31-Mar-10

A5 A5

If paint mat'l or coating system used for repair/ touch-up is different from srcinal applied coating system, paint material for touch-up meets Over Coating Compatibility Chart per Attachment 1.

A4 A4

Paint material for touch-up is supplied by the same Manufacturer (Different brands may be used if approved by CSD).

Note:

Note: Thinner used is supplied or approved by the paint manufacturer.)

SAES-H-001, Para. 7.4 SAES-H-100,

Para. 8.5 A3

A3 Compressed air for blasting used is not contaminated with oil, moisture, debris, etc. This is determined by performing a blotter test.

SAES-H-100, Para. 5.4.1

DATE APPROVED QR NUMBER

A

A General requirementsGeneral requirements

Saudi Aramco Paint Data Sheet for the coating system (APCS) applied is provided.

NOTES:

NOTES: Fill in the required information for

Existing Coating System: _______________________ Coating System for Touch-up/Repair: _____________ *Cleanliness Level for Touch-up/Repair: ________________ ( *Refer to the applicable APCS for ) ________________ ( cleanliness requirement based on )

( area of repair. ) Wet film thickness/Coat : ____________

Reqd. DFT(Prime):_________/ Reqd. DFT (Full Coat):________ Recoat interval (Min / Max):________/________ at Steel Temp10 ºC

________/________ at Steel Temp 30 ºC ________/________ at Steel Temp 50 ºC SAES-H-101 Para 4.2 A1 A1

R

Re

ep

pa

aiir

r a

an

nd

d//o

or

r T

To

ou

uc

ch

h--u

up

p o

of

f C

Co

oa

attiin

ng

gs

s

S

SA

AIIC

C--H

H--2

20

03

32

2

31

3

1--A

Au

ug

g--1

11

1

C

CO

OA

AT

T

--PLANT NO. SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) REV 4

SAUDI ARA

SAUDI ARAMCO INSPECTIO

MCO INSPECTION CHECKLIST

N CHECKLIST

PROJECT TITLE WBS BI JO / / NUMBER CONTRACTOR SUBCONTRACTOR/

SAIC NUMBER

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

MH's SPENT TRAVEL TIME QUANTITY INSP.

WORK PERMIT REQUIRED? SCHEDULED INSPECTION DATE & TIME

REV. NO. PURCHASE ORDER NUMBER

A

ACCCCEEPPTTAANNCCE E CCRRIITTEERRIIAA RREEFFEERREENNCCEE PAPASSSS FFAAIILL N//ANA

LAYOUT DRAWING NUMBER

ACTUAL INSPECTION DATE & TIME

SAUDI ARAMCO USE ONLY SAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

EC / PMCC / MCC NO.

A2 A2

Crew Supervisor and Coating Applicator hold valid coating certification card issued by Saudi Aramco in accordance with the requirements of SAEP-316.

SAEP-316 Para 3.1

SAUDI ARAMCO INSPECTION LEVEL

RE-INSP DATE RE-INSP DATE ITEM ITEM No. No.

CONTRACTOR INSPECTION LEVEL

(2)

31-Mar-10

B

B WeaWeathther er CoCondndititioions ns fofor Pr Paiaintntiningg

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) REV 4

B1 B1 D D C1 C1 C4 C4 C7 C7 B2 B2 SAES-H-100 Para 8.4.7 C2

C2 All coated areas near to the defective area are protected by covering with heavy duty textile or fabric adhesive tape.

SAES-H-100 Para 8.4.1 SAES-H-100 Para 8.1.1 SAES-H-100 Para 5.4.3 Para 8.2.4 Paint shall not be applied if one or more of the following conditions exist

(unless paint is specifically formulated for averted condition): a) Substrate temperature is less than 10°C of the temperature

limit given in the applicable Saudi Aramco Data Sheet b) Substrate temperature is more than the temperature limit

given in the applicable Saudi Aramco Data Sheet. c) Substrate temperature is less than 3°C above the dew point.

E

E QQC DC D ooccuummeennttaattiionon C

C

The coating shall be holiday tested when fully cured. Any defects shall be repaired.

. ,

pre treatment srcinally specified. Feather edge the coating at least 50 mm beyond bare metal. Dust and debris are removed by brush or vacuum.

SAES-H-100 Para 8.4.3 Para 8.4.5 Areas less than 0.1 m², are grinded to a rough metal surface using at

least an 80 grit disc sander. Alternatively spot blast to bare steel. Feather edge the coating at least 50 mm beyond bare metal. Dust and debris are removed by brush or vacuum.

SAES-H-100 Para 8.4.3 Para 8.4.5 an s a no e app e urng a verse wea er con ons suc as,

but not restricted to following:

1) Wind is strong enough to blow sand, salt spray or other foreign matter onto the surface being painted.

2) Wind is strong enough to cause dry spay or otherwise seriously

disturb the spray pattern when application is by spray gun. 3 Rain

SAES-H-100 Para 8.1.1

Necessary safety requirements specified in SAES-H-102 are provided such as:

A) High intensity flood or spotlights are installed in vessels, tanks, and other poorly illuminated locations for visibility.

B) Continuous forced ventilation is operated throughout the paint application and curing period while coating inside Tanks & Vessels.

Repair of Coatings for Atmospheric Service Repair of Coatings for Atmospheric Service

Final DFT of the repair coating is measured per SAIC-H-2031.SAIC-H-2031. DFT conforms with the specific requirement of the respective APCS noted in Item A1.

Inspection & Testing for repair of coating are recorded in QC Form SATR-H-2006.

SATR-H-2006.(Quality Plan, SATIP-H-100-01)

SAES-H-100, Para. 9.2 D1

D1

Repair of atmospheric coatings is conducted following the

recommendations of surface preparation and application requirements given in the applicable APCS and the manufacturer's technical data sheet. SAES-H-100 Para 8.5 D2 D2 SAES-H-100 Para 8.1.6 E1 E1 ITEM ITEM No.

No. AACCCCEEPPTTAANNCCE E CCRRIITTEERRIIAA RREEFFEERREENNCCEE

Repair of Coatings for Immersion Service Repair of Coatings for Immersion Service

P

PAASSSS FFAAIILL NN//AA RREE--IINNSSP P DDAATTEE

CONTRACTOR / SUBCONTRACTOR

R

Re

ep

pa

aiir

r a

an

nd

d//o

or

r T

To

ou

uc

ch

h--u

up

p o

of

f C

Co

oa

attiin

ng

gs

s

S

SA

AIIC

C--H

H--2

20

03

32

2

31

3

1--A

Au

ug

g--1

11

1

C

CO

OA

AT

T

--SAUDI ARAM

SAUDI ARAMCO INSPECTION

CO INSPECTION CHECKLIST

CHECKLIST

SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE JO NUMBER/ WBS BI /

C5 C5 C3

C3 Defective area are first cleaned by solvent or detergent wash. SAES-H-100 Para 8.4.2

C6 C6

Coating is applied by brush for areas less than 0.1 m² and by spray for areas greater than 0.1 m² to the srcinal specification except that the first coat of a multi-coat system shall be thinned by 15%.

SAES-H-100 Para 8.4.6

(3)

31-Mar-10 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) REV 4

CONTRACTOR / SUBCONTRACTOR

R

Re

ep

pa

aiir

r a

an

nd

d//o

or

r T

To

ou

uc

ch

h--u

up

p o

of

f C

Co

oa

attiin

ng

gs

s

S

SA

AIIC

C--H

H--2

20

03

32

2

31

3

1--A

Au

ug

g--1

11

1

C

CO

OA

AT

T

--SAUDI ARAM

SAUDI ARAMCO INSPECTION

CO INSPECTION CHECKLIST

CHECKLIST

SAIC NUMBER DATE APPROVED QR NUMBER

PROJECT TITLE JO NUMBER/ WBS BI /

Work / Rework May Proceed

Name, Initials and Date: Name, Initials and Date:

3. SAES-H-101, Approved Protective Coating Systems (29 June 2005) ATTACHMENTS:

ATTACHMENTS:

2. SAES-H-102, Safety Requirements for Coating Applications (11 Aug., 2007) REFERENCE DOCUMENTS:

REFERENCE DOCUMENTS: 1 -

1 - Over coating Compatibility Chart of SAOver coating Compatibility Chart of SAES-H-001 (2 Pages)ES-H-001 (2 Pages)

Work Verified

Saudi Aramco

Saudi Aramco

T&I Wi tnessed QC Record Reviewed

Q

QC C IInnssppeeccttoorr PPIID D RReepprreesseennttaattiivvee Construction Representative*

Construction Representative*

Name, Initials and Date:

PMT Representative PMT Representative

Work Verified Work is Complete and Ready for Inspection:

Name, Initials and Date:

Performed Inspection

7. Steel Structures Painting Council, SSPC-PA 1, June 1996 REMARKS:

REMARKS:

4. SAES-H-101V, Approved Saudi Aramco Data Sheets – Paints and Coatings, (19 April 2009) 5. SAEP-316, Performance Qualification of Coating Personnel (4 August 2008)

1. SAES-H-100, Coating Materials & Application Requirements for Industrial Facilities (31 July, 2004)

Work Verified

6. SAES-H-001, Selection Requirements for Industrial Coatings (21 February 2010)

Q

QC C SSuuppeerrvviissoorr PPrrooppoonneennt aant nd d OOtthheerrss

Contractor / Third-Party

Contractor / Third-Party

T&I Wi tnessed QC Record Reviewed

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED T&I Wi tnessed QC Record Reviewed

Name, Sign and Date:

Quality Record Approved:

Name, Organization, Initials and Date:

(4)

31-Mar-10

31-Aug-11

31-Aug-11

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2010) REV 4

COAT

COAT

-SAUDI ARAM

SAUDI ARAMCO INSPECTION

CO INSPECTION CHECKLIST

CHECKLIST

SAIC NUMBER DATE APPROVED QR NUMBER

Attachment 2 -

Attachment 2 - Overcoating Chart of SAES-H-001

Overcoating Chart of SAES-H-001 (Page 1

(Page 1 / 2)

/ 2)

R

(5)

Attachment 2

(6)

References

Related documents