• No results found

Development of an integrated building load and ground source heat pump model to assess heat pump and ground loop design and performance in a commercial office building

N/A
N/A
Protected

Academic year: 2021

Share "Development of an integrated building load and ground source heat pump model to assess heat pump and ground loop design and performance in a commercial office building"

Copied!
352
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

Ground and Water-Source Heat Pump - A Manual for the Design and Installation of Ground-Coupled, Groundwater and Lake Water Heating and Cooling Systems in Southern Climates.

This study presented the simulation and performance evaluation of a ground source heat pump (GSHP) system integrated with water-based solar photovoltaic thermal (PVT)

As the base case, the commonly accepted control strategy of operating the cooling tower and boiler to maintain heat pump entering fluid temperature between 60ºF and 90ºF (15.56

User Guide - Web tool for the initial assessment of subsurface conditions for open-loop ground source heat pump installations (West Midlands).. Energy Science Programme Open

For certain heat demand in a house and for known horizontal ground loop length, the numerical tool analyses whether the available ground loop length would be suffient to supply heat

Compared with the currently widely-used secondary loop Ground Couple Heat Pump (GCHP) system, it has higher energy efficiency, lower operating costs, and less environ- mental

Commercial Program Development for a Ground Loop Geothermal System: Energy Loads, GUI, Turbulent Flow, Heat Pump Model, and Grid Study.. The use of the earth’s thermal energy to

A simple 2-D steady state flow, transient heat transport model was set up to simulate a vertical closed-loop ground source heat pump used for heating.. Modelling was undertaken