• No results found

The Suitability of Typhoon Disaster Reconstruction Work Planning—A Case of Meizuolyu Stream in Taitung County

N/A
N/A
Protected

Academic year: 2020

Share "The Suitability of Typhoon Disaster Reconstruction Work Planning—A Case of Meizuolyu Stream in Taitung County"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. The location of study area watershed.
Table 1. Topography distribution in this study area.
Figure 4. Elevation distribution in this study area.
Table 2. Reconstructions after typhoon disaster.
+4

References

Related documents

Field experiments were conducted at Ebonyi State University Research Farm during 2009 and 2010 farming seasons to evaluate the effect of intercropping maize with

The single variable beam theories taking into account effect of transverse shear deformation for the buckling, bending and free vibration analysis of the thick beam

The paper assessed the challenges facing the successful operations of Public Procurement Act 2007 and the result showed that the size and complexity of public procurement,

Effect of the pH value of aqueous buffer, concentration of chiral additive, composition of mobile phase, and column temperature on the enantioseparation of Tedizolid phosphate

This paper presents an ID-based modified mutual authentication key agreement protocol based on elliptic curve cryptography.. In this protocol, two entities which

This study aims to test whether the liquidity proxied by Current Ratio (CR) has an effect on the dividend policy of manufacturing sector of consumer goods sector

It was decided that with the presence of such significant red flag signs that she should undergo advanced imaging, in this case an MRI, that revealed an underlying malignancy, which

Long term treatment with only metformin and pioglitazone and in combination with irbesartan and ramipril significantly ( P <0.001) reduced elevated serum