Oliver Hazard Perry – Addendum No. 1

Interior/Exterior Renovation Bid Package Page 2 of 2 December 20, 2013

DRAWING S1.2 –

*Corrected Work Item Numbers for Work Item 10, 11, & 12

*Work Item 11 – Change 50 Brick Units to 20 Lineal Feet

DRAWING S1.3 –

*East and West Elevation: Change Work Item 1 to Work Item 8 in description for Penthouse

concrete repair

*Added Note on Work Item 8

DRAWING S1.4 –

*Partial Interior Elevation detail – Change Work Item 5 to Work Item 12

*Section 3 – Change Work Item 5 to Work Item 12

*Partial Plan At Gymnasium – Change Work Item 2 to Work Item 1 in note on east side

describing tuck pointing

DRAWING S1.5 – Added Base Bid Quantities for concrete repair work

Addendum #1 Attachment A

(6)
(7)
(8)
(9)
(10)

PARTIAL PLAN AT GYMNASIUM

1/8"=1'-0"

EXISTING STAIR EXISTING STAIR

SHORE EXISTING BEAM - SEE SECTION 2 FOR DETAILS

TUCKPOINT OPEN MASONRY JOINTS SEE WORK ITEM #1 DETAIL THIS SHEET (APPROXIMATELY 30 L.F.)

EXISTING WINDOW TYPICAL OF (8)

PARTIAL REPAIR OF MASONRY PIER. WORK ITEM #12 - SEE PARTIAL ELEVATION

EXISTING MASONRY COLUMN

EXISTING CHIMNEY

REPAIR CRACKS IN MASONRY WALL - SEE WORK ITEM #11 DETAIL THIS SHEET (APPROXIMATELY 20 L.F.) EXISTING GYMNASIUM FLOOR

EXISTING WINDOW TYPICAL OF (8)

REFLECTED PARTIAL

ROOF PLAN FOR SHORING ONLY

TYPICAL

2

2

- CHANGED WORK ITEM 2 TO WORK ITEM 1 (DECEMBER 20, 2013)

EXISTING WINDOW TO REMAIN CONTRACTOR TO REMOVE AND SALVAGE BULLNOSE BRICK. CONTRACTOR TO REINSTALL AFTER ALL REPAIRS HAVE BEEN COMPLETED. REMOVE A MINIMUM OF (1) WYTHE 4 COURSES HIGH OF MASONRY INCLUDING SILL BRICK ALONG LENGTH OF WINDOW. TYPICAL @ 8 LOCATIONS CLEAN PER SSPC-SP2 AND PAINT EXPOSED STEEL LINTEL WITH SHERWIN WILLIAMS DURA PLATE 235 MULTI PURPOSE EPOXY REMOVE AND SALVAGE RADIATOR COVER AND GUARD. REINSTALL AFTER MASONRY REPAIRS ARE COMPLETE

SECTION 1

1"=1'-0"

EXISTING MASONRY WALL

EXTERIOR

1'-5"

SECTION 2

1"=1'-0"

EXISTING MASONRY WALL

EXTERIOR

EXISTING 3/4" PLATE WITH ANCHORS

EXISTING 24" BEAM

EXISTING CONCRETE JOIST CONSTRUCTION EXISTING ROOFING

CONTRACTOR TO PROVIDE SHORING TO SUPPORT A 20,000 POUND POINT LOAD OR 1,000 POUNDS PER LINEAL FOOT UNIFORM LOAD

INTERIOR

WORK ITEM #10 (8 LOCATIONS)

SILL BRICK MAY EXTEND TO WINDOW SILL/EDGE

APPROXIMATE LIMITS OF MASONRY COLUMN DEMOLITION. SEE WORK ITEM #12

EXISTING MASONRY COLUMN

SHORING SHALL BE IN PLACE PRIOR TO DEMOLITION OF MASONRY. SEE SECTION 2 FOR SHORING REQUIREMENTS

SECTION 3

1"=1'-0"

EXTERIOR

INTERIOR

WORK ITEM #12 (1 LOCATION)

2

2

- CHANGED WORK ITEM 5 TO WORK ITEM 12 (DECEMBER 20, 2013)

EXISTING RADIATOR

APPROXIMATE LIMITS OF DEMOLITION

PARTIAL INTERIOR ELEVATION

1/4"=1'-0"

REMOVE BRICK TYPICAL AT 8 WINDOW LOCATIONS. SEE DETAIL THIS SHEET. EXISTING FLOOR MASONRY COLUMN REPAIR. 1 LOCATION ONLY. SEE PLAN FOR LOCATION. WORK ITEM #12.

2

2

- CHANGED WORK ITEM 5 TO WORK ITEM 12 (DECEMBER 20, 2013)

1/4"

EXISTING MASONRY THICKNESS

NOTES: 1.

EXISTING SEALANT MAY OCCUR OVER/IN EXISTING CRACK AND SHALL BE REMOVED PRIOR TO REPAIRING CRACK.

2.

CUT BACK AND CLEAN OUT EXISTING CRACK FOR THE WIDTH AND DEPTH INDICATED.

3.

INSTALL SEALANT PRIMER ON CUT SURFACES OF JOINT (PER MANUFACTURING RECOMMENDATIONS). COLOR TO MATCH CLEANED MASONRY.

4.

INSTALL CLOSED CELL BACKER ROD AND URETHANE SEALANT.

1/2"

CONTINUOUS CLOSED CELL BACKER ROD

EXISTING CRACK CONTINUOUS SEALANT

1/4" CUT

ALONG CRACK

TYPICAL MASONRY CRACK

REPAIR DETAIL

WORK ITEM #11

BASE BID = 20 L.F.

OCTOBER 23, 2013

OLIVER HAZARD PERRY

SCHOOL - INTERIOR/

EXTERIOR RENOVATION

GYMNASIUM REPAIRS

OLIVER HAZARD PERRY

SCHOOL

18400 SCHENELY AVE

CLEVELAND, OHIO 44119

SEAL

Consulting Engineers

PROJECT NAME DRAWN BY

2217 East 9th Street, Suite 350

Cleveland OH 44115-1257

216-875-0100/ (F) 216-875-0111

barberhoffman.com

PROJECT ADDRESS CHECKED BY DRAWING SCALE PROJECT NUMBER DRAWING TITLE DRAWING NUMBER

Cleveland, OH Columbus, OH

Cranberry Twp., PA

c 2013 COPYRIGHT BARBER & HOFFMAN, INC.

DATE

NO.

DATE

DESCRIPTION

S1.4

PLAN DETAILS

AND SECTIONS

ETP MAM AS NOTED 13124 1 10/23/2013 OWNER REVIEW 2 12/16/2013 ADDENDUM #1

(11)
(12)

Addendum #1 Attachment B: Bid Form 2

Interior and Exterior Renovation at Oliver Hazard Perry School

Having read the specifications and examined the Drawings, Visited the Site, and Inspected the

Site conditions governing the work, I hereby agree to furnish all labor, materials, transportation,

equipment, to pay for all federal, state, and local taxes, all insurance costs, and permit fees if

necessary, to complete the work for this project, as required by the Contract Documents, as

described in this bid specification, and indicated on the drawings, including all Addenda issued,

and to complete by the Agreed to completion date. I will hold my pricing firm for a period of

sixty (60) days, and state that I complete the aforementioned project for the base bid listed below.

Bidder acknowledges receipt of the following Addenda:

Addendum No. .

Dated: .

Base Bid:

Interior and Exterior Renovation at Oliver Hazard Perry School

Base bid is to be ALL INCLUSIVE:

Material for the sum of:

$ .

Labor for the sum of:

$ .

Allowance

Total:

$ .

BASE BID GRAND TOTAL:

$ .

Base Bid Grand Total Written Out:_______________________________________

____________________________________________________________________

Alternate No. 1 - Price to Remove Incinerator: $_________________________Add

Firm:

.

Address:

.

City, State, Zip:

.

Name & Title:

.

Representative:

.

Telephone Number:

.

Fax

Number:____________

Signature:____________________________________________

References

Related documents

Based on current land use guidance in City Plan and relevant subarea plans, rezoning of properties containing manufactured housing communities with

As with viruses, worms, and Trojan horses, scanning the outgoing traffic and scanning the listening ports (e.g. by sending a TCP SYN) can help a network to detect terminals

It is also explicitly created in such a way as to avoid the holistic view which is otherwise often presented as a general trademark of business model research (e.g. Zott

675 (2014) (concluding that the SEC’s initial burden is only to prove but-for cause and an intervening cause raised by the defendant is not dispositive), with Happ, 392 F.3d at

In addition to the repurchase agreement safe harbor, financial participants can also avail themselves of similar safe harbor treatments if their financing is structured as a

This review deals with study of the Rhino population dynamics vis a vis increase in Rhino habitat using Remote sensing technology over the years in Gorumara

This study aimed to investigate how the Smart Cape Access project is utilised by the community of Delft within the framework of UNESCO’s MDGs in particular to what

Sizzle Cymbal Suspended Cymbal Piatti Ruthe on Bass Drum Shell Puelli Sticks Piccolo Side Drum Side Drum (OD)Bodhran (OD)Djembe & (OD)Djun-Djun Gran Cassa Celesta Tuvan Throat