• No results found

ARCHITECTS ENGINEERS FULL SERVICE A+E

N/A
N/A
Protected

Academic year: 2021

Share "ARCHITECTS ENGINEERS FULL SERVICE A+E"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

ARCHITECTS

ENGINEERS

FULL SERVICE A+E

(2)

ATI Architects and Engineers provides multidiscipline diverse architectural and engineering

services. Included are Architects with in-house support by structural, mechanical/plumbing,

electrical, and civil engineering disciplines, when needed.

We have provided high-value services to our clients for over 23 years. Our history of innovation continues with

our LEED AP’s driving ATI’s growing Energy Consulting and sustainability design practice. Markets served

include industrial, commercial, college and university, K-12 schools, health-care, government, hospitality,

retail, biopharmaceutical, telecommunications, high tech, power, and research and development facilities.

(3)

ARCHITECTURAL DESIGN CAPABILITIES

ATI has highly skilled

staff members throughout its offices. Our approach to projects is value based – we are

interested in developing functional, client need-oriented facilities that are aesthetically

pleasing and within budgetary constraints. We have a strong reputation instituting a

“form” follows “function” approach to projects.

PROJECT TYPES

Office Buildings

Research and Development Facilities

Government Facilities

Industrial and Manufacturing Facilities

Institutional Facilities

Retail and Mixed-use Projects

Renovations and Remodels

SERVICES

Facilities Programming and Planning

Feasibility Studies

Master Planning

Project Entitlement

Facilities Condition Analysis

Construction Documents

Construction Support

Sustainable Design

As a full service A/E consulting firm, ATI routinely provides a wide range of services ranging

from feasibility studies, to programming, full design engineering, consulting support, and for

some projects ATI uses its GC license to perform construction services. With in-house expertise in all major

building systems, ATI manages all facets of design and construction management with expertise.

The synergy of a multi-discipline firm naturally results in effectiveness and efficiency. Clients have enjoyed

a long relationship with ATI due to its unique qualities, capabilities, and record of project success.

(4)

PROJECT HIGHLIGHT

MAG-LITE INSTRUMENTS HEADQUARTERS

ONTARIO, CA

The MAG-LITE headquarters consists of a 30-acre, 795,000 sf facility employing 1,200 people and housing the administrative offices, machining, fabrication, finishing, assembly, warehousing, shipping and receiving functions for the flashlight manufacturer.

ATI provided architectural and engineering design services, permitting services and construction administration services for all sitework, shell construction, complete tenant improvement construction, equipment installation and owner occupancy. The project was completed under a multi-phase schedule as the facility was occupied in stages according to the timetable controlling the installation of the various manufacturing systems.

OFFICE

PARTIAL PROJECT LIST

Centerpointe Office Development, Dublin, CA MAG-LITE Instruments HQ, Ontario, CA Mt. View School District Offices, El Monte, CA Unified Port of San Diego, San Diego, CA OC Fair and Events Center, Costa Mesa, CA Alred Barnett Research Center, La Habra, CA Pacific Plaza, Irvine, CA

City of Livermore, CA City of Walnut Creek, CA

Hall of Administration, County of Orange, CA

John Wayne Airport Maintenance Facility, Costa Mesa, CA Sysco Foods Services, Riverside, CA

City of Lathrop, CA

(5)

PROJECT HIGHLIGHT

ARROWHEAD REGIONAL MEDICAL CENTER CAMPUS

COLTON, CA

San Bernardino County commissioned a new medical office building at the Arrowhead Regional Medical Center Campus in Colton,

California. The 3-story, 66,000 sf structure is a steel brace-framed with a slab-on-grade foundation. Exterior walls and core

construction are tilt-up, reinforced concrete. The interior built-out to meet commercial medical office building standards. The building exterior design is intended to be compatible with existing Hospital and Mental Health buildings, while introducing volumetric and tonal complexity. This projects received LEED Silver certification.

ADVANCED TECHNOLOGY

PARTIAL PROJECT LIST

Arrowhead Regional Medical Center, Colton, CA UC Davis, CA

UC San Francisco, CA

Sysco Foods Services, Riverside, CA MAG-LITE Instruments HQ, Ontario, CA Alred Barnett Research Center, La Habra, CA Riverside Community Medical Center, Riverside, CA

University of Irvine, CA

HOAG Health Center, Newport Beach, CA Abbott Labs, San Jose, CA

2 Sister Food Group, Riverside, CA Las Vegas Review Journal, Las Vegas, CA Boeing C-17 Facility, Long Beach, CA

(6)

PROJECT HIGHLIGHT

SYSCO FOOD SERVICES - DISTRIBUTION FACILITY

RIVERSIDE, CA

This project is based on Sysco’s prototype distribution facility that has been constructed in multiple locations throughout the United States. Currently under construction, features include:

• An overall area of 482,000 sf for the main building

• A vehicle maintenance facility of over 13,000 sf, including fueling and washing

• Approximately 188,000 sf of low-temperature construction, including cold- and frozen-storage areas and a cold dock • Approximately 210,000 sf of dry-storage warehouse

• Approximately 56,000 sf of two-story offices, including a commercial-grade kitchen • Miscellaneous service and machine areas

• A combination of concrete tilt-up construction and steel-framed construction with insulated metal panel walls

INDUSTRIAL AND MANUFACTURING

PARTIAL PROJECT LIST

2 Sisters Food Group, Riverside, CA

Apffels Gourmet Coffees, Santa Fe Springs, CA Del Mar Foods, Watsonville, CA

Del Monte Foods, Salinas, CA Great West Produce, Commerce, CA

Inland Cold Storage Rialto Plant Expansion, Rialto, CA Pepsi Bottling Group, Riverside, CA

IKEA Western Regional Distribution Center, Tejon Ranch, CA Sysco Foods Services, Riverside, CA

Tawa Foods/Walong Supermarkets, Buena Park & Union City, CA Universal Studios Foods, North Hollywood, CA

Sunny Delight, Anaheim, CA

Knott’s Berry Farm, KNOTT’S, Buena Park, CA Dreyer’s Ice Cream, Phoenix, AZ

(7)

PROJECT HIGHLIGHT

TOON LAGOON - UNIVERSAL STUDIOS

ORLANDO, FL

Toon Lagoon, one of five “themed islands” in the Universal Studios - Orlando “Islands of Adventure” Theme Park, consists of approximately 15 acres of rides, theaters, play areas, restaurants and shops. This verdant island of fun consists of 12 buildings and a 10-acre lagoon.

The Comic Strip themed Café style eateries have a 1,000 meal per hour capacity, and were designed by ATI principal Rick Coleman, AIA.

RETAIL AND MIXED USE

PARTIAL PROJECT LIST

Panera Bread, California, Oregon and Washington State Puccino Cafe, Hollywood, CA

Bubba Gump Shrimp Co. Restaurant, Various Locations Jurassic Park “The Ride” and “The Cove Cafe”, Universal Studios - Hollywood, CA

Toon Lagoon - Universal Studios, Orlando, FL Foster Freeze, Various Locations

San Ramon Retail Center, San Ramon, CA

349 Main St., Pleasanton, CA

Mission Boulevard, Fremont, CA

Orange County Fair and Events Center, Costa Mesa, CA Ashley Furniture Center, Natomas, CA

Burlington Coat Factory, Natomas, CA Longs Drugs, Various Locations

(8)

PROJECT HIGHLIGHT

CASINO 580

LIVERMORE, CA

ATI was retained to provide design development, construction documents, and construction management services for this 10,400 sf

tenant improvement project in an existing building in an industrial park along Interstate 580 in Livermore. It is classified as a card room, and it contains a large gaming room, a semi-private gaming room for higher-limit gaming, a restaurant with a full service commercial kitchen, a cocktail lounge, a reception and waiting area. The back of house spaces include an employee lounge, an administration office, security office, storage, mechanical and electrical rooms. The design concept was based on an open plan scheme that maximized efficiency while providing for high capacity participation with minimal security staffing.

RENOVATION AND REMODEL

PARTIAL PROJECT LIST

Casino 580, Livermore, CA

Lotus Casino (aka Silver Fox Casino), Sacramento, CA River Rock Casino, Alexander Valley, CA

Commerce Casino, City of Commerce, CA Chevron Corporation, San Ramon, CA Clorox, Pleasanton, CA

USPS, Various Locations

City of Livermore, CA City of Walnut Creek, CA

Hall of Administration, County of Orange, CA The Rose Hotel, Pleasanton, CA

The Hyatt Hotel - SFO, Burlingame, CA San Leandro Hospital, San Leandro, CA St. Luke’s Hospital, San Francisco, CA

(9)

PROJECT HIGHLIGHT

CALIFORNIA STATE UNIVERSITY, EAST BAY

HAYWARD, CA

ATI has been an On-Call Engineer for CSUEB for over 8 years and has completed more than 57 projects for the university. ATI has carried out a 12 KV Power Distribution System upgrade, several Mechanical, Electrical and Structural Engineering projects for remodel, retrofit, and tenant improvements in various buildings on the Campus. ATI has provided a parking lot master plan and parking lot upgrades involving civil and electrical engineering services, civil engineering design for the new Recreation and Wellness Center, and replacement of two old substations at the Health Center and Theater Buildings.

INSTITUTIONAL FACILITIES

PARTIAL PROJECT LIST

CSU East Bay, CA

San Jose State University, CA UC Davis, CA

UC Los Angeles, CA UC San Francisco, CA UC Berkeley, CA

Chabot and Los Pasitos College, CA

San Ramon Valley Unified School District, San Ramon, CA Mt. Diablo Unified School District, Concord, CA

Alameda County Office of Education, Alameda, CA Piedmont Unified School District, Piedmont, CA New Haven Unified School District, Hayward, CA Dublin Unified School District, Dublin, CA

(10)

PROJECT HIGHLIGHT

SAN RAMON FIRE STATION 36

SAN RAMON, CA

A new single story, 7,740 sf Fire Station. The station’s design incorporated 2 apparatus bays to house an engine, grass rig, and ambulance, dorm space for 4 duty personnel plus Captain, dayroom, gym, EMT, kitchen/dining area, and support space.

GOVERNMENT

PARTIAL PROJECT LIST

City of Livermore, CA City of Walnut Creek, CA

San Ramon Valley Fire District, San Ramon, CA Alameda County Sheriff’s Department, Alameda, CA Alameda-Contra Costa County Transit District, Hayward, CA County of San Bernardino, CA

County of Orange, CA

City of Pleasanton, CA Pleasanton Fire Department, CA City of Saratoga, CA

City of Tracy Fire Department, CA Santa Cruz Fire Department, CA South Orange County, CA City of Pasadena, CA

(11)

PROJECT HIGHLIGHT

GENENTECH - STEAM LINE EXTENSION PROJECT

SOUTH SAN FRANCISCO, CA

ATI provided support to the Genentech South San Francisco Campus for the past three years. Projects include pressure control valve station design and installation, ion-exchanger polishing softener installation and a safety feature upgrade to their major utility pipe rack. ATI also provided support to the completion of the integration of the central boiler plant. This includes providing the construction sequence and logic to bring the central boiler plant on-line and the demolition of the individual building boilers afterwards. All were performed without interruption to the steam supply to the manufacturing and research facilities. The latest project ATI performed for Genentech is a fourteen million dollar steam line extension project. ATI first completed a feasibility study to recommend the best option for routing and developed the design phase of the project. The project included the design of 1,500 foot high pressure steam line from the central boiler plant to their Founder’s Research Center, tie-in to the existing building steam system, demolition of the old boilers, and installation of new heat exchangers to provide for the heating load.

INFRASTRUCTURE

PARTIAL PROJECT LIST

PG&E Company - Moss Landing Power Plant, Moss Landing, CA Environ Corporation, Emeryville, CA

CSU East Bay, Hayward, CA

Genentech - Steam Line Extension Project, S. San Francisco, CA OC Fair and Events Center, Costa Mesa, CA

MAG-LITE Instruments HQ, Ontario, CA

John Wayne Airport Maintenance Facility, Costa Mesa, CA

Lockheed Martin, Sunnyvale, CA

MCI/WorldCom/ (now Verizon), San Francisco Bay Area, CA PG&E Company, Diablo Canyon Nuclear Power Plant, San Louis Obispo, CA

Alameda-Contra Costa County Transit District, Hayward, CA UC Berkeley, CA

(12)

SAN FRANCISCO BAY AREA

3860 Blackhawk Road

Danville, CA 94506

925.648.8800

ORANGE COUNTY

3050 Pullman Street

Costa Mesa, CA 92626

714.338.1600

SACRAMENTO

2510 Douglas Boulevard, Suite 400

Roseville, CA 95661

References

Related documents

In LCM, change is thus modelled through MLP using mathematics and explanatory spatial variables in a trends driven approach ( P erez-Vega et al., 2012 ). Spatial anal- ysis of

Defendants researched, developed, designed, tested, manufactured, inspected, labeled, distributed, marketed, promoted, sold, and/or otherwise released into the stream of commerce

This work builds on previous work done by Ai Group, including our submissions to successive Parliamentary inquiries into innovation, stakeholder consultation to Boost Commercial

Inpatient Rehabilitation Services must be able to provide resource intensive therapy and support to children and adolescents suffering functional impairment and disability

PROFESSIONAL EXPERIENCE POINT LOMA NAZARENE UNIVERSITY, San Diego, CA 2014–present Associate Professor of Management, Fermanian School of Business RANDALSCHOBER.COM, San Diego,

I urge Governments to join the UK, and other anti-whaling countries, in the International Whaling Commission to maintain the moratorium on commercial whaling so that our

Client based games that require a DVD to be played. In general these are single player games. Predominant genres are adventure, role playing games and real time