Analysis of voltage source converter-based high-voltage direct current under DC line-to-earth fault

N/A
N/A
Protected

Academic year: 2019

Share "Analysis of voltage source converter-based high-voltage direct current under DC line-to-earth fault"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1.  Possible Earthing points of DC Converter System
Fig.  1.  Two-terminal VSC-HVDC system with DC cable line-to-earth Fault, with AC transformer earthed on the (a) Converter side, and (b) the grid side
Fig.  2.  Simplified system layout during a line-to-earth fault with: (a) Earthing configuration S1; (b) Earthing configuration S2; (c) Single sub-module for MMC; (d) Equivalent Converter layout of blocked MMC
Fig.  3 Simulated waveforms during line-to-earth fault: DC link unearthed/AC transformer earthed (S1), with freewheeling diode current through (g) top diode group (D1, D3, and D5 ), and  (h) bottom diode group (D2, D4, and D6)
+7

References

Related documents

Killer Phrase (“You’ve got to do better than that”) …those seven words work well against average negotiators, who tend to make an immediate and unilateral

Therefore, further the Pareto-dominated equilibria (12) - (14) are studied depending on the initial ratio of the parties forces and, in particular, the extreme points of the

• The Constitution defined federalism in terms of delegated powers, national supremacy clause, the powers reserved to the states, and powers denied by the

The publications were examined for indicators of reproducibility and transparency, which included availability of: materials, data, protocol, analysis script, open- access,

Volz and Meyers ( 2009 ) examined the effect of social mixing on SIR disease spreading for a family of temporal networks, providing an important early result that the

Figure 10 shows the average task response time (total task response time divided by the number of tasks) and its histogram for the proposed task-scheduling scheme and

The main results are that the expected time complexity has (1) linear dependency on the number of data vectors, (2) quadratic dependency on the number of clusters, and (3)

The motorway with and without traffic control are tested under four scenarios of traffic conditions, namely, heavily congested traffic (> 0.95*capacity), lightly congested traffic