• No results found

Electricity peak demand in Uganda: insights and foresight

N/A
N/A
Protected

Academic year: 2020

Share "Electricity peak demand in Uganda: insights and foresight"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1 Distribution of electricity demand in 2015
Table 2 Installed electricity capacity in MW 2010–2015
Fig. 3 Regional comparison of peak demand, MW
Table 3 Distribution companies in Uganda
+7

References

Related documents

The present work was carried out to study the effect of the genotype, meteorological factors (temperature, precipitation and number of days with T max C 30 ° C) and agronomic

These general terms and conditions urban and regional public transport are applicable to the use of urban and regional public transport (by bus, tram, light rail, metro) and

• Indien ’n kandidaat ’n vraag TWEE keer beantwoord, merk slegs die EERSTE poging.. • Volgehoue akkuraatheid is DEURGAANS in ALLE aspekte van die memorandum van

Effects of extended-release eprinomectin on productivity Effects of extended-release eprinomectin on productivity measures in cow-calf systems and subsequent feedlot measures

The ON resistance for these geometries for the two types of devices (RON-P and RON-N) has been calculated to be 7.875 k Ω and 3.75 k Ω respectively based on experimental work

for portable GynTrainer without anatomical pelvis model, with Simball tracking system, including hysteroscope, grasper/punch and software. 573225 Essure ® Module, advanced

[r]

In this way, attempting to integrate data from data sources that con- flicts on the phone number of “John”, the data management component need not consult the user, but simply stores