• No results found

Sample Certification Questions SAP PI 7.3

N/A
N/A
Protected

Academic year: 2021

Share "Sample Certification Questions SAP PI 7.3"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Sample Questions:

01. Which types of acknowledgment are available for asynchronous communication in Process Integration?

Note: There are 2 correct answers to this question.

a) System Acknowledgment b) ABAP Acknowledgment c) Application Acknowledgment d) HTTP Acknowledgment e) Java Acknowledgment

02. What is the purpose of the standard SplitByValue function?

Note: Please choose the correct answer.

a) To split the payload

b) To replicate a value of a field that occurs once c) To insert context changes into a queue

d) To split a string into substrings

03. Which of the following pipeline steps belong to logical routing?

Note: There are 2 correct answers to this question.

a) Interface Determination b) Call Adapter

c) Receiver Determination

d) Message Split According to Receiver List e) Request Message Mapping

04. The Advanced Adapter Engine is installed as a component on the Integration Server. When would you install the non-central Advanced Adapter Engine?

Note: Please choose the correct answer.

a) When a firewall between the business system and the Integration Server prevents them from communicating directly

b) When the business department requires Knowledge Management on a separate system

c) When you want to use cross-component business process management (ccBPM) in the Advanced Adapter Engine

d) When you want to use the advanced monitoring capabilities of the Integration Engine

05. How can you describe a provider proxy?

Note: Please choose the correct answer.

a) A provider proxy is a Java class used in the Advanced Adapter Engine.

b) A provider proxy is a language-specific implementation of an outbound service interface.

c) A provider proxy is a language-specific implementation of an inbound service interface. d) A provider proxy is an ABAP program used in ALE distribution.

06. Which conversion parameters are available in the SOAP adapter?

Note: There are 2 correct answers to this question.

(2)

b) Do Not Use SOAP Envelope c) Sync/Async Bridge

d) File Content Conversion

07. SAP NetWeaver provides the Enterprise Services Repository Content (ESR Content). What is one of the advantages of using ESR Content?

Note: Please choose the correct answer.

a) Additional configuration options for the Advanced Adapter Engine Extended b) Extended monitoring capabilities based on predefined business objects

c) Fast implementation based on pre-configured content that supports industry standards d) High user acceptance based on standard compliant user interfaces

08. You are working on a dual-stack system and want to configure an

integration scenario with one sender and two receivers. Each receiver uses two different service interfaces. The WS adapter is used for each receiver. The sender provides an IDoc from an ABAP system. How many sender agreements do you have to configure?

Note: Please choose the correct answer.

a) 0 b) 1 c) 3 d) 2

09. Which engine is used to process a ccBPM process?

Note: Please choose the correct answer.

a) Advanced Adapter Engine b) Mapping Engine

c) Integration Engine d) Business Process Engine

10. Which Web-services-related protocol is supported by SAP NetWeaver PI 7.31?

Note: Please choose the correct answer.

a) Web Services Description Language (WSDL) b) WS-Reliable Messaging (WS-RM)

c) Representational state transfer (REST) d) Open Data Protocol (OData)

11. How can you modify an XSLT mapping used in an operation mapping?

Note: There are 2 correct answers to this question.

a) Export the XSLT style sheet to an external editor, edit it, and reimport it. b) Edit the XSLT style sheet using a Mapping Template object.

c) Edit the XSLT style sheet in the Mapping Editor.

d) Edit the XSLT style sheet in the operation mapping, compile it, and import it as a class file.

e) Edit the XSLT style sheet in the Imported Archive.

(3)

12. Which of the following are characteristics of enterprise services?

Note: There are 2 correct answers to this question.

a) They are based on global data types.

b) They are semantically harmonized across applications. c) They can be easily used as imported archive objects. d) They can be used to extend BAPIs.

13. Which objects are available in the design environment to reuse Java code across different message mappings?

Note: There are 2 correct answers to this question.

a) Function Module b) Function Library c) Imported Archive d) External Definition

14. You want to build an operation mapping using multiple mapping programs per direction. Which restrictions do you have to consider?

Note: Please choose the correct answer.

a) The output of each mapping program must fit the target message type.

b) The mapping programs are processed in the specified sequence from top to bottom. c) The checkbox must be enabled in interface determination to preserve the sequence during the runtime.

d) All the mapping programs have to belong to the same namespace.

15. Which of the following mapping types are supported in SAP NetWeaver PI?

Note: There are 3 correct answers to this question.

a) Java b) .Net c) Message Mapping d) C++ e) XSLT

16. In which cases do you need to use ccBPM processes?

Note: There are 2 correct answers to this question.

a) When collecting messages b) When querying databases

c) When using a synchronous/asynchronous bridge

d) When using scenarios that are based on an AEX installation

17. What are the three types of communication components in the Integration Directory?

Note: Please choose the correct answer.

a) Name Namespace

Software Component Version b) Business Service

(4)

Abstract Service c) Business Component Integration Process Business System d) Business System Logical System Application Component

18. Which of the following SAP NetWeaver components use Enterprise Services Repository?

Note: There are 2 correct answers to this question.

a) SAP NetWeaver Business Warehouse b) SAP NetWeaver Portal

c) SAP NetWeaver Process Integration d) SAP NetWeaver Mobile

e) SAP NetWeaver Developer Studio

19. You have created a deadline branch. When the deadline expires, the integration process should be canceled. How can you achieve this using SAP design patterns for integration processes?

Note: Please choose the correct answer.

a) Insert a control step that raises an alert to inform the administrator to stop the process manually.

b) Insert a control step in the deadline branch that cancels the process.

c) No action is necessary; the process is cancelled automatically once the deadline has expired.

d) Insert a switch to send a message to another integration process to cancel the process.

20. You want to implement an IDoc-based scenario that uses SAP NetWeaver Process Integration. What are the prerequisites for this?

Note: There are 2 correct answers to this question.

a) A sender communication channel must be defined in the service registry. b) The IDoc adapter must have access to the IDoc metadata to enable conversion between IDoc and XI message format at runtime.

c) IDoc metadata must be imported into the Enterprise Services Repository to enable IDoc conversion to XML at runtime.

d) The logical system name (ALE name) for the business system must be defined in the SLD.

Solutions:

QUESTION: 01

Answer: a, c

QUESTION: 02

Answer: c

QUESTION: 03

Answer: a, c

QUESTION: 04

Answer: a

QUESTION: 05

Answer: c

QUESTION: 06

Answer: a, b

QUESTION: 07

Answer: c

QUESTION: 08

Answer: a

QUESTION: 09

Answer: d

QUESTION: 10

Answer: b

(5)

Answer: a, e

Answer: a, b

Answer: b, c

Answer: b

Answer: a, c, e

QUESTION: 16

References

Related documents

They include representatives from the Met Services, Water Resources Authority (WRA) , ODPEM, Ministry of Health, Ministry of Agriculture and Fisheries, Rural

decisions of the Supreme Court of Canada are evidence of the legal transplant approach wherein the Canadian Court relies on the approaches adopted by the Court of the United States

%ubsection 2>4 of the %ection A gives a general liberty providing that any person may sell or draw foreign exchange to or from an authoried person for a capital

The Chair of a working group is required to submit the completed Product Development & Dissemination Plan (See Appendixes C and D) to the working group’s sponsoring Committee

The purpose of this paper is to analyze the optimal timings at which the government should adopt environmental policies to deal with increases in greenhouse gas concentrations and

The Watts and Strogatz (1998) result, which was based on numerical sim- ulation, revealed that, with small probability p of rewiring, the clustering coefficient of the network is

Operational data of the company have been used for that purpose; in turn, the assessment and selection of the key suppliers took place through the use of the following methods:

The project will achieve this by: developing and improving the Sri Lankan and EU’s staff and postgraduate students’ professional and research skills associated with the creation