Analyzing Component Importance in Multi-Function Multi-Capability Systems Developmental Maturity Assessment

N/A
N/A
Protected

Academic year: 2021

Share "Analyzing Component Importance in Multi-Function Multi-Capability Systems Developmental Maturity Assessment"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)

Dr. Brian Sauser

Associate Professor

Stevens Institute of Technology

School of Systems & Enterprises

[email protected]

(2)

Encompases being aware of the correct

time and place to deploy and knowing

when to operate appropriately

according to the situation

This response is designed (in some

instances learned) and not determined

by the system’s age.

Indicates how a system responds to the

circumstances or environment in an

appropriate and adaptive manner.

(3)

http://dailymobile.se/2010/07/28/iphone-4-vs-iphone-2g-3g-3gs-speed-comparison/

http://www.defenseindustrydaily.com/the-usas-new-littoral-combat-ships-updated-01343/ www.microsoft.com

(4)

iPhone Evolution

Launch Time

2007, Jun

2008, Jul

2009, Jun

2010, Jun

2011, Oct

(5)

Systems Evolution and Lifecycle Management

Technology

Readiness

Level (TRL)

Integration

Readiness

Level (IRL)

SRL = f (TRL, IRL)

The System

Value Proposition:

To provide

a systemic view of

development maturity

with

opportunities to drill down to

element-level contributions

To allows managers to

evaluate

system development to

take

proactive measures

To

create highly adaptive

(6)

USV US3 AN/AQS-20A AN/ASQ-235 (AMNS) AN/AES-1 (ALMDS) BPAUV PC MVCS (USV) MVCS (RMMV) TSCE MH-60 MPS Combat Mgmt System MVCS (On-board) MPCE

MP SRL w/o Sea Frame MP SRL

MP 1 0.60 0.57 USV; MPCE; RMMV; MVCS (USV); BPAUV PC MH-60S 7 7 6 7 7 7 7 3 6 6 6 6 7 6 6 6 6 6 6 6 7 7 7 7 7 BPAUV AN/WLD-1 (RMMV) 7 6 6

LEGEND

Risk to Cost and/or Schedule

Low Medium High

1 Technology Readiness Level Current Mission System SRL Status

1 Integration Maturity Level

1 System Readiness Level Demarcation MP Technology

Current Mission Package SRL Status

Scheduled Position Sea Frame System

Previous Mission Package SRL Status

Memory Card Hard Drive 6 6 3 3 6 MH-60S; MH-60S MPS MVCS (OB) MVCS

(RMMV) BPAUV US3; AQS-20 ALMDS AMNS;

Trade Between Advanced Capability

or Increased Maturity

.1 .2 .3 .4 .5 .6 .7 .8 .9 1

SRL

Example provided by Northrop Grumman in support of the US Navy PMS 420 Program

(7)

AN/AES-1 (ALMDS) USV US3 AN/AQS-20A AN/ASQ-235 (AMNS) BPAUV PC MVCS (USV) DLS (RMMV) TSCE MH-60 MPS Combat Mgmt System MVCS (On-board) MPCE

MP SRL w/o Sea Frame MP SRL

MP 1 0.64 0.67 MH-60S 6 9 7 7 7 6 6 6 6 7 6 6 6 6 6 6 7 7 7 7 9 BPAUV AN/WLD-1 (RMMV) 7 6 6 Memory Card Hard Drive 6 6 7 6 DLS (On-board) 7 5 9 5 6 .1 .2 .3 .4 .6 .7 .8 .9 MVCS (OB) MVCS (USV) DLS (OB) USV BPAUV BPAUV PC

US3 DLS(RMMV) MPCE RMMV MH-60S AQS-20

AMNS ALMDS MH-60S MPS

System Maturity is

Enhanced

7 7

LEGEND

Risk to Cost and/or Schedule

Low Medium High

1 Technology Readiness Level Current Mission System SRL Status

1 Integration Maturity Level

1 System Readiness Level Demarcation MP Technology

Current Mission Package SRL Status

Scheduled Position Sea Frame System

Previous Mission Package SRL Status

1

SRL

.5

Example provided by Northrop Grumman in support of the US Navy PMS 420 Program

(8)

Expected SRL

(9)
(10)
(11)

This is RESEARCH…

Component importance is significantly dependent on interest:

component importance should be situation-dependent

Discernibility in components importance determination: difference

between important components is very small, largely due to the

inconsistency of estimates across all technologies

Technologies that have more integration rank relatively higher

than those having less integration when all other factors are the

same: With out a proper weighting of component importance,

intergration will drive risk

Maturity of one system is not the same as maturity for another

system: SRL for one system cannot be compared to the SRL of

another system unless they are the same system.

WARNING

References

Related documents

In the mining industry competencies profiles shall be a supplement to qualifications, as they show a full characteristics of the employee, thus allowing the development of a precise

How the WorkCentre 5019/5021 Multifunction System exceeds the installation and ease of use

The most widely-used textbook for the communication theory course, A First Look at Communication Theory analyzes the major communication theories at a level that is appropriate

Open the Simscape > SimHydraulics > Hydraulic Cylinders library and place the Single-Acting Hydraulic Cylinder block into the model w indow.. To model the valve, open the

To deliver world-class quality outcomes relevant to their business objectives, IT organizations need to choose wisely between industry standard and advisory testing

According to the Bible, the church is the body of Christ—all those who have placed their faith in Jesus Christ for salvation (John 3:16; 1 Corinthians 12:13). Local churches

History: The AT-3 Tzu-Chiang was AIDC's second indigenous design to enter Taiwanese service behind the turboprop powered Chung Tsing, and serves with the Taiwanese Air Force as

Including knowledge of the nature of waves in the basis of approximation has been shown to reduce the number of degrees of freedom required in simulations of the Helmholtz