Power sector

India is the world's sixth largest energy consumer accounting for about 3.5% of the world's total annual energy consumption. The thermal, hydro and nuclear energy are the major sources of generation of electricity in India.

The Ministry has several undertakings/ organizations operating under it. They may be classified as follows:-

Statutory bodies which include:-

Central Electricity Authority- is an attached office of the Ministry and assists it in

all technical matters. CEA is responsible for overall planning and technical coordination as well as supervision of standard programmes of entire electricity sector of the country. It specifies the technical and safety requirements for construction, operation and maintenance of electrical standards and electrical lines. It is also involved in formulating the 'National Electricity Plan' in accordance with the National Electricity policy', once in five years.

Central Electricity Regulatory Commission - has been constituted in order to:-

(i) regulate the tariff of generating companies owned or controlled by the Central Government; (ii) regulate the tariff of generating companies other than those owned or controlled by the Central Government, if such generating companies enter into or otherwise have a composite scheme for generation and sale of electricity in more than one State; (iii) regulate the inter-State transmission of energy including tariff of the transmission utilities; (iv) grant licences for inter-State transmission and trading; and (v) advise the Central Government in formulation of National electricity policy and tariff policy.

State Electricity Regulatory Commission - have been constituted in order to:- (i)

determine the tariff for generation, supply, transmission and wheeling of electricity, whole sale, bulk or retail sale within the State; (ii) issue licences for intra-State transmission, distribution and trading; and (iii) promote generation of electricity from renewal sources of energy etc.

Appellate Tribunal for Electricity - has been constituted for the purpose of

hearing cases against the orders of the Regulatory Commissions and the Adjudicating officer.

Damodar valley corporation- is the first multi-purpose river valley project of the Government, set up for the unified development of Damodar Valley region spread over the States of West Bengal and Jharkhand. Its objectives are:- (i) flood control and irrigation; (ii) water supply and drainage; (iii) generation, transmission and distribution of electrical energy; (iv) afforestation and control of soil erosion; and (v) promotion of industrial, economic and general well-being of the people.

Bhakra Beas Management Board - has been constituted for the administration,

maintenance and operation of Bhakra Nangal Project. It manages the facilities created for harnessing the waters impounded at Bhakra and Pong in addition to those diverted at Pandoh through the BSL Water Conductor System. It has also been

(2)

assigned the responsibility of delivering water and power to the beneficiary States in accordance with their due/ entitled shares.

Public Sector Undertakings, which include:-

Power Grid Corporation of India Ltd. (POWERGRID) - is the Central transmission utility of India which possesses one of the largest transmission network in the world. It has been set up with the mandate 'to establish and operate Regional and National Power Grids to facilitate transfer of power within and across the regions with reliability, security and economy on sound commercial principles'. It is responsible for all the existing and future transmission projects in the Central sector.  National Thermal power corporation- is the largest thermal power generating

company of India and has been identified as one of the Navratnas. It has been set up with the objective of planning, promoting and organizing an integrated development of thermal power in the country.

National Hydro-Electric Power Corporation - has been set up in order to

harness the vast hydro, tidal and wind potential of the country to produce cheap/ pollution-free and inexhaustible power. It covers all aspects such as investigation, planning, designs, construction, operation and maintenance of hydroelectric, tidal and wind power projects.

North Eastern Electric Power Corporation limited - has been set up with the

objective of developing the large power potential of the North Eastern (NE) region of the country by installing hydro and thermal power plants so as to ensure optimum utilization of commissioned generation projects. It aims to plan, design, operate and maintain power stations in the NE region.

Rural Electrification Corporation - has been set up with the objective of financing

and promoting rural electrification projects all over the country. The projects cover electrification of villages, including tribal villages and Dalit Bastis, energisation of pump sets, provision of power for small, agro-based and rural industries, lighting of rural households and street lighting. REC provides financial assistance to State Electricity Boards, State Government Departments and Rural Electric Cooperatives.  Power Finance Corporation (PFC ) - function as the prime development financial

institution dedicated to the growth and overall development of the power sector. It provides financial assistance/ services for power projects in the form of project term loan, lease financing, direct discounting of bills, short term loan, consultancy services, etc.

Neyveli Lignite Corporation Limited:

Neyveli Lignite Corporation Limited is a Central Public Sector Undertaking engaged in lignite mining and power

(3)

Autonomous Bodies, which include:-

Central power research laboratory - serve as a National Laboratory for

undertaking applied research in electric power engineering, besides functioning as an independent National Testing and Certification Authority for electrical equipment and components so as to ensure reliability and develop new products.

National power training Institute - functions as the National Apex body for the

human resource development of the power sector personnel in India. Its headquarter is located in Faridabad (Haryana). It operates on all India basis through its five Regional Power Training Institutes located at Neyveli (Tamil Nadu), Durgapur (West Bengal), Badarpur (New Delhi), Nagpur (Maharashtra) and Guwahati (Assam). They are fully equipped with the latest state-of-the-art training infrastructure and having expert faculties with long years of professional and teaching background.

Bureau of energy efficiency - has been set up to develop policies and strategies

within the overall framework of Energy Conservation Act 2001. It aims to promote energy saving measures and in turn reduce energy intensity (i.e. energy consumed per unit product/services, practice and procedure) of Indian economy.

Joint Venture Corporations, which include:-

Satluj jal vidyut nigam limited - is a joint venture of the Government of India and the Government of Himachal Pradesh, set up with the objective to plan, promote, organize and execute hydro-electric power projects in the Satluj river basin in the Himachal Pradesh.

Tehri Hydro Development Corporation (THDC) - is a joint venture of Government of India and Government of Uttar Pradesh, set up with the objective to plan, promote, organize, execute, operate and maintain hydro power projects in Bhagirathi- Bhilangna Valley in Uttar Pradesh.

(4)

Installed Capacity

Sector

MW

%age

State Sector

82,026.05

52.5

Central Sector

51,867.63

34.0

Private Sector

33,183.68

13.5

Total

1,67,077.36

Fuel Wise break up

Fuel

MW

%age

Total Thermal

108362.98

64.6

Coal

89,778.38

53.3

Gas

17,384.85

10.5

Oil

1,199.75

0.9

Hydro (Renewable)

37,367.40

24.7

Nuclear

4,560.00

2.9

RES** (MNRE)

16,786.98

7.7

Total

1,67,077.36

(5)

As on 30/11/12

**Renewable Energy Sources (RES) include SHP, BG, BP, U&I and Wind Energy SHP= Small Hydro Project, BG= Biomass Gasifier, BP= Biomass Power,

U & I=Urban & Industrial Waste Power, RES=Renewable Energy Sources

The installed capacity figures as on 30.06.2010 in respect of RES is based on statement dated 02.11.10 from Ministry of Renewable Energy (MNRE) where cumulative Grid interactive power installed capacity has been indicated as 17174.60 MW. Reconciliation of installed capacity of Hydro capacity resulted in transfer of 135 MW from conventional to SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition of 67.8 MW to SHP under RES. Also 30 MW of capacity in the nature of Waste Heat Recovery Power Plant at Goa Energy Private Limited under U&I category of RES Out of this installed capacity due to wind - (374.636 MW) and small hydro (110.79 MW) appearing in captive capacity has been deducted to arrive at installed capacity of utilities in respect of RES.(17174.60-485.43+67.8+30=16786.98)

GENERATION INSTALLED CAPACITY (MW) OF POWER UTILITIES IN STATES/UTS

As on 30/11/12

State/UT MODE WISE BREAKUP

THERMAL NUCLEAR HYDRO RES TOTAL

(Utilities)

COAL GAS DIESEL TOTAL (Renewable)(MNRE)

STATE SECTOR A & N ISLAND 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30 ANDHRA PRADESH4382.50 0.00 0.00 4382.50 0.00 3695.53 190.83 8268.86 ARUNACHAL PRD.0.00 0.00 15.88 15.88 0.00 0.00 78.55 94.43 ASSAM 60.00 239.00 20.69 319.69 0.00 100.00 27.11 446.80 BIHAR 530.00 0.00 0.00 530.00 0.00 0.00 54.60 584.60 CHANDIGARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CHHATISGARH 2060.00 0.00 0.00 2060.00 0.00 120.00 19.05 2199.05 D & N HAVELI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DAMAN & DIU 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DELHI 385.00 800.40 0.00 1185.40 0.00 0.00 0.00 1185.40

GOA 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05

GUJARAT 4440.00 892.72 17.28 5350.00 0.00 772.00 29.90 6151.90

(6)

HIMACHAL PRD. 0.00 0.00 0.13 0.13 0.00 393.60 337.82 731.55 JAMMU & KASHMI0.00 175.00 8.94 183.94 0.00 780.00 129.33 1093.27

JHARKHAND 1190.00 0.00 0.00 1190.00 0.00 130.00 4.05 1324.05 KARNATAKA 2220.00 0.00 127.92 2347.92 0.00 3599.80 594.55 6542.27 KERALA 0.00 0.00 234.60 234.60 0.00 1881.50 142.83 2258.93 LAKSHADWEEP 0.00 0.00 9.97 9.97 0.00 0.00 0.00 9.97 MADHYA PRADESH2807.50 0.00 0.00 2807.50 0.00 1703.66 11.76 4522.92 MAHARASHTRA 7295.00 672.00 0.00 7967.00 0.00 2884.84 257.73 11109.57 MANIPUR 0.00 0.00 45.41 45.41 0.00 0.00 5.45 50.86 MEGHALAYA 0.00 0.00 2.05 2.05 0.00 156.00 31.03 189.08 MIZORAM 0.00 0.00 51.86 51.86 0.00 0.00 36.47 88.33 NAGALAND 0.00 0.00 2.00 2.00 0.00 0.00 28.67 30.67 ORISSA 420.00 0.00 0.00 420.00 0.00 2061.92 64.30 2546.22 PONDICHERRY 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50 PUNJAB 2630.00 25.00 0.00 2655.00 0.00 2230.23 222.55 5107.78 RAJASTHAN 3615.00 443.80 0.00 4058.80 0.00 987.96 30.25 5077.01 SIKKIM 0.00 0.00 5.00 5.00 0.00 0.00 47.11 52.11 TAMIL NADU 2970.00 523.20 0.00 3493.20 0.00 2122.20 85.55 5700.95 TRIPURA 0.00 148.50 4.85 153.35 0.00 0.00 16.01 169.36 UTTAR PRADESH 4072.00 0.00 0.00 4072.00 0.00 524.10 25.10 4621.20 UTTRAKHAND 0.00 0.00 0.00 0.00 0.00 1252.15 132.92 1385.07 WEST BENGAL 4780.00 100.00 12.06 4892.06 0.00 977.00 143.40 6012.46 Total State 47267.0 0 4077.12 602.61 51946.730.00 27257.0 0 2822.32 82026.05

MODE WISE BREAKUP

THERMAL NUCLEAR HYDRO RES TOTAL

State/UT(Utiliti

es COAL GAS DIESEL TOTAL

(MNRE) (Renewable) CENTRAL SECTOR DVC 3700.00 90.00 0.00 3790.00 0.00 143.20 0.00 3933.20 HP / NJPC JV 0.00 0.00 0.00 0.00 0.00 1500.00 0.00 1500.00 NEEPCO 0.00 375.00 0.00 375.00 0.00 755.00 0.00 1130.00

NEVEYLY LIG. COR2615.00 0.00 0.00 2615.00 0.00 0.00 0.00 2615.00

NHDC 0.00 0.00 0.00 0.00 0.00 1520.00 0.00 1520.00

NHPC 0.00 0.00 0.00 0.00 0.00 3767.20 0.00 3767.20

NTPC 25605.00 4017.23 0.00 29622.23 0.00 0.00 0.00 29622.23

NUCLEAR P CORP0.00 0.00 0.00 0.00 4560.00 0.00 0.00 4560.00

NTPC+ONGC 0.00 2220.00 0.00 2220.00 0.00 0.00 0.00 2220.00

TEHRI HYD CORP.0.00 0.00 0.00 0.00 0.00 1000.00 0.00 1000.00

Total Central 31920.00 6702.23 0.00 38622.234560.00 8685.400.00 51867.63 PRIVATE SECTOR

A & N ISLAND 0.00 0.00 20.00 20.00 0.00 0.00 0.10 20.10

ANDHRA PRADESH0.00 2878.40 36.80 2915.20 0.00 0.00 530.76 3445.96

(7)

ASSAM 0.00 24.50 0.00 24.50 0.00 0.00 0.00 24.50 BIHAR 0.00 0.00 0.00 0.00 0.00 0.00 9.50 9.50 CHHATISGARH 1600.00 0.00 0.00 1600.00 0.00 0.00 199.90 1799.90 DELHI 0.00 0.00 0.00 0.00 0.00 0.00 1.05 1.05 GOA 0.00 48.00 0.00 48.00 0.00 0.00 30.00 78.00 GUJARAT 1640.00 2577.50 0.20 4217.70 0.00 0.00 1821.14 6038.84 HARYANA 0.00 0.00 0.00 0.00 0.00 0.00 35.80 35.80 HIMACHAL PRD. 0.00 0.00 0.00 0.00 0.00 578.00 0.00 578.00

JAMMU & KASHMI0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

JHARKHAND 360.00 0.00 0.00 360.00 0.00 0.00 0.00 360.00 KARNATAKA 1460.00 220.00 106.50 1786.50 0.00 0.00 1842.94 3629.44 KERALA 0.00 174.00 21.84 195.84 0.00 0.00 0.03 195.87 LAKSHADWEEP 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.75 MADHYA PRADESH0.00 0.00 0.00 0.00 0.00 0.00 232.60 232.60 MAHARASHTRA 2470.00 180.00 0.00 2650.00 0.00 447.00 2316.15 5413.15 MIZORAM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ORISSA 600.00 0.00 0.00 600.00 0.00 0.00 4.30 604.30 PONDICHERRY 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03 PUNJAB 0.00 0.00 0.00 0.00 0.00 0.00 73.08 73.08 RAJASTHAN 270.00 0.00 0.00 270.00 0.00 0.00 1132.20 1402.20 TAMIL NADU 250.00 503.10 411.66 1164.76 0.00 0.00 5130.04 6294.80 TRIPURA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UTTAR PRADESH 600.00 0.00 0.00 600.00 0.00 0.00 587.08 1187.08 UTTRAKHAND 0.00 0.00 0.00 0.00 0.00 400.00 0.05 400.05 WEST BENGAL 1341.38 0.00 0.14 1341.52 0.00 0.00 17.15 1358.67 Total Pvt. Sector 10591.38 6605.50 597.14 17794.020.00 1425.0013964.66 33183.68 TOTAL 89778.38 17384.85 1199.75 108362.98 4560.00 37367.40 16786.98 167077.36

Region wise break up

Capacity addition for the 11th Plan:

Type/Sector Central State Private Total

Thermal 24840 23301 11552 59693 Hydro 8654 3482 3491 15627 Nuclear 3380 0 0 3380 Total 36874 26783 15043 78700

3380 15627

SL. REGION THERMAL Nuclear HYDRO R.E.S.@ TOTAL

NO. COAL GAS DSL TOTAL (Renewable) (MNRE)

1 Northern 23620.003813.26 12.99 27446.25 1620.00 13622.75 2777.32 45466.32 2 Western 29290.507903.81 17.48 37211.79 1840.00 7447.50 4918.28 51417.57 3 Southern 19172.504690.78 939.32 24802.60 1100.00 11299.03 8517.55 45719.18 4 Eastern 17635.38190.00 17.20 17842.58 0.00 3882.12 344.41 22069.11 5 N. Eastern 60.00 787.00 142.74 989.74 0.00 1116.00 223.32 2329.06 6 Islands 0.00 0.00 70.02 70.02 0.00 0.00 6.10 76.12 7 All India 89778.3817384.85 1199.75 108362.98 4560.00 37367.40 16786.98167077.36

(8)

5969

TOTAL CAPACITY COMMISSIONED DURING 2008-09 (MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

CENTRAL 750 - - 750

STATE 852.2 969 - 1821.2

PRIVATE 882.5 - - 882.5

TOTAL 2484.7 969 - 3453.7

TOTAL CAPACITY COMMISSIONED DURING 2009-10 (MW)

SECTOR THERMAL HYDRO NUCLEAR TOTAL

CENTRAL 1740 440 2180

STATE 3079 39 3118

PRIVATE 4287 - - 4287

TOTAL 9106 39 440 9585

*

COMMISSIONED- Unit achieved full load

CAPACITY ADDITION TARGET FOR THE YEAR 2010-11

SECTOR THERMAL HYDRO NUCLEAR TOTAL

CENTRAL 6015 649 1220 7884

STATE 6549.2 356 6905.2

PRIVATE 6191 461 6652

TOTAL 18755.2 1466 1220 21441.2

CAPACITY COMMISSIONED DURING 2010-11 as on 17 July 2010

SECTOR THERMAL HYDRO NUCLEAR TOTAL

CENTRAL 125 80 - 205

(9)

STATE 1250 50 - 1300

PRIVATE 735 - - 735

TOTAL 2110 130 0 2240

Public Sector Utilities:

1. National Thermal Power Corporation:

NO. OF PLANTS

CAPACITY (MW)

NTPC Owned

Coal

15

25,375

Gas/Liquid Fuel

7

3,955

Total

22

29,330

Owned By JVs

Coal & Gas

5

3,364

Total

27

32,694

Regional Spread of Generating Facilities

REGION

COAL

GAS

TOTAL

Northern

8,015

2,312

10,327

Western

6,360

1,293

7,653

Southern

3,600

350

3,950

Eastern

7,400

-

7,400

JVs

1,424

1,940

3,364

Total

26,799

5,895

32,694

NTPC has also formulated its business plan of capacity addition of about 1,000 MW thru renewable resources by 2017. In addition, capacity addition of 301 MW through Solar PV and Thermal by March 2014 has envisaged in line with National Solar Mission.

(10)

Beyond XIth Plan

Updated On :- 27/07/2010

S No. Project Country/State Capacity Total Capacity Status

1 Dibang Arunachal Pradesh 12 * 250 3000 Awating clearances 2 Kotli Bhel Stage - I B Uttarakhand 4 * 80 320 Awating clearances 3 Kotli Bhel Stage - II Uttarakhand 866.25 * 530 Awating clearances 4 Pakal Dul* JammuKashmir & 4 * 250 1000 Awating clearances 5 Kotli Bhel Stage - I A Uttarakhand 3 * 65 195 Awating clearances 6 Teesta - IV Sikkim 4 * 130 520 Awating clearances

7 Kiru* Jammu &

Kashmir 4 * 150 600 Awating clearances

8 Kwar* JammuKashmir & 4 * 130 520 Awating clearances

9 Tawang-I Arunachal Pradesh 3 * 200 600 Awating clearances 10 Loktak Downstream* Manipur 2 * 33 66 Awating clearances 11 Tawang-II Arunachal Pradesh 4 * 200 800 Awating clearances 12 Tipaimukh* Manipur 6 * 250 1500 Awating clearances 13 Kishenganga JammuKashmir & 3 * 110 330 Under Construction

14 Bursar JammuKashmir & 4 * 255 1020 Under Survey and Investigation Stage 15 Karmoli Lumti Tulli Uttarakhand 2 * 27.5 55 Under Survey and Investigation Stage 16 Garba Tawaghat Uttarakhand 3 * 210 630 Under Survey and Investigation Stage 17 Chungar Chal Uttarakhand 2 * 120 240 Under Survey and Investigation Stage 18 Lachen Sikkim 3 * 70 210 Under Survey and Investigation Stage 19 Goriganga-IIIA Uttarakhand 3 * 40 120 Under Survey and Investigation Stage 20 Dhauliganga Intermediate Uttarakhand 3 * 70 210 Under Survey and Investigation Stage

Total 12466 * Under Joint Venture

Projects under category ‘Under Survey and Investigation Stage’ are for survey & investigation for preparation of PFR/FR/DPR of the project for getting various statutory clearances. For preparation of these reports, various hydrological, geological, meteorological, power potential studies etc are

(11)

carried out at the project site.

Projects under ‘Awaiting clearances’ category are awaiting various statutory clearances from CWC / CEA / MOP / MOWR/PIB and investment sanction from Cabinet Committee on Economic Affairs (CCEA) after preparation of DPRs.

3. Nuclear Power Corporation India Limited:

Project Capacit

y (MWe) Expected Commercial Operation

RAJASTHAN ATOMIC POWER PROJECT

2 x 700 Unit 7 – Jun-2016 Unit 8 – Dec-2016 KAKRAPAR ATOMIC POWER

PROJECT 2 x 700 Unit 3 – Jun-2015Unit 4 – Dec-2015

4. North Eastern Electric Power Corporation limited:

Ongoing:

1. TUIRIAL HYDRO ELECTRIC PROJECT ( 60 MW) Mizoram:

Lot – IV (Hydro-Mechanical works): NIB floated on 03.11.10, and the last date for submission has been fixed on 07.01.2011. The bids shall be opened on the same day. Lot-V (EM works)

2. KAMENG HYDRO ELECTRIC PROJECT (600 MW) Arunachal Pradesh:

Commissioning schedule May, 2013( Revised)

3. TRIPURA GAS BASED COMBINED CYCLIC POWER PROJECT, Tripura (101MW)

Years of Commissioning / Completion Schedule - 36 months from the date of award (i.e. by July'2013) for Main Plant Work.

Future Projects:

Sl

No. NAME OF THE PROJECT COMMISSIONING SCHEDULE

1 Kameng-I H.E. Project (1120

MW), Ar. Pradesh 6 Years from the Date of CCEA Clearnce.

2

Mawphu H.E. Project (85 MW),

Meghalaya 4.5 years from CCEA Clearnce.

3

Projects in Mizoram :

a

Lungreng H.E. Project ( 815MW) Necessary action has been initiated for obtaining clearances of the Ministry of External Affairs, Ministry of Defense, Home Ministry, Govt. of India.

b

Chhimtuipui H.E. Project ( 635 MW)

c

Mat H.E. Project ( 76 MW)

4

Garo Hills Thermal Power

Project (500 MW) Meghalaya 36 months from CCEA Clearnce.

5

West Khasi Hills Thermal Power

Project (240 MW) Meghalaya 32 months from CCEA Clearance.

6

Agartala Gas Turbine Plant- Combined Cycle Conversion Project (52 MW), Tripura

(12)

4. Tehri Hydro Development Corporation (THDC) Future Projects:

THDC proposes to add 2804 MW during XIIth Plan (2012-2017) in the Capacity Addition

Programme of MOP with the planned commissioning of following Projects:

1. Tehri Pumped Storage Plant - 1000 MW

2. Vishnugad Pipalkoti HEP - 444 MW

3. Kishau Multi Purpose Project - 600 MW

4. Malari Jelam HEP - 114 MW

5. Jelam Tamak HEP - 126 MW

6. Karmoli HEP - 140 MW (*)

7. Jadhganga HEP - 50 MW (*)

8. Bokang Bailing HEP - 330 MW (*)

(*) Under Wildlife clearance

5.

Satluj

jal vidyut nigam limited

Future Projects:

Projects under Survey and Investigation and DPR Preparation

A. In the State of Himachal Pradesh

Sr. No. Project

Installed Capacity

1.

Luhri HEP

775 MW

2.

Dhaulasidh

66 MW

B. In the State of Uttarakhand

Sr. No Project

Installed Capacity

1.

Devsari HEP

252 MW

2.

Naitwar Mori HEP

60 MW

3.

Jakhol Sankri HEP

51 MW

C. In the State of Manipur

Sr. No Project

Installed Capacity

1.

Tipaimukh HEP*

1500 MW

*This project will be developed by a joint venture company to be established in

which SJVN have agreed to take a 26% equity inerest, with NHPC Limited and State

of Manipur taking 69% and 5% equity interest respectively.

(13)

Future Plans

The SJVN proposes to add 5000 MW additional capacity by 2014-15. This would

require an additional investment of about Rs. 29,000 Crores which shall be met

mainly from internal accruals and loans from domestic /multi literal funding

agencies.

To achieve the target of setting up of additional 5000 MW SJVN is exploring the

possibilities of taking up new projects in Himachal Pradesh, Arunachal Pradesh,

Nepal and Bhutan.

Neyveli Lignite Corporation Limited:

Neyveli Lignite Corporation Limited is a Central Public Sector Undertaking engaged in lignite mining and power generation

Future Plans:

1. WIND POWER PROJECT IN TAMILNADU: NLC is in the process of setting up a 50MW capacity wind based power project in Tirunelveli District of Tamilnadu.

2. Thermal Power Plant of 250 MW capacity with linked mine of 2.25 MTPA is proposed to be set up at Bithnok in Bikaner District, Rajasthan.

3. BARSINGSAR EXTENSION POWER PROJECT (250 MW) AND HADLA & PALANA LIGNITE MINE (2.5 MTPA), Rajasthan

4. 2 x 800 MW power plant with linked lignite mine of 13.5 MTPA at Jayamkondam in the State of Tamil Nadu

5. COAL BASED THERMAL POWER PLANT IN ORISSA (4 X 500 MW)

List of Hydro projects under execution

(Excluding projects under Ministry of New & Renewable Energy) *****

Sl. Name of Project Unit State/ Capacity Likely

No. No. Implem. Agency (MW) Commissioning

A. Projects as per 11th Plan Programme

Central Sector

1 Parbati St. II U-1 to H imachal Pradesh/ 800 1 2th P la n

4x200= 800 MW U-4 NHPC

2 Chamera-III U-1 to H imachal Pradesh/ 231 2011-12

3x77= 231 MW U-3 NHPC

3 Parabati-III U-1 to H imachal Pradesh/ 520 2011-12

4x130= 520 MW U-4 NHPC

4 Kol Dam U-1 to H imachal Pradesh/ 800 2011-12

4x200= 800 MW U-4 NTPC

5 Rampur U-1 to H imachal Pradesh/ 412 1 2th P la n

6x68.67= 412 MW U-6 SJVNL

6 Uri-II U-1 to Jam m u & K ashm ir/ 240 2011-12

4x60= 240 MW U-4 NHPC

7 Chutak U-1 to Jam m u & K ashm ir/ 44 2011-12

4x11=44 MW U-4 NHPC

(14)

3x15=45 MW U-3 NHPC

9 Koteshwar U-1 to Uttaranchal/ 400 2010-12

4x100= 400 MW U-4 THDC

10 Loharinagpala U-1 to Uttaranchal/ 600 1 2th P la n

4x150=600 MW U-4 NTPC

11 Tapovan Vishnugad U-1 to Uttaranchal/ 520 1 2th P la n

4x130=520 MW U-4 NTPC

12 Teesta Low Dam-III U-1 to W est Bengal/ 132 2011-11

4x33= 132 MW U-4 NHPC

13 Teesta Low Dam-IV U-1 to W est Bengal/ 160 2011-12

4x40= 160 MW U-4 NHPC

14 Subansiri Lower U-1 to A runachal Pradesh/ 2000 1 2th P la n

8x250= 2000 MW U-8 NHPC

15 Kameng U-1 to A runachal Pradesh/ 600 1 2th P la n

4x150= 600 MW U-4 NEEPCO

Sub- total (Central): 7504 State Sector

16 Uhl-III U-1 to H imachal Pradesh/ 100 1 2th P la n 3x33.33= 100 MW U-3 Beas Valley Power Corp.

Ltd. (BVPC)

17 Swara Kuddu U-1 to H imachal Pradesh/ 110 1 2th P la n

3x36.6= 110 MW U-3 HPPCL

18 Priyadarshni Jurala U-6 Andhra Pradesh/ 39 2010-11

6x39= 234 MW APGENCO

19 Nagarujana Sagar TR U-1 & Andhra Pradesh/ 50 2011-12

2x25= 50 MW U-2 APGENCO

20 Lower Jurala U-1 to Andhra Pradesh/ 240 1 2th P la n

6x40= 240 MW U-6 APGENCO

21 Pulichintala U-1 to Andhra Pradesh/ 120 2011-12

4x30= 120 MW U-4 APGENCO

22 Pallivasal U-1 to Kerala/ 60 1 2th P la n

2x30= 60 MW U-2 KSEB

23 Bhawani Barrage II U-1 & Tam il Nadu/ 30 2011-12

2x15= 30 MW U-2 TNEB

24 Bhawani Barrage III U-1 & Tam il Nadu/ 30 2011-12

2x15= 30 MW U-2 TNEB

25 Myntdu U-1& Meghalaya/ 84 2011-11

2x42= 84 MW U-2 MeSEB

26 New Umtru U-1& Meghalaya/ 40 2011-12

2x20= 40 MW U-2 MeSEB

Sub- total (State): 903 Private Sector

Sl. Name of Project Unit State/ Capacity Likely

No. No. Implem. Agency (MW) Commissioning

27 Karcham Wangtoo U-1 to H imachal Pradesh/ 1000 2011-12

4x250= 1000 MW U-4 JKH CL

28 Budhil U-1 & H imachal Pradesh/ 70 2010-11

2x35= 70 MW U-2 LANCO

29 Malana-II U-1 & H imachal Pradesh/ 100 2010-11 2x50= 100 MW U-2 Everest Pow er

30 Sorang U-1 & H imachal Pradesh/ 100 2011-12

2x50= 100 MW U-2 Himachal Sorang Power

31 Shrinagar U-1 to U ttarakhand/ 330 2011-12

4x82.5= 330 MW U - 4 M /s G VK Industries

32 Maheshwar U-1 to M adhya Pradesh/ 400 2011-12

(15)

33 Chujachen U-1& Sikkim/ 99 2010-11

2x49.5= 99 MW U-2 Gati

34 Teesta- III U-1 to Sikkim/ 1200 2011-12

6x200= 1200 MW U-6 T eesta U rja L td.

Sub- total (Private): 3299

Total ‘A’ (11th Plan): 11706

A-1 Additional Unit likely to commission in 11th Plan

25a Myntdu U-1 Meghalaya/ 42 2011-12

1x42= 42 MW MeSEB

B. Projects likely to give benefits beyond 11th Plan

Central Sector

35 Kishanganga U-1 to Jamm u & Kashm ir/ 330 1 2th P la n

3x110= 330 MW U-3 NHPC

36 Pare U-1 to A runachal Pradesh/ 110 1 2th P la n

2x55= 110 MW U-2 NEEPCO

State Sector

37 Baglihar-II* U-1 to J&K/ 450 1 2th P la n

3x150= 450 MW U-3 JKPDC

38 Kashang-I H imachal Pradesh/ 65 1 2th P la n

65 MW HPPCL

39 Thottiyar K erala/ 40 1 2th P la n

40 MW KSEB

Private Sector

40 Tidong-I U-1 to H imachal Pradesh/ 100 1 2th P la n 2x50= 100 MW U-2 M /s Nuziveedu Seeds

41 Phata Byung U ttarakhand/ 76 1 2th P la n

76 MW M /s Lanco

42 Singoli Bhatwari U-1 to U ttarakhand/ 99 1 2th P la n 3x33= 99 MW U-3 L & T U ttaran chal H ydro

power Limited

43 Teesta- VI U-1 to Sikkim/ 500 1 2th P la n

4x125= 500 MW U-4 LANCO

44 Rangit-IV U-1 to Sikkim/ 120 1 2th P la n

3x40= 120 MW U-3 Jal P ow er corp . L td .

45 Jorethang Loop Sikkim/ 96 1 2th P la n

2x48= 96 MW M/s DANS Energy

46 Bhasmey U-1 to Sikkim/ 51 1 2th P la n

3x17= 51 MW U-3 G ati In frastru ctu re

Total ‘B’ (Beyond 11th Plan): 2037

Total- Under Execution: 13785

THERMAL UNITS TARGETED FOR COMMISSIONING IN THE YEAR 2010-11

(Original Target and Actual Achieved) As On-31.10.10

State Project Name Impl Unit No Targeted Cap. (MW) Commd. Cap. (MW) Actual(A)/ Ant Comm.

Agency Date

A.CENTRAL SECTOR

Rajasthan Barsingsar NLC U-2 125 11/2010

Lignite

U-1 * 125 28.06.10(A)

Haryana Indira APCPL U-1 500 500 31.10.10(A)

Gandhi TPP

UP NCP Project NTPC U-6 490 490 30.07.10(A)

St-II,

WB Mejia TPS DVC U-1 500 500 30.09.10(A)

Extn

U-2 500 02/2011

(16)

Steel TPS

U-2 500 05/2011

Farakka NTPC U-6 500 02/2011

STPS- III

Chhattisgarh Korba STPP NTPC U-7 500 11/2010

Jharkhand Kodarma TPP DVC U-1 500 '03/2011

TN Neyveli TPS- NLC U-1 250 02/2011

II Exp.

AP Simhadri NTPC U-3 500 01/2011

STPP Extn.

Jharkhand Maithon RB DVC U-1 525 02/2011

TPP

Sub Total(A) 5890 1615

B.STATE SECTOR

Delhi Pragati PPCL GT-1 250 250 24.10.10(A)

CCGT – III GT2 250 12/2010 GT-3 250 04/2011 ST-1 250 06/2011 GT-4 250 02/2011 ST-2 250 05/2011

Gujarat Surat Lignite GIPCL U-3* * 125 12.04.10(A)

TPP Extn.

U-4 * * 125 23.04.10(A)

Hazira CCPP GSECL GT 223 03/2011

Extn.

ST 128 03/2011

Pipavav CCPP GSECL Block-1 351 04/2011

Haryana Rajiv Gandhi HPGCL U-2 600 600 01.10.10(A)

TPS,Hissar

Karnataka Raichur U-8 KPCL U-8 250 250 26.06.10(A)

Rajasthan Chhabra TPS RRVUNL U-2 * * 250 04.05.10(A)

AP Kakatiya APGENCO U-1 500 500 27.05.10(A)

TPP

Rayalseema APGENCO U-5 210 11/2010

(17)

State Project Impl Agency Unit No Targeted Cap. Commd. Cap. Actual/ Ant Comm. Date

Name (MW) (MW)

UP Parichha Extn UPRVUNL U-5 250 06/2011

U-6 250 06/2012

Harduaganj UPRVUNL U-8 250 03/2011

Ext

U-9 250 04/2011

Maharashtra Khaperkheda MSPGCL U-1 500 02/2011

TPS Expn.

Bhusawal MSPGCL U-4 500 03/2011

TPS Expn.

WB Santaldih TPP WBPDCL U-6 250 12/2010

Extn Ph-II

Tripura Baramura TSECL GT* 21 03.08.10(A)

GT

Sub Total (B) 6012 2121

C.PRIVATE SECTOR

AP Konaseema Konaseema ST 165 165 30.06.10(A)

CCPP gas Power

Ltd.

Lanco Lanco ST 133 133 18.07.10(A)

Kondapalli Kondapalli Ph-II (ST)

Delhi Rithala CCPP NDPL GT-1 35.75 11/2010

GT-2 35.75 11/2010

ST 36.5 12/2010

Gujarat Mundra TPP Adani Power U-3 330 330 02.08.10(A)

Ph-I(U-3&4) Ltd

U-4 330 11/2010

Maharashtra JSW JSW U-1 300 300 24.08.10(A)

Ratnagiri Energy(Ratn

TPP agiri) Ltd

U-2 300 11/2010

U-3 300 11/2010

U-4 300 04/2011

Wardha WPCL U-1 * 135 05.06.10(A)

Warora (KSK)

Wardha U-2 * 135 10.10.10(A)

Warora

Orissa Sterlite TPP Sterlite U-2(Ist 600 600 14.10.10(A)

Energy Ltd. Unit)

U-1 600 01/2011

Rajasthan Jallipa- Raj West U-2 135 135 08.07.10(A)

Kapurdi TPP Power Ltd.(JSW) U-3 135 01/2011 U-4 135 02/2011 U-5 135 04/2011 U-6 135 06/2011 U-8 135 09/2011

UP Anpara-C Lanco U-1 600 01/2011

Anpara Power Pvt. Ltd.

Rosa TPP Rosa Power U-2 * 300 28.06.10(A)

Ph-1 supply

Co.Ltd ( Reliance)

Karnataka Udupi TPP UPCL U-1 507.5 600 23.07.10(A)

U-2 507.5 01/2011

SubTotal (C ) 5891 2833

17793 6569 Grand Total (A+B+C)

(18)

State Generation Board

Northern Region:

1. Delhi:

2. Punjab:

Hydel project

:

a) SHAHPUR KANDI HYDRO ELECTRIC PROJECT (168 MW) - This project is likely to be completed during 12th plan.

b) SHAHPURKANDI EXTENSION (55.5 MW) - The Project is likely to be commissioned during 12th Plan.

Thermal Project:

Goindwal Sahib - 2X270 MW Coal Based Thermal Power Project - the 1 st unit is scheduled for commercial operation on 31.01.2013 and 2 nd unit on 30.04.2013.

3. Rajasthan:

Ongoing:

Sl.n

o

Project

Capacity

Commission

ing

Schedule

1

KALISINDH TPS UNIT-1 600 MW December

2011

2

KALISINDH TPS UNIT-2 600 MW March 2012

3

CHHABRA TPS PHASE 2 (UNIT-3) 250 MW November 2011

4

CHHABRA TPS PHASE 2 (UNIT-4) 250 MW December 2011

5

RAMGARH EXTN. PROJECT GT 110 MW NOV 2011

6

RAMGARH EXTN. PROJECT ST 50 MW FEB 2012

Future Projects:

Sl.

no

Project

Capacity

Commission

ing

Schedule

1

CHHABRA TPS STAGE II (UNIT-5) 660 MW 30.11.2013

2

CHHABRA TPS STAGE II (UNIT-6) 660 MW 30.05.2014

3

SURATGARH TPS STAGE V (UNIT- 7) 660 MW 30.11.2013

(19)

4

SURATGARH TPS STAGE V (UNIT- 8) 660 MW 30.05.2014

Gas based Power plant:

Sl.

no

Project

Capacity

Commission

ing

Schedule

1

Dholpuer Gas Thermal Power Station

Stage-II

330 MW 2013-14

2

KOTA Gas Power Project 330 MW 2013-14

3

Chabra Gas Power Project 330 MW 2013-14

4

Ramgarh Gas Power Station(Stage -IV)

160 MW 2015-16

Coal based power plant:

Sl.

no

Project

Capacity

Commission

ing

Schedule

1

Suratgarh TPS unit 9-10(Super

Critical) 1320 MW 2015-16

2

Kalisindh TPS Unit 3-4 (Super Critical) 1320 MW 2015-16

3

Banswara TPS Unit I-II(Super Critical) 1320 MW 2016-17

4.

Himanchal Pradesh:

Projects which have been alloted/under process of allotment and expected to yield benefit during the 12th Plan period

A) CENTRAL /JOINT SECTOR

1. Khab-I – Satluj – 450mw - Allotted to SJVNL 2. Khab-II - 186.00mw - Allotted to SJVNL 3. Luhri - 750.00mw - Allotted to SJVNL

4. Parbati-I - Beas 750.00mw - Allotted to NHPC

B) PRIVATE SECTOR

S.no Project Basin Capacity

(MW)

Status

(20)

2 Chanju-II Ravi 17 Allotted

3 Bara Banghal Ravi 20 Allotted

4 Bajoli-Holi Ravi 18 Allotted

5 Kuther Ravi Ravi 260 Allotted

6 Suil Ravi Ravi 13 Under process of

allotment

7 Sal-I Ravi Ravi 6.5 Allotted

8 Bardang Chenab 126 Under process of

allotment

9 Chattru Chenab 108 Allotted

10 Miyar Chenab 90 Under process of

allotment

11 Tinget Chenab 81 Under process of

allotment

12 Teling Chenab 69 Under process of

allotment

13 Tandi Chenab 104 Under process of

allotment

14 Rashil Chenab 102 Under process of

allotment

15 Gondhala Chenab 144 Under process of

allotment

16 Khoksar Chenab 90 Under process of

allotment

17 Ropa Satluj 60 Under process of

allotment

18 Mane Nadang Satluj 70 Under process of

allotment

19 Lara Satluj 60 Under process of

allotment

(21)

21 Chango Yangthang Satluj 140 Allotted

22 Yangthang Khab Satluj 261 Under process of allotment

23 Sumta Kathang Satluj 130 Under process of allotment

24 Kut Satluj 24 Allotted

25 Tidong-II Satluj 60 Allotted

26 Jangi thopan Satluj 480 Allotted

27 Thopan Porari Satluj 480 Allotted

28 Kilhi-Balh Beas 7.5 Under process of

allotment

29 Dhaula-Sidh Beas 40 Allotted

30 Shalvi Yamuna 7 Under process of

allotment

31 Rupin Yamuna 39 Allotted

5. Haryana:

Ongoing:

1320 MW Mahatma Gandhi Thermal Power Project in Jhajjar Case-II -

Power likely to be available from Dec., 2011

Future Projects:

1500 MW Gas based Project at Faridabad.

660 MW capacity additional super critical Thermal Unit at Yamuna

Nagar as an extension of 2x300 MW DCRTPP, Yamuna Nagar.

2800 MW (4x700 MW) Nuclear Power Plant in Distt. Fatehabad near

Village Gorakhpur – Site stands identified by Nuclear Power

Corporation of India. Govt. of India has approved the setting of this

Nuclear Power Project in Haryana during October 2009

6. Jammu and Kashmir:

(22)

S.n

o

Project

Capacity

(MW)

1

Baglihar Stage-II 450

2

Pahalgam(3rd Unit) 1.50

3

Matchil 0.35

4

Baderwah (3rd Unit) 0.5

5

Sanjak 1.26

7. Uttar Pradesh:

New Identified Projects

Schedule I – List of Tentative Small Hydro Projects (These details are

indicative. Capacity & Location of a particular SHP may change as per

assessment of Developer subject to approval of UPJVNL)

S

No

.

Name of Project

Capacity(

M.W)

Distt

Canal

1 Khairi

3.75 Saharanpur

Hathini Kund Link Canal

2 Madho-I

3.75 Pilibhit

Sharda Canal Hardoi

Branch

3 Madho-II

2.50

Shahjahanp

ur

Sharda Canal Hardoi

Branch

4

Shahjahanpur(Nahil

)

2.50

Shahjahanp

ur

Sharda Canal Hardoi

Branch

5 Ram Ganga

3.20 Bijnore

Ram Ganga Feeder

Canal

6 Bansagar-I

12.00 Mirzapur

Adwa Meja Link Canal

7 Bansagar-II

10.00 Mirzapur

Adwa Meja Link Canal

8 Ken Branch-I

3.00 Banda

Ken Branch

9 Ken Branch-II

1.50 Banda

Ken Branch

10 Bandran

10.50 Lalitpur

Dam toe

11 Karmnasa

2.00 Chanduli

Dam toe

(23)

13 Dunda

5.00 Pilibhit

Sharda Canal Hardoi

branch

14 Malakpur Rehni

4.00 Saharanpur

Eastern Yamuna Canal

15 Meja

9.50 Mirzapur

Dam toe

Total

M.W.

76.20

8. Uttrankhand:

Future Plan:

S.no

Project

District

Capacity

(KW)

Completion

Year of

1

Asiganga-III Uttarkashi 9000 2012-13

2

Dunao Pauri Garhwal 1500 2012-13

3

Suwarigad Uttarkashi 2000 2012-13

4

Tankul Pithoragarh 12000 2012-13

5

Sonegad Uttarkashi 3000 2012-13

6

Suringad II Pithoragarh 5000 2012-13

7

Urgam II Chamoli 3800 2012-13

8

Painagad Pithoragarh 9000 2012-13

9

Pilangad II Uttarkashi 4000 2012-13

10

Bhilangana-II- 2A Tehri 24000 2012-13

11

Bhilangana-II- 2B Tehri 24000 2012-13

12

Bhilangana-II- 2C Tehri 24000 2012-13

Greensite Project allocated to UJVNL

S.No. Name of Project EstimatedPotential

(MW) District River/Tributary

Completion Schedule

1. Vyasi 120 Dehradun Yamuna May 2014

2. Lakhwar 300 Dehradun Yamuna 2016

3. Kishau 660 Dehradun Tons 2023

4. Pala Maneri 480 Uttarkashi Bhagirathi

Work on hold

due to

environment issues in river Bhagirathi

5. Bharon Ghati 381 Uttarkashi Bhagirathi Same as above

6. Bowla Nandprayag 300 Chamoli Alaknanda 2016

(24)

8. Tamak lata * 280 Chamoli Dhauliganga 2016 9. Sirkari Bhyol Rupsiabagar 210 Pithoragarh Goriganga

10. Sela Urthing 230 Pithoragarh Dhauliganga

11. Taluka Sankri 140 Uttarkashi Tons

12. Rishiganga I 70 Chamoli Rishiganga

13. Rishiganga - II 35 Chamoli Rishiganga

PROJECTS UNDER DEVELOPMENT (Up to 25 MW)

S.No Name of project Capacity(MW)

2 Asiganga I 4.5 3 Asiganga II 3.0 4 Kaliganga I 4.0 5 Kaliganga II 6.0 6 Kalidigad 9.0 7 Madhyamaheshwar 15 8 Sobla-I 8 Total 53.0 MW

Western Region

1. Goa:

The Department does not have its own generation and purchases power from the Central Sector Power Stations of the National Thermal Power Corporation. Besides this, the department also purchases power of 16 Mw from Reliance Industries Ltd., Sancoale.

2. Daman and DIU:

The UT of Daman & Diu does not have its own power generation. The bulk power supply is drawn from the Central Sector Power Stations in Western Region through GETCO Grid.

3. Gujarat:

(25)

S.n

o

Project

Capacity (MW)

Commissioning

Date

1

Sikka TPS Extn

2*250

Unit 2 - 06/12

Unit 3 - 08/12

2

Pipavav Energy Private

Limited

2*600

Unit 1 - 08/13Unit 2 – 12/13

Following Projects are under various stages of Planning:

1 4X800 MW Coal Based Units at Kuchhadi, Dist. Porbandar

2 2X800 MW Coal Based Units at Sinor, Ta. Sinor, Dist. Vadodara

3 2X800 MW Coal Based Units at Dahej, Dist. Bharuch

4 2X1000 MW Gas Based Power Plants in North Gujarat

4. Madhya Pradesh:

Thermal projects in planning stage:

S.n

o

Project

Capacity

1

Banasagar TPP 2 X 800 MW

2

New Birsingpur TPS Distt:

Umaria 2 X 500 MW or 1 X 500 MW or 2 X 250 MW

3

Amarkantak Extn Unit 6

Distt : Annupur 1 X 250 MW

4

Shahpura Project Distt -

Jabalpur 1000 MW

5

Shree Singaji TPP –I (Malwa TPP ) 2*600 MW

State Projects in Planning Stage - Hydel Projects

S.n

o

Project

Capacity

1

Sone HPS Distt Sidhi 5X20MW

2

Gandhi Sagar HEP Mandasaur 4X40MW

3

Kanhan HPS Distt Chindwara 2X45MW

4

Chambal Extn Stage-II (i) Devipura (120 MW) (ii) Jaitpura (40 MW) (iii) Gujjapura (40 MW) (iv) Barsala (70MW) 270 MW

5. Maharashtra:

(26)

Ongoing:

• Chandrapur TPS Unit 8 & 9 (2 x 500 MW) - Trial operation of Unit 8 is expected by Dec. 2012 followed by Unit 9 by March 2013.

• Parli TPS Unit 8 (1 x 250 MW - against existing 2 x 20 MW derated capacity units, netcapacity addition : 210 MW). Trial operation is scheduled by Jan. 2012

• Koradi TPS Unit 8, 9 & 10 (3 x 660 MW - Unit 8 is against the existing 4 x 105 MWderated capacity units - Net capacity addition 1560 MW). The Trial operation of Unit 8 is scheduled by Dec.2013 followed by Unit 9 by June 2014and Unit 10 by Dec. 2014.

Future Projects:

1. Uran Gas Based Combined Cycle Power Plant (1220 MW): (Block-I : 406

MW, Block-II:

814 MW).The trial operation of Block I (406 MW) is expected by June 2013 followed by Block II (814 MW) by September 2013.

2. Bhusawal TPS Unit 6 (1 x 660 MW against existing 55 MW capacity

units at Paras &

Bhusawal - Net capacity addition: 550 MW): Trial operation is expected by June

2015.

3. Nashik TPS Unit 6 (1 x 660 MW against existing 2 x 125 MW derated

capacity units – Net

capacity addition - 410 MW) :

Future Projects through Joint Venture – 9240 MW:

Latur Coal Based Unit 1&2 (2 x 660 MW) or Gas based CCPP

Block-I & Block-IBlock-I (2 x 750

MW): the trial operation of the project is expected as under:

(i) Coal based: Unit 1 by June-2015 & Unit 2 by December- 2015 or (ii) Gas based: Block-I by August 2013 and Block-II by November-2013.

Joint Venture through PPP (Public-Private Participation): • Dhopawe TPS Project Unit – 1 to 3 (3 x 660 MW) :

• Dondaicha TPS Unit – 1, 2, 3, 4 & 5 (5 x 660 MW) :

• Coal based Thermal Power Project near Kanpa (Tal.Nagbhid, Dist. Chandrapur) (2x660 MW) - Planning stage

• Coal based Thermal Power Project in Gondia District (2 x 660 MW) - Planning stage

(27)

6. Chhattisgarh:

Ongoing:

Korba tpp west extension 500MW – Commissioning schedule 06/12

Marwa tpp – 2*500MW Janjgar - chamba - Commissioning schedule Unit

1 –sep 12, unit 2 – Nov 12

Future Projects:

Southern Region

1.

Andhra Pradesh:

Future Projects:

Rayalaseema TPP Unit-6 (600 MW) - commission by September,

2013.

Gas based Station near Karimnagar (3x700 MW): 1

st

Block (700

MW) will be completed by March, 2013.

IGCC Plant at Vijayawada TPS (182 MW): Unit is programmed to

commission by September, 2013.

Sattupally TPS (600 MW): Unit is programmed to commission by

March, 2014.

Vadarevu TPP Stage-I (1600 MW)

Srikakulam TPS (2400 MW)

(28)

Polavaram HEP (12x80 MW): First four units will be commissioned

by September, 2014 and the balance 8 units at an interval of 2 months

thereafter.

Nuclear Power Plant in Kadapa District JV with Apgenco with Npcil

2. Karnataka:

Ongoing:

Bidadi Combined Cycle Power Plant: 1400

MW – Unit is programmed to

commission by

2013

3. Kerela:

ON GOING SCHEMES

(Undertaken by KSEB)

Sl. No.

Name of Project

Power in MW Energy in MU

1.

PALLIVASAL EXTENSION SCHEME

60

153.9

2.

THOTTIYAR HEP

40

99.0

3.

POOZHITHODE SHEP

4.80

10.97

4.

RANNI-PERUNAD SHEP

4.0

16.73

5.

CHATHANKOTTUNADA-II SHEP

6.0

14.76

6.

VILANGAD SHEP

7.5

22.63

7.

PEECHI SHEP

1.25

3.315

8.

SENGULAM AUGMENTATION

SCHEME

85.0

9.

ADYANPARA SHEP

3.5

9.01

PROJECTS TENDERED FOR IMPLEMENTATION BY KSEB

Sl. No. Name of Project

Power in MW

Energy in MU

1

ATHIRAPILLY HEP

163

233

2

MANKULAM HEP

40

82

3

KARAPUZHA DAM TOE SHEP

0.5

2.054

4

ANAKKAYAM SHEP

7.5

22.83

(29)

6

BARAPOLE SHEP

15

36

PROJECTS IN PIPELINE

Sl. No.

Name of Project

Power in MW

1

Kakkayam Small HEP

3.0

2

Poringalkuthu SHEP

24.0

3

Chimmony Small HEP

2.5

4

Sengulam Tail Race Project

3.6

5

Pazhassi Sagar HE Project

20.0

6

Chembukkadavu Stage III

6.0

7

Peruvannamoozhy

7.0

8

Upper Kallar Project

2.0

9

Peechad Project

3.0

10

Thumboormuzhi

8.0

11

Western Kallar

5.0

12

Koodam

4.5

13

Chinnar

24.0

14

Sengulam Extn. Scheme

48.0

15

Olikkal

4.5

16

Poovaramthodu

2.7

4. Tamilnadu: Ongoing:

NTPC-TNEB joint venture)

Vallur Thermal Power Station: Unit III (500MW) -

commission by

Nov 2012

Udangudi Thermal Power Station:

Unit I (800MW) -

commission by

Mar.2013 Unit II (800MW)-

commission by

Sep.2013

Future:

(30)

Establishment of Ennore SEZ project of 2x800MW coal based supercritical thermal power plant in the ash dyke of North

Chennai (Kattupalli) :the project is scheduled to be completed by 2015-16.

5. Pondicherry:

The

bulk power supply is drawn from the Central Sector Power Stations and other state electricity board. PPCL had had invited bidders to build a 500MW coal based project. The last date for the prequalification was July 2009.

Eastern Region

1. Bihar:

Ongoing:

2.

Barauni TPS Extension Under Bihar SEB: (

2x250 MW) the project is scheduled to be completed by 2013-14

3. Muzaffarpur TPS Extension - Under Kanti Bijlee Utpadan Nigam Ltd.- JV of

Bihar SEB & NTPC Ltd.

2x195 MW extension at Muzaffarpur TPS (2013-14)

IPP Power-Stations under Case-2: Tariff based Bidding

S.no Project Capacity Expected Schedule

1 Buxar Bijlee

Company Pvt. Ltd. at Chausa, Buxar Dist.

2x660 MW 2015-16 2 Lakhisarai Bijlee Company Pvt. Ltd. at Kajara, Lakhisarai. 2x660 MW 2015-16 3 Pirpainti Bijlee Company Pvt. Ltd. at Pirpainti, Bhagalpur District 2x660 MW 2015-16

IPP Power Stations (MOU Signed with BSEB)

1 M/s Jas Infrastructure Capital Pvt. Ltd., Nagpur at Banka (Bhagalpur) 2x660 MW + 2x660 MW 2014-15

2 M/s Vikas Metal & Power Ltd., Kolkata, at Begusarai.

500 MW Firm has postponed their project activities till the allotment of coal block and

(31)

suitable land by BIADA. 3 M/s Nalanda Power Company Ltd. Kolkata at Pirpainti (Bhagalpur) 4x500 MW in two phases 2014-15

4 M/s Adhunik Power & Natural Resources Ltd., Kolkata, at Lakhisarai/Bhagalpur . 2x500 MW in two phases 2014-15

Other IPP projects approved by State Investment Planning Board (SIPB)

S.n

o

Project

Capacit

y

Expected Schedule

1

M/s Subhas Projects &

Marketing Ltd., Kolkata, at Lakhisarai.

1200 M

W 13th Plan

2

M/s IL&FS, New Delhi, at

Motipur (Muzaffarpur) 500 MW 13th Plan

3

M/s India Power Corporation

Ltd., Kolkata 1650 MW 13th Plan

4

M/s Cement Manufacturing Company Ltd., Kolkata, at Kahalgaon (Bhagalpur)

500 MW 13th Plan

5

M/s Essar Power, Ranchi 1800 M

W 13th Plan

6

M/s Usha-Martin, New Delhi,

at Kahalgaon (Bhagalpur) 1200-1320 MW 13th Plan

7

M/s East-West Power Generation Co. Ltd., Maharashtra at Kahalgaon, Bhagalpur 1000 M W 13th Plan

8

M/s Triton Energy Ltd.,

Gurgaon, Haryana, at Kochar, Aurangabad.

1320 M

W 13th Plan

9

M/s Krishak Bharti

Co-operative Ltd., New Delhi. 1320 MW 13th Plan

10

NPCIL proposed for installation of 4x700 MW Nuclear Power Plant at Rajauli, Nawada District.

4x700 M

W

(32)

New projects:

1. 1000 MW thermal power plant at Patratu

2. 1000 MW thermal power plant in Santhal Pargana region

3. 1000 MW thermal power plant linked with Maurya coal block (210 MT) to be allocated to Jharkhand/JSEB under tariff based competitive bidding

Bihar State Hydroelectric Power Corporation Limited:

Ongoing Projects IN BIHAR:

S.n

o

Project

Capacity

1

Bathnaha Phase-I Small Hydel Project 8 MW

2

Nirmali Small Hydel Project 7 MW

3

Dhoba Small Hydel Project 2x1000 KW

4

Katanya Small Hydel Project 2x1000 KW

5

Mathauli Small Hydel Project 2x400 KW

6

Barwal Small Hydel Project 2x800 KW

7

Walidad Small Hydel Project 1x700 KW

8

Dehra Small Hydel Project 2x500 KW

9

Sipaha Small Hydel Project 2x500 KW

Projects in Jharkhand:

1. North Koel Hydroelectric Project (2x12 MW)

2. Chandil Dam H.E. Project (2x4 MW)

3. Tenu-Bokaro Link Canal H.E.P. (1x1 MW)

4. Sadani Hydroelectric Project (2x500 KW)

5. Lower Ghaghari Small Hydroelectric Project ( 2x200 KW)

6. Netarhat Small Hydroelectric Project ( 1x40 KW)

7. Nindighagh Demo Hydroelectric Project (1x200 KW)

8. Jalimghagh Demo Hydroelectric Project (1x200 KW)

Planned Project:

1. Kanhar Pumped – Storage Hydroelectric Project –

2. Sankh Hydroelectric Project

Proposed Big Projects

• Sinafdar PSS (3 x 115 MW) • Panchgotia PSS (3x75 MW) • Telharkund PSS (4 x 100 MW)

(33)

• Hathiahdah- Durgawati PSS (8 x 200 MW) • Indrapuri Reservour Project (450 MW)

• Kohira Dam Pumped Storage (3x38 MW) • Dagmara Hydroelectric Power Project

3. Orissa:

Hydel Project Under construction:

S.n

o

Project

Capacity

1

Potteru Small HE Project

2 x 3 MW

Hydel project Identified for Future Implementation

S.n

o

Project

capacity

1

Sindhol Complex

a

Deogaon 3 x 30 MW

b

Kapasira 3 x 30 MW

c

Godhaneswar 4 x 30 MW

2

Middle Kolab Hydro Electric

Project 285 MW

3

Tel Integrated Project To be assessed during DPR stage

4

Lower Vansadhara Project To be assessed during DPR stage

5

Balijori Hydro Electric Project 160 MW

6

Salki Hydro electric Project 96 MW

7

Khadago Project To be assessed during DPR stage

8

Uttel & Roul Integrated Project To be assessed during DPR stage

9

Mahanadi-Brahmani River Link 150 MW

10

Barmul Hydro Electric Project 60 MW

Private- Thermal projects: S.n

o

Project Company Capacity Commissioning

Schedule

1 Kamalanga TPP GMR Kamalanga

Energy ltd 3*350 Unit 1 - 04/12 Unit 2 – 06/12

Unit 3 – 08/12

2 Derang TPP JITPL 2*600 Unit 1 - 12/11

Unit 2 – 02/12

3 Ind.Bharat Energy TPP

Ind.Bharat

Energy 2*350 Unit 1 - 12/11 Unit 2 – 02/12

(34)

The West Bengal Power Development Corporation Ltd. 2 Units of 500 MW each-Unit No.3 & 4

North and Eastern region:

1.

Assam, Arunachal Pradesh, Meghalaya and Nagaland :

The government has envisaged to establish a number of small Hydel projects

2. Tripura:

Tripura CCPP Village :Palatana, Distt:Udaipur (Tripura) -OTPC (JV of ONGC, Tripura State and IL&FS) –

Unit 1 – (363.3MW) – To be commissioned during 09/12

Unit 2 – (363.3MW) – To be commissioned during 02/13

Proposed Capacity Addition in Generation

 105 MW CCGT Project at Chakmaghat.  104 MW TGBPP at Manarchwak by NEEPCO.  740 MW CCGT at Palatana by OTPC.

3. Manipur:

New Proposals :

A). Proposed Micro Hydel Schemes to be implemented under Capital Subsidy Programme.

The State Government proposes to implement/ investigate the following hydel projects with different funding agencies. Investigation schemes for medium sized projects are funded by Govt. of India as an Additional Plan Assistance through NEC. The micro hydel schemes are subsidised by the Ministry of Non-Conventional

Energy Sources, Government of India. The projects not covered by the above will be taken up under State Plan.

Proposed Micro Hydel Schemes under Capital Subsidy Programme

Sl.

No. Name of Project Capacity(KW)

Estimated Cost(Rs. in

lakhs) Present status

1. Gelnel - II 2 x 100 115.51 DPR prepared and submitted to Govt.

(35)

Clearance from Forest and Environment

angles awaited for submission to MNES

3. Haipi 2 x 50 91.80

Total : 800 463.90

B). Schemes proposed for survey and investigation

The following schemes are being taken up under the State Sector.

i) Medium/Small Hydro Electric Projects:

Sl.

No. NameProject of Capacity(KW)

Estimated Cost(Rs. in

lakhs) Present status

1. Irang 4 x 15 MW 186.55 Under Detail Survey and Investigation (DSI) with NEC fund.

2. Tuivai 3 x 17 MW 131.29*

NEC fund is awaited for completion of

survey and investigation work. * Revision is in progress.

3. Maklang-Tuyungbi 3 x 15 MW 243.00 NEC fund is awaited for starting survey and investigation work.

ii). Mini/Micro Hydro Electric Projects:

Sl.

No. NameProject of Capacity (KW)

Estimated Cost (Rs. in

lakhs) Present status

1. Chakpi/Phunchang 3 x 200 6.00 Pre-Feasibility Report (PFR) submitted to Govt. Detail

Survey and

Investigation (DSI) is being

taken up

as soon as the financial health

of the state permits. 2. Chakpikarong 3 x 200 6.00 3. Irang 3 x 100 4.00 4. Ijai 3 x 500 5.00 5. Tupul 3 x 300 4.00 Total : 3900 25.00

References

Related documents

Comparative study of various bomber aircrafts The first step in the design of aircraft is to collect data of existing aircraft of similar purpose i.e., bomber.. This step

Our new favourite thing will be to listen to music together We will be so happy when Covid is

5.1 Deployment models (four types):- Private, Community, Public and Hybrid, the four types of deployment models refers to location and management of cloud’s infrastructure

Open Society Georgia (Soros) 27 Course Baccalaureate Nursing Curriculum 40 Continuing Tbilisi State University Iashvili Children’s Hospital National Medical Center. Model

Even if we were able to correctly classify each Twitter user, we would not be able to make a reliable estimate of the voting results as (i) several Twitter users may not vote,

She has created mechanisms to feedback customer service and mystery shopping data into real time, revenue producing activities by the front line and outside sales forces.

While it is good to see possible altered chord extensions as a simple substitution, as shown in previous chapters, there is a very easy way to add tension and color to your

Using a Public Goods Game, we are interested in assessing how cooperation rates change when agents can play one of two different reactive strategies, i.e., they can pay a cost in