• ensure that an asbestos removalist is used to perform asbestos removal work o Removal of friable asbestos requires a certified asbestos removalist o Removal of 10m 2 or more

Non-friable asbestos containing material can be removed from a single-family residence by a licensed asbestos contractor, a non-licensed contractor, or the homeowner.. If the ACM

Work Procedures (depending on the type of ACM being removed, whether it is bonded or friable), are to ensure that exposure to airborne asbestos fibres is minimized and remain

If the asbestos register identifies that asbestos or ACM is present, the person with management or control of the workplace must ensure all asbestos likely to be disturbed

(1) Where removal of friable asbestos is performed, a glove bag must be used, or a temporary enclosure must be constructed to prevent asbestos fibres from leaving the work area..

Under the Work Health and Safety Regulation 2011 (NSW) non-friable asbestos removal work requires a licence when removing over 10 square metres of asbestos containing material..

Where there is a risk of deterioration of the asbestos material (for example weathering of asbestos roofing) Master Builders recommends that the non-friable asbestos

The Strategy now needs to focus on the removal of any remaining friable asbestos containing material from non-Department of Public Works maintained buildings and the management