• No results found

A320 After Landing Parking Manual

N/A
N/A
Protected

Academic year: 2021

Share "A320 After Landing Parking Manual"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

(1)

PF

PF

PNF

PNF

AFTER LANDING – PARKING – SECURING THE A/C

(2)

PF

PF

PNF

PNF

1.a. AFTER LANDING

GRND SPLRS……….….DISARM

Depending on the taxi position :

ANNOUNCE………..”LANDING LIGHTS” LAND LIGHTS………..………...…RETRACT

STROBE………...AUTO

Signal for PNF actions

(3)

PF

PF

PNF

PNF

1.b. AFTER LANDING

1- RADAR……….OFF/STBY 2- PREDICTIVE WINDSHEAR…………..……..OFF 3- ENG MODE SEL………...NORM 4- FLAPS………..RETRACT TCAS MODE SEL……….………STBY

5-ATC……….….…AS RQRD 6- APU……….START 7- ANTI ICE………...AS RQRD

Observe the ECAM MEMO : 7 5 4 3 2 1 6

(4)

PF

PF

PNF

PNF

1.c. AFTER LANDING

BRAKE TEMP………..CHECK

AFTER LDG C/L

Brake temperature Limitations :

Use of brake fans :

FCOM 3.04

(5)

PF

PF

PNF

PNF

2.a. PARKING PARKING BRK ACCU PRESS….………..CHECK

PARKING BRK………..ON ENG MASTER 1 & 2………OFF GROUND CONTACT………ESTABLISH BEACON ...………..….OFF SEAT BELTS………OFF ANTI - ICE………....OFF APU BLEED………..ON SLIDE DISARMED………CHECK ELAPSED TIME………STOP FUEL PUMPS………..OFF ATC……….…STBY IRS PERFORMANCE………..CHECK STATUS……….CHECK 3 minutes minimum at or near IDLE

Landing ENG shut down

t

WHEEL DOOR

ECAM SD auto - switching (when last Engine is shut down)

Observe the ECAM MEMO :

Consider « GROUND OPERATIONS IN HEAVY RAIN », refer to FCOM 3.04.30

To stabilize engine hot

(6)

PF

PF

PNF

PNF

2.b. PARKING PARKING BRK……….AS RQRD

Dus..………..DIM

REPORT SEVERE ICING CONDITIONS

BRAKE FAN………OFF

Dus..………..DIM

Release parking brakes after chocks are in place

Parking with a flat tire on

the nose gear Keep the brakes ON

" BRAKES HOT "

PARKING C/L

(7)

PF

PF

PNF

PNF

3. SECURING THE AIRCRAFT PARKING BRK……….CHECK ON

ADIRS (1+2+3)……….……..OFF OXY CREW SUPPLY………..…OFF

EXTERIOR LIGHTS……….……OFF

MAINT BUS……….…AS RQRD

APU BLEED………..………OFF APU MASTER SW………..…….OFF EMER EXIT LIGHT………..…….OFF NO SMOKING………..….OFF EXT PWR……….AS RQRD BAT 1 & 2………..……OFF

APU flap closed Set BAT 1 & 2 OFF APU AVAIL light

goes out

t

2 min

Observe the ECAM MEMO :

SECURING THE AIRCRAFT C/L

To prevent smoke entering the cabin during next start :

To ensure the ADIRS memorize the last data:

Electrical supply OFF ADIRS OFF

t

(8)

PF

PF

PNF

PNF

1.b. AFTER LANDING

1- RADAR……….OFF/STBY 2- PREDICTIVE WINDSHEAR…………..……..OFF 3- ENG MODE SEL………...NORM 4- FLAPS………..RETRACT TCAS MODE SEL……….………STBY

5-ATC……….….…AS RQRD 6- APU……….START 7- ANTI ICE………...AS RQRD

Observe the ECAM MEMO : 7 5 4 3 2 1 6 Icing conditions

Slush or snow on the runway

Wait until engine shutdown and ground confirmation that flaps & slats are cleared of obstructing ice

(9)

PF

PF

PNF

PNF

1.b. AFTER LANDING

1- RADAR……….OFF/STBY 2- PREDICTIVE WINDSHEAR…………..……..OFF 3- ENG MODE SEL………...NORM 4- FLAPS………..RETRACT TCAS MODE SEL……….………STBY

5-ATC……….….…AS RQRD 6- APU……….START 7- ANTI ICE………...AS RQRD

Observe the ECAM MEMO : 7 5 4 3 2 1 6

Depending on local regulations, ATC transponder may be operated in mode S

Depending on local regulations, ATC transponder may be operated in mode S

(10)

PF

PF

USE OF BRAKE FANS

PNF

PNF

To avoid brake oxidation

Short turnaround time

Select brake fans

just before stopping at the gate (short taxi) OR

5 min after landing (long taxi)

Use of brake fans without oxidation consideration

Observe the ECAM memo if the brake fans are selected

(11)

PF

PF

PNF

PNF

2.a. PARKING PARKING BRK ACCU PRESS….………..CHECK

PARKING BRK………..ON ENG MASTER 1 & 2………OFF GROUND CONTACT………ESTABLISH BEACON ...………..….OFF SEAT BELTS………OFF ANTI - ICE………....OFF APU BLEED………..ON SLIDE DISARMED………CHECK ELAPSED TIME………STOP FUEL PUMPS………..OFF ATC……….…STBY IRS PERFORMANCE………..CHECK STATUS……….CHECK 3 minutes minimum at or near IDLE

Landing ENG shut down

t

WHEEL DOOR

ECAM SD auto - switching (when last Engine is shut down)

Observe the ECAM MEMO :

Consider « GROUND OPERATIONS IN HEAVY RAIN », refer to FCOM 3.04.30

To stabilize engine hot

section temperature :

Above 500 °C, parking brake application should be avoided, unless operationally necessary. Above 500 °C, parking brake application should be avoided, unless operationally necessary.

(12)

PF

PF

PNF

PNF

2.a. PARKING PARKING BRK ACCU PRESS….………..CHECK

PARKING BRK………..ON ENG MASTER 1 & 2………OFF GROUND CONTACT………ESTABLISH BEACON ...………..….OFF SEAT BELTS………OFF ANTI - ICE………....OFF APU BLEED………..ON SLIDE DISARMED………CHECK ELAPSED TIME………STOP FUEL PUMPS………..OFF ATC……….…STBY IRS PERFORMANCE………..CHECK STATUS……….CHECK 3 minutes minimum at or near IDLE

Landing ENG shut down

t

WHEEL DOOR

ECAM SD auto - switching (when last Engine is shut down)

Observe the ECAM MEMO :

Consider « GROUND OPERATIONS IN HEAVY RAIN », refer to FCOM 3.04.30

To stabilize engine hot

section temperature :

Switch ON the APU BLEED as later as possible to avoid ingestion of exhaust gases from the engines. Switch ON the APU BLEED as later as possible to avoid ingestion of exhaust gases from the engines.

(13)

PF

PF

PNF

PNF

2.a. PARKING PARKING BRK ACCU PRESS….………..CHECK

PARKING BRK………..ON ENG MASTER 1 & 2………OFF GROUND CONTACT………ESTABLISH BEACON ...………..….OFF SEAT BELTS………OFF ANTI - ICE………....OFF APU BLEED………..ON SLIDE DISARMED………CHECK ELAPSED TIME………STOP FUEL PUMPS………..OFF ATC……….…STBY IRS PERFORMANCE………..CHECK STATUS……….CHECK 3 minutes minimum at or near IDLE

Landing ENG shut down

t

WHEEL DOOR

ECAM SD auto - switching (when last Engine is shut down)

Observe the ECAM MEMO :

Consider « GROUND OPERATIONS IN HEAVY RAIN », refer to FCOM 3.04.30

To stabilize engine hot

section temperature : If APU not

available

Set EXT PWR ON

before

ENG MASTERS OFF

If JP4 fuel used T > 10°C

Dry motor the engine for 2 minutes

~90 seconds after engine

shutdown

Select ENG MODE to CRANK

with MASTER switch OFF

thenMAN START pb toON

(14)

PF

PF

IRS PERFORMANCE

PNF

PNF

Drift check:

Check that the drift is in the acceptable margins defined in Fcom 3.03.25

Residual ground speed check:

UNACEEPTABLE -CONSIDER THE IRU AS

FAILED

ACEEPTABLE FOR USE

CHECK ON NEXT FLIGHT. IF STILL IN OR ABOVE THIS AREA AFTER 2nd FLIGHT?

CONSIDER THE IRU AS FAILED POSITION MONITOR page

Ground Speed > 15 kts

&

Excessive deviation occurred after 2 consecutive flights

Ground Speed > 21 kts

Consider IR as failed OR

(15)

PF

PF

PNF

PNF

2.a. PARKING PARKING BRK ACCU PRESS….………..CHECK

PARKING BRK………..ON ENG MASTER 1 & 2………OFF GROUND CONTACT………ESTABLISH BEACON ...………..….OFF SEAT BELTS………OFF ANTI - ICE………....OFF APU BLEED………..ON SLIDE DISARMED………CHECK ELAPSED TIME………STOP FUEL PUMPS………..OFF ATC……….…STBY IRS PERFORMANCE………..CHECK STATUS……….CHECK 3 minutes minimum at or near IDLE

Landing ENG shut down

t

WHEEL DOOR

ECAM SD auto - switching (when last Engine is shut down)

Observe the ECAM MEMO :

Consider « GROUND OPERATIONS IN HEAVY RAIN », refer to FCOM 3.04.30

To stabilize engine hot

section temperature :

If maintenance status messages are displayed:

At transit : disregard, unless AIR BLEED.

At main base or airport with repairs available: report for maintenance analysis. If maintenance status messages are displayed:

At transit : disregard, unless AIR BLEED.

(16)

PF

PF

MAINTENANCE BUS SETTING

PNF

PNF

Should electrical power be required for the crew or servicing personnel, consider setting the overhead MAINT BUS switch (in the forward cabin) to the ON position, prior to setting aircraft power to off.

References

Related documents

In the six weeks after devaluation, Overseas Sterling Area (OSA) balances, belonging for the most part to interests in Commonwealth countries or nations with longstanding

The passage quoted most often to describe this form of interpretation is: The passage quoted most often to describe this form of interpretation is: “In

(1996) indicating that students with spelling difficulties may struggle to produce texts free from spelling errors using spellcheck, the writers with dyslexia produced text

Reaffirm Accreditation via Self Studv or Periodic Review Reportand request a Progress Report or Monitoring Report: The Commission has acted to reaffirm accreditation but requires

3 4 Start Select Measurement Method (Section 7.9) Set Hardware Scope (Section 7.4) Perform OS power consumption assessment (Section 7.5) Perform Application only power

Please note that each partner institution is responsible for the organisation and delivery of their part of the programme; term dates and module titles may differ. During your Euro

The results of the study showed a very high degree of influence of each of the factors, legal and professional legislation and administrative and organizational factors

Tackling everything from the community college term time after the same account for the item as well sedgefield hardwick primary schools and staff and what does the information