Chiller vs VRF system
Chiller vs VRF system
LG Electronics Inc.
LG Electronics Inc.
LGEHQ CAC Team
LGEHQ CAC Team
1. Design Comarison
1. Design Comarison
VRF is very simplifed rerigerant piping system. More exible than water p
VRF is very simplifed rerigerant piping system. More exible than water p
VRF is very simplifed r
VRF is very simplifed r
erigerant piping system. More exible than water pi
erigerant piping system. More exible than water pi
Chiller
Chiller
MULTI V Plus Ⅱ (VRF) MULTI V Plus Ⅱ (VRF) Chiller system Chiller system •• Otdoor nit !"ir#cooled type$ Otdoor nit !"ir#cooled type$ •
• Indoor nit Indoor nit •
• %e&riger"nt piping %e&riger"nt piping •
• Chiller Chiller •
• 'C( !'"n Coil (nit$ 'C( !'"n Coil (nit$ •
• A)( !Air )"ndling (nit$ A)( !Air )"ndling (nit$
System System composition composition Feature Feature •
• Cooling to*er Cooling to*er •
• +"ter piping, -ct *oring +"ter piping, -ct *oring • • +"ter pps +"ter pps
!ystem concet
!ystem concet
Desin Desin Desin#et$or%
Feature Chiller system
• Coplic"ted *iring
MULTI V Plus Ⅱ (VRF)
• iple *iring Desin
Desin !peration Installation Commissionin Maintenance Relia"ility
Easy network wiring
Easy network wiring
1. Design Comarison
"et#or$ %esign
1. Design Comarison
Total management
Desin
Desin !peration Installation Commissionin Maintenance Relia"ility
'(an)*act)rer+
VAV ,o-es s)lier
Control system
Feature Chiller system MULTI V Plus Ⅱ (VRF)
(For VRF M
(For VRF Man!a"t!rer
an!a"t!rer provide all e#!ipment
provide all e#!ipment
• Simple control structure
No additional control provider
• Central control and energy monitoring with low cost available
• Complicated control structure, additional control manager in the system needed, increasing cost
• Third part control provider needed, interconnectivity problems.
Desin Commissionin
MULTI V Plus Ⅱ (VRF) Chiller system
• 3he systes condition only the necess"ry roos *ith rear& to user &eman&s'
• 3he systes coonly condition the entire ilding "t predeterined ties, *ith no rear& to user &eman&s' (ery hot mi&niht $ee%en& holi&ay etc)
Capacity control
Feature
$ter o%"e ho!rs operation& VRF "o!ld be operated or the !ser demands.
$ter o%"e ho!rs operation& VRF "o!ld be operated or the !ser demands.
/etter Caacity oeration0
erating Area
Limite% oeration0
In%ivi%)al oeration
!peration
!peration Installation Maintenance Relia"ility
Temerat)re control
Feat)re
Chiller system
Re3)ire 1 or 2℃ ℃
(4LTI V &l)s 5VRF6
ⅡVery recise 7 8.9℃
're"ise temperat!re "ontrol
're"ise temperat!re "ontrol
30
30
2
2
20
20
!
!
18
18
28
28
:8
:8
;8
;8
98
98
<8
<8
=8
=8
Cooling
Cooling
(I".
(I".
Chiller system
MULTI V
system
R o o m t e m . R o o m t e m . ±
8.9
8C *rom set oint
Desin !peration!peration Installation Commissionin Maintenance Relia"ility
Tem. control
VRF system doesnt need a d!"t spa"e.
VRF system doesnt need a d!"t spa"e.
Space *++iciency
Feature MULTI V Plus Ⅱ (VRF)
• "ll re&riger"nt sp"ce Chiller system
• L"rge dct sp"ce
Desin !peration InstallationInstallation Commissionin Maintenance Relia"ility
!ace 5D)ct #or$ing6
Chiller &)m /oiler Cooling to#er "#n the roo$top%
5(achine room %ra#ing6
)t%oor 4nit "#n the roo$top%
5Roo*to %ra#ing6
VRF system is no need or a ma"hine room.
VRF system is no need or a ma"hine room.
Installation space
Feature MULTI V Plus Ⅱ (VRF)
• 7o need " "chine roo Chiller system
• 7eed " "chine roo
Desin !peration InstallationInstallation Commissionin Maintenance Relia"ility
Installation sace
E%"ient !se o spa"e is possible or VRF system
E%"ient !se o spa"e is possible or VRF system
Chiller system Space *++iciency Feature
&
&
1>:
CHILLER !?!TE(
CHILLER !?!TE(
• L"rge pipe sh"&t is needed &or *"ter piping
MULTI V Plus Ⅱ (VRF)
VRF !ystem
VRF !ystem
• "ll pipe sh"&t is needed
Desin !peration InstallationInstallation Commissionin Maintenance Relia"ility
!ace 5&ie sha*t6
VRF system expansion is very easy with extra o!tdoor ) indoor !nit.
VRF system expansion is very easy with extra o!tdoor ) indoor !nit.
Chiller system
System *,pansion
Feature
• Capacity addition is di$$icult
as additional mechanical room, pump, cooling tower, panel and piping is re&uired.
MULTI V Plus Ⅱ (VRF)
• System '(pansion is 'asy
-Desin !peration InstallationInstallation Commissionin Maintenance Relia"ility
!ystem e-ansion
1 step Commissioning
6 steps Commissioning
MULTI V Plus Ⅱ (VRF) Chiller system Commissionin Feature*here are a lot o "ommissioning points or the "hiller system
*here are a lot o "ommissioning points or the "hiller system
• 5 teps Coissioning • 1 tep Coissioning
@ater coole% chiller 5:6
5;6
Desin !peration Installation CommissioninCommissionin Maintenance Relia"ility
". o* commissioning oint
Maintenance
Feature
Maintenan"e "osts or a M!lti V is lower than "hilled water systems.
Maintenan"e "osts or a M!lti V is lower than "hilled water systems.
@ater coole% chiller 5:6
5;6
MULTI V Plus Ⅱ (VRF)
• 'ilter cle"ning
• )e"t e9ch"nger cle"ning
• Cycle chec y noteoo !LG :;$ Chiller system
• 'ilter cle"ning • -ct cle"ning
• +"ter pipe – "inten"nce • <eriodic"l oil ch"nge, overh"l
• <p
• +"ter tre"tent • Cooling to*er cle"ning
Desin !peration Installation Commissionin MaintenanceMaintenance Relia"ility
(aintenance list
(For +hiller ,ater treatment is re#!ired or "lean water
(For +hiller ,ater treatment is re#!ired or "lean water
&oll)te% Cooling To#er0
.ater treatment
Feature Chiller system
• .ater treatment is re/uire&
!de&icient service c"n c"se legion"ry dise"se in the syste$
MULTI V Plus Ⅱ (VRF)
• #o $ater treatment is nee&e& Desin !peration Installation Commissionin MaintenanceMaintenance Relia"ility
@ater treatment
Scale cleanin
Feature Chiller system MULTI V Plus Ⅱ (VRF)
The system is consist o* re*rigerant ies 0 • "o #ater ies "o scale 5)se
re*rigerant6 • "ee% to clean the #ater ies
System e$$iciency drop ) origin o$ germs
*$ter 2+3year *$ter +year *$ter -+year
18B
29:8B
:9;8B
thic$ness o* scale
E n e r g y L o s (nit = (nit = >(For +hiller Maintenan"e ) "leaning periodi"ally by ex"l!sive "ompany
(For +hiller Maintenan"e ) "leaning periodi"ally by ex"l!sive "ompany
Desin !peration Installation Commissionin MaintenanceMaintenance Relia"ility
!cale cleaning
(aintenance !ta**
9. (aintenance Comarison
Desin !peration Installation Commissionin MaintenanceMaintenance Relia"ility
Maintenance Sta++
Feature Chiller system MULTI V Plus Ⅱ (VRF)
(For +hiller +ertifed maintenan"e sta- is needed
(For +hiller +ertifed maintenan"e sta- is needed
• No need special maintenance sta$$. • 'conomic and easy maintenance • The system re&uires certi$ied maintenance
sta$$ not only $or chillers but also pumps, boilers, cooling towers etc.
• /ore e(pensive maintenance cost.
" (aintenance !ta**0 (aintenance !ta**0
&ie Erosion
<. Relia,ility Comarison
Desin !peration Installation Commissionin Maintenance Relia"ilityRelia"ility
Pipe *rosion
Feature Chiller system MULTI V Plus Ⅱ (VRF)
(For +hiller +ertifed maintenan"e sta- is needed
(For +hiller +ertifed maintenan"e sta- is needed
• e$rigerant does not cause corrosion there$ore no pipe damage occurred
• 1ipe erosion can cause leaage. • System capacity reduction.
• rines use increase corrosion, anti corrosion additives needed
Cooer &ie0 @ater ie lea$age 0
Category
1roduct
4nitial Cost
"5S6%
4nitial Cost
"5S6%Total
7ater
Cooled
Chiller
Chiller 1rice
:99;;
==8=
*85 9 Cooling
Tower 9 1ump,
1rice
1;8<9
4nstallation
::=1
::
/ulti :
=;;
118<<8
4nstallation
2:91<1
• *pril 200 •Cooling #nly • *ir 6uct 4ncludedInitial Cost
Initial Cost
R)nning Cost
(aintenance Cost
Total cost
• Tye o* /)il%ing !hoing (all
• Total area ;,000 m2 < storey uilding <!,00 m29$loor • *ctual cooling area < !,00 m2 = 0 > = ?loor @ -,200 m2 • Cooling Aoad "Tr% 9 m2 < -00 Tr =!2000 tu98r @ !,! tu9m2 • E3)iment @ater coole% chiller >()lti V )nit
B 7ater Cooled Chiller <Trane 7ater cooled chiller 30 Tr ( 2 set @-00 Tr 300 ac up
1umpDs @E00 Tr ( 2 set
*85 @ 000 C?/ ( 3 set
Cooling Tower @!200 Fpm ( 3 3 ac up B :? System <AF /ulti : 1lus 44
E 8p ( !; set@;!2 8p -2 Tr • Air con%itioning time eration
B !3 hour a day "0;<00 + 22<00% B 30 days a month
B average load by month
'&uipments ) 4nstallation cost
'&uipments ) 4nstallation cost
(4LTI V vs Chiller
()lti V r)nning cost is <9 B comare to chiller
Category
1roduct
unning
Cost
"5S6%Total
7ater
Cooled
Chiller
Chiller 1rice
:8<=
*85 9
Cooling
Tower 9
1ump, 1rice
/ulti :
1rice
28819
•ased on G7 data chiller9/ulti : •ased on, Thailand electrical standard • *4B*ir conditioning ) e$rigeration 4nstitute
R)nning cost
!avings ) to
19
thyr :9B
Chiller
()lti V
'lectrical cost
'lectrical cost
(4LTI V vs Chiller
=. Economic analysis
Category
1rice
/aintenance
Cost
"5S6%Total
7ater
Cooled
Chiller
Chiller 1rice
:21==
*85 9 Cooling
Tower 9 1ump,
1rice
/ulti :
1rice
11;<
Chiller
()lti V
(aintenance
Cost savings
4 to 19
thyr
<<B
•/aintenance breadown•Chiller system B3! 5S6 9 t 9 yr.B times9yr •/ulti :B E 5S6 9 4ndoor 9 yr.B times9yr
B !E 5S6 9 #utdoor 9 yr.B times9yr
()lti V maintenance cost is 2; B comare to chiller
/aintenance cost
/aintenance cost
(4LTI V vs Chiller
=. Economic analysis
Category
Chiller system
:? system
emars
'conomic
*nalysis
4nitial cost
"5S6%
--,0;-
;2-,0-unning cost
"5S6%
30,;
200,!
Shopping
mall
?, ;,000
㎡
/aintenace cost
"5S6%
32,!--
!!,E
Total cost "5S6%
!,2!-,;-2
!,!3,3
'1
B
!.- years
=. Economic analysis
ACC "Ai$e Cycle Cost $or ! years% < Chiller .;; /H I /ulti : E.2- /H "-!>%
'1 "rea 'ven 1oint%
< !.- Jears
ACC "! years%
'1
!
styear
2
ndyear
3rd year
Eth year
28 J18 J;8 J=8
/E&
1.= ?ears
Cost savings
2B
/E&
1.= ?ears
. LCC
Chiller
()lti V
122
118 == :2 :8 288 111:21
=B
&ro%)ct K Installation (aintenance Electrical FeeChiller
()lti V
92
2:B 19B B ==B =:B ;B;2=;
:9B
&ro%)ct K Installation (aintenance Electrical Fee4nitial Cost "!
styear%
5 4! 6
ACC "! years%
. LCC
ARI Release% The "e# !tan%ar% in 288:
0aila"le throuh the 0RI $e" site1 ...'0RI'!R2