EB-2007-0050

NOTICE OF AMENDED APPLICATION

LEAVE TO CONSTRUCT A TRANSMISSION REINFORCEMENT PROJECT BETWEEN THE BRUCE POWER FACILITY AND MILTON SWITCHING STATION,

ALL IN THE PROVINCE OF ONTARIO

(BRUCE TO MILTON TRANSMISSION REINFORCEMENT PROJECT)

Application

Hydro One Networks Inc. (“Hydro One”) has filed an amended application (the

“Amended Leave to Construct Application”) with the Ontario Energy Board (the

“Board”) dated November 30, 2007 under section 92 of the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B (the “Act”). This amended application addresses certain changes to Hydro One’s original application filed with the Board on March 29, 2007.

Hydro One is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the existing transmission corridor (500 kV and/or 230 kV) extending from the Bruce Power Facility in Kincardine Township to Hydro One’s Milton Switching Station in the town of Milton.

Hydro One also proposes to make modifications at the Milton, Bruce A and Bruce B transmission stations to accommodate the new transmission lines.

Hydro One has submitted that the project is required to meet the increased need for transmission capacity associated with the development of wind power in the Bruce area and the return to service of nuclear units at the Bruce Power Facility. The proposed transmission project would require widening the existing transmission corridor by approximately 53m to 61m (175 ft to 200 ft) to accommodate construction of a double- circuit 500 kV electricity transmission line. Hydro One proposes an in-service date of

(2)

Fall 2011 for the new 500 kV transmission line and related facilities. The estimated cost of the transmission project is approximately $635 million.

Application Amendments

Hydro One is undertaking local route alternative studies in three areas along the proposed transmission project. The potential local route changes are being examined in response to comments received by Hydro One during its ongoing consultation activities.

The original proposed route for the Bruce to Milton Transmission Reinforcement Project and the three areas for potential local route changes are shown on a map below in this Notice. The three potential local route changes under consideration are in the following areas: Brockton/ Hanover/ West Grey; Camp Creek; and Halton Hills. The purpose of this Notice is to ensure that all potentially directly affected property owners are informed and can participate in this proceeding before the Board.

The Application File No. is EB-2007-0050.

How to see Hydro One’s Amended Application

Copies of the Amended Leave to Construct Application will be available for public inspection:

• at the Board’s offices;

• at Hydro One’s head office and on its website: www.hydroonenetworks.com

• at the offices of municipalities and towns with addresses shown below; and

• on the Board’s website at www.oeb.gov.on.ca.

How to Participate

If you have previously been accepted as an intervenor in this proceeding, there is no need to respond to this Notice, and your status as an intervenor remains.

For all other persons, you may participate in the Amended Leave to Construct proceeding in one of three ways:

(3)

1. You may send the Board a letter of comment. Your letter should include any request to make an oral presentation to the Board, and must be

received by the Board no later than 15 days from the date of publication of this notice or, if you have been served this notice personally, no later than 15 days from the date of service.

2. You may request observer status in order to receive documents issued by the Board in the proceeding. Your request must be made by letter

received by the Board no later than 15 days from the date of publication of this notice, or, if you have been served this notice personally, no later than 15 days from the date of service.

3. You may request intervenor status if you wish to participate actively in the proceeding. Your request must be made by letter of intervention received no later than 15 days from the date of publication of this notice, or, if you have been served this notice personally, no later than 15 days from the date of service.

Your letter of intervention must include a description of how you are, or may be, affected by the proceeding and if you represent a group, a description of the group and its membership. The Board may order costs in this proceeding. You must indicate in your letter of intervention whether you expect to seek costs from the applicant and the grounds for your eligibility for costs. You must provide a copy of your letter of intervention to the Applicant.

Need More Information?

Further information on how to participate may be obtained by visiting the Board’s Web site at www.oeb.gov.on.ca or by calling our Consumer Relations Centre at 1-877-632- 2727.

How to Contact Us

In responding to this Notice please reference Board file number EB-2007-0050. It is also important that you provide your name, postal address, telephone number and, if available, an e-mail address and fax number. All communications should be directed to the attention of the Board Secretary at the address below, and be received no later than 4:45 p.m. on the required date.

(4)

For your convenience, the Board accepts letters of comment by either post or e-mail.

Our e-mail address is Boardsec@oeb.gov.on.ca. Please include the application file reference number in the subject line of your e-mail.

Letters of intervention must be sent to the Board by regular mail to the address below.

Please remember that you must send a copy of your request for intervention to the Applicant at the address listed below.

IMPORTANT

IF YOU DO NOT INFORM THE BOARD OF YOUR WISH TO PARTICIPATE IN THIS PROCEEDING, IN ACCORDANCE WITH THIS NOTICE OF AMENDED

APPLICATION, THE BOARD MAY PROCEED WITHOUT YOUR PARTICIPATION AND YOU WILL NOT BE ENTITLED TO ANY FURTHER NOTICE OF THE

PROCEEDING.

FURTHER, IF THE AMENDED APPLICATION FOR LEAVE TO CONSTRUCT IS GRANTED, HYDRO ONE NETWORKS INC. MAY SUBSEQUENTLY APPLY FOR THE RIGHT TO EXPROPRIATE IF NECESSARY.

ADDRESSES

(for viewing of copies of application and pre-filed evidence)

Ontario Energy Board P.O. Box 2319, 27th Floor 2300 Yonge Street

Toronto, ON, M4P 1E4 Attn: Kirsten Walli

Board Secretary

Tel: 1-888-632-6273 (Toll free) Fax: 416-440-7656

E-mail: boardsec@oeb.gov.on.ca

Hydro One Networks Inc.

8th Floor, South Tower 483 Bay Street

Toronto, ON, M5G 2P5 Attn: Glen MacDonald

Senior Advisor – Regulatory Research and Administration

Tel: 416-345-5913 Fax: 416-345-5866

E-mail: regulatory@HydroOne.com

County of Bruce 30 Park Street, P.O. Box 70

Walkerton, ON, N0G 2V0

Solicitors for Hydro One Networks Inc.

Osler, Hoskin and Harcourt LLP Suite 2500, TransCanada Tower 450 First Street S.W.

(5)

Attn: Bettyanne Cobean Clerk

Tel:519-881-1291 Fax: 519 881-1619

E-mail: bcobean@brucecounty.on.ca

Calgary, Alberta T2P 5H1

Attn: Gord Nettleton

Tel: 403-260-7047 Fax: 403-260-7024

E-mail: GNettleton@osler.com

Municipality of Kincardine 1475 Concession 5, R.R. 5 Kincardine, ON, N2Z 2X6

Attn: Donna McDougall Clerk

Tel:519-396-3468 Fax: 519-396-8288

E-mail: clerk@kincardine.net

Municipality of Brockton 100 Scott Street

Walkerton, ON, N0G 2V0

Attn: Richard Radford CAO/Clerk

Tel:519-881-2223 Fax:519-881-2991

E-mail: info@brockton.ca

County of Grey 595 9th Avenue East

Owen Sound, ON, N4K 3E3

Attn: Sharon Vokes Clerk

Tel: 519-376-2205, Ext 227 Fax: 519-376-7970

E-mail: svokes@greycounty.ca

Town of Hanover 341 10th Street

Hanover, ON, N4N 1P5

Attn: William Roberts CAO/Clerk

Tel: 519-364-2780 Fax: 519-364-6456

E-mail: wroberts@hanover.ca

Municipality of West Grey 402813 Grey Road, R.R. 2 Durham, ON, N0G 1R0

Attn: Christine Shewchuk Clerk/Administrator

Tel: 519-369-2200 Fax: 519-369-5962

E-mail: CShewchuk@westgrey.com

Township of Southgate R.R. 1, 185667 Grey Road 6 Dundalk, ON, N0C 1B0

Attn: Don Seim

Clerk/Administrator

Tel: 519-923-2110 Fax: 519-923-9262

E-mail: dseim@town.southgate.ca

(6)

County of Wellington 74 Woolwich Street Guelph, ON, N1H 3T9

Attn: Donna Van Wyck Clerk

Tel: 519-837-2600, Ext 252 Fax: 519-837-1909

E-mail: donnav@wellington.ca

Township of Wellington North Box 125, 7490 Sideroad 7 West Kenilworth, ON, N0G 2E0

Attn: Lorraine Heinbuch Clerk

Tel: 519-848-3620, Ext 32 Fax: 519-848-3228

E-mail: lheinbuch@wellington-north.com

County of Dufferin 51 Zina Street

Orangeville, ON, L9W 1E5

Attn: Linda Dean CAO/Clerk

Tel: 519-941-2816 Fax: 519-941-4565

E-mail: clerk@dufferincounty.on,ca

Township of East Luther Grand Valley 5 Main Street North

Grand Valley, ON, L0N 1G0

Attn: Jane M. Wilson CAO/Clerk/Treasurer

Tel: 519-928-5652 Fax: 519-928-2275

E-mail: mail@eatluthergandvalley.ca

Township of East Garafraxa 374028 6th Line, Amaranth, RR #3 Orton, ON, L0N 1N0

Attn: Susan M. Stone CAO/Clerk-Treasurer

Tel: 519-928-5298 Fax: 519-941-1802

E-mail: township@amaranth-eastgary.ca

Town of Erin

5864 Wellington Road 24, RR#2 Hillsburgh, ON, N0B 1Z0

Attn: Kathryn Ironmonger Clerk

Tel: 519-855-4407, Ext 222 Fax: 519-855-4821

E-mail:

kathryn.Ironmonger@town.erin.on.ca

Regional Municipality of Halton 1151 Bronte Road

Oakville, ON, L6M 3L1

Attn: Monica Wallenfels CAO/Treasurer

Tel: 905-825-6000

Town of Halton Hills 1 Halton Hills Drive

Halton Hills, ON, L7G 5G2

Attn: Karen Landry Clerk

Tel: 905-873-2600, Ext 2341

(7)

Fax: 905-825-9010

E-mail: monica.wallenfels@halton.ca

Fax: 905-873-2347

E-mail: karenl@haltonhills.ca

Town of Milton 43 Brown Street Milton,ON, L9T 5H2

Attn: Troy McHarg Clerk

Tel: 905-878-7252, Ext 2137 Fax: 905-876-5022

E-mail: troy.mcharg@milton.ca

DATED at Toronto, December 11, 2007 ONTARIO ENERGY BOARD

Original Signed By

Kirsten Walli Board Secretary

(8)

"

"

"

"

"

Canadian Forces Base Borden

HIGHWAY 9

HURONTAR IO ST

TOWN OF MILTON

TOWN OF HALTON HILLS TOWNSHIP OF

EAST LUTHER

GRAND VALLEY TOWNSHIP OF GARAFRAXAEAST MUNICIPALITY OF

KINCARDINE MUNICIPALITY

BROCKTONOF

MUNICIPALITY OF WEST GREY

TOWNSHIP OF SOUTHGATE

TOWN OF ERIN TOWNSHIP OF

WELLINGTON NORTH

County Road 109

County Road 109

HuronLake

HIGHWAY 6 HIGHWAY 407

HIGHWAY 89

HIGHWAY 9

HIGHWAY 23

Kincardine

COUNTY RD 1

LONDON RD

COUNTY RD 86

HARRISTON RD

DONNYBRO OK LINE

HOWICK TURNBERRY RD

HIGHW AY 400

SIDEROAD 25

COUN TY RD

56

BRUCE POWER COMPLEX (Bruce Transformer Station)

Halton Hills Teeswater River

Saugeen River

Rocky Saugeen River

Proposed Transmission Line

Mount Forest Hanover TOWN OF

HANOVER Orangeville

Luther Lake

BelwoodLake

Grand River

Colbeck JCT

Milton Guelph

MILTON SS

Guelph

Oakville Innisfil

Seaforth Goderich

Kitchener & Waterloo

Bluewater

King City Bradford West Gwillimbury

"

HIGHWAY 7

MILTON

HALTON HILLS

TRAFAL GAR RD REGION

AL RD 25 Switchover

Zone

MILTON SS

STEELES AVE SIDEROAD 5

SIDEROAD 15 SIDEROAD 22

NORMANBY BENTINCK TLINE

WEST GREY BA

SELINE VARNEY RD

CONC ESIO

N RD 2 W GR

CONCESSION RD 16 COUN

TY R D 10

COUN TY R

D 3

CONCESSION RD 4 CONCESSION RD 6

HANOVER BROCKTON

WESTGREY

SIDER OAD 5

Alt. 1

Alt. 1(a)

Alt. 2

!!!!!!!!!!!!!!!!!!! !!

!

!

!

!

!

!

!

!

!

!

!

1 2 3

3 2

1

Potential Route Refinements in Brockton/Hanover/West Grey area, Camp Creek and Halton Hills

0 5 10 20km

´

Map not drawn to scale

Legend

Produced By: Inergi LP, GIS Service Date: October 2007, Map07-175_RouteMap(B&W)_v3 (C) Copyright Hydro one Inc. All rights reserved. No part of this drawing may be redistributed or reproduced in any form

by any photographic, electronic, mechanical or any other means, or used in any information storage or retrieval system.

Neither Hydro One Inc. nor any of its subsidiaries assumes liability for any errors or omissions.

NOT TO BE REPRODUCED OR REDISTRIBUTED CONFIDENTIAL TO HYDRO ONE NETWORKS INC.

Towns / Cities

Transformer Station / Switching Station Proposed 500 kV Transmission Line (Bruce x Milton) Existing Transmission Line (Bruce x Milton)

Townships / Municipalities 1 Potential Local Refinement Potential Local Refinement Areas

Brockton/Hanover/West Grey

Refinement Area Camp Creek Refinement Area Halton Hills Refinement Area

Major Roads

References

Related documents

- a transition (13) that is present between the image section (11) and the storage section (12) and a transition region that comprises the tran- sition (13) and parts of the

Excited at the prospect of deeper customer insights and the chance to take its overall customer experience strategy to the next level, Grocery Outlet partnered with Leger Metrics

This study aims to explore the psychosocial aspects of internet use among high school students in Pattani, Thailand and to investigate how the psychosocial

The libraries that have migrated to a multitenant cloud systems report important organisational consequences: (1) the staff involved in the technical management of the system is

Gorazd Meško, Ph.D., is Professor of Criminology and Dean of the Faculty of Criminal Justice and Security, University of Maribor, Slovenia, and a visiting scholar at the Institute

This equation can estimate the distance from a signal, given that d is the distance between the transmitter and receiver, RSSI is the received signal strength measurement,

5.2 Maximum allowed azimuth and elevation variance in LoS environments 63 5.3 Maximum allowed mean value of noise in time estimation, NLoS en-

Constellation urges the Board, OPG and stakeholders should take the time and make the effort to choose the best approach to integrate the output of the prescribed assets into

Energy Inc. BBB/Positive/— BBB/Stable/— May 25, 2006 Standard & Poor’s revised the outlook on the Duke Energy family of companies to positive as a result of Duke Energy’s

The total route length of the proposed transmission line within the Bruce Power Complex.. is 6 km: 3 km of 500 kV single-circuit line from Bruce A TS and 3 km of 500

The Applicant is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the

Hydro One is seeking an Order of the Board to construct approximately 180 kilometres of double-circuit 500 Kilovolt (“kV”) electricity transmission line adjacent to the existing

Act, 1998 (the “Act”) for an Interim Order of the Board providing for access by Hydro One and its agents to land affected by the Applicant’s proposed Bruce to Milton 500

filed an application with the Ontario Energy Board on March 30, 2007 for approval to access land in connection with Hydro One’s application to construct a new transmission

Presented paper Avid versus struggling readers : co-construed pupil identities in school booktalk at Departaments de lenguas de la facultad de ciencias de la education y el centro

for an Order or Orders pursuant to section 92 of the Ontario Energy Board Act, 1998 granting leave to construct a 230 kV transmission line and associated facilities to connect

(“Hydro One” or “the Company”) filed an Application with the Ontario Energy Board (the “Board”) under section 78 of the Ontario Energy Board Act, 1998 for approval of rates

is granted leave pursuant to subsection 90 (1) of the Ontario Energy Board Act, 1998 to construct approximately 6.5 kilometres of 24 inch natural gas pipeline and related

Milton Hydro filed an application with the Ontario Energy Board (the “Board”) for an order or orders approving or fixing just and reasonable rates for the distribution of

In this figure, green line represents the EDP obtained using classic approach, while the rest of lines are the ones for SM using different values of TEC in equation 2.4 to calculate