Technology services for existing facilities

Kristian Risdal

SVP C&T MMO

(2)

MMO - Field life solutions

Tie-in 1992 Sleipner 2001 Gullfaks C 1999 Platform integrity 1998 Statfjord B Satellite tie-in Veslefrikk Drilling upgrade Ekofisk 2009 Oseberg B Norne 2010Swivel replacement 2010 Low pressure production Kristin Compression modification

2005Conversion to gas production

Statfjord A, B, C

Reanalysis and studies

2008 Decommissioning 1997 Maureen AH-001 2004Duty holder Mongstad 2010In-service inspection

Aker Solutions delivers:

high value added technologies and services in selected niches,

complex facility upgrade solutions, and

decommissioning technologies and services.

(3)

to edit this text

Technology services for existing facilities

Slide 3 © 2010 Aker Solutions part of Aker

Januar 2011

Mature fields is a growing market for Aker Solutions

0,5 - 4 years

Up to 40 years

1-4 years

Field

Fielddevelopmentdevelopment Concept and technology > Facility upgrades DecommissioningDecommissioning

Process

improvements

Water injection

Low Pressure Production Satellite tie-backs

Drilling upgrades

Debottelnecking

Debottelnecking IORIOR EOREOR Increased field lifeIncreased field life

Next step New technology Safety solutions Technical integrity Inspection technology Oseberg B Rig renewal Gudrun tie-back Examples of projects that can increase

oil recovery Åsgard gas

compression Process

(4)

Concept and Technology (C&T) MMO; Locations and capacity

Bergen

Concept and technology

Inspection and maintenance technology

Trondheim

Stavanger

110

168

149

25

Bergen

Stavanger

Trondheim

278

149

25

35

Aberdeen

494

b

Aberdeen

35

(5)

to edit this text

Technology services for existing facilities

Slide 5 © 2010 Aker Solutions part of Aker

MMO C&T Offering

Structural inspection and maintenance programme (SIMP) Technical integrity management services (TIMS) Flow assurance Risk and decision making Coabis Front end

Aberdeen

Front end

Trondheim

Computational fluid dynamics (CFD) Floater solutions

Inspection and maintenance technology Structural analyses Riser solutions New technology Front end

Bergen

SIL Hazop Asset management Laser scanning and modelling

Structural analysis and decommissioning Flow assurance and dynamic simulations Front end

(6)

Existing technology services

IOR projects

Structural Fire Design / Structural Integrity

Laser scanning and 3D Remodeling

Inspection and maintenance technology

(Advanced NDT Technology)

(7)

to edit this text

Technology services for existing facilities

Slide 7 © 2010 Aker Solutions part of Aker

IOR; Concept Selection, Feed and EPCI

Kristin low

pressure

production (LPP)

Marulk tie-in

Illustration: Eni Norge

Oseberg B

drilling upgrade

Photo: Statoil Photo: Statoil

(8)

Structural Fire Design – Integrated Analyses

Kameleon FireEx analysis based on realistic leakage scenarios

Corresponding non-linear structural response analysis

Sufficient need for mitigating measures is found (e.g. fire protection, deluge,

sectionalisation)

(9)

to edit this text

Technology services for existing facilities

Slide 9 © 2010 Aker Solutions part of Aker

PDMS Internet accessible Engineering

Study Phase

Engineering Phase

Result: -Saved offshore trips, reduced POB

-508 000 points/sec (surveyor 1 point/sec)

-TruView`s, 360 panorama useful for all disciplines -Improved quality in engineering

-Early involvement and scanning beneficial

Laserscanner Pointcloud TruView 3D model

(10)

Decommissioning market

0 5 10 15 20 25 30 35 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Year of platform removal Cost per year (Bn NOK)

No. of platform removals

Cost NCS Cost UKCS No. of platforms NCS No. of platforms UKCS

Experiences from Maureen GBS and Frigg & MCP01

Huge growing market

FMRD Model (FEED-Modification-Removal-Disposal)

Offshore preparation can be regarded as an modification task

without fabrication/installation (AKSO key competence)

Removal Disposal Modification

(Engineering & Preparation)

Close-down FEED

■ 350 installations (UK/N 290/60) ■ Market value 160-200 bn NOK ■ Key prospects;

● Brent

● Valhall

● Statfjord A

(11)

to edit this text

Technology services for existing facilities

Slide 11 © 2010 Aker Solutions part of Aker

February 2011 Slide 11

Aker Solutions

Inspection and Maintenance Technology

Asset Integrity Management Advanced NDT

• Structures • Equipment • Rope Access Rig Inspection • Technical Integrity Management Service (TIMS™) • Structural Integrity • Maintenance Engineering • Phased Array • Thermo Scale mapping • Vibration/Fatigue/Stress • Eddy Current & RFT

• Digital Radiography

In Service Inspection

• Inspection Strategy • Inspection planning

• Weld and Surface inspection • Corrosion under insulation • Non Intrusive Inspection (NII)

Fabrication and Weld Inspection

• Weld Inspection

• Welding Procedure Qualification • Welder certification

(12)

Advanced NDT technology

Heat Exchanger Tube Inspection

Advanced Ultrasonic

Phased Array ultrasonic

Thermographic Inspection

Thermographic scale mapping

Gas find

Vibration & Stress Measurement

16,1°C 42,4°C 20 25 30 35 40 Temperatureline 1

(13)

to edit this text

Technology services for existing facilities

Slide 13 © 2010 Aker Solutions part of Aker

Buoyancy Tank Assemblies (BTA) for large jacket removal

48 large jackets UK/N weighing more than 8 000 tons

Competition with HLVs (subsea sectionalizing and multiple lifts)

BTA technology proven on Frigg DP2for transport to shore

Reversed launching method to shore to be further developed

Standardization of friction clamps to replace lifting brackets

(14)

Decommissioning technologies

Large Demolition Excavators for piece small removal of integrated topsides

Weighing membranes for weighing of modules

FlexSeaFast for transport of large structures

Jack-up rig with relocatable deck and LQ (AKSO patent)

Key subcontracted technology areas;

● Subsea; cutting, ROV, dredging, debris removal

● Cleaning & flushing

● Large Demolition Excavators

● External/internal lifting tools

● Heavy lifting

(15)

to edit this text

Technology services for existing facilities

Slide 15 © 2010 Aker Solutions part of Aker

New technology services

TIMS

3D visualisation and simulation

IPort

(16)

An Aker Solutions initiative within

Integrity Management Services.

(17)

to edit this text

Technology services for existing facilities

Slide 17 © 2010 Aker Solutions part of Aker

Use of 3D visualisation and simulation drilling rigs

Some reference cases

BP’s Valhall IP – Performance Optimisation Phase 1

All deliveries on time and budget

Offshore commissioning time reduced with 70% for new TFM

Each day in simulator = one day saved NPT rig time

ROI for simulator within the first 6 months of operation

First well after upgrade – fastest ever drilled at Valhall IP

Simulator has been a major contribution to Rig NPT decrease from 8%-2%

Vantage (TMT 1) Platinum explorer, Drillhship newbuild

Simulator used for

Trouble shooting during commissioning

Pre commissioning of CTRL systems

Contributed to commissioning and delivery on time

(18)

IPort facilities

Rig Concept Phase Rig Constructio n Upgrade and Modification

Well Construction and Drilling Management

Operator Simulator Training

Crew Changeover Briefing/Training

Mission Control and Support

E support - Condition Based Monitoring

(19)

to edit this text

Technology services for existing facilities

Slide 19 © 2010 Aker Solutions part of Aker

EOR

How do we get more oil from the Norwegian Continental Shelf?

Illustration:

(20)
(21)

to edit this text

Technology services for existing facilities

Slide 21 © 2010 Aker Solutions part of Aker

Aker Solutions is part of the EOR future

Aker Solutions has high ambitions to play an proactive role in future EOR

challenges.

Aker Solutions have started initiatives with NTNU

EOR challenges

Technology development and pilots to be focused

The oil business has an common goal in reducing the EOR cost

Projects with high risk will in many cases be replaced by other good

IOR projects.

Building on total Aker Solutions capabilities to become the preferred partner:

Aker Offshore Partner

Aker Geo

Aker Process Systems

Aker Well Services

(22)

Thank you for your attention!

Don’t hesitate to contact us if you have any

questions.

(23)

to edit this text

Technology services for existing facilities

Slide 23 © 2010 Aker Solutions part of Aker

Copyright

Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction.

(24)

Disclaimer

This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or

implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use.

Aker Solutions consists of many legally independent entities, constituting their own separate

identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker

References

Related documents