Don Houston Environmental Project Manager 1010 Tavern Road Alpine, CA 91901 (T) XXX-XXX-XXXX (F) XXX-XXX-XXXX November 25, 2012 Ms. Lisa Orsaba Project Manager

California Public Utilities Commission 505 Van Ness Avenue, 4th Floor San Francisco, CA 94102

Re: Notice to Proceed (NTP) Request #13 to Construct the Section 4 138 kilovolt (kV) Overhead

Transmission Line

Dear Ms. Orsaba:

On June 21, 2012, the California Public Utilities Commission (CPUC) selected the East County (ECO) Substation Alternative Site combined with the ECO Partial Underground 138 kV Transmission Route Alternative (Decision A.09-08-003) as the approved ECO Substation Project (Project). The decision grants San Diego Gas & Electric Company (SDG&E) a Permit to Construct and conditionally authorizes

construction of the Project with the implementation of pre-construction mitigation measures (MMs). A Notice of Determination was submitted to the State Clearinghouse on June 21, 2012, indicating the CPUC’s approval of the Project.

Purpose

SDG&E is formally requesting authorization from the CPUC to construct the Section 4 138 kV Overhead Transmission Line, which includes Steel Pole- (SP-) 105B and SP-108A. These poles will transition the portion of the Section 3 138 kV Underground Transmission Line that runs within the ECO Substation southern access road to the ECO Substation. SP-105B is located approximately 1,000 feet southeast of Old Highway 80 within the permanent footprint of the ECO Substation southern access road. Construction of the ECO Substation southern access road was discussed in NTP request #6, which was approved by the CPUC on July 2, 2013. From SP-105B, an approximately 1,200-foot-long northeast overhead span will connect to SP-108A, which is located within the ECO Substation. NTP request #2 to construct the ECO Substation was issued by the CPUC on February 1, 2013. SP-105B and SP-108A will be 170 and 160 feet tall, respectively. The poles to be constructed under this NTP request are depicted in Attachment A: Section 4 Overview Map. SP-105B and SP-108A were included in Minor Project Refinement (MPR) request #4, which was approved by the CPUC on June 26, 2013. Construction methods, equipment, and Project components associated with overhead construction were described in detail in the Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS).

Pre-Construction Mitigation Measures

Attachment B: Pre-Construction Status Report to NTP request #11 to construct the Section 2 138 kV Overhead Transmission Line—which was approved by the CPUC on November 5, 2013—includes a list of the pre-construction MMs associated with the Project’s Overhead Transmission Line (as identified in the Mitigation Monitoring, Compliance, and Reporting Program). The measures and their statuses—as described in Attachment B: Pre-Construction Status Report to NTP request #11, with a few exceptions described in the paragraph that follows—are applicable to the Section 4 138 kV Overhead Transmission Line.

(2)

2

Attachment A: Section 4 Overview Map includes a Project map showing the limits of temporary and permanent workspace with jurisdictional waters identified for the Section 4 138 kV Overhead Transmission Line, in accordance with MMs BIO-1a, BIO-2a, BIO-2c, and VIS-3e. The Section 4 138 kV Overhead Transmission Line was included in the final engineering plans submitted to the CPUC with NTP request #6, demonstrating compliance with MM CUL-1d. The LU-2 Letter Report—demonstrating compliance with MMs VIS-3l and LU-2, which were still pending as of the submittal of NTP request #11—was submitted to the CPUC on October 8, 2013. In addition, because no new access roads will be constructed for the Section 4 138 kV Overhead Transmission Line, MMs BIO-2c and VIS-3d—as described in Attachment B: Pre-Construction Status Report to NTP request #11—are not applicable to the Section 4 138 kV Underground Transmission Line. All other pre-construction measures that are relevant to the Section 4 138 kV Overhead Transmission Line, as described in Attachment B: Pre-Construction Status Report to NTP request #11, have been completed or will be implemented immediately prior to construction.

Activity Summary

Construction of the Section 4 138 kV Overhead Transmission Line will occur in accordance with the descriptions provided in MPR request #4, NTP request #11, and Section B.3.1.3, Project Description in the Final EIR/EIS. The information described in these documents includes specific details pertaining to excavation, disturbance areas, material staging and storage, pole installation, and conductor pulling. Construction of the Section 4 138 kV Overhead Transmission Line is anticipated to take approximately 60 work days to complete, with work activities taking place intermittently beginning in December 2013 and ending in November 2014. Temporary impact areas associated with the Section 4 138 kV Overhead Transmission Line will be restored following construction; all temporary facilities and Project-generated waste, trash, and debris will be removed from the site.

We respectfully request authorization of this NTP request by December 6, 2013, so that we can meet the Project schedule. Should you have any questions or need additional information, please do not hesitate to contact me at (XXX) XXX-XXXX.

Sincerely,

Don Houston

SDG&E Environmental Project Manager Attachment A: Section 4 Overview Map cc: Kirstie Reynolds, SDG&E David Hochart, Dudek

Anne Marie McGraw, Insignia Environmental Jeffry Coward, Insignia Environmental

(3)
(4)

   

(5)

Attachment A: Section 4 Overview Map

East County Substation Project

Z:\Projects\SDGE_ECO\MXDs\NTP_Requests\Section4_Risers_.mxd OLD H IGHWA Y 80 SP-105 RISER B SP-108A 0 500 1,000Feet 1:5,000 Proposed Poles 138 kV Pole Riser Pole

Approved Work Area 138 kV Overhead 138 kV Underground 11/13/2013 Detail Area Old Highw ay 80 8

References

Related documents

This paper describes the approaches taken to extend an array programming language compiler using a Virtual SIMD Machine (VSM) model for parallelizing array operations on Cell

Edematous Petechial Haemorrhage Acute (focal) Tubular Necrosis Severe Interstitial Inflammation, Congested Capillary. Loops

In the absence of these proposed actions, particularly the construction of the 161-kV transmission line, equipment in the existing UCEMC Algood 69-kV Substation and in the TVA

In the next subsections we present the analysis of the spatial organization of new firms in general and new fast-growing firms in particular in the different

for an Order or Orders pursuant to section 92 of the Ontario Energy Board Act, 1998 granting leave to construct a 230 kV transmission line and associated facilities to connect

If fuel oil temperature inside storage tank reached and settling tank in empty condition, fuel oil transfer process will activated.. When transfer process

Category 2 wetlands "...support moderate wildlife habitat, or hydrological or recreational functions," and as wetlands which are "...dominated by native species

The Applicant is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the

Hydro One is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the existing

Hydro One is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the existing

Figure 2 shows an example of the 765 kV insulator strings with 35 insulators divided into four branches (to withstand tensile forces), in which to limit the

Individual absence management plans were in place and staff followed policies and procedures when children left the centre without permission or were considered missing from

Under Regulation 21 (1) (c) you are required to: Maintain, and make available for inspection by the chief inspector, the additional records specified in Schedule 4 of the Health

The Duluth Loop Project includes the construction of (1) a new 115 kV transmission line connecting the existing Hilltop Substation, located in southwest Duluth, and the

Through three studies I (a) examine the motivational factors African Americans perceive as being either present or absent in baseball, (b) examine the role of racial

Presented paper Avid versus struggling readers : co-construed pupil identities in school booktalk at Departaments de lenguas de la facultad de ciencias de la education y el centro

Preparations of Bti are widely used against a number of insect species, but specific activity against disease vector species such as mosquitoes and blackflies has

 High Performance Architectures for Embedded Systems (2005)  Technologies and Architectures for Embedded Systems (2006-2007) June’03 – June’04 Visiting Assistant Professor

In addi- tion to impaired lipoprotein-apo B secretion by hepatocytes from diabetic rats, the cellular apo B concentration of these cells was significantly reduced when compared

A number of managers and human resources experts (40% of the participants) believed that the involvement of the medical universities in the health needs assessments and