• No results found

य लयर प वर क प र शन ऑफ इ डय ल मट ड

N/A
N/A
Protected

Academic year: 2021

Share "य लयर प वर क प र शन ऑफ इ डय ल मट ड"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

यूि लयर पॅावर काप रेशन ऑफ इंिडया िलिमटेड

NUCLEAR POWER CORPORATION OF INDIA LTD

(भारत सरकार का उ म A Government of India Enterprise

कैगा थल

KAIGA SITE

संिवदा एवं साम ी बंधन Contracts & Materials Management

कैगा थल, कैगा-581400, उ तर क नड िजला, कनाटक,इं डया. Kaiga Site, Kaiga – 581400, U.K. District, Karnataka, INDIA.

िनगम पहचान संCorporate Identity No. (CIN) : U40104MH1987GOI149458, वेबसाइट website: www.npcil.nic.in

e-mail: cmm_kgs@npcil.co.in, Ph: 08382- 252655 /253 530/ 264141/ 264069 Tender No. CMM/KAIGA1-4/ TPT/ KGS5&6/ 59268

Tender ID. No. 55878

Reply to On-Line Pre- Bid Meeting Queries

Point

No

Query Response

1 As per clause#4 of Annexure-X, we want to know the

estimated cost of the work, so that we can calculate

average annual financial turnover required as

qualification criteria

An annual financial turnover criterion has been removed from the tender.

2

Sr.No. 42 of BoQ (Section-C, Technical specifications),

specification for excavation of trench - to be mentioned

Tech specification for Item No

42 may be given as below: Digging and Excavation of trenches including Road and concrete cutting for Laying OFC cable should be at least 3 Ft. Below soil surface (Clamping and labeling at every 10 meter as per EIC instructions)

3

With reference to Sr# 8 of page# 116 of Section-D, we would like to request you to review the delivery period and extend it to 60 days as

a) various materials from different manufacturers need

to be organised from different parts of India and other countries

b) Cabling work including civil work like digging, cable

laying etc is involved

Duration of the contract may be extended up to 65 days

4

With reference to Sr# 8 of page# 116 of Section-D, kindly

share the details of drawings required to be submitted and days required from your end to get approval

Delivery period has been revised upto 65 Days instead of 30 Days. Hence, all the activities shall be completed within 65 Days. All documents related to installation shall be

(2)

submitted after work

completion. This shall include installation procedure & as built details. No drawing approval is required during the work.

5

As per clause#5.6.1 - we understand that the payment term as

a. 90% of the materials along with taxes in full will be

paid on pro-rata basis on receipt at stores

b. balance 10% of materials and erection & commissioning charges, taxes in full will be released

after commissioning and final acceptance.

Kindly share the details of acceptance procedure for releasing 90% of material cost on receipt of materials at stores on pro-rata basis. Kindly share the details of Final acceptance procedure for releasing balance 10% of material value and 100% of I&C charges

Tender Terms & conditions shall prevail. i.e., as per 1.7 of Special Condition of Contract. (Acceptance of “Terms of

Payment”: 100% payment

shall be released within 30 days after receipt, inspection, installation, commissioning &

final acceptance of the

materials at Kaiga).

6

Warranty period - for how many months? Warranty period will be

minimum 12 months which is already mentioned in technical specification of the tender.

7

We would like to visit your plant to understand and assess the scope of work. Kindly confirm

Yes, you can visit the plant site with prior intimation & by

furnishing the details of

visitors.

8

Operating Temp. for NVR (-10 to 55 degree C) is not supported in commercial grade NVR. Whether 0 to 50 degree support is acceptable?

OK

9

Warranty period - for how many months? 12 months

10

Can we have the complete route layout for OFC and other cables and the Camera locations for both the parts namely:

a. P art-A: CCTV NETWORK ALONG THE BIFURCATION FEN CING BETWEEN KGS: 1-4 AND KAIGA 5&6 AT KAIGA SITE

b. Part-B: FIBRE CABLE LAYING BETWEEN KGS 3&4 CBS GATE, KGS3&4 CAS GATE AND KAIG A 5&6 TIME OFFICE

Already described in Scope of Work document and network diagram as well.

(3)

11

Are there any Radioactive area where we have to execute the work?

Non radioactive area.

12

Who will supply the Camera mounting poles OR is it to be fixed on existing poles?

All cameras are to be installed

on existing poles using

mounting frame. Mounting frames are to be provided by supplier.

13

How the 3 core x 2.5 sq.mm, 1 100V grade, PVC insulated, PVC sheathed, multistrand, flexible cable is to be laid? It is not advisable to lay both OFC & this cable in the same duct.

As per our requirement.

14

UTP quantity is 305 x 15 = 4575 metres, whereas 20 mm HDPE is only 3000 metres.

It will be used to cover angles, obstacles & spare.

15

HDPE pipes are not PLB? Even the sizes 32/28 and 20/16 are non-standard for PLB.

As per tender specifications.

16

The Mounting brackets for above camera models should be of OEM make. This clause is not desirable and is highly restrictive.

Suitable make can be used.

17

OUTDOOR RACK 6U is required with UL certification--- can we with RoHS /ISO certificates instead of UL

As per our Specification

18

Is EMD exemption documents to be submitted in hardcopy

EMD is not applicable.

19

Power supply will be provided by NPCIL at single point in ground floor-- but required power cable is 3000 mtr, we will need additional power source at regular interval which NPCIL only can provide

Will be provided along the fencing at maximum possible extent.

20

In BOQ laying of HDPE and OFC are on existing U clamps on existing poles so there is no scope of laying underground- Kindly confirm

Comprising some portion

underground laying.

21

In Boq sr. 39 -Fixing and termination of 24 port UTP Jack panel is mentioned but not supply of the said item. kindly confirm

Its includes supply and

installation.

22

Sr.no 42. Digging and Excavation of trenches including Road and concrete cutting for Laying OFC cable- 400 mtr-- kindly confirm the road size and do we need any permission from other authorities- also confirm the depth size

Depth size is 3 meter and work is within the NPCIL site boundary.

23

In specification of 32CH NVR- The offered NVR should support minimum 32 channels of recording. Redundant recording, holiday recording and capture schedule

(4)

configuration.-- kindly confirm REDUNDANT RECORDING feature because in NVR single recording can be done redundant recording if required can be done if we have separate workstation. OR do we need integrated Redundant power unit for NVR

24

Outdoor 6U rack do we need with exact given dimension or as per the requirement at site to house the IT equipments with proper ventilation

As per our requirement

25

Model no. Bullet camera for hikvision is same of PTZ so kindly provide exact model no. of Bullet camera for quoting proper housing.

Model no. of PART-A item no. 21 is DS-2CD2643G0-IZS and item no. 20 is Hikvision DS-2DE4A320IWDE

26

OUTDOOR 6U rack-UL certificate is it mandatory or ISO, RoHS, Crisil rated product will be allowed.

As per our Specification

27

Depth of Digging of Trench and preparation of trench kindly be desired.

Depth size is 3 meter and work is within the NPCIL site

boundary.

28

You are planning to install chinese cameras that is hikvision which has being banned by the govt

We have already purchased the camera.

29

You are going to install hikvision camera which is banned and having security breach

We have already purchased the camera and these are in a isolated secure system.

30

No Brand of Industrial grade switches is mentioned As per our technical

specification requirement.

31

Switches Brand is not Mentioned any third party brand is ok?

As per our requirement

32

We understand that In tender work asked is for Two groups. Please confirm from the boq, which is Part A and which is part B.

Item No. 1 - 24 are for Part-A and item No. 25 - 44 are for Part-B.

33

As per drawing doc , " NETWORK DIAGRAM for C CTV Network, NETWORK DIAGRAM for Time Office Set-up" there is two architecture is mention . We understand that these two are Part A and Part B. Please confirm our understanding.

Yes

34

As per technical doc, we understand that annexure 18-21 is Part B. Please confirm our understanding.

(5)

35

In second architecture OF "NETWORK DIAGRAM for Time Office Set-up", connection is between Kaiga 5&6 to Kaiga 3&4 via OFC Cable. As per diagram we understand that we need to provide only 2 no. of layer 2 access switches for Kaiga 3&4 site. Please confirm.

Yes

36

But as per BOQ Qty of layer 2 access switch asked is 4 no. We understand that rest will be for spare. Please confirm our understanding.

2 switches will be used for LAN.

37

Regarding LIU 12 PORT Rack mount, Size get contradicts. Specification is asking for 1 u where as boq is asking for 1.5u. Please confirm the requirement.

1U

38

Dimension of liu asked si 12 PORT FULLY LOAD E RACK MOUNT LIU:- Dimension: 42*410*310 mm (H*W*D) .The dimension of liu may vary OEM to OEM. Request you to accept it as per OEM dimension. Please confirm.

As per our requirement

39

As per specification of 15u and 12u rack, requirement is for 1 year warranty for 15U and 12U Rack. IN Rack warranty is not coming. Request you to remove this line.

As per our requirement

40

For outdoor rack, annexure 8, IP 42 Rating is enough. As it will increase the costing twice. Request you to accept as IP42/ IP55 Rating.

As per our requirement

41

Regarding layer 2 switch, annexure 3, Request you to accept as 8K / 16K Mac address.

As per our requirement

42

Regarding 12 port fiber rack mount LIU, Annexure 7, Can we quote ABS Plastic 64321 - Splice Tray, 24F. As most of the vendor is having Splice tray as Plastic.

As per our requirement

43

We understand that OFC Cable and power cable will lay in single 32 MM HDPE Pipe. And cat 6 cable will lay in 20mm HDPE PIPE. Please confirm our understanding.

This shall be instructed by Engineer in Charge at the time of installation of system.

44

Do we need to provide the camera bracket of the same OEM?

As per our requirement

45

Please confirm the camera mounting type - pole/ wall mount bracket for both camera?

pole

46

We understand that camera installation will be in bidder scope. Please confirm the mounting structure for camera. Is it existing/ we have to provide structure?

Cameras to be mounted on

existing structure of

bifurcation fencing poles.

47

As per BOQ, S.NO. 2, We understand that requirement is for cat 6 UTP Unarmored cable. Please confirm.

(6)

48

As per technical specification OF "Supply of Mounting Bracket for 4 MP Network Camera to Suit Model (HIKVISION DS-2DE4425I W- DEUHK) of OEM”, we understand that existing bullet camera is 70 no. But requirement of mounting bracket is only 68 no. we understand that res t of the mounting bracket is existing / in M/ S Npcil scope. Please confirm.

As per our requirement

49

Do we have to integrate all the existing 75 n o. of camera to NEW 32 CHANNEL OF NVR?

All cameras will be configured with 3 NVRs

50

"Qty of NVR is 3 no. How the connection is going to be done. Is all three NVR will get integrated? Or all three will be stand alone a s the distribution switch asked is 1 no. only. Is all NVR will be in same control room? "

Technical configuration of

devices will be discussed and executed by the qualified engineer of contractor with the instructions and planning by engineer in charge of NPCIL at the time of Installation. All NVRs will be in same room.

51

If all 3 NVR are stand alone Then please con firm the no. of camera going to connect in each NVR.

Technical configuration of

devices will be discussed and executed by the qualified engineer of contractor with the instructions and planning by engineer in charge of NPCIL at the time of Installation.

52

"As per boq s.no. 2 and 4 , We understand that 15 no. of cat 6 cable is required i.e. 15*3 05=4575 mtrs . But HDPE required is 3000 mtrs only. As per s.no.19, laying of cat 6 cable qty is also 3000 mtrs . We understand that only 3000 mtrs of cat 6 cable will get utilize and rest will be in spare part. Please confirm our understanding."

As per our requirement

53

We understand that 12 core ofc cable of S.NO. 25 is asked for PART B, .Please confirm our understanding.

Yes

54

We understand that OFC CABLE AS PER S.NO. 25, is required for connecting kaiga 3&4 to kaiga 5&6. Please confirm our understanding.

Yes

55

As per architecture diagram of connection, distance is 1000 mtrs only but as per BOQ Requirement is for 1500 mtrs. We understand that rest 500 mtrs asked is for spare parts only. Please confirm ur understanding.

Yes It will be used to cover angles and obstacles.

(7)

56

Do we have to give cable route marker? Please confirm the distance, if required.

Yes. As per instructions of engineer in charge and as actual required at the time of installation.

57

Please confirm the HDPE pipe required for laying of OFC , power and cat 6 cable will lay underground/ on the wall using saddle for PART A. Please confirm.

Both

58

If HDPE will lay underground please confirm the type of soil- hard / soft soil?

Mix

59

We understand that HDPE Sl.no. 26, is required for PART B- HDPE will lay underground. If yes, Please confirm the type of soil- hard/ soft soil?

Mix

60

Do we have to provide GI Pipe for underground (road and concrete cutting) laying of cable?

If required for successful completion of works, yes.

61

We understand that as per BOQ, Requirement is for Parallel mode UPS. I.e. we need to provide parallet UPS qty will be 2 no. As ked qty in boq is 1 no. only. Please confirm our understanding.

In parallel mode 2 UPS systems work as single unit.

62

Please confirm if we are offering 6kVA UPS with inbuilt isolation for parallel mode.

As per our requirement

63

Request you to extend this case for at least 1 week. Due date has been extended

upto 21.09.2020.

64

Respected Sir, Pls. Share Your Direct Email Address & Mob No. So we can send our query in proper excel sheet.

Pls. note our e-Mail ID given in

tender. i.e.,

cmm_kgs@npcil.co.in and

contact No. 08382 - 264141. You can send your detailed query on this e-Mail ID.

65

PLS CONFIRM EMD EXEMPTION CERTIFICATE AND ANY OTHER TENDER DOCUMENTS TO BE SUBMITTED IN HARD COPY.

EMD is not applicable. All the documents shall be uploaded on e-Portal only.

Note: The above clarification shall form a part of Tender Document.

With the above all the bidder queries as on date have been addressed, in case if any queries remain unaddressed, same may please be brought to notice immediately.

References

Related documents

Sähkön kysyntä kasvaa kaikissa skenaarioissa, mutta sähkön kysynnän osuus energian kokonaiskysynnästä kasvaa merkittävimmin nopean kehityksen skenaa- riossa ja perusskenaariossa,

Memorandum of Marks of all Examinations starting from HSC onwards (Candidates whose results are awaited will be given provisional admission at their own risk and must produce

3) PHOTOGRAPH: One recent coloured passport size photograph (not more than three months old) is to be scanned and uploaded in the space earmarked in the on-line

The study is significant in the sense it will highlight the major problems that serve as a detriment to public transport, the quality of intra public transport services in the

"The company's performance for current financial year has invigorated us to strengthen business verticals like Smart Energy Meters, ICT-IOT, Mini PC manufacturing,

17:00 Hrs.. Candidate needs to reach Noida Transit Accommodation or Aligarh Transit Accommodation well in time and then from these points one can avail Corporation

We assume that Operating System & Infrastructure Support Services Resource (3 resource per site) will provide supports for only Windows based platform, Hyper-V,

Memorandum of Marks of all Examination starting from HSC onwards (Candidates whose results are awaited will be given provisional admission at their own risk and must produce