PRIMARY LOAD CASES
LOAD 1 SEISMIC IN X-DIRECTION (SQX)- Qk LOAD 2 SEISMIC IN Y-DIRECTION (SQY)- Qk LOAD 3 SEISMIC IN Z-DIRECTION (SQZ)- Qk
LOAD 11 DEAD LOAD (DL)- Gk
LOAD 12 FIREPROOFING LOAD (FP)- Gk
LOAD 13 LIVE LOAD (LL)- Qk
LOAD 14 CABLE TRAY LOAD (CT)- Gk
LOAD 15 SNOW LOAD (SL)- Qk
LOAD 21 EQUIPMENT / PIPING EMPTY LOAD (EE/PE)- Gk LOAD 22 EQUIPMENT / PIPING OPERATING LOAD (EO/PO)- Qk LOAD 23 EQUIPMENT / PIPING TESTING LOAD (ET/PT)- Qk LOAD 51 FRICTION LOAD IN +X-DIRECTION (FX)- Qk LOAD 52 FRICTION LOAD IN +Z-DIRECTION (FZ)- Qk LOAD 53 ANCHOR LOAD IN +X-DIRECTION (TAX)- Qk LOAD 54 ANCHOR LOAD IN +Z-DIRECTION (TAZ)- Qk LOAD 61 WIND LOAD IN +X-DIRECTION (+WLX)- Qk LOAD 62 WIND LOAD IN -X-DIRECTION (-WLX)- Qk LOAD 63 WIND LOAD IN +Z-DIRECTION (+WLZ)- Qk LOAD 64 WIND LOAD IN -Z-DIRECTION (-WLZ)- Qk
LOAD 75 ADDITIONAL 10KN LOAD + 5% AXIAL LOAD OF PIPE OPERATING (PA) 0.825
Loading Combinations and Factors for Steel/Concrete Design
Load Sr. Load 1 2 3 11 12 13 14 15 21 22 23 51 52 53 54 61 62 63 64 75
Conditions No. Comb SQX SQY SQZ DL FP LL CT SL EE/PE EO/PO ET/PT FX FZ TAX TAZ +WLX -WLX +WLZ -WLZ PA
Empty 1 201 . . . 1.49 1.49 - 1.49 . 1.49 . - . . . -2 202 . . . 1.49 1.49 1.65 1.49 . 1.49 . - . . . - . . . . -3 203 . . . 1.32 1.32 1.65 1.32 . 1.32 . - . . . . 1.65 . . . -4 204 . . . 1.32 1.32 1.65 1.32 . 1.32 . - . . . 1.65 . . -5 205 . . . 1.32 1.32 1.65 1.32 . 1.32 . - . . . 1.65 . -6 206 . . . 1.32 1.32 1.65 1.32 . 1.32 . - . . . - 1.65 -7 207 . . . 0.90 0.90 . 0.90 . 0.90 - . - . . . 1.65 . . - . 8 208 . . . 0.90 0.90 . 0.90 . 0.90 - . - . . . . 1.65 . - . 9 209 . . . 0.90 0.90 . 0.90 . 0.90 - . - . . . 1.65 - . 10 210 . . . 0.90 0.90 . 0.90 . 0.90 - . - . . . 1.65 . Operating 11 211 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 1.65 - . . - . 12 212 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 1.65 1.65 . . - . 13 213 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 1.65 - 1.65 . - . 14 214 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 1.65 - . 1.65 - . 15 215 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 1.65 - . . 1.65 . 16 216 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 -1.65 1.65 . . - . 17 217 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 -1.65 - 1.65 . - . 18 218 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 -1.65 - . 1.65 - . 19 219 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - 1.65 -1.65 - . . 1.65 . 20 220 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 1.65 1.65 . . - . 21 221 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 1.65 - 1.65 . - . 22 222 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 1.65 - . 1.65 - . 23 223 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 1.65 - . . 1.65 . 24 224 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 -1.65 1.65 . . - . 25 225 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 -1.65 - 1.65 . - . 26 226 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 -1.65 - . 1.65 - . 27 227 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . - - -1.65 -1.65 - . . 1.65 .
Loading Combinations and Factors for Steel/Concrete Design Test 28 228 - - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 1.65 0.825 . . - . 29 229 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 1.65 - 0.825 . - . 30 230 - - . 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 1.65 . . 0.825 - . 31 231 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 1.65 . . . 0.825 . 32 232 - - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 -1.65 0.825 . . - . 33 233 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 -1.65 - 0.825 . - . 34 234 - - . 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 -1.65 . . 0.825 - . 35 235 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . 1.65 -1.65 . . . 0.825 . 36 236 - - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 1.65 0.825 . . - . 37 237 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 1.65 - 0.825 . - . 38 238 - - . 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 1.65 . . 0.825 - . 39 239 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 1.65 . . . 0.825 . 40 240 - - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 -1.65 0.825 . . - . 41 241 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 -1.65 - 0.825 . - . 42 242 - - . 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 -1.65 . . 0.825 - . 43 243 . - - 1.32 1.32 - 1.32 . 1.32 - 1.65 - . -1.65 -1.65 . . . 0.825 .
Loading Combinations and Factors for Steel/Concrete Design- Local Analysis
Load Sr. Load 1 2 3 11 12 13 14 15 21 22 23 51 52 53 54 61 62 63 64 75
Conditions No. Comb SQX SQY SQZ DL FP LL CT SL EE/PE EO/PO ET/PT FX FZ TAX TAZ +WLX -WLX +WLZ -WLZ PA
Operating 44 244 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 1.65 - - 1.65 . . - 1.65 45 245 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 1.65 - - - 1.65 . - 1.65 46 246 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 1.65 - - - . 1.65 - 1.65 47 247 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 1.65 - - - . . 1.65 1.65 48 248 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 -1.65 - - 1.65 . . - 1.65 49 249 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 -1.65 - - - 1.65 . - 1.65 50 250 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 -1.65 - - - . 1.65 - 1.65 51 251 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . 1.65 -1.65 - - - . . 1.65 1.65 52 252 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 1.65 - - 1.65 . . - 1.65 53 253 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 1.65 - - - 1.65 . - 1.65 54 254 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 1.65 - - - . 1.65 - 1.65 55 255 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 1.65 - - - . . 1.65 1.65 56 256 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 -1.65 - - 1.65 . . - 1.65 57 257 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 -1.65 - - - 1.65 . - 1.65 58 258 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 -1.65 - - - . 1.65 - 1.65 59 259 . . . 1.32 1.32 1.65 1.32 . 1.32 1.65 . -1.65 -1.65 - - - . . 1.65 1.65 Test 60 260 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 1.65 - - 0.825 . . - 1.65 61 261 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 1.65 - - - 0.825 . - 1.65 62 262 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 1.65 - - . . 0.825 - 1.65 63 263 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 1.65 - - . . . 0.825 1.65 64 264 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 -1.65 - - 0.825 . . - 1.65 65 265 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 -1.65 - - - 0.825 . - 1.65 66 266 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 -1.65 - - . . 0.825 - 1.65 67 267 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 1.65 -1.65 - - . . . 0.825 1.65 68 268 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 1.65 - - 0.825 . . - 1.65 69 269 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 1.65 - - - 0.825 . - 1.65 70 270 . . . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 1.65 - - . . 0.825 - 1.65 71 271 - - - 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 1.65 - - . . . 0.825 1.65 72 272 . - - 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 -1.65 - - 0.825 . . - 1.65 73 273 - - . 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 -1.65 - - - 0.825 . - 1.65 74 274 . - - 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 -1.65 - - . . 0.825 - 1.65 75 275 - - - 1.32 1.32 1.65 1.32 . 1.32 . 1.65 -1.65 -1.65 - - . . . 0.825 1.65
PRIMARY LOAD CASES
LOAD 1 SEISMIC IN X-DIRECTION (SQX)- Qk LOAD 2 SEISMIC IN Y-DIRECTION (SQY)- Qk LOAD 3 SEISMIC IN Z-DIRECTION (SQZ)- Qk
LOAD 11 DEAD LOAD (DL)- Gk
LOAD 12 FIREPROOFING LOAD (FP)- Gk
LOAD 13 LIVE LOAD (LL)- Qk
LOAD 14 CABLE TRAY LOAD (CT)- Gk
LOAD 21 EQUIPMENT / PIPING EMPTY LOAD (EE/PE)- Gk LOAD 22 EQUIPMENT / PIPING OPERATING LOAD (EO/PO)- Qk LOAD 23 EQUIPMENT / PIPING TESTING LOAD (ET/PT)- Qk LOAD 51 FRICTION LOAD IN +X-DIRECTION (FX)- Qk LOAD 52 FRICTION LOAD IN +Z-DIRECTION (FZ)- Qk LOAD 53 ANCHOR LOAD IN +X-DIRECTION (TAX)- Qk LOAD 54 ANCHOR LOAD IN +Z-DIRECTION (TAZ)- Qk LOAD 61 WIND LOAD IN +X-DIRECTION (+WLX)- Qk LOAD 62 WIND LOAD IN -X-DIRECTION (-WLX)- Qk LOAD 63 WIND LOAD IN +Z-DIRECTION (+WLZ)- Qk LOAD 64 WIND LOAD IN -Z-DIRECTION (-WLZ)- Qk
LOAD 75 ADDITIONAL 10KN LOAD + 5% AXIAL LOAD OF PIPE OPERATING (PA) Note: Anchor loads are considered in all four quadrans when combined with wind load. Loading Combinations and Factors for Steel/Concrete Design- Global Analysis
Load Sr. Load 1 2 3 11 12 13 14 21 22 23 51 52 53 54 61 62 63 64 75
Conditions No. Comb SQX SQY SQZ DL FP LL CT EE/PE EO/PO ET/PT FX FZ TAX TAZ +WLX -WLX +WLZ -WLZ PA
Empty 1 201 . . . 1.35 1.35 - 1.35 1.35 . - . . . -2 202 . . . 1.35 1.35 1.50 1.35 1.35 . - . . . - . . . . -3 203 . . . 1.20 1.20 1.50 1.20 1.20 . - . . . . 1.50 . . . -4 204 . . . 1.20 1.20 1.50 1.20 1.20 . - . . . 1.50 . . -5 205 . . . 1.20 1.20 1.50 1.20 1.20 . - . . . 1.50 . -6 206 . . . 1.20 1.20 1.50 1.20 1.20 . - . . . - 1.50 -7 207 . . . 0.90 0.90 . 0.90 0.90 - . - . . . 1.50 . . - . 8 208 . . . 0.90 0.90 . 0.90 0.90 - . - . . . . 1.50 . - . 9 209 . . . 0.90 0.90 . 0.90 0.90 - . - . . . 1.50 - . 10 210 . . . 0.90 0.90 . 0.90 0.90 - . - . . . 1.50 . Operating 11 211 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 1.50 - . . - . 12 212 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 1.50 1.50 . . - . 13 213 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 1.50 - 1.50 . - . 14 214 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 1.50 - . 1.50 - . 15 215 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 1.50 - . . 1.50 . 16 216 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 -1.50 1.50 . . - . 17 217 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 -1.50 - 1.50 . - . 18 218 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 -1.50 - . 1.50 - . 19 219 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - 1.50 -1.50 - . . 1.50 . 20 220 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 1.50 1.50 . . - . 21 221 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 1.50 - 1.50 . - . 22 222 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 1.50 - . 1.50 - . 23 223 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 1.50 - . . 1.50 . 24 224 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 -1.50 1.50 . . - . 25 225 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 -1.50 - 1.50 . - . 26 226 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 -1.50 - . 1.50 - . 27 227 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . - - -1.50 -1.50 - . . 1.50 .
Loading Combinations and Factors for Steel/Concrete Design- Global Analysis Test 28 228 - - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 1.50 0.75 . . - . 29 229 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 1.50 - 0.75 . - . 30 230 - - . 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 1.50 . . 0.75 - . 31 231 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 1.50 . . . 0.75 . 32 232 - - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 -1.50 0.75 . . - . 33 233 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 -1.50 - 0.75 . - . 34 234 - - . 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 -1.50 . . 0.75 - . 35 235 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . 1.50 -1.50 . . . 0.75 . 36 236 - - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 1.50 0.75 . . - . 37 237 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 1.50 - 0.75 . - . 38 238 - - . 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 1.50 . . 0.75 - . 39 239 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 1.50 . . . 0.75 . 40 240 - - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 -1.50 0.75 . . - . 41 241 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 -1.50 - 0.75 . - . 42 242 - - . 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 -1.50 . . 0.75 - . 43 243 . - - 1.20 1.20 - 1.20 1.20 - 1.50 - . -1.50 -1.50 . . . 0.75 .
Loading Combinations and Factors for Steel/Concrete Design- Local Analysis
Load Sr. Load 1 2 3 11 12 13 14 21 22 23 51 52 53 54 61 62 63 64 75
Conditions No. Comb SQX SQY SQZ DL FP LL CT EE/PE EO/PO ET/PT FX FZ TAX TAZ +WLX -WLX +WLZ -WLZ PA
Operating 44 244 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 1.50 - - 1.50 . . - 1.50 45 245 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 1.50 - - - 1.50 . - 1.50 46 246 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 1.50 - - - . 1.50 - 1.50 47 247 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 1.50 - - - . . 1.50 1.50 48 248 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 -1.50 - - 1.50 . . - 1.50 49 249 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 -1.50 - - - 1.50 . - 1.50 50 250 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 -1.50 - - - . 1.50 - 1.50 51 251 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . 1.50 -1.50 - - - . . 1.50 1.50 52 252 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 1.50 - - 1.50 . . - 1.50 53 253 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 1.50 - - - 1.50 . - 1.50 54 254 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 1.50 - - - . 1.50 - 1.50 55 255 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 1.50 - - - . . 1.50 1.50 56 256 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 -1.50 - - 1.50 . . - 1.50 57 257 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 -1.50 - - - 1.50 . - 1.50 58 258 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 -1.50 - - - . 1.50 - 1.50 59 259 . . . 1.20 1.20 1.50 1.20 1.20 1.50 . -1.50 -1.50 - - - . . 1.50 1.50 Test 60 260 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 1.50 - - 0.75 . . - 1.50 61 261 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 1.50 - - - 0.75 . - 1.50 62 262 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 1.50 - - . . 0.75 - 1.50 63 263 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 1.50 - - . . . 0.75 1.50 64 264 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 -1.50 - - 0.75 . . - 1.50 65 265 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 -1.50 - - - 0.75 . - 1.50 66 266 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 -1.50 - - . . 0.75 - 1.50 67 267 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 1.50 -1.50 - - . . . 0.75 1.50 68 268 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 1.50 - - 0.75 . . - 1.50 69 269 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 1.50 - - - 0.75 . - 1.50 70 270 . . . 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 1.50 - - . . 0.75 - 1.50 71 271 - - - 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 1.50 - - . . . 0.75 1.50 72 272 . - - 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 -1.50 - - 0.75 . . - 1.50 73 273 - - . 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 -1.50 - - - 0.75 . - 1.50 74 274 . - - 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 -1.50 - - . . 0.75 - 1.50 75 275 - - - 1.20 1.20 1.50 1.20 1.20 . 1.50 -1.50 -1.50 - - . . . 0.75 1.50
PRIMARY LOAD CASES
LOAD 1 SEISMIC IN X-DIRECTION (SQX)- Qk LOAD 2 SEISMIC IN Y-DIRECTION (SQY)- Qk LOAD 3 SEISMIC IN Z-DIRECTION (SQZ)- Qk LOAD 11 DEAD LOAD (DL)- Gk
LOAD 12 FIREPROOFING LOAD (FP)- Gk LOAD 13 LIVE LOAD (LL)- Qk
LOAD 14 CABLE TRAY LOAD (CT)- Gk LOAD 15 SNOW LOAD (SL)- Qk
LOAD 21 EQUIPMENT / PIPING EMPTY LOAD (EE/PE)- Gk LOAD 22 EQUIPMENT / PIPING OPERATING LOAD (EO/PO)- Qk LOAD 23 EQUIPMENT / PIPING TESTING LOAD (ET/PT)- Qk LOAD 51 FRICTION LOAD IN +X-DIRECTION (FX)- Qk LOAD 52 FRICTION LOAD IN +Z-DIRECTION (FZ)- Qk LOAD 53 ANCHOR LOAD IN +X-DIRECTION (TAX)- Qk LOAD 54 ANCHOR LOAD IN +Z-DIRECTION (TAZ)- Qk LOAD 61 WIND LOAD IN +X-DIRECTION (+WLX)- Qk LOAD 62 WIND LOAD IN -X-DIRECTION (-WLX)- Qk LOAD 63 WIND LOAD IN +Z-DIRECTION (+WLZ)- Qk LOAD 64 WIND LOAD IN -Z-DIRECTION (-WLZ)- Qk
LOAD 75 ADDITIONAL 10KN LOAD + 5% AXIAL LOAD OF PIPE OPERATING (PA)
LOAD COMB101 - - - 1.49 1.49 1.65 1.49 1.49 - - -
-LOAD COMB102 - - - 1.49 1.49 1.65 1.49 1.49 - - - 1.49 - -
-LOAD COMB103 - - - 1.49 1.49 1.65 1.49 1.49 - - - 1.49 - - -1.49
LOAD COMB104 - - - 1.49 1.49 1.65 1.49 1.49 - - - -1.49 1.49
-LOAD COMB105 - - - 1.49 1.49 1.65 1.49 1.49 - - - -1.49 - -1.49
DEAD LOAD + FIRE PROOFING + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND (SHUT DOWN )
LOAD COMB106 - - - 0.9 0.9 - 0.9 0.9 - - - 1.49 - 1.49 -LOAD COMB107 - - - 0.9 0.9 - 0.9 0.9 - - - 1.49 - - -1.49 LOAD COMB108 - - - 0.9 0.9 - 0.9 0.9 - - - -1.49 1.49 -LOAD COMB109 - - - 0.9 0.9 - 0.9 0.9 - - - -1.49 - -1.49 OPERATING CONDITION LOAD COMB110 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 1.49 1.49 - 1.49 -LOAD COMB111 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 1.49 1.49 - - -1.49 LOAD COMB112 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 1.49 - -1.49 1.49 -LOAD COMB113 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 1.49 - -1.49 - -1.49
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE OPERATING + ANCHOR LOAD + WIND LOAD
LOAD 64 (-WLZ) ULTIMATE LIMIT STATE (ULS)
LOAD COMBINATION USED FOR FOUNDATION AND STEEL DESIGN EMPTY CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY
LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP)
LOAD 64 (-WLZ) LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP) LOAD COMB114 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 -1.49 1.49 - 1.49 -LOAD COMB115 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 -1.49 1.49 - - -1.49 LOAD COMB116 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 -1.49 - -1.49 1.49 -LOAD COMB117 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - 1.49 -1.49 - -1.49 - -1.49 LOAD COMB118 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 1.49 1.49 - 1.49 -LOAD COMB119 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 1.49 1.49 - - -1.49 LOAD COMB120 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 1.49 - -1.49 1.49 -LOAD COMB121 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 1.49 - -1.49 - -1.49 LOAD COMB122 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 -1.49 1.49 - 1.49 -LOAD COMB123 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 -1.49 1.49 - - -1.49 LOAD COMB124 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 -1.49 - -1.49 1.49 -LOAD COMB125 - - - 1.49 1.49 1.65 1.49 - 1.49 - - - -1.49 -1.49 - -1.49 - -1.49 LOAD COMB126 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 1.49 0.75 - 0.75 -LOAD COMB127 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 1.49 0.75 - - -0.75 LOAD COMB128 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 1.49 - -0.75 0.75 -LOAD COMB129 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 1.49 - -0.75 - -0.75 LOAD COMB130 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 -1.49 0.75 - 0.75 -LOAD COMB131 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 -1.49 0.75 - - -0.75 LOAD COMB132 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 -1.49 - -0.75 0.75 -LOAD COMB133 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - 1.49 -1.49 - -0.75 - -0.75 LOAD COMB134 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 1.49 0.75 - 0.75 -LOAD COMB135 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 1.49 0.75 - - -0.75 LOAD COMB136 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 1.49 - -0.75 0.75 -LOAD COMB137 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 1.49 - -0.75 - -0.75 LOAD COMB138 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 -1.49 0.75 - 0.75 -LOAD COMB139 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 -1.49 0.75 - - -0.75 LOAD COMB140 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 -1.49 - -0.75 0.75 -LOAD COMB141 - - - 1.49 1.49 1.65 1.49 - - 1.49 - - -1.49 -1.49 - -0.75 - -0.75 LOAD COMB150 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 1.49 - - 1.49 - 1.49 -LOAD COMB151 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 1.49 - - 1.49 - - -1.49 LOAD COMB152 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 1.49 - - - -1.49 1.49 -LOAD COMB153 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 1.49 - - - -1.49 - -1.49 LOAD COMB154 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 -1.49 - - 1.49 - 1.49 -LOAD COMB155 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 -1.49 - - 1.49 - - -1.49 LOAD COMB156 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 -1.49 - - - -1.49 1.49 -LOAD COMB157 - - - 1.49 1.49 1.65 1.49 - 1.49 - 1.49 -1.49 - - - -1.49 - -1.49 LOAD COMB158 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 1.49 - - 1.49 - 1.49 -LOAD COMB159 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 1.49 - - 1.49 - - -1.49 LOAD COMB160 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 1.49 - - - -1.49 1.49 -LOAD COMB161 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 1.49 - - - -1.49 - -1.49 LOAD COMB162 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 -1.49 - - 1.49 - 1.49 -HYDROTEST CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + ANCHOR LOAD + REDUCED WIND LOAD
LOAD COMBINATION USED FOR LOCAL BEAM DESIGN
LOAD 64 (-WLZ) LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP) LOAD COMB163 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 -1.49 - - 1.49 - - -1.49 LOAD COMB164 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 -1.49 - - - -1.49 1.49 -LOAD COMB165 - - - 1.49 1.49 1.65 1.49 - 1.49 - -1.49 -1.49 - - - -1.49 - -1.49 LOAD COMB166 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 1.49 - - 0.75 - 0.75 -LOAD COMB167 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 1.49 - - 0.75 - - -0.75 LOAD COMB168 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 1.49 - - - -0.75 0.75 -LOAD COMB169 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 1.49 - - - -0.75 - -0.75 - -LOAD COMB170 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 -1.49 - - 0.75 - 0.75 -LOAD COMB171 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 -1.49 - - 0.75 - - -0.75 LOAD COMB172 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 -1.49 - - - -0.75 0.75 -LOAD COMB173 - - - 1.49 1.49 1.65 1.49 - - 1.49 1.49 -1.49 - - - -0.75 - -0.75 - -LOAD COMB174 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 1.49 - - 0.75 - 0.75 -LOAD COMB175 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 1.49 - - 0.75 - - -0.75 LOAD COMB176 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 1.49 - - - -0.75 0.75 -LOAD COMB177 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 1.49 - - - -0.75 - -0.75 - -LOAD COMB178 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 -1.49 - - 0.75 - 0.75 -LOAD COMB179 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 -1.49 - - 0.75 - - -0.75 LOAD COMB180 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 -1.49 - - - -0.75 0.75 -LOAD COMB181 - - - 1.49 1.49 1.65 1.49 - - 1.49 -1.49 -1.49 - - - -0.75 - -0.75
-DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE OPERATING + ANCHOR LOAD + WIND LOAD
LOAD 75 (PA) ULTIMATE LIMIT STATE (ULS)
LOAD COMBINATION USED FOR FOUNDATION AND STEEL DESIGN EMPTY CONDITION
LOAD 75 (PA) -1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 HYDROTEST CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + ANCHOR LOAD + REDUCED WIND LOAD
LOAD COMBINATION USED FOR LOCAL BEAM DESIGN
LOAD 75 (PA) 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + FRICTION LOAD + REDUCED WIND LOAD + ADDITIONAL LOAD
PRIMARY LOAD CASES
LOAD 1 SEISMIC IN X-DIRECTION (SQX) LOAD 2 SEISMIC IN Y-DIRECTION (SQY) LOAD 3 SEISMIC IN Z-DIRECTION (SQZ) LOAD 11 DEAD LOAD (DL)
LOAD 12 FIREPROOFING LOAD (FP) LOAD 13 LIVE LOAD (LL)
LOAD 14 CABLE TRAY LOAD (CT)
LOAD 21 EQUIPMENT / PIPING EMPTY LOAD (EE/PE) LOAD 22 EQUIPMENT / PIPING OPERATING LOAD (EO/PO) LOAD 23 EQUIPMENT / PIPING TESTING LOAD (ET/PT) LOAD 51 FRICTION LOAD IN +X-DIRECTION (FX) LOAD 52 FRICTION LOAD IN +Z-DIRECTION (FZ) LOAD 53 ANCHOR LOAD IN +X-DIRECTION (TAX) LOAD 54 ANCHOR LOAD IN +Z-DIRECTION (TAZ) LOAD 61 WIND LOAD IN +X-DIRECTION (+WLX) LOAD 62 WIND LOAD IN -X-DIRECTION (-WLX) LOAD 63 WIND LOAD IN +Z-DIRECTION (+WLZ) LOAD 64 WIND LOAD IN -Z-DIRECTION (-WLZ)
LOAD 75 ADDITIONAL 10KN LOAD + 5% AXIAL LOAD OF PIPE OPERATING (PA)
- - - 1 1 1 1 1 - - - -LOAD COMB202 - - - 1 1 1 1 1 - - - 1 - 1 -LOAD COMB203 - - - 1 1 1 1 1 - - - 1 - - -1 LOAD COMB204 - - - 1 1 1 1 1 - - - -1 1 -LOAD COMB205 - - - 1 1 1 1 1 - - - -1 - -1 LOAD COMB206 - - - 1 1 - 1 1 - - - 1 - 1 -LOAD COMB207 - - - 1 1 - 1 1 - - - 1 - - -1 LOAD COMB208 - - - 1 1 - 1 1 - - - -1 1 -LOAD COMB209 - - - 1 1 - 1 1 - - - -1 - -1 LOAD COMB210 - - - 1 1 1 1 - 1 - - - 1 1 1 - 1 -LOAD COMB211 - - - 1 1 1 1 - 1 - - - 1 1 1 - - -1 LOAD COMB212 - - - 1 1 1 1 - 1 - - - 1 1 - -1 1 -LOAD COMB213 - - - 1 1 1 1 - 1 - - - 1 1 - -1 - -1 LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP) LOAD 64 (-WLZ) SEVICEBILITY LIMIT STATE (SLS)
LOAD COMBINATION USED FOR FOUNDATION AND STEEL DESIGN EMPTY CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY
LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD COMB201
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND
DEAD LOAD + FIRE PROOFING + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND (SHUT DOWN )
OPERATING CONDITION
LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP) LOAD 64 (-WLZ) LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD COMB214 - - - 1 1 1 1 - 1 - - - 1 -1 1 - 1 -LOAD COMB215 - - - 1 1 1 1 - 1 - - - 1 -1 1 - - -1 LOAD COMB216 - - - 1 1 1 1 - 1 - - - 1 -1 - -1 1 -LOAD COMB217 - - - 1 1 1 1 - 1 - - - 1 -1 - -1 - -1 - - - 1 1 1 1 - 1 - - - -1 1 1 - 1 -LOAD COMB219 - - - 1 1 1 1 - 1 - - - -1 1 1 - - -1 LOAD COMB220 - - - 1 1 1 1 - 1 - - - -1 1 - -1 1 -LOAD COMB221 - - - 1 1 1 1 - 1 - - - -1 1 - -1 - -1 LOAD COMB222 - - - 1 1 1 1 - 1 - - - -1 -1 1 - 1 -LOAD COMB223 - - - 1 1 1 1 - 1 - - - -1 -1 1 - - -1 LOAD COMB224 - - - 1 1 1 1 - 1 - - - -1 -1 - -1 1 -LOAD COMB225 - - - 1 1 1 1 - 1 - - - -1 -1 - -1 - -1 LOAD COMB226 - - - 1 1 1 1 - - 1 - - 1 1 0.5 - 0.5 -LOAD COMB227 - - - 1 1 1 1 - - 1 - - 1 1 0.5 - - -0.5 LOAD COMB228 - - - 1 1 1 1 - - 1 - - 1 1 - -0.5 0.5 -LOAD COMB229 - - - 1 1 1 1 - - 1 - - 1 1 - -0.5 - -0.5 LOAD COMB230 - - - 1 1 1 1 - - 1 - - 1 -1 0.5 - 0.5 -LOAD COMB231 - - - 1 1 1 1 - - 1 - - 1 -1 0.5 - - -0.5 LOAD COMB232 - - - 1 1 1 1 - - 1 - - 1 -1 - -0.5 0.5 -LOAD COMB233 - - - 1 1 1 1 - - 1 - - 1 -1 - -0.5 - -0.5 LOAD COMB234 - - - 1 1 1 1 - - 1 - - -1 1 0.5 - 0.5 -LOAD COMB235 - - - 1 1 1 1 - - 1 - - -1 1 0.5 - - -0.5 LOAD COMB236 - - - 1 1 1 1 - - 1 - - -1 1 - -0.5 0.5 -LOAD COMB237 - - - 1 1 1 1 - - 1 - - -1 1 - -0.5 - -0.5 LOAD COMB238 - - - 1 1 1 1 - - 1 - - -1 -1 0.5 - 0.5 -LOAD COMB239 - - - 1 1 1 1 - - 1 - - -1 -1 0.5 - - -0.5 LOAD COMB240 - - - 1 1 1 1 - - 1 - - -1 -1 - -0.5 0.5 -LOAD COMB241 - - - 1 1 1 1 - - 1 - - -1 -1 - -0.5 - -0.5 LOAD COMB250 - - - 1 1 1 1 - 1 - 1 1 - - 1 - 1 -LOAD COMB251 - - - 1 1 1 1 - 1 - 1 1 - - 1 - - -1 LOAD COMB252 - - - 1 1 1 1 - 1 - 1 1 - - - -1 1 -LOAD COMB253 - - - 1 1 1 1 - 1 - 1 1 - - - -1 - -1 LOAD COMB254 - - - 1 1 1 1 - 1 - 1 -1 - - 1 - 1 -LOAD COMB255 - - - 1 1 1 1 - 1 - 1 -1 - - 1 - - -1 LOAD COMB256 - - - 1 1 1 1 - 1 - 1 -1 - - - -1 1 -LOAD COMB257 - - - 1 1 1 1 - 1 - 1 -1 - - - -1 - -1 LOAD COMB258 - - - 1 1 1 1 - 1 - -1 1 - - 1 - 1 -LOAD COMB259 - - - 1 1 1 1 - 1 - -1 1 - - 1 - - -1 LOAD COMB260 - - - 1 1 1 1 - 1 - -1 1 - - - -1 1 -LOAD COMB261 - - - 1 1 1 1 - 1 - -1 1 - - - -1 - -1 LOAD COMB218 HYDROTEST CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + ANCHOR LOAD + REDUCED WIND LOAD
LOAD COMBINATION USED FOR LOCAL BEAM DESIGN
LOAD 22 (EO/PO) LOAD 23 (ET/PT) LOAD 51 (FX) LOAD COMBINATION LOAD 1 (SQX) LOAD 2 (SQY) LOAD 3 (SQZ) LOAD 11 (DL) LOAD 12 (FP) LOAD 64 (-WLZ) LOAD 52 (FZ) LOAD 53 (TAX) LOAD 54 (TAZ) LOAD 61 (+WLX) LOAD 62 (-WLX) LOAD 63 (+WLZ) LOAD 13 (LL) LOAD 14 (CT) LOAD 21 (EE/PE) LOAD COMB262 - - - 1 1 1 1 - 1 - -1 -1 - - 1 - 1 -LOAD COMB263 - - - 1 1 1 1 - 1 - -1 -1 - - 1 - - -1 LOAD COMB264 - - - 1 1 1 1 - 1 - -1 -1 - - - -1 1 -LOAD COMB265 - - - 1 1 1 1 - 1 - -1 -1 - - - -1 - -1 LOAD COMB266 - - - 1 1 1 1 - - 1 1 1 - - 0.5 - 0.5 -LOAD COMB267 - - - 1 1 1 1 - - 1 1 1 - - 0.5 - - -0.5 LOAD COMB268 - - - 1 1 1 1 - - 1 1 1 - - - -0.5 0.5 -LOAD COMB269 - - - 1 1 1 1 - - 1 1 1 - - - -0.5 - -0.5 - -LOAD COMB270 - - - 1 1 1 1 - - 1 1 -1 - - 0.5 - 0.5 -LOAD COMB271 - - - 1 1 1 1 - - 1 1 -1 - - 0.5 - - -0.5 LOAD COMB272 - - - 1 1 1 1 - - 1 1 -1 - - - -0.5 0.5 -- - - 1 1 1 1 - - 1 1 -1 - - - -0.5 - -0.5 - -LOAD COMB274 - - - 1 1 1 1 - - 1 -1 1 - - 0.5 - 0.5 -LOAD COMB275 - - - 1 1 1 1 - - 1 -1 1 - - 0.5 - - -0.5 LOAD COMB276 - - - 1 1 1 1 - - 1 -1 1 - - - -0.5 0.5 -LOAD COMB277 - - - 1 1 1 1 - - 1 -1 1 - - - -0.5 - -0.5 - -LOAD COMB278 - - - 1 1 1 1 - - 1 -1 -1 - - 0.5 - 0.5 -LOAD COMB279 - - - 1 1 1 1 - - 1 -1 -1 - - 0.5 - - -0.5 LOAD COMB280 - - - 1 1 1 1 - - 1 -1 -1 - - - -0.5 0.5 -LOAD COMB281 - - - 1 1 1 1 - - 1 -1 -1 - - - -0.5 - -0.5
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + FRICTION LOAD + REDUCED WIND LOAD + ADDITIONAL LOAD
-LOAD 75 (PA) SEVICEBILITY LIMIT STATE (SLS)
LOAD COMBINATION USED FOR FOUNDATION AND STEEL DESIGN EMPTY CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND
DEAD LOAD + FIRE PROOFING + CABLE TRAY + EQUIPMENT / PIPE EMPTY + WIND (SHUT DOWN )
OPERATING CONDITION
LOAD 75 (PA) -1 1 1 1 1 1 1 1 1 1 1 1 HYDROTEST CONDITION
DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + ANCHOR LOAD + REDUCED WIND LOAD
LOAD COMBINATION USED FOR LOCAL BEAM DESIGN
LOAD 75 (PA) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DEAD LOAD + FIRE PROOFING + LIVE LOAD + CABLE TRAY + EQUIPMENT / PIPE TESTING + FRICTION LOAD + REDUCED WIND LOAD + ADDITIONAL LOAD