Pakistan Petroleum Ltd
Pakistan Petroleum Ltd
Tim O’Rourke – MEA – ML Manager Fahd Ali - PAG Marketing Manager Anees Khokhar– CEO - ITS Pakistan Anees Khokhar– CEO - ITS Pakistan Karachi, Pakistan
Multilaterals – “a new approach?”
Quick overview of TAML Levels
Moving forward – MRC to ERC
ARACMO – Level 3 SPE Presentation
ARACMO Level 3 SPE Presentation
WEL TAML Presentation – Deep Water
Multilaterals – a new approach,
emerging technology ?
Think again!!!
• 1929 – Leo Ranney rudimentary attempts MLs. He drilled a 2.44 m vertical shaft in Ohio put men and vertical shaft in Ohio, put men and equipment in the bottom of the hole and they dug horizontal holes– he also drilled in a horizontal radial pattern “spokes of a wheel” perhaps pattern, spokes of a wheel perhaps creating the 1stML ever.
• In the 1940’s John Zublin drilled
horizontal drain holes for operators in Calif.
• In 1945 Mr. Zublin eventually
re-enters 250 wells in Calif., West Texas and Wy Averaging 2 laterals per and Wy. Averaging 2 laterals per well
ML’s are Not New
1939 – Alexander Grigoryan graduated from Azerbaijan Industrial Institute.
1941 – He drilled what is on record the world first 1941 – He drilled, what is on record, the world first
directional well (Baku 135) using only Turbo Drills.
This directional well led to him to develop a way to This directional well led to him to develop a way to
increase of production in the same way a “tree root extends to soil”.
* In 1953 he drilled (66/45) 9 branches ea leg 80 toIn 1953 he drilled (66/45) 9 branches, ea leg 80 to 300 m without whipstocks or cement plugs
* Increased exposure to the pay zone by 5.5 times * Increased production by 17 times
110 wells followed from Eastern Siberia to the West Ukraine near the Black Sea.
What are the TAML Classifications
O h l i b
Level 1 Level 6
Open hole mainbore Open hole lateral
Mainbore cased
Open hole lateral Hydraulic isolation at the
Pressure integrity within the junction
Level 2 Level 5
Open hole lateral
junction, via completion
Level 3 Level 4
Mainbore cased Mechanical support
in the lateral
Mainbore and lateral cemented
Why Does This Work?
Why Does This Work?
The Future MRC’s to ERC’s
“Extreme Reservoir Contact” 50K’ to 75K’ on the pay
p y
Current MRC (Maximum
Reservoir Contact wells) Wells
Future ERC (Extreme Reservoir Contact)
Wells
Costs / Benefit Discussion
/
Well cost:
4 M$
Time to Drill & Complete: 2.5 / 3.0 Months
Average Production: 5000 bopd
Additional cost: < 1 M$
Ti t D ill & C
l t 1 M th
Time to Drill & Complete: < 1 Month
Incremental Production: +3000 bopd
Possible ML Design for Producers and Injectors
3-Leg ML Producer
2-Leg ML Injector
2-Leg ML Injector
Nahr Umr
Sandstone 12m
ML Flow Chart
ML Flow Chart
FEA of RapidExclude Junction verses the
Washover Junction
Washover Junction
RapidX
w/ 2500 psi
L
l 4
/
p
Level 4
Washover System
w/ 10 psi
p
Negligible deflection with 2500
psi of load applied to the
Connector and Template
3.51” of deflection into the
mainbore at 10 psi of load to a
standard level 4 wash-over
j
ti
Connector and Template
junction
Mechanical Integrity at a Junction
9-5/8” casing
Full size window
L= 15 ft , W= 8.5 in.
P j
t d A
1500
i
/Projected Area= 1500 sq.in
.+/-Formation Contact Pressure:
er
if p = 100 psi
Radial Force Component on
C
ti
Schlumber gerConnection:
F = 150,000 Lb
F
Reliability issues and future workovers
Schlumberger ML milestones since 2006
• 2006: Woodside Tender – Vincent Field, 7 systems –RapidX Level 5 – Sub Sea Vincent Field RapidX Level 5 Sub Sea Vincent Field
• 2006: Development of 7” Level 5 RX*
• 2007: Woodside Vincent Field 4 systems installed
• 2007: Woodside Vincent Field – 4 systems installed
• 2008: First Tri Lateral – Level 3 Aramco
2008: Woodside Vincent Field – 4 systems plus World world first TAML level 5 first Tri Lateral
• 2008: Woodside orders 17 systems
• 2008: First Tri Lateral – Level 3 Aramco
Rapid Products Strength
•
High Mechanical strength at
•
High Mechanical strength at
the junction
•
Junction has long term stability
•
Junction has long term stability
e.g. fragile shales, mobile salts,
depleted reservoirs
Level 4 Mill-over Junction
p
•
Junction is assembled
downhole not constructed
Phase 1- MRC Australia
well xxx Well xxx well xxx Well xxx 1 2 3 4 5 --22 --11 Well xxx 1Formations
Geological
Considerations
Formations
Water depth 375 –
400m
Considerations
400m
Overburden
Calcarenite & Marl
Calcarenite & Marl
Claystone / Shale
Claystone / Shale
Sandstone – Reservoir
Sandstone Reservoir
(top res ±1300m
TVDSS)
Oil Industries Highest Strength
Multilateral Junction – RapidX System
p
y
TAML Level 5
9 5/8” RapidX
9-5/8 RapidX
SLB Level 5 Junction
RapidX, RapidExclude and RapidConnect
Sizes
Sizes
A
B
•
Size
7”
9-5/8”
C
•
A
7.00”
9-5/8”
D
•
B
4.00”
4.75”
•
C
2.99”
4.00”
E
•
D
3-1/2”
5.00”
•
E
4 1/2
7 00”
•
E
4-1/2
7.00
RapidX Junction
Template
Connector Connector