• No results found

Impact of Modification Made in Re UCP on Software Effort Estimation

N/A
N/A
Protected

Academic year: 2020

Share "Impact of Modification Made in Re UCP on Software Effort Estimation"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Actor type and respective weight.
Table 3. Technical complexity factor and weight.
Table 5. Percentage of deviation from actual estimated efforts for UCP, e-UCP and Re-UCP methods
Figure 1. Actual efforts and deviations using UCP, e-UCP and Re-UCP.
+7

References

Related documents

In the present study, the mean value of AgNORs was 2.49 ± 0.30 in normal mucosa, whereas mean AgNOR counts were 3.15 ± 0.11, 3.43 ± 0.28, and 4.82 ± 0.18 in mild, moderate,

“Understanding the unique experiences of refugee children should make teachers more committed to assisting them in their school experience” (Strekalova & Hoot, 2008,

ASSESSMENT OF CD34+ CELL COUNT IN THAWED CORD BLOOD UNITS.

In pure agile if requirements are changing (due to defect or some additional requirements generated) after completing the project will defiantly increase

In contrast, if we use the approximation only, i.e., half the product of the unit holding cost and the expectation of the demand in the period, to represent the holding cost

After normalization for lung size, changes in lung dimensions between inspiration and expiration were used for analysis; normalization was based on the cranial-caudal length

Results: At similar grass pollen concentrations, the daily mean of the individual maximum symptom scores reported in the early season were higher as compared to that reported in