What we do: We remove asbestos, lead, and hazardous waste from industrial, commercial, and residential buildings. As result of our success we have expanded into interior demolition. We currently hold Asbestos Contractor Licenses in the below listed states:

Ohio # AC1870 Michigan # C42754 Pennsylvania # C0885A “Lead-Safe Certified Firm” in the United States, Certification # NAT-67040-1

Who we serve: We have worked for some of the most safety sensitive sites such as Ohio EPA, PPG Chemical, NASA, and US Navy. We also serve schools and Universities with emergency response and maintenance contracts for clients such as Akron Public Schools and Kent State University. We don’t always have to take the lead on projects. We have built successful relationships with other contractors that perform demolition, construction, renovation, and restoration contractors specializing in insurance claims due to fire, smoke, wind, water, and storm damage.

Who we are: We started in 2004 with four employees and have grown in the last 10 years to a staff of 25 full and part time employees. Our staff is trained by a third party for the following:

OSHA 30 Hour and 10 Hour Construction 40 Hour Hazwopper

Lead Safety for Renovation, Repair & Painting Lead & Cadmium Operations & Maintenance

Mold Remediation

Mobile Equipment Training Lift Operator Training

Confined Space Entry Training

Safety First! We are very proud of our safety record and currently have an EMR rating of 0.52 allowing us to pay reduced rates on our workers compensation. We have participated in the Drug Free Safety Program along with Return to Work Program since 2005. We have job specific safety plans for each project and we are always investing time and capital in safety.

Insurance & Bonding: We carry two million dollars in Asbestos Liability Insurance, one million dollars Automobile Insurance, and a one million dollars Umbrella as well as Workers’ Compensation in the State of Ohio and Michigan. We have an aggregate $750,000 bonding capability for public and private jobs.

Why choose us? Because we will make a commitment and we will keep it! Experience

customer service the way it should be.

HEPA

Environmental Services, Inc.

5130 Tallmadge Rd. Rootstown, OH 44278 Phone/Fax 330.818.0188 Toll Free: 866.366.1896

www.hepa1.net

(2)

Metropolitian Housing Project:

Project Challenge: A large general contractor needed an asbestos abatement company to remove all of

the asbestos containing walls and ceilings from 16 multiunit apartment buildings while coordinating with multiple trades on a demanding schedule.

The Solution: Every successful project starts with a brilliant plan. We sat down with the other trades

and owners rep. and designed this project to maximize the schedule and still perform discreetly in a populated neighborhood. The end result is why we are proud of this project, No complaints! We were seen and not heard. This is the result we seek each time. Currently we are 75% complete with this project and we continue to perform better on each phase. We are never done improving.

Project Stats:

Cavanaugh Construction

1744 Collier Rd. Akron, OH 44320

Project Description: Removal of asbestos containing drywall, floor tile & mastic in Federally owned

housing Akron, OH.

Contract Value: $850,000.00 Ph: 330.753.6658

(3)

Asbestos Abatement: Four Large Industrial Sites

The Project: Removal of asbestos from four

large manufacturing facilities in the Mahoning Valley.

The Challenge: Perform the abatement within

the time constraints of the client’s schedule in full compliance with the regulatory agencies and maintain an unblemished safety record. HEPA made the commitment and finished this project on time on budget.

Project Stats:

Large manufacturing company: Niles, Warren, & Youngstown, OH Project Description: Removal of asbestos

containing drywall, plaster, floor tile & mastic, vapor barrier, pipe, and boiler insulation.

Contract Values: $1,200,000.00 Ph: 440.933.6348, Mike Perry

When working in manufacturing facilities over 80 years old you have multiple renovation dates which means multiple layers of building

materials.

In one office there were five layers of flooring to remove in order to abate the asbestos containing layer. These challenges are overcome by assembling the best team and implementing the best plan of action. We joke in the office about “plan C” but in reality that is what it takes. We have to have back up plans for back up plans.

(4)

International Food Products Company: Facility Expansion and

site demolition

The Project: The client purchased two old

rundown foundries which had several

environmental issues. They did the right thing and hired us to perform remediation prior to demolition to allow for parking and facility expansion.

The Challenge: Remove all non hazardous and

hazardous waste so that demolition could be performed without migration of contaminants during record rainfall.

HEPA finished this project in four weeks and demolition was safely and environmentally performed making way for much needed space.

Project Stats:

International Food Products Company Project Description: Removal of asbestos

containing fireproofing, floor tile & mastic, PCB’s, transite, and 40 truckloads of non-haz waste.

Contract Values: $225,000.00 Ph: Aaron Thompson, 330.666.7878

Many of our projects combine several different disiplines: in this project there was a little of everything (asbestos, PCB’s, and non hazardous waste). We assembled the team and took this one head on. It is very rewarding working with great customers especially ones that do the right thing. This mess has been transformed into a pristine corporate campus that will employ future generations.

(5)

(6)

(7)
(8)

References

Related documents

Main Building 12x12 Vinyl Floor Tile & Mastic RS-26 ND Good Low NF Kitchen Flooring... Bulk Sample Data

Study the generalization of the Knights and Liars problem to directed graphs, in which the directed Knights and Liars number is the maximum number of red vertices in a red-blue

MATERIAL DESCRIPTION: 12x12 Tan Vinyl Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON:. HISTORICAL RESPONSE

 asbestos friction materials  asbestos-cement product  vinyl asbestos floor tile... * Asbestos is used in the manufacturing process

• The most dangerous types are the forms comprising amphibole asbestos, which was not widely used in building products.. ACDJC is non-friable, meaning that it is a more

11.2 Where work to asbestos containing materials is required the FMS Department shall employ the services of licensed asbestos removal in collaboration with Head of

Project monitoring including work area inspection and routine and final clearance air sampling shall be required on all asbestos abatement projects except for floor tile

The results indicate that fund managers who trade index futures in this manner are unencumbered by investor flows and have superior fund flow conditional alpha and market