• No results found

Optimizing Flexible Manufacturing System: A Developed Computer Simulation Model

N/A
N/A
Protected

Academic year: 2020

Share "Optimizing Flexible Manufacturing System: A Developed Computer Simulation Model"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Process of Computer Modeling
Figure 2. Modeling process of flexible manufacturing system in case study
TABLE 2. Summary of t-test calculations for queue length of different units
TABLE 4. The results of observations- queue length of different units
+2

References

Related documents

Except SSE, there are a few industrial and technological parks functioning in Podkarpacie, such as: Podkarpacie Science-Technology Park AEROPOLIS, Mielec Industrial Park,

After ensuring that all the necessary component .xsd files are present, a user should point to the ‘top-level’ .xsd file (shown above, circled in yellow) as the schema to ‘Add’ from

Mcl-1 levels at 8 hours were not altered by highly effective caspase inhibition with Q-VD.OPh (Figure 2), and GM-CSF was able to significantly increase Mcl-1 levels, back to

Various Security and Intelligence institutions covering and operating in these areas are responsible for the creation and promotion of National Cyber Defense Strategy, analyzing the

Decreased serum sodium concentration is a rather frequent electrolyte disorder in the elderly population because of the presence of factors contributing to

Once traffic is congested, fewer (serious) crashes are expected to occur within the queue. In contrast, at the tail of the queue more severe rear- end crashes are to be expected. It

Exposure to virus from employees returning from holidays or normal activities outside of work (social distancing relaxed).. Exposure to