Fuzzy Critical Path With Centroidmeasure
Full text
Related documents
The most important model outputs are the optimum haul distance, productivity rate, number of cycles, cycle time, queue time, fuel consumption based on cycle time, energy
in E-cadherin defective MCF7 A02 J BT549 K and SKBR3 L cells exposed to either crizotinib or foretinib, compared to E-cadherin wild type MCF7 Parental cells.
The study observed that the insurance premium capital has significantly impacted on economic growth in Nigeria; that the level of total insurance investment
Due to the low energy generated by the harvester, current progress of research in piezoelectric vibration energy harvester are focusing on optimizing the output power
study was verification of the hypothesized that the non-preferred leg of elite male kickboxers would have lower knee extensor and flexor strength and there will be a higher
(c) all four judo-specific tests measure the same ability, which confirms their factorial validity in the sample of female junior judo athletes; (d) the magnitude of the
In turn, high school athletes practicing various sports, including mar‑ tial arts (taekwondo, Korean wrestling and judo), demonstrate a higher level of trait and state anxi‑ ety
Antioxidant activity was corroborated by different assays, showing that the compounds present in the extracts act by different mechanisms (radical scavenger and iron