• No results found

Integration of facilities management (FM) practices with building information modeling (BIM)

N/A
N/A
Protected

Academic year: 2020

Share "Integration of facilities management (FM) practices with building information modeling (BIM)"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Illustration Position in Organization by CEFM

References

Related documents

Clancy et al.. Improving our understanding of the basis to the rela- tionship between psychosis and epilepsy is important as it may provide clues to the pathophysiology of

Members Present: Scott Holmes, Mike Nolan, Justin Bradley, Jesse Medford, Joe Coscia Other Attendees: Marc Tisdelle (FreeLake Youth Softball), James Taylor (FreeLake

CSD: Cat-scratch disease; HNL: Histiocytic necrotizing lymphadenitis; KFD: Kikuchi-Fujimoto disease; NHL: Non-Hodgkin ’ s lymphoma; SLE: Systemic lupus erythematosus; TbL:

Board of Regents: Proposed Adoption of a Resolution Authorizing the Issuance, Sale, and Delivery of Board of Regents of The University of Texas System Permanent University

The sensitivity of other four antibiotics, namely meropenem, fosfomycin, amikacin and combination cefoperazone-sulbactam were still potential for clinical usage to treat ESBL-

The former is the time for passengers boarding and alighting at bus stops, including doors opening and closing, and the latter is the time when buses are actually moving from one

Guest Scholar at the International Institute for Applied Systems Analysis, (IIASA), Laxenburg, Austria, April–May, 1986 with a travel grant from the Swedish Institute,

Coelho, “Technology Audit performed to the Company Jorge Honório da Silva & Filhos, Lda” (in Portuguese), IPT, Tomar 2006. Coelho, “Technology Audit performed to the Company