EHisDon A R C H E N

Saudi Bin Laden attn. Essam Zahran

P.O. Box 105 / PC 11411, C.R. 1010081126 Riyadh,

Project: South Border Infrastructure Project (Roads and Buildings)

Date: 03 Sep 2012 H1433/10/17

Reference: TRA-SBI-ARC-SBG-3228-2012-TS

Subject: Inspection And Test Plan (ITP) For Roads DOC GEN PC0037 REV. NO. 01 {B-Approved as noted) Transmittal To: Jl Company: is^Ui Phone: Ufa Fax: ^ Email: (JJJJ3^ ALH Essam Zahran

Saudi Bin Laden

01476 1427 055 506 8485 info.sb@sbgabc.com From: O* Company: <S>1!I Phone: Ufa Fax: j-fl* Email: ^jjfci' *-»

Majdi Issa Twal

Archen

m.twal@archenec.com

LIST OF DOCUMENTS ISSUED Revision Copies # of pages:

•-ii1 jj j""1^ .'J-J.-H jjc. 1 1 3 Format AJU— a]1 Hard Copy Comment

^ !

f

;;:;.;;

^ 0 3 SEP '

Majdi Issa Twal H/ Archen . . . , UbOl BIKUD1N C R O U P jfQ^j^1 0 J Ddi *^ "' ^Ey^^» ttl^rtr^lltn^rT™ tL

Saudi Bin Laden

Archen Riyadh,

rel Web

(2)

: CONSULTANT /^jLH-Vl

A R r H s - >•

: CONTRACTOR /djli-lt

SAUDI BINIADIN CROUP

PROJECT NO / ejj-^Jl A) 1370 PROJECT NAME / tJ-^1 *-' South Border Infrastructure Project (Roads and Buildings) Work Package / JL*!fl General Area General

Location /

• • . - ' • • " " • " " ; - "

General Discipline Project Control

DOCUMENTS SUBMITTAL /

Ref. No / ft»jJt ( DOC-GEVPC0037 Rev. No. 01

Sub. To / ^1 #*& ARCHEN 8/27/2012 Contract No / J*«J1

Subject / Inspection And Test Plan (ITP) For Roads

FOR APPOROVAL / -J-^ [ j FOR INFORMATION / WE SUBMIT THE FOLLOWING / &

Inspection And Test Plan (ITP) For Roads

OTHER REMARKS / j>l ^U

Contractor's Authorized Manager

JjlUl JjS j* Jji-JI

Consultant's Representative Comments /

c. *

Status f - 1i _ JA -APPROVED APPROVED AS NOTED

iiua*5U; JAU

r - j

1 _ I

C - REVISE & RESUBMJT i - j

I _ I D -REJECTED ,jjsjSjj Consultant's Representative / ! l~/ Ji 9-v . <*"" IIJ " -*^r ^ . . _ , ^- . , — ~^/$y SIGNATURE/^ ZLOZ Dfltf /. Z 1 Form ^i-; -,-•-, • »•>.•-'<Mc DATE

f

. IX )ING / ji— r&j^i : TURE / t^J^1

(3)

1 : ﻙﻟﺎﻣﻟﺍ ﺔﻳﻠﺧﺍﺩﻟﺍ ﺓﺭﺍﺯﻭ ﺭﻳﻭﻁﺗﻟﺍﻭ ﻁﻳﻁﺧﺗﻠﻟ ﺓﺭﺍﺯﻭﻟﺍ ﺔﻟﺎﻛﻭ ﻲﻧﻣﻷﺍ : CONSULTANT / ﻱﺭﺎﺷﺗﺳﻻﺍ : CONTRACTOR / ﻝﻭﺎﻘﻣﻟﺍ

PROJECT NO : 1370 PROJECT NAME: South Border Infrastructure Project (Roads and Buildings)

General Inspection and Test Plan (ITP) for Roads

GENERAL INSPECTION

AND TEST PLAN (ITP)

FOR ROADS

Rev. No. Date Revision Details / Description Status

1 06/09/2012 1P

st

P

Revision as per supervision consultant’s comments B

0 12/06/2012 Initial Submittal C

Prepared By: Reviewed By: Approved For Submission By:

Name: Mohamed Elmahdy Name: Salvador D. Paguntalan Name: Nabeel Abusadah Designation: QA/QC Engineer Designation: QA/QC Engineer Designation: QA/QC Manager

(4)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

Earthwork 2.03 Excavation Soil Classification AASHTO

1TU

M 145U1T

RFI, TRS P W

R W S

A

One per Source or

material type (50 Kg) sample to be collected from site and to be tested in lab Pre Construction California Bearing Ratio (CBR) ASTM 1TU D 1883U1T TRS P W R W S A

One per Source or

material type Use same Sample Pre Construction

Atterberg limits ASTM

1TUD

4318

TRS P W

R W S

A

One per Source or

material type Use same Sample. Accepted materials AASHTO Class A-1-a, A-1-b, A-2-4 or as per specifications. Pre Construction Moisture Density (Modified Proctor) or Relative Density AASHTO 1TU T 180U1T or ASTM 1TU D 4253U1T TRS P W R W S A

One per Source or

material type Use same Sample Pre Construction

2.05.2.1 Embankment Soil Classification AASHTO

1TU

M 145U1T

RFI, TRS P W

R W S

A

One per Source or

material type (50 Kg) sample to be collected from site (road bed) immediately prior to placement of next layer and to be tested in lab. Pre and During Construction

(5)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification TL SBG Archen 2.05.4.2 Moisture Density Test (Modified Proctor) AASHTO 1TU T 180U1T TRS P W R W S A

One per layer per 50,000 square meters or Whenever the materials or source changes.

Use same sample and immediately prior to placement of next layer and to be tested in lab.

Pre

Construction

2.05.4.2 Field Density AASHTO

1TU T 191U1T or 1TU T 238U1T and 1TU T 239U1T RFI, TRS P W R W S A Minimum of 8 nuclear gage or 5 cone density test on each embankment lift or portion lift up to a maximum of 50,000 square meters. In-place after compaction, Selected by Archen Supervisor During Construction

2.05.4.2 Plate Load Test AASHTO

1TU T 221U1T RFI, TRS P W R W S A It is encouraged to use this testU, but it is not requiredU.

In-place after compaction. Applicable for all soils, but not rock. Use it for Dune sand A-3(0) if needed.

During Construction

2.05.4.4 Rock

Embankment Compaction (preparation) of natural ground AASHTO 1TU T180U1T Method D RFI, TRS P W R W S A

As per specification In-place after compaction, Selected by Archen Supervisor.

During Construction Soil Classification AASHTO

1TU

M 145U1T

RFI, TRS P W

(6)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

A 5P

th

P

lot when changes materials properties is suspected.

placement and to be tested in lab. The lot size is 5,000 square meters.

2.05.7.2 Field Density AASHTO

1TU T 191U1T or 1TU T 238U1T and 1TU T 239U1T RFI, TRS P W R W S A Minimum of 3 nuclear gage or 5 cone density test on each embankment lift or portion lift up to a maximum of 50,000 square meters. In-place after compaction, Selected by Archen Supervisor. During Construction Percent relative

compaction ASTM 1TUD 4253U1T

RFI, TRS P W

R W S

A

1 test per (3) lots. Percent of compaction is based on 3 consecutive tests. In-place after compaction. Lot size is 5,000 square meters During Construction Rock

Embankment Rock test

section P W R W S A Maximum settlement is 1% for acceptable compaction and as per specification. In-place after

compaction During Construction

Moisture Density Test (Modified AASHTO 1TU T 180U1T TRS P W R W S A

One per layer per 50,000 square meters or

To be sampled from the road bed and to be tested in lab

Pre

(7)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

Proctor) Whenever the

materials or source changes. California Bearing Ratio (CBR) ASTM 1TU D 1883U1T TRS P W R W S A

One per source or

material type In place and to be tested in lab Pre and During Construction 2.06 2.06.3.2 Untreated Subgrade Imported Borrow Material Soil Classification

and Gradation AASHTO 1TUM 145U1T

RFI, TRS P W

R W S

A

One per source or material type then One per 50,000 sq. m. of completed subgrade.

50 Kg sample to be collected from material source and to be tested in lab. In place (from road bed) and to be tested in lab, 50 Kg Sample Pre Construction Moisture Density (Modified Proctor) AASHTO 1TU T 180U1T TRS P W R W S A

One per source then One per layer per 20,000 SQ. M.

(50 Kg) sample to be collected from material source and to be tested in lab. In place (from road bed) and to be tested in lab, 50 Kg Sample

Pre

(8)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

Field Density AASHTO

1TU T 191U1T, OR 1TU T 238U1T and 1TU T 239U1T. RFI, TRS P W R W S A

One per layer per

20,000 SQ. M. In place immediately prior to placement of next layer During Construction California Bearing Ratio (CBR) ASTM 1TU D 1883U1T TRS P W R W S A One per 5,000 square meters of completed subgrade.

Use same collected sample from Road bed. Pre and During Construction 2.06.3.6 Subgrade in

Earth Cuts Soil Classification AASHTO 1TU M 145U1T

RFI, TRS P W

R W S

A

One per source or material change then One per 50,000 sq. m. of completed subgrade. 50 Kg sample to be collected from material source and to be tested in lab. In place (from road bed) and to be tested in lab, 50 Kg Sample Pre Construction Moisture Density (Modified Proctor) AASHTO 1TU T 180U1T TRS P W R W S A

One per layer per

20,000 SQ. M. In place (from road bed) and to be tested in lab, 50 Kg Sample

Pre

(9)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

Field Density AASHTO

1TU T191U1T,OR 1TU T238U1T and 1TU T 239U1T. RFI, TRS P W R W S A

One per layer per 20,000 SQ. M. For cohesionless soils, use relative density ASTM 1TUD

4253U1T In place immediately prior to placement of next layer. During Construction California Bearing Ratio (CBR) ASTM 1TU D 1883U1T TRS P W R W S A One per 5,000 square meters of completed subgrade.

Use same collected sample from Road bed.

Final approval of the material shall be based on

acceptance samples taken from each layer of subgrade.

Pre and During Construction

2.06.3.7 Subgrade in

Rock Cuts Gradation AASHTO1TUM43

OR 1TU ASTM D448U1T RFI, TRS P W R W S A

One per source or material change then One per 50,000 sq. m. of completed subgrade. 50 Kg sample to be collected from material source and to be tested in lab. In place (from road bed) and to be tested in lab, 50 Kg Sample

Pre

(10)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

Rock Quality ASTM 1TU6

032 RFI, TRS P W R W S A As recommended by Geotechnical Engineer on site. Sample to be collected from project site and to be tested in lab. Pre Construction 2.06.03.8 Subgrade on Embankment (including Sand Dunes Areas)

Soil Classification AASHTO

1TU M 145U1T RFI, TRS P W R W S A One per 50,000 sq. m. of completed subgrade.

In place (from road bed) and to be tested in lab Pre Construction Moisture Density (Modified Proctor) AASHTO 1TU T 180U1T TRS P W R W S A

One per layer per

20,000 SQ. M. Use same collected sample for lab test. Pre Construction California Bearing Ratio (CBR) ASTM 1TU D 1883U1T TRS P W R W S A One per 5,000 square meters of completed subgrade.

Use same collected sample from Road bed.

Final approval of the material shall be based on test results for each layer of subgrade.

Pre

Construction

Field Density 1TAASHTO

1TU T 191 UOR 1TU T RFI, TRS P W R W S A Minimum of 8 nuclear gage or 5 cone density test on each embankment In place immediately prior to placement of next layer During Construction

(11)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen

238 Uand

1TU

T 239 lift or portion lift up to a maximum of

50,000 cubic meters lot.

% Relative

Compaction ASTM 1TUD 4253

RFI, TRS P W

R W S

A

1 test per (3) lots. Percent of compaction is based on 3 consecutive tests. In-place after compaction. Lot size is 5,000 square meters During Construction 2.06.3.9 Preparation of Existing Subgrade Material

Classification AASHTO 1TUM 145

RFI, TRS P W

R W S

A

As specified in Paragraph 1TU2.06.3.6U1T

One per material type and to be tested in lab

Pre

Construction

2.10 Trench

Excavation Backfill AASHTO 1TUT 180U1T

RFI, TRS P W

R W S

A

As per specification Section 2.05. One per source or material type.

One per source and

to be tested in lab Pre and During Construction

2.10.3 Bedding

Materials Sand Bedding,

Sieve Analysis AASHTO 1TU T 27U1T TRS P W R W S A As per specification Section 2.10.3 for sieve size and % passing. Collected from source and to be tested in lab. Pre Construction 2.10.4 Trench Backfilling Materials Material

Classification AASHTO 1TUM 145U1T

TRS P W

R W S

A

One per material

type. Collected from source and to be tested in lab.

Pre

Construction

Base Material See

section 1TU

3.03U1T for

TRS P W

R W S

A

One per material

type. Collected from source and to be tested in lab.

During Construction

(12)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification TL SBG Archen testing require-ment Untreated Granular Sub-Base and Base Courses 3.02 Aggregate Sub-base Coarse

Sieve Analysis AASHTO

1TU

T 27U1T

RFI, TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m.

One per source.

(75 Kg) Sample from pit or crusher. 35 kg from central mix plant.

Pre

Construction

Sand Equivalent AASHTO

1TUT 176U1T

TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m.

Use same sample Pre

Construction

Plasticity Index AASHTO

1TU

T 90U1T

TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m.

In place after processing

Pre

Construction

Abrasion Loss AASHTO

1TU

T 96U1T

TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m.

In place after processing

Pre

Construction Moisture Density AASHTO

1TU

T 180U1T

TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m.

Lab test Pre

(13)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen California

Bearing Ratio ASTM 1TUD 1883U1T

TRS P W

R W S

A

One test per source.

1 Test for every 10,000 cu. m. In place after processing Pre and During Construction

Field Density AASHTO

1TU T191U1T,O R 1TUT238U1T and 1TU T 239U1T. RFI, TRS P W R W S A

One per layer per

20,000 SQ. M. In place immediately prior to placement of next layer. During Construction 3.02.3.1 Proportioning Aggregates Sub-Base Mixture

Job mix design

proposal Job Mix Formula Grading AASHTO 1TU T 27U1T RFI, TRS P W R W S A If grading is approved, submit detailed proposals for JMF to the Engineer In place after processing Pre Construction

Field Density AASHTO

1TU T 191U1T, OR 1TU T 238U1T and 1TU T 239U1T. RFI, TRS P W R W S A

At least 5 min. test randomly selected location in each lot. At least 8 min. nuclear gage test.

In place immediately prior to placement of next layer. During Construction Gradation AASHTO 1TU T 27U1T TRS P W

(14)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen A

Sand Equivalent AASHTO

1TU

T 176U1T

TRS P W

R W S

A

1 test for every 2000

cu. m. In place after processing Pre Construction

Plasticity Index AASHTO

1TU

T 90U1T

P W

R W S

A

1 test for every 2000

cu. m. In place after processing Pre Construction

Abrasion Loss AASHTO

1TU T 96U1T TRS P W R W S A 1P ST P , 2P ND P , 3P RD P FOR 500 cu. m. 1 test & 1 test each 250 cu. m. thereafter

In place after

processing Pre Construction

CBR ASTM 1TU D 1883U1T TRS P W R W S A

1 Test for 5000 cu.

m. In place after processing Pre and During Construction 3.03 Base Coarse Aggregate Grading AASHTO 1TUT 27U1T

RFI, TRS P W

R W S

A

1 Test for every

2000 cu. m. In place after processing Pre and During Construction Abrasion Loss AASHTO 1TUT 96U1T

TRS P W R W S A 1P ST P , 2P ND P , 3P RD P FOR 500 cu. m. 1 test & 1 test each 250 cu .m. thereafter In place after processing Pre Construction

Plasticity Index AASHTO

1TU

T 90U1T

TRS P W

R W S

A

1 Test for every

2000 cu. m. In place and tested

in lab.

Pre

(15)

Minimum sampling for Soil and Aggregate

for Project number 1370

Legend: W = Witness P = Perform R = Review A = Approve S = Surveillance SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev01

RFI= Request for Inspection #13, Rev-01.

General

Spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

inspection point Sampling Frequency Point of Sampling ITP Activities Classification

TL SBG Archen CBR

(Grading 1) AASHTO 1TUD 1883U1T

TRS P W

R W S

A

1 Test for every

5000 cu .m. In place and tested in lab. Pre Construction CBR

(Grading 2) AASHTO 1TUD 1883U1T

TRS P W

R W S

A

1 Test for every

5000 cu. m. In place and tested in lab. Pre Construction CBR

(Grading 3) AASHTO 1TUD 1883U1T

TRS P W

R W S

A

1 Test for every

5000 cu. m. In place and tested in lab. Pre Construction

Thickness As Comp-acted RFI P W R W S A Test hole

measurement In place and compacted at area During and Post Construction

(16)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

Minimum Sampling and Testing for Asphalt

General

Specification MOT Reference

Section

Material Name Characteristics Test Method Approved

Form # to be used

Responsibility/

Inspection Points Sampling Frequency Point of Sampling ITP Activities

Classification

TL SBG Archen

Bituminous

Construction 4.03 Aggregates For Bituminous Surface

Treatments And Seal Coats

Sieve analysis AASHTO

T 27 RFI, TRS P W R W S

A

One per production day One per source

to be tested in lab Pre and During Construction Flakiness AASHTO T11 TRS P W R W S A

One per production day One per source

to be tested in lab Pre Construction Loss by abrasion AASHTO T 96 TRS P W R W S A

One per production week In place or in source, To be tested in the lab. Pre Construction Soundness AASHTO T 104 TRS P W R W S A

One per production week In place or in source, To be tested in the lab. Pre Construction Stripping AASHTO T 182 TRS P W R W S A

One per source In place or in

source, To be tested in the lab.

Pre

Construction Liquid limit (2) AASHTO

T 89 TRS P W R W S

A

One per production week In place or in source, To be tested in the

Pre

(17)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

lab. Plasticity

index (2) AASHTO T 90 TRS P W R W S

A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab Pre Construction Sand equivalent (2) AASHTO T 176 TRS P W R W S A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab Pre Construction Loss by abrasion AASHTO T 96 TRS P W R W S A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab Pre Construction Stripping AASHTO T 182 TRS P W R W S A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab Pre Construction Aggregates for Bituminous Sand Sub-base Courses and Open Graded Sub-bases Corse (Hot bines)

Sieve analysis AASHTO

T 27 TRS P W R W S

A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab Pre Construction Bituminous sand sub-base courses Marshall Mix

Design AASHTO T 245 RFI, TRS P W R W S

A

One set per plant per

(18)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

Marshall

stability AASHTO T 245 TRS P W R W S

A

One per source In place OR in

the stockpile to be tested in the lab Pre and During Construction Effect of water AASHTO T 165 TRS P W R W S A

One per plant per

production day Per plant to be tested in the lab Pre and During Construction Extracted

Asphalt AASHTO T 164 TRS P W R W S

A

One per plant per

production week Per plant to be tested in the lab During Construction Gradation of Extracted Aggregate AASHTO T 30 TRS P W R W S A

One per (5000) cu. meter. From Roadway

behind paver During Construction

Thickness AASHTO

T 168 TRS P W R W S

A

One per (5000) cu. meter. In place as directed by engineer

Post

Construction

Field Density AASHTO

T 166 TRS P W R W S

A

One core per (1,000) sq.

meter Every roadway complete course Post Construction

Aggregates for Bituminous Base Corse (Stockpiled)

Sieve analysis AASHTO

T 27 RFI, TRS P W R W S

A

One core per (1,000) sq.

meter Every roadway complete course Post Construction

Fractured

faces ASTM D 5821 TRS P W R W S

A

One per week during production and stockpiling Per source During production and stockpiling to be tested in the lab. Pre Construction

(19)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

Sand

Equivalent (2) AASHTO T 176 TRS P W R W S

A

One per week from the cold feed during mix production Per source During production and stockpiling to be tested in the lab. Pre Construction Plasticity index (2) AASHTO T 90 TRS P W R W S A

One per week from the cold feed during mix production Per source During production and stockpiling to be tested in the lab. Pre Construction Soundness AASHTO T104 TRS P W R W S A

One per week from the cold feed during mix production Per source During production and stockpiling to be tested in the lab. Pre Construction Loss by abrasion AASHTO T 96 TRS P W R W S A

One per source In place or in

source, To be tested in the lab. Pre Construction Thin and Elongated pieces Specificatio n as directed by engineer TRS P W R W S A

One per week during production and stockpiling Per source During production and stockpiling to be tested in the lab. Pre Construction

(20)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

Aggregates for Bituminous Base Course (Hot bins) Striping AASHTO T 182 TRS P W R W S A

One per week during production and stockpiling Per source During production and stockpiling to be tested in the lab. Pre and During Construction

Sieve analysis AASHTO

T 27 TRS P W R W S

A

One per source In place or in

source, To be tested in the lab.

Pre

Construction

Mineral filler Sieve analysis AASHTO

T 37 TRS P W R W S

A

One set per plant per

production day from each bin During Construction

Bituminous

Base Marshall Mix Design AASHTO T 245 TRS P W R W S

A

One per source per 500

ton filler In place Randomly as

directed by engineer. Pre and During Construction Marshall Stability AASHTO T 245 TRS P W R W S A

One per source In place to be

tested in the lab Pre Construction Effect of

water AASHTO T 165 TRS P W R W S

A

One per plant per

production day Per plant to be tested in the lab During Construction Extracted Asphalt content AASHTO T 164 TRS P W R W S A

One set per plant per

production day Per plant to be tested in the lab During Construction Gradation of Extracted Aggregate AASHTO T 30 TRS P W R W S A

One per (5000) cu. meter. From Roadway

(21)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

Super Pave Mix Design Sampling and Testing Specifications of Source of coarse and Fine Aggregate

Sand

Equivalent AASHTO T 176 TRS P W R W S

A

One per (5000) cu. meter. In place as directed by engineer During Construction Soundness AASHTO T 104 TRS P W R W S A

One per week during production and stockpiling In place OR in the stockpile to be tested in the lab During Construction Friability and Deleterious Material AASHTO T 112 TRS P W R W S A Randomly test OR as

directed by engineer. In place or in source, To be tested in the lab. During Construction Specifications for Aggregate as a Blend to Match Super-Pave Requirements Angularity of Coarse Aggregate ASTM D 5821 RFI, TRS P W R W S A

One per (10,000) cu.

meter Of concrete From source to be tested in the lab During Construction Angularity of Fine Aggregate AASHTO T 304 – Method A TRS P W R W S A

One per week Per source

During production and stockpiling to be tested in the lab. During Construction Flakiness of Aggregate ASTM D 4791 TRS P W R W S A

One per week Per source

During production and stockpiling to be tested in the During Construction

(22)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan.

Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request form #12, Rev01 TRS= Test Report Submittal #17, Rev-01 RFI= Request for Inspection #13

(1) Contractor not required to furnish facilities to perform test. Tests may be performed in an independent laboratory approved by the Ministry.

(2) If lime is added, acceptance samples shall be taken after the addition of the slurry but before the drier. In this case, minimum acceptance sampling frequency shall be one per

production day as indicated in 1998 MOT Specification.

(3) Physical tests required on all samples. Chemical tests required on occasional samples selected by the Engineer.

* The Final approved Super Pave mix design will determine more specific tests to be conducted.

lab. Structural Ratios of Aggregate Resistance of Compacted Bituminous Mixture to Moisture Induced Damage for Super pave AASHTO T 312 TRS P W R W S A

One per production week In place or in source, To be tested in the lab. During Construction Evaluation of Strength and moisture Sensitivity AASHTO T 283 TRS P W R W S A As required in

(23)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

Minimum sampling and testing for concrete, grout, and incidental construction

General

spec. MOT Reference Section

Material

Name Characteristics Test Method

Approved Form # to be used

Responsibility/

Inspection Points Sampling Frequency Point of Sampling ITP Activities Classification TL SBG Archen Concrete, Steel And Structures 5.01 Coarse Aggregate For Concrete

Sieve analysis AASHTO

1TU T 27U1T RFI, TRS P W R W S A One per (10,000) cu. meter Of concrete From source OR in the stockpile to be tested in the lab

Pre

Construction

Loss by

abrasion AASHTO 1TUT 96U1T

TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Soundness AASHTO 1TUT 104U1T TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Friable

particles AASHTO 1TUT 112U1T

TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Specific Gravity

and Absorption AASHTO 1TUT 85U1T

TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

(24)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

Soft Fragments

and Shale AASHTO M 80 TRS P W R W S

A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Thin and Elongated pieces Specification as directed by engineer TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Soluable Sulfates and Chlorides 1TU BS 882U1Tand ASTM 1TU D 1411U1T (1) TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Moisture AASHTO 1TU T 255U1T TRS P W R W S A One per

production day From source to be tested in the lab. Pre Construction

Fine aggregate

for Concrete Sieve analysis (including

fineness modulus) AASHTO 1TU T 27U1T AASHTO M 6 RFI, TRS P W R W S A One per (10,000) cu. meter Of concrete From source OR in the stockpile to be tested in the lab.

Pre Construction Soundness AASHTO 1TUT 104U1T TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

(25)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

particles 1TUT 112U1T R S

A (10,000) cu. meter Of concrete

tested in the lab Construction

Organic

Impurities AASHTO 1TUT 21U1T

TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Sand

Equivalent AASHTO 1TUT 176U1T

TRS P W R W S A One per (10,000) cu. meter Of concrete From source to be

tested in the lab Pre Construction

Moisture AASHTO 1TUT 255U1T TRS P W R W S A One per

production day From source to be tested in the lab Pre Construction Soluable sulfates 1TU BS 882U1T (1) TRS P W R W S A One per (10,000) cu. meter From source to be

tested in the lab Pre Construction

Water for Portland Cement Concrete

Water Quality AASHTO

1TUT 26U1T RFI, TRS P W R W S A One per (10,000) cu. meter of concrete. From source to be

tested in the lab Pre Construction

Portland

Cement Cement Quality ASTM

1TU C 150U1T (1) MIR P W R W S A 1-Certificates of Guarantee 2- One per (10,000) cu. meter Of concrete

From Several Bags

or Silo Pre and Post

(26)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

3- The engineer reserve the right to order a retest of the cement at anytime.

Time Of Set

(Vicat) AASHTO 1TUT 131U1T Or

ASTM1TUC 191U1T

TRS P W

R W S

A

One test per

Shipment In Randomly as directed by engineer. Pre Construction Portland Cement Concrete Mix Design MRDTM 515 MVC circular 885/409 28/11/1409H (2) RFI, TRS P W R W S A

One test per

Mix design In Randomly as directed by engineer.

Pre

Construction

Compressive

Strength AASHTO 1TUT 23U1Tand

1TU T 126U1T TRS P W R W S A One set-(3 cylinders)-of cylinders per (500) cu. meter. Not less than (1) per production day From Mixer or truck. In Randomly as directed by engineer. Post Construction

Air Content AASHTO

1TU T 152U1T OR MRDTM 520 RFI P W R W S A

One test per (50) cu. meter. Not less than (1) per production day From Mixer or truck. In Randomly as directed by engineer. During Construction Unit Weight

/Cement Factor AASHTO 1TUT 121U1T

P W

R W S

A

One test per (50) cu. meter. Not less than (1) per production From Mixer or truck. In Randomly as directed by During Construction

(27)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

day engineer. Slump AASHTO 1TUT 119U1T RFI P W R W S A

One test per

(20) cu. meter. From Mixer or truck. In Randomly as directed by engineer. During Construction Reinforcing

Steel Quality Specification as directed

by engineer (1) MIR P W R W S A 1-Certificates of Guarantee 2- each (50)ton OR fraction of that

one sample for

each size bar Pre Construction

Grout Portland

cement quality ASTM

1TU C 150U1T, Type I MIR P W R W S A 1-Certificates of Guarantee 2- One per (10,000) cu. meter Of concrete

From Several Bags

or Silo Pre and Post

Construction

Water quality AASHTO

1TUT 26U1T MIR, TRS P W R W S A One per (10,000) cu. meter of concrete. From source to be

tested in the lab Pre Construction

Initial set AASHTO

1TU

T 197U1T

RFI P W

R W S

A

One test per

shipment In Randomly as directed by engineer.

Pre

Construction compressive

strength AASHTO 1TUT 106U1T

TRS P W R W S A One set-(3 cylinders)-of cylinders per (500) cu. meter. Not less than (1) per production day From Mixer or truck. In Randomly as directed by engineer. Post Construction

(28)

Legend: W = Witness; P = Perform; R = Review; A = Approve; S = Surveillance; SBG = Saudi Bin Laden Group; ITP = Inspection & Testing Plan. Archen = Archen / Ellisdon; TL = Testing Laboratory MIR= Material Inspection Request #12, Rev-01 RFI= Request for Inspection #13, Rev-01 TRS= Test Report Submittal #17, Rev-01

(1) Contractor not required to furnish facilities to perform test. Tests may be performed in an independent laboratory approved by the Ministry. (2) If lime is added, acceptance samples shall be taken after the addition of the slurry but before the drier. In this case, minimum acceptance sampling frequency shall be one per production day.

(3) Physical tests required on all samples. Chemical tests required on occasional samples selected by the Engineer.

* The above table is MOT general specification. The project road typical sections and drawings govern over the general specification and must be followed.

* The above tables is MOT general specification, which is the main bases for construction material testing (CMT) of

the QA/QC plan. This testing plan is in compliance with and in accordance to the approved design concepts, specifications, and drawings.

* The SBG’s QA/QC department is recommending that all technical staff on project site to be familiar with 1998 MOT specification.

Incidental construc-tion 6.01 Thermoplastic Traffic Markings Quality (1) MIR P W R W S A 1-Certificates of Guarantee 2-one sample from each lot

Note (3)

From each lot or

project storage Pre and Post Construction

(29)

Page 1 of 10

METHOD STATEMENT

FOR

SURVEYING WORKS

(Materials Sampling and Testing)

Rev Date of Issue

Prepared by Reviewed by Description

QA/QC Engineer QA/QC Manager

0 15 July 2012 Salvador D. Paguntalan Nabeel AbuSadah Initial issue 1 14 August 2012 Salvador D. Paguntalan Nabeel AbuSadah 1P

st

(30)

Page 2 of 10

Table of Contents

Page Number C11Tover Page 1 11T Revision Page 2 11T TABLE OF CONTENTS11T ... 2 11T 1.11T 11TSCOPE OF WORK11T ... 3 11T 2.11T 11TPURPOSE11T ... 3 11T 3.11T 11TREFERENCES11T ... 3 11T 4.11T 11TRESOURCES11T ... 3 11T

5.11T 11TDEFINITION & ABBREVIATIONS:11T ... 3

11T

6.11T 11TRESPONSIBILITIES:11T... 4

11T

7.11T 11TPROCEDURE:11T ... 4

11T

7.1.11T11TPRIMARY CONTROL POINTS11T 4

11T

7.2.11T11TESTABLISHING WORKING POINTS11T 4

11T

7.3.11T11TSTAKING AND GRADING11T 5

11T

7.4.11T11TTRAVERSING11T 8

11T

7.5.11T11TAS-BUILT SURVEY11T 8

11T

7.6.11T11TSURVEY EQUIPMENT TOLERANCES11T 8

11T

8.11T 11TQUALITY:11T ... 9

11T

(31)

Page 3 of 10

1. SCOPE OF WORK

The following steps are proceed in a road construction project which include the establishment of Primary Working Points, Control Points, Staking and Grading, Traversing, and Road Center Line Setting Out and Line Marking.

The works involves all surveying works throughout the entire project but not limited to the following:

1.1 Establishing primary control points. 1.2 Establishing working points

1.3 Establishing control coordinate points and reference lines 1.4 Establishing bench marks

1.5 Achieve horizontal control 2. PURPOSE

To achieve an advance to coordinated survey system that will be used as a standard procedure of the work throughout the project.

3. REFERENCES

3.1 Contract Document and Specifications 3.2 Shop Drawings

3.3 Approved Quality Assurance and Quality Control Plans 4. RESOURCES

4.1 Materials 4.2 Equipment 4.3 Personnel

- Wooden Stake - Concrete Nails - Warning Tapes

- Spray Paints and Markers - Steel Bar (for Staking)

- GPS Total Station - Theodolite Instrument - Auto Level Instrument - Hammer and set of Minor Tools - Project Engineer - Site Engineer - QA/QC Inspector - Safety Officer - Surveyor - Survey Team

5. DEFINITION & ABBREVIATIONS: PE - Project Engineer

SE – Site Engineer

QA/QC – Quality Control/Quality Assurance Engineer SEO –Safety Environment Officer

(32)

Page 4 of 10

6. RESPONSIBILITIES:

6.1. The Project Engineer shall direct when and where to start the Surveying Works and establish deadlines for activity to be finished. He shall make sure that Surveying Works shall be finished with-in the time frame set forth on the construction schedule.

6.2. The Site Engineer shall be responsible for the execution of the Surveying Works.

6.3. The QAQC Inspector shall monitor and periodically inspect all the Surveying Works at all times to ensure that setting out and establishing coordinates is correct and conforms to the approved shop drawings related Surveying Works.

6.4. The Surveyor is responsible for executing and leading all the elements of Surveying Works

6.5. The Survey Team composed of at least, but not necessarily limited to the following: Lead Surveyor, Stadia Man, and Helpers is responsible for the execution of the Survey Works.

7. PROCEDURE:

The foregoing procedure for the Surveying Works will serve as a guide by the Surveyor

together with the SE and QA/QC Inspector along the course of their work in order to achieve an acceptable quality of workmanship and attaining the optimum results with less time and effort:

7.1. PRIMARY CONTROL POINTS

a. Locate Permanent Bench Marks (The Municipality Bench Marks) as provided in theContract Document.

b. Based on the above bench marks Primary Control Points shall be established by Closed Traversed Method duly check by the consultant.

c. The Municipality Bench Marks and the Primary Control Points shall then be plotted showing their coordinates, angles, levels, and distances to form part as Working Drawings for Survey Control Points for approval by the Engineer.

d. These Primary Control Points shall be fixed on a steel bar embedded in a solid cast in place concrete.

e. Upon approval of the Survey Working Drawings by the Engineer, the surveyor may establish more convenient control points for future setting outs.

7.2. ESTABLISHING WORKING POINTS

7.2.1. Setting Out of working points shall be conveniently located for easy access and as

to avoid future disturbances by impact, vibration and/or settlement as the construction progress.

(33)

Page 5 of 10

7.2.2. Enough Working Points shall then be established. These working points will be

used to complete the survey and demarcate the required profiles and stationing as shown on the approved plans.

7.3. STAKING AND GRADING 7.3.1. General

After Clearing and Grubbing works were done (see Method Statement for Clearing and Grubbing) Road Site Grading shall be established to ensure a level base as per specified slope, the base and sub-base course, surface drainage and any other improvements shall be put in place so as to establisha sub-grade or finished contouring that will form a sound foundation by avoiding over cutting of natural ground especially if existing soil is found to be alreadysuitable for the design load of the roadway.

A rough grading will be run through the proposed roadway leaving a 200mm clearance above subgrade level manned by a surveyor to avoid overcutting beyond the design subgrade level. After Rough Grading the following sequence of work shall be observed:

7.3.2. Staking Layout

Staking shall be established basing the approved roadway layout and following its intended design cross-sections and profiles (see figure 1: Staking Layout below).

(34)

Page 6 of 10

(35)

Page 7 of 10

A. Stake Marking will be marked following its cross-sections as shown below:

A.1 Stake marking for Road Embankment

1. Stake start of road embankment 2. Stake for end road embankment

3. Stake mark for end of roads slope embankment

A.2 Stake marking for Slope Side Cutting

1. Stake mark for start of road slope side cutting

A. Stake mark for end of Side Cutting under design subgrade B. Stake mark for start of first slope of side cutting.

C. Stake mark for end of first slope of side cutting. D. Stake mark for start of second slope transition. E. Stake mark for end of second slope side cutting.

B. Laying out of Stake Marks shall be done on a 25-m interval along the proposed roadway to avoid over-cutting as shown below:

(36)

Page 8 of 10

C. Wooden Stake shall be used with appropriate marking showing the intended elevations to be cut or filled along the roadway cross-section on a 25m interval. 7.4. TRAVERSING

7.4.1. General

A GPS Total Station shall be used to traverse the entire road networks. The same instrument and/or the theodolite will be employed for Staking and Grading, Road Stationing, Vertical and Horizontal Traverse.

7.4.2. GPS Total Station Traversing

a. The surveyor shall locate the Municipality Bench Mark at the nearest location to the project site, this BM shall be ensured to be correct and updated.

b. Coordinates shall be fed to the Total Station from the approved Working Coordinates Plan.

c. The surveyor shall start and position his instrument at the Benchmark and feed to the instrument the known BM’s coordinate and elevation.

d. The surveyor can now conveniently locate and establish the control points for future references.

e. After establishing the control points, the surveyor may now start to run the required surveying works such as Staking and Grading, Road Stationing, Road Center Line Setting Out and Line Marking.

7.5. AS-BUILT SURVEY

a. As-Built Survey will be conducted as soon as substantial work has been completed. b. Results of the As-built Survey will then be correlated with the proposed or planned

coordinates noting any variance or if results is within acceptable limits i.e. coordinates deviation from plan to actual.

c. If results is beyond acceptable limits, necessary corrective action shall be made to address the concern. All Subsequent work maybe stop as per instruction by the Engineer until corrective actions has been rectified.

d. Results of the Survey shall be kept, tagged, and properly bounded in binder folder.

7.6. SURVEY EQUIPMENT TOLERANCES

The Equipment Accuracy for Survey Equipment will be maintained as per Project Specifications.

(37)

Page 9 of 10

8. QUALITY:

DESCRIPTION OF WORK IN-CHARGE

The QA/QC Manager will monitor and ensure that this Method Statement shall be strictly enforced so that smooth Work Flow will be attained. 8.1.In general, our team of Surveyors, Project/Site Engineers and Foremen

together with QC Inspectors will ensure that the approved Method statement is being followed and inspections are taking place. In particular, the following shall be taken care of:

8.1.1 Survey equipment/instruments used on site are calibrated. The original Calibration certificates are always kept in store and copies of same are available along with the instrument.

8.1.2 The Surveyors carry out periodical checks to the tolerances of the manufacturer and maintain the relevant records.

8.1.3 Any defective or damaged surveying equipment is properly identified and immediately removed from site.

8.1.4 All Control Points are clearly marked and located on elements which are not likely to be disturbed by impact, vibration,

settlement or heave and are checked periodically by the Surveyor. 8.1.5 Regular checking is carried out and its record maintained

throughout the construction progress.

8.2 All the measuring and test equipment shall be controlled, calibrated and maintained at site. The equipment shall be used in a manner, which ensures that equipment uncertainty is known and is consistent with the required capability.

8.3 Site surveying and related equipment will be checked and kept within calibration to the Tolerances as recommended by the manufacturer of the equipment and accepted Engineering/ construction practice. 8.4 Re-calibration and checking must take place not only as scheduled but

also at any time when there is any doubt about the integrity and accuracy of the equipment during its use on the site

8.5 When an error in an instrument is evident, the Surveyor may: Adjust the instrument on site in accordance with the instructions

provided by the instrument manufacturer (only if the Surveyor/Engineer is competent, having adequate experience to take such action) or request the Project Manager to send the instrument to the local agent for

recalibration.

QA/QC Manager

SU, SE, QA/QCI, ST

(38)

Page 10 of 10

9. SAFETY:

DESCRIPTION OF WORK IN-CHARGE

The Safety Officer of the contractor and the Survey Team together with the QA/QC Team shall work together in the prevention of any work related accidents in the job site.

The following safety requirements must always be observed and adhered in the site at all times:

9.1 Safe means of access when working on excavated area will be provided & maintained.

9.2 Persons working closely to roof edges or any other high platform where the potential of falling exists will use fall protection. 9.3 Equipment close to edges will be secured so as to avoid falling

or dropping.

9.4 All other hand tools, equipment or material will be secured at all times.

SO, Survey Team, QAQC Team

SO, Survey Team, QAQC Team

(39)

Page 1 of 7

METHOD STATEMENT

FOR

ROADWAY EXCAVATION

(Materials Sampling and Testing)

Rev Date of Issue

Prepared by Reviewed by Description

QA/QC Engineer QA/QC Manager

0 15 July 2012 Salvador D. Paguntalan Nabeel Abusadah Initial issue 1 14 August 2012 Salvador D. Paguntalan Nabeel Abusadah 1P

st

(40)

Page 2 of 7

Table of Contents

Page Number C10Tover Page 1 10T Revision Page 2 10T TABLE OF CONTENTS10T ... 2 10T 1.10T 10TSCOPE OF WORK10T ... 3 10T 2.10T 10TPURPOSE10T ... 3 10T 3.10T 10TREFERENCES10T ... 3 10T 4.10T 10TRESOURCES10T ... 3 10T

5.10T 10TDEFINITION & ABBREVIATIONS:10T ... 3

10T 6.10T 10TRESPONSIBILITIES:10T... 3 10T 7.10T 10TPROCEDURE:10T ... 4 10T 7.110T 10TGENERAL10T 4 10T 7.210T 10TSURVEY LAYOUT10T 4 10T

7.310T 10TSITE CLEARANCE/EXCAVATION PERMIT10T 4

10T

7.410T 10TTRIAL PIT LOCATION10T 5

10T

7.510T 10TROAD WORKS EXCAVATION10T 5

10T

7.610T 10TTEST METHODS AND MINIMUM SAMPLING FOR EMBANKMENT MATERIAL10T 6

10T

8.10T 10TQUALITY:10T ... 6

10T

(41)

Page 3 of 7

1. SCOPE OF WORK

The Roadway Excavation covers soil digging, cutting,and grading for roadway construction at South Border Infrastructure Projects of the MOI up to the working level (design subgrade) and as determined by the Engineer when the area of soil excavation is found to be unsuitable to carry the design load for the roadway.

2. PURPOSE

To describe and outline the methodology and work procedures for Roadway Excavation utilizing equipment such as Bulldozer, Grader, Backhoe for digging soils, and Dump Trucks for soil disposal.

3. REFERENCES

3.1 Contract Document and Specifications 3.2 Shop Drawings

3.3 Approved Quality Assurance and Quality Control Plans.

4. RESOURCES

4.1 Materials 4.2 Equipment 4.3 Personnel

- Wooden Stake - Concrete Nails - Warning Tapes

- Spray Paints and Markers - Steel Bar (for Staking)

- Bulldozer - Excavator (Backhoe) - Grader - Dump Truck - Shovel - Wheelbarrow - Set of Minor Tools

- Project Engineer - Site Engineer - Surveyor - Safety Officer

5. DEFINITION & ABBREVIATIONS: PE – Project Engineer

SE - Site Engineer

QCE – Quality Control Engineer SU – Surveyor

SO - Safety Officer 6. RESPONSIBILITIES:

(42)

Page 4 of 7

6.1 The Project Engineer shall direct when and where to start the Excavation Works and establish deadlines for activity to be finished. He shall make sure that Excavation Works shall be finished with-in the time frame set forth on the construction schedule.

6.2 The Site Engineer shall be responsible for the execution of the Roadway Excavation. 6.3 The Quality Control Engineer shall be responsible for monitoring the working

excavation level as per the approved plans and specifications. He shall likewise ensure that appropriate documentation such as excavation permits, clearances, etc.has been obtained from the concerned authorities prior to the start of the work.

6.4 The Surveyor is responsible for establishing the boundaries, limits and extent of Roadway Excavation.

6.5 The Safety Officer shall ensure that safety of the workers is taken into consideration at all times. He shall make sure that stake/poles and barricades with warning tapes on it shall be in place whenever required as the excavation progresses. Warning lights shall likewise be introduced if found necessary.

7. PROCEDURE:

The foregoing procedure for the Roadway Excavation will serve as a guide by the Site Engineer together with the surveyor along the course of their work in order to achieve an acceptable quality of workmanship and attaining the optimum results with less time and effort:

7.1 GENERAL

The Excavation Works shall be done by the use of the Excavator, Bulldozer, Grader,Dump Truck for soil disposal and a set of minor tools such as shovel, wheel borrow, etc.

7.2 SURVEY LAYOUT

7.2.1 The Surveyor in coordination with the site engineer shall stake out the limits and extent of the excavation and constantly check the depth of excavation and inform the excavator when and where to stop digging.

7.2.2 He shall make sure also that working level is established so as to avoid over cutting. 7.2.3 The Site Engineer will coordinate with the planning department the potential

location of utility services that may be affected if any and this will be marked by the Surveyor.

7.3 SITE CLEARANCE/EXCAVATION PERMIT

7.3.1 Before commencing the roadway excavation, the area will be cleared of all tress, stumps, roots, bushes, vegetation, debris, materials or other obstructions.

7.3.2 Before removal of any trees or shrubs, the approved Environmental Clearances shall be obtained from the competent agency the Meteorology and Environmental

protection Administration (MEPA).

7.3.3 Holes left by slumps or roots shall be filled with suitable material compacted to the Engineer’s satisfaction. The compacted density of the fill will be equal to or greater than 95% of Maximum Dry Density as determined in the project specification.

(43)

Page 5 of 7

7.3.4 If there are many structures or any other existing structures such abandoned underground utilities or any other obstruction on the excavated area, the removal work procedure will be submitted separately to obtain the approval from the concerned authority.

7.3.5 The excavation will not proceed unless the municipality permit for excavation has been obtained.

7.4 TRIAL PIT LOCATION

7.4.1 Trial Pit Location Plan shall be submitted for approval by the consultant.

7.5 ROAD WORKS EXCAVATION 7.5.1. Excavation Phasing

The excavator in coordination with the site engineer shall locate and determine the sequence of excavation phasing as well as the entrance and exit of equipment vehicle.

7.5.2. Soil Digging, Cutting, and Grading

a. Digging, Cutting, and grading of soil shall be done to a working level to a depth as shown on working drawings and in constant monitoring with the surveyor and the site engineer.

b. Rock shall be excavated to a depth of 150mm below subgrade within roadbed limits and backfilled as per approved materials compacted to the required density.

c. Soil below subgrade other than solid rock shall be thoroughly scarified to a depth of 150mm throughout this layer and will be brought to a moisture content suitable for maximum compaction output.

d. Removal of unsuitable material (soil) shall go beyond the excavation level (sug-grade level) until excavation reaches a soil of which appropriate load bearing has to be achieved.

e. Careful Excavation shall be observed along the course of the work not to disturb/damage the underneath existing pipe utilities if any.

f. Once the soil is dig, it will be immediately transferred to the standby dump truck.

7.5.3. Stability of Excavations

a. Slopes of excavations to comply with the following: 1. Slopes of cuts in natural; 1:1

2. Slopes of compacted fill; 1-1/2 : 1 3. Slopes of uncompacted fill; 2:1

.

Maintain sides and slopes of excavations in a safe condition until completion of backfilling