jawa akan

nonlinear Acrobot model revealed that the basin of attraction around the vertically erect equilibrium afforded by these physically realizable gains lay nearly below the

The Lower Rio Grande Valley TPDES Stormwater Taskforce. A WORKI NG MODEL F OR REGI

• Activities in a watershed affect water quality in streams and rivers in that watershed..

Items requiring approval of the president only (Chancellor for U. All interdepartmental transfers. All budget transfers between line-item appropriations within a department.