Welcome to Ark Data Centre’s information pack.
As the CEO of Ark I welcome the opportunity to work with you either full of the details you need to support your decision. If you do need any further information please don’t hesitate to ask.
Our new, modular data centre solutions, based on dedicated campuses, lead the market and offer best in class facilities for our customers. Ark don’t shoehorn data centre infrastructure into an security options to be included.
year.
sector.
desire to work with you to continuously and responsibly deliver that underpins our modern economy and public services.
Our Commitment
Huw Owen
Contents
Our Commitment 3 Our Data Centre
Our Data Centre
Data Centre Solutions 6 Ark Product Portfolio 7 Ark Product Portfolio
Modular 8 Ark Product Portfolio
Security 10 Sustainability 11
Operational Excellence 13
Our Data Centre Campus Cody Park
with advanced power and network infrastructure.
Always On
Always Connected
Our Data Centre Campus Spring Park
5
4
t
36 acre, secure campust
Freehold, low risk sitet
Data Centre A9 module 1 operational, second phase under constructiont
t
t
t
t
c1,001,043 ftt
t
t
t
t
t
Diversely fed Primary and Secondary PoP roomsAlways On
Always Connected
t
t
t
t
t
t
Diversely fed Primary and Secondary PoP roomsAlways On
Always Connected
t
38 acre, secure campust
Freehold, low risk sitet
Data Centre SQ17 module 1 operational, second phase under constructiont
t
t
t
t
Data Centre Solutions
in a fraction of the time it takes for a traditional build.
Low proven PUE:
losses taken into account.
Consistently low PUE across variable loads:
Low, medium and high rack kW densities:
space.
Small, medium and large data centres:
data centres of thousands of racks over hundreds of thousands of square feet.
Resilience:
tolerance if required.
Financial:
be kept as low as possible on day one with maximum return on investment achieved
Our Solutions
Ark Product Portfolio
Ark Product Portfolio
Modular:
Tailored:
requirements.
Ark Product Portfolio - Modular
Ark Product Portfolio - T
ailored
Spring Park - P1
Spring Park - SQ17
P1 is located within its own secure 86,700 ft
sequence of phased construction in 3 phases that does not impact upon the initial occupants in any way. and incorporates its own dedicated M&E power and Once fully developed, P1 will consist of:
t
t
Each data room is provided with a maximum oft
t
t
is due in May 13.
Cody Park - A101
A101 is located within its own secure 86,700 ft compound at Cody Park.
of phased construction in 3 modules that does not impact upon the initial occupants in any way. Each infrastructure
Once fully developed, A101 will consist of:
t
t
Each data room is provided with a maximum oft
t
t
within an IL3 security environment.
further modules rolled out to meet customer demand.
SQ17 is located within its own secure 375,660 ft Once fully developed, SQ17 will consist of:
t
t
Suites
t
Each suite incorporates 1,679 ft of white spacet
Secure maintenance service corridors containt
IL4 and above.
SQ17 module 1 is operational and development of the next phase for subsequent modules currently underway.
Cody Park - A9
A9 is located within QinetiQs secure headquarters at Once fully developed, A9 will consist of:
t
t
t
Suites can incorporate either 1,345 ft or 1,614 ftt
separately.
t
Security
Security
Security at each campus includes:
the Campus
Sustainability
Sustainability
needs.
Agility
enable the rapid delivery of Best In Class data centre solutions.
manufactured solution.
t
Reduced time to markett
Lower obsolescencet
Continuous improvementt
t
t
t
Modular Deploymentt
Innovativet
Best PracticeOperational Excellence
13
Operational Excellence
Planned Preventative Maintenance
Example Maintenance Reports
Maintenance Providers
t Mechanical Systems
Build - Operate - Maintain
Senior Leadership T
eam
Senior Leadership T
eam
recapitalisation in July. Huw will move the business to the next level and ensure it is
Professional Examination and then Law Society’s Final Examination in 1990. He was admitted to the Law Society
Ian Perryment, Director, Finance & Compliance
In addition to Finance, Ian also has responsibility for the Compliance team who Ark’s business critical standards and compliance.
services to the British armed forces.
Steve Hall, Executive Sales & Marketing Director
full P&L, of over £400M, responsibility.
Jeffrey Thomas, Non - Executive Chairman
Senior Leadership T
eam
17
Senior Leadership T
eam
16
Philip (Pip) Squire, Director, Design & Build
Richard Borton, Director, Live Services
procedure development and optimi
s
ation. portfolio value in excess of £650 million.Simon Burrage, Commercial Director
Company where he was responsible for operations in Europe, South Africa and Japan.
Italy.
it was acquired by Cendant Corporation.
Kevin Bone, Director, Business Programmes & Client
Change
#MBOLQBHFPGJOTFSUQPDLFU
professional in the Ark approach to data centre delivery.