• No results found

Ark Data Centre Information Pack

N/A
N/A
Protected

Academic year: 2021

Share "Ark Data Centre Information Pack"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

Ark Continuity Limited

Hartham Park

Corsham

Wiltshire

SN13 0RP

0845 389 3355

www.arkcontinuity.co.uk

Our Commitment

Welcome to Ark Data Centre’s information pack.

As the CEO of Ark I welcome the opportunity to work with you either full of the details you need to support your decision. If you do need any further information please don’t hesitate to ask.

Our new, modular data centre solutions, based on dedicated campuses, lead the market and offer best in class facilities for our customers. Ark don’t shoehorn data centre infrastructure into an security options to be included.

year.

sector.

desire to work with you to continuously and responsibly deliver that underpins our modern economy and public services.

Our Commitment

Huw Owen

Contents

Our Commitment 3 Our Data Centre

Our Data Centre

Data Centre Solutions 6 Ark Product Portfolio 7 Ark Product Portfolio

Modular 8 Ark Product Portfolio

Security 10 Sustainability 11

Operational Excellence 13

(3)

Our Data Centre Campus Cody Park

with advanced power and network infrastructure.

Always On

Always Connected

Our Data Centre Campus Spring Park

5

4

t

36 acre, secure campus

t

Freehold, low risk site

t

Data Centre A9 module 1 operational, second phase under construction

t

t

t

t

t

c1,001,043 ft

t

t

t

t

t

t

Diversely fed Primary and Secondary PoP rooms

Always On

Always Connected

t

t

t

t

t

t

Diversely fed Primary and Secondary PoP rooms

Always On

Always Connected

t

38 acre, secure campus

t

Freehold, low risk site

t

Data Centre SQ17 module 1 operational, second phase under construction

t

t

t

t

t

(4)

Data Centre Solutions

in a fraction of the time it takes for a traditional build.

Low proven PUE:

losses taken into account.

Consistently low PUE across variable loads:

Low, medium and high rack kW densities:

space.

Small, medium and large data centres:

data centres of thousands of racks over hundreds of thousands of square feet.

Resilience:

tolerance if required.

Financial:

be kept as low as possible on day one with maximum return on investment achieved

Our Solutions

Ark Product Portfolio

Ark Product Portfolio

Modular:

Tailored:

requirements.

(5)

Ark Product Portfolio - Modular

Ark Product Portfolio - T

ailored

Spring Park - P1

Spring Park - SQ17

P1 is located within its own secure 86,700 ft

sequence of phased construction in 3 phases that does not impact upon the initial occupants in any way. and incorporates its own dedicated M&E power and Once fully developed, P1 will consist of:

t

t

Each data room is provided with a maximum of

t

t

t

is due in May 13.

Cody Park - A101

A101 is located within its own secure 86,700 ft compound at Cody Park.

of phased construction in 3 modules that does not impact upon the initial occupants in any way. Each infrastructure

Once fully developed, A101 will consist of:

t

t

Each data room is provided with a maximum of

t

t

t

within an IL3 security environment.

further modules rolled out to meet customer demand.

SQ17 is located within its own secure 375,660 ft Once fully developed, SQ17 will consist of:

t

t

Suites

t

Each suite incorporates 1,679 ft of white space

t

Secure maintenance service corridors contain

t

IL4 and above.

SQ17 module 1 is operational and development of the next phase for subsequent modules currently underway.

Cody Park - A9

A9 is located within QinetiQs secure headquarters at Once fully developed, A9 will consist of:

t

t

t

Suites can incorporate either 1,345 ft or 1,614 ft

t

separately.

t

(6)

Security

Security

Security at each campus includes:

the Campus

Sustainability

Sustainability

needs.

(7)

Agility

enable the rapid delivery of Best In Class data centre solutions.

manufactured solution.

t

Reduced time to market

t

Lower obsolescence

t

Continuous improvement

t

t

t

t

Modular Deployment

t

Innovative

t

Best Practice

Operational Excellence

13

Operational Excellence

Planned Preventative Maintenance

Example Maintenance Reports

Maintenance Providers

 t Mechanical Systems

Build - Operate - Maintain

(8)

Senior Leadership T

eam

Senior Leadership T

eam

recapitalisation in July. Huw will move the business to the next level and ensure it is

Professional Examination and then Law Society’s Final Examination in 1990. He was admitted to the Law Society

Ian Perryment, Director, Finance & Compliance

In addition to Finance, Ian also has responsibility for the Compliance team who Ark’s business critical standards and compliance.

services to the British armed forces.

Steve Hall, Executive Sales & Marketing Director

full P&L, of over £400M, responsibility.

Jeffrey Thomas, Non - Executive Chairman

(9)

Senior Leadership T

eam

17

Senior Leadership T

eam

16

Philip (Pip) Squire, Director, Design & Build

Richard Borton, Director, Live Services

procedure development and optimi

s

ation. portfolio value in excess of £650 million.

Simon Burrage, Commercial Director

Company where he was responsible for operations in Europe, South Africa and Japan.

Italy.

it was acquired by Cendant Corporation.

Kevin Bone, Director, Business Programmes & Client

Change

(10)

#MBOLQBHFPGJOTFSUQPDLFU

professional in the Ark approach to data centre delivery.

Credentials

(11)

References

Related documents

This paper examines how differentially valued embodied identities are reproduced through the social networks and relationships of young people with mind-body- emotional

This system available from Cannon and our worldwide partner network enables clients to deploy High Density Computing, CCTV, Cell Telco, Network switching, Card Services or

The transducer should be fitted by tapping a hole at the point where it has to be fixed. If this is not possible, apply a block with tapped hole on the machine support. The use

Booklet N.8 - “Accuracy in balancing rigid rotors” Booklet N.10 - “Balancing of flexible rotors” Booklet N.11 - “Testing of balancing machines”. Booklet N.17 -

REMARQUE : prenez garde de ne pincer aucun câble lors de l’installation de la base de la

Uniquely for this kind of truck, the M series are fitted with a solid bloc chassis that is perfectly able to withstand the effects from twisting on rough terrain, with a suspended

bilingual phrases 2000 frases bilingues NIVEL 5 para el quinto curso de las escuelas de idiomas LEVEL 5 for the fifth course of the schools of languages...

Proof Recall that if T K is tangent to circle at T and O is centre of circle, then the angle between chord T L and tangent line T is one half of angle subtended at centre O by chord