103545

Date:1999-11-17

Large

Hadron

Collider

project

Quality Assurance Policy

QUALITY ASSURANCE PLAN CONTENTS AND

STATUS

Abstract

This document enumerates the LHC Quality Assurance Plan documents. It is updated

with every new release of a Quality Assurance document.

Prepared by :

M Mottier

EST/ISS

[email protected]

Checked by :

LHC Quality Assurance

Working Group

Approved by :

Paul Faugeras

Deputy to LHC Project

Leader for Quality

Assurance

(2)

History of Changes

Rev. No.

Date

Pages

Description of Changes

0.1 1.0 1.1 1.2 1999-06-29 1999-07-08 1999-10-19 1999-11-16 1st draft Released

Update following new release of document

Release of LHC-PM-QA-207.00, and new versions of documents

(3)

Chapter 100 - Quality Assurance Policy

Number

Rev. Status

Date

Title

LHC-PM-QA-100.00 1.1 Released 1999-11-09 Quality Assurance Policy and Project Organisation LHC-PM-QA-101.00 1.2 Released 1999-11-16 Quality Assurance Plan Contents and Status

Chapter 200 - Definitions

Number

Rev. Status

Date

Title

LHC-PM-QA-201.00 1.0 Released 1998-06-25 Quality Assurance Categories

LHC-PM-QA-202.00 1.1 Released 1999-11-15 Document Types and Naming Conventions LHC-PM-QA-203.00 1.0 Released 1999-06-16 Glossary, Acronyms, Abbreviations

LHC-PM-QA-204.00 1.0 Released 1999-09-17 Equipment Naming Conventions LHC-PM-QA-205.00 In-work LHC Engineering Vocabulary LHC-PM-QA-206.00 1.1 Released 1999-11-09 LHC Part Identification

LHC-PM-QA-207.00 1.0 Released 1999-11-16 Naming Conventions for Buildings and Civil Engineering Works

Chapter 300 - Procedures

Number

Rev. Status

Date

Title

LHC-PM-QA-300.00 Planned Product Breakdown Structure Process and Control LHC-PM-QA-301.00 Planned Planning and Scheduling Process and Control

LHC-PM-QA-301.01 1.1 Released 1998-11-10 Planning and Scheduling Requirements for Institutes, Contractors and Suppliers

LHC-PM-QA-302.00 Planned Work Breakdown Structure Process and Control LHC-PM-QA-303.00 1.1 Released 1999-11-15 Documents and Parameters Process and Control

LHC-PM-QA-304.00 1.1 Released 1999-11-16 Configuration Management - Change Process and Control LHC-PM-QA-305.00 1.0 Released 1998-06-25 Drawing Management and Control

LHC-PM-QA-306.00 1.0 Released 1998-06-25 Drawing Process-External Drawing LHC-PM-QA-307.00 1.1 Released 1999-11-15 Design Process and Control

LHC-PM-QA-308.00 In-work Purchasing and Contracting Process and Control LHC-PM-QA-309.00 1.0 Released 1999-06-16 Manufacturing and Inspection of Equipment LHC-PM-QA-310.00 1.0 Released 1999-06-16 Handling of Nonconforming Equipment LHC-PM-QA-311.00 Planned Installation and Commissioning LHC-PM-QA-312.00 Planned Operation and Maintenance

(4)

Chapter 400 - Standards

Number

Rev. Status

Date

Title

LHC-PM-QA-401.00 Planned Planning and Scheduling Standards

LHC-PM-QA-402.00 1.1 Released 1999-11-15 Design Stands.-Mechanical Engineering and Installations LHC-PM-QA-403.00 In-work Design Standards - Electrical Schematics

LHC-PM-QA-404.00 In-work Design Standards - Fluids Schematics LHC-PM-QA-405.00 1.2 Released 1999-11-15 Document Standards

LHC-PM-QA-406.00 In-work Technical Specification and Market Survey Technical Description Standards

LHC-PM-QA-407.00 In-work Purchasing and Contracting Documents Standards

Chapter 500 - Document Templates

Number

Rev. Status

Date

Title

LHC-PM-QA-501.00 1.1 Released 1999-10-13 Engineering Specification LHC-PM-QA-502.00 1.1 Released 1999-10-13 Engineering Change Request

LHC-PM-QA-503.00 1.1 Released 1999-11-17 Market Survey-Technical Description LHC-PM-QA-504.00 1.0 Released 1999-05-20 Market Survey-Questionnaire LHC-PM-QA-505.00 1.0 Released 1999-03-10 Market Survey-Qualification Criteria LHC-PM-QA-506.00 1.1 Released 1999-11-16 Technical Specification

LHC-PM-QA-507.00 1.1 Released 1999-10-08 Technical Specification Questionnaire LHC-PM-QA-508.00 1.0 Released 1999-04-09 Drawing List

Chapter 600 - Instructions

Number

Rev. Status

Date

Title

LHC-PM-QA-601.00 Released 1998-06-10 How to Use the Engineering Specification Template LHC-PM-QA-602.00 Released 1998-12-10 Technical Specification Help and Guidelines

LHC-PM-QA-603.00 Released 1999-03-10 Technical Specification Questionnaire Help and Guidelines LHC-PM-QA-604.00 Released 1999-03-10 Market Survey Technical Description Help and Guidelines LHC-PM-QA-605.00 Released 1999-05-20 Market Survey Questionnaire Help and Guidelines LHC-PM-QA-606.00 Released 1999-03-10 Market Survey Qualification Criteria Help and Guidelines LHC-PM-QA-607.00 Released 1999-06-10 How to prepare a plot file in HPGL format from AutoCAD

Note

: Instructions are not version controlled. The latest version is available from the WWW at:

http://www.cern.ch/CERN/Divisions/EST/LHCQAP/qaphome.htm#600

(5)

Usage

i

Related Activity as in ISO 9001

Model

ii

LHC QAP Document Title

Int. Ext No. Title

Quality Assurance Policy

Quality Assurance Policy and Project Organisation ! ! 4.1 Management Responsibility Quality Assurance Contents and Status ! ! 4.1 Management Responsibility

Definitions

Quality Assurance Categories ! ! 4.4

4.10 4.13

Design Control

Inspection and Testing Control of Nonconforming Product

Document Types and Naming Conventions ! 4.5 Document and Data Control Glossary, Acronyms, Abbreviations ! ! -

-Equipment Naming Conventions ! 4.5 Document and Data Control LHC Engineering Vocabulary ! ! -

-LHC Part Identification ! ! 4.8 Product Identification and Traceability

Procedures

Product Breakdown Structure Process and Control Planning and Scheduling Process and Control

Planning and Scheduling Requirements for Institutes, Contractors and Suppliers

!

Work Breakdown Structure Process and Control

Documents and Parameters Process and Control ! 4.5 Document and Data Control Configuration Management - Change Process and Control ! 4.1 Design Control

Drawing Management and Control ! ! 4.1

4.5 Design ControlDocument and Data Control Drawing Process-External Drawing ! 4.5 Document and Data Control Design Process and Control ! !iii 4.1 Design Control

Purchasing and Contracting Process and Control ! 4.6 Purchasing Manufacturing and Inspection of Equipment ! ! 4.7

4.8 4.9 4.10 4.11 4.12 4.15 4.16

Control of Customer Supplied Product

Product Identification and Traceability

Process Control Inspection and Testing

Control of Inspection, Measuring and Test Equipment

Inspection and Test Status Handling, Storage, Packaging, Preservation and Delivery Control of Quality Records Handling of Nonconforming Equipment ! ! 4.13 Control of Nonconfroming

Product Installation and Commissioning

(6)

Standards

Planning and Scheduling Standards

Design Stands.-Mechanical Engineering and Installations ! 4.1 Design Control Design Standards - Electrical Schematics

Design Standards - Fluids Schematics

Document Standards ! 4.5 Document and Data Control Technical Specification and Market Survey Technical

Description Standards

! 4.6 Purchasing Purchasing and Contracting Documents Standards ! 4.6 Purchasing

i

INT. (Internal) indicates documents for LHC Project internal use

EXT. (External) indicates documents for use by Institutes, Contractors and Suppliers

ii

This gives an indication of the corresponding chapters of the ISO 9001 - Model for quality

assurance in design, development, production, installation and servicing

iii

For contracts based on a functional specification requiring that the contractor execute a large

amount of design work.

References

Related documents

5:30 pm Xavier Riddle and the Secret Museum 6:00 pm Molly of Denali 6:30 pm Hero Elementary 7:00 pm Wild Kratts 7:30 pm Wild Kratts 8:00 pm Odd Squad 8:30 pm Odd Squad 9:00 pm

N/A  NOT  Satisfied  8:00 AM  9:00 AM  186  149  10:00 AM  11:00 AM  50  42  11:00 AM  12:00 PM  73  76  12:00 PM  1:00 PM  134  99  2:00 PM  3:00 PM  75  59 

Thursday & Friday        9:00 am to 5:00 pm      

Our Watershed Sunday, 8:00 PM Wednesday, 8:00 PM Thursday, 8:00 AM Thursday, 2:00 PM Friday, 2:00 PM. Integrated Pest Management Expert Mike Leventry discusses IPM in

Master of Arts Program in Social Science : Type 2 (Track of Development Studies) Doctor of Philosophy Program in Public Policy : Type 2.1 (Master’s Degree based). Master's

Lower Division Certificate in Cybersecurity – Network Security (Approved 01-22-13) The certificate programs are designed for students interested in network security. Lower

5:00 PM (Vigil Mass) 7:00 PM (Vigil Mass) Sunday 8:30 AM 10:00 AM, 12:00 P 7:00 PM..

• 25% instant discount on orders above Rs 1,500 (including taxes) • Timings: 12:00 PM to 3:00 PM and 7:00 PM to 11:00 PM. • Minimum order value of INR 1500