Mar 2012

Planning and Economic Development

Department

1

Developing in Tulsa

IDP

for

Contractors

(2)

Mar 2012

Planning and Economic Development

Department

2

Topics

– IDP Process

– Contracts

– Bonds

– Insurance

– Escrow Accounts

– Permits

– Construction/Inspection

– Acceptance by City

(3)

Mar 2012

Planning and Economic Development

Department

3

What is IDP?

• Process to build public infrastructure by the

private development community

– Water and Sanitary Mains

– Streets

– Stormwater Facilities

• Pipes

• Channels

(4)

Mar 2012

Planning and Economic Development

Department

4

IDP Process

– Pre-development meetings

– Design

– Permits

– Construction/Inspection

– Acceptance by City

(5)

Mar 2012

Planning and Economic Development

Department

5

Infrastructure Development

Process

Sanitary Sewer

Construction

DEVELOPER

CITY

Plat Filed

2 Yr Maint

Formal Acceptance

Substantial

Completion

Construction

Complete

Permit

Issued

Permit

Application

Building Permit

Certificate of

Occupancy

Water

Street & Stormwater

Infrastructure

Design Period

(6)

Mar 2012

Planning and Economic Development

Department

6

IDP Contracts

City

Developer

Engineer

Contractor A

Contractor

B

C

ont

rac

t

C

ont

rac

t

Pool of Engineers under

annual contract

Pool of Contractors under

annual contract

Contractor A

Every development

project

(7)

Mar 2012

Planning and Economic Development

Department

7

A

nnual Contracts

Engineers

Contractors

Arterial

$250K Bond

Contractors

Non-Arterial

$100k Bond

City

Annual Contract

(8)

Mar 2012

Planning and Economic Development

Department

8

ANNUAL CONTRACTS

CONSTRUCTION CONTRACTOR

APPLICATION

Signed Contract

$250 fee

Annual Bond:

$250,000 Arterial

$100,000

Non-arterial

Type of Work

Insurance Certificate

Taps & Water Mains

must have

“D” License

City

Attorney

Planning &

Economic

Development

Director

TMUA

MAYOR

CONTRACT

(9)

Mar 2012

Planning and Economic Development

Department

9

Contracts

Type of Work

175 E. 2nd Street, Ste 450 Tulsa, OK 74103 918-596-2514

APPLICATION FOR ANNUAL

CONTRACTOR’S CONTRACT FOR

INFRASTRUCTURE DEVELOPMENT PROCESS

(IDP)

www.cityoftulsa.org Please print or type. Incomplete applications will be rejected.

Name of Company ___________________________________________ Account Number ______________________

Type of Legal Entity: _____Corporation _____Partnership _____LLC _____Other

Address ____________________________________ City ____________________________ State _______ Zip ______

Phone ______________________________ FAX _________________________________________

Point of Contact________________________________________ Phone_____________________________

Email _________________________________________________

Level of Work: _____Major Construction and/or Minor Construction Arterial Right-of-Way (includes Minor Non-Arterial Right-of-Way) (Requires $250,000 Bond)

_____Minor Construction Non-Arterial Right-of-Way

(Constructed using standard Design, Requires $100,000 Bond)

Bonding Level: (Copy of Bond Required)

Bonding Company ____________________________________ Amount of Bond _____$100,000 or _____$250,000

Type of Work

:

WATER*

SEWER

STORMWATER

TRAFFIC & TRANSPORTATION

___ Main Extension ___New

___Detention

__Streets/Median Modification

___Revision

___Revision __Floodplain __Sidewalks/Driveways

___Tap _ _Tap __Pipes/Channels __Traffic Signalization

__Boring

__

OTHER

________________________

City of Tulsa Construction Experience _______________________________________________________________________ ___________________________________________________________________________________________________________

Other Construction Experience __________________________________________________________________________ ___________________________________________________________________________________________________________ Please include: . ____Application ____Copy of Insurance ____Copy of Bond ____$250 application fee

Date:_____________

*Contractor must have Class D Water License

(10)

Mar 2012

Planning and Economic Development

Department

10

Bonds

• Annual Bond

– Standard Form

– Performance, Payment, 1 year Maintenance

• $250,000 – Includes Arterial, non-arterial streets and

IDP projects

• $100,000 – Non-arterial streets only

• 2 year maintenance bond

– IDP Major Permit work (every project)

– Value of the work

(11)

Mar 2012

Planning and Economic Development

Department

11

Insurance

• Worker’s Comp

– State requirements

• Public Liability

– $175,000 Individual

– $1 million per accident

– $100,000 property damage

– City named as additional insured

• Owners Protection Liability

– Coverage amounts same as public

– Same Company as public

(12)

Mar 2012

Planning and Economic Development

Department

12

E

SCROW

• Field Inspection $68 per day

• Testing & QA $50 per day

• ODEQ Fees $2 /100ft ($10 min)

• Water Main Force Acct $200 per connection

• W M Testing & Chlor $0.25/ft of water line

(13)

Mar 2012

Planning and Economic Development

Department

13

Right-of-Way Permits

– R/W, Major Construction (Engineer Designed)

• Commonly called IDP Permit

– R/W, Minor Construction (Standards Used)

• Arterial Streets

• All other

(14)

Mar 2012

Planning and Economic Development

Department

14

Send Contractor’s

Permit to

Field Engineering

APPLICATION FOR

ROW MAJOR

CONSTRUCTION

PERMIT

List type of work

Escrow

Number of

construction days

Value of work

2-yr. Maintenance

bond

PreWork

Conference

ACTUAL

CONSTRUCTION

(All construction contracts

between Developer &

Contractor)

Inspection and

Testing by COT

Substantial

Completion

2-Year

maintenance

period begins

(15)

Mar 2012

Planning and Economic Development

Department

15

R/W Major Construction Permit

175 E. 2

nd

Street, Ste 450

Tulsa, OK 74103

918-596-7815

PERMIT APPLICATION FOR

INFRASTRUCTURE DEVELOPMENT PROCESS

MAJOR CONSTRUCTION

(IDP)

www.cityoftulsa.org Please print or type. Incomplete applications will be rejected.

IDP Name _______________________________________________________

IDP Location _______________________________________________________

Subdivision ________________________________________________

IDP Number (If known) ________________________________________________

Name of Contractor ___________________________________________ Account Number ______________________

Point of Contact ___________________________________________ Phone ______________________

E-Mail ________________________________

Type of Work

:

WATER

SEWER

STORMWATER

TRAFFIC & TRANSPORTATION

[ ] Main Ext

[ ] New

[ ] Detention

[ ] Streets

[ ] Revision

[ ] Revision [ ] Floodplain

[ ] Sidewalks/Driveways

[ ] Taps

[ ] Taps

[ ] Floodway

[ ] Median Modification

[ ] Pipes/Channels [ ] Traffic Signalization

[ ]

OTHER

________________________

If Water is checked please include 6 sets of plans.

If Sewer is checked please include 3 sets of plans.

If both Water and Sewer are checked please include 9 sets of plans.

Estimated Work Days

__________________________________

(16)

Mar 2012

Planning and Economic Development

Department

16

SUBSTANTIAL COMPLETION

• Infrastructure project that has been inspected by

the City

• Certified to be complete for all intended

purposes

• Authorizes the public use of the infrastructure for

which the facility was designed

(17)

Mar 2012

Planning and Economic Development

Department

17

Issue Permit

APPLICATION FOR

WATERSHED - ROW MINOR

CONSTRUCTION PERMIT

Must have Annual Contract

PreWork

Conference

ACTUAL

CONSTRUCTION

(All construction contracts

between Developer &

Contractor)

Inspection and

Testing by COT

R/W Minor Construction Permit

(18)

Mar 2012

Planning and Economic Development

Department

18

Contacts

Harold Tohlen

– Infrastructure Development Manager

– (918) 596-7344

Julie Miller

– IDP Coordinator

– (918) 596-2514

Website

www.cityoftulsa.org

• Business – Get a Permit

References

Related documents

Buyers to apply to the Economic Development Board for a registration certificate as a Smart City Developer The Smart City Developer is a company, registered with the

• Illustration showing the proposed development, existing and proposed infrastructure and proposed servicing connection points and diameter for water, sanitary

Sanitary Sewer Service: Sanitary sewer will be extended from Bowman Meadows 6th Addition off the end of Archer Drive to the east to serve the development.. The sanitary sewer

Application of the PCQ-PD in a very large cohort of PD patients unveiled the level of patient- centeredness of PD care in The Netherlands: a compelling call to professionals to

The team will help you to identify your key risk areas and implement effective measures, using relevant elements of the Risk Management solution including Driver and Vehicle

The City regularly consults with the Mayor's Office, Department of Community Development, Planning Division, Economic Development officials, Finance Department, Public

OUR Mission: To provide high quality cost conscious public services that contribute to a healthy, safe and prosperous community, in a sustainable manner.. OUR Culture:

Internet access routers built specifically for consumer ship from the factory with DHCP client services enabled on the Internet-facing interface, DHCP server