ABOVE GUIDELINE RENT INCREASE [AGI] What You Should Know

N/A
N/A
Protected

Academic year: 2021

Share "ABOVE GUIDELINE RENT INCREASE [AGI] What You Should Know"

Copied!
19
0
0

Loading.... (view fulltext now)

Full text

(1)

ABOVE GUIDELINE RENT INCREASE [AGI]

What You Should Know

(2)

SOME BASICS

• As we know only too well, an annual rent increase is allowed by law - subject to a guideline % set by the Province

• Landlords can apply to the Landlord & Tenant Board to increase rents by a greater amount

• The Residential Tenancies Act [2006]

established clearer rules as to what is allowed – which can work to the advantage of either side

(3)

SOME BASICS

• When an application is made you must be

notified in writing 90 days before the date it will – if approved – take effect. This will be the same

date as your “normal” annual increase. We will all see one in due course for 2016

• The Landlord must make the information &

records about the application available to you if you so request

• There will be a hearing before the Board – you

will be told the time & place. Probably May 2016 at the earliest!

(4)

SOME BASICS

• You have the right to appear at the hearing to challenge ALL or PART of the requested

increase

• If you wish you can authorize – IN WRITING – someone to appear on your behalf

• The Board’s decision applies to ALL residents – not just those who appear at the hearing

(5)

SOME BASICS

• You do not have to start paying the AGI part of the total increase on your due date unless it has been approved by that date

• You DO have to pay the “annual guideline

increase” portion and you can choose to pay the AGI as well

• IF the AGI is approved after your date & you have not been paying, you must pay the

arrears in a lump sum

(6)

SOME BASICS

• If you have been paying the AGI and it is not approved OR reduced you will get a refund

• You must let Parkbridge know if you want to start paying the AGI immediately on the due date – they will act as if you do NOT unless so informed

(7)

Reality check

• As we noted earlier, the new rules are

considerably clearer as to what may or may not be the subject of an AGI application

• The Association would not be doing residents any favours by raising false hopes or

expectations as to the possibility of challenging ALL of the present application

• Let’s look at the details which are taken directly from a Landlord & Tenant Board document

(8)

THE LANDLORD MAY APPLY IF:

• The landlord’s costs for municipal taxes and/or utilities (heat, water and electricity combined) have increased by an “extraordinary” amount.

• The landlord did “extraordinary” or

“significant” renovations, repairs,

replacements or new additions. This type of work is called a “capital expenditure”

(9)

MUNICIPAL TAXES

• An increase in costs for taxes is considered

“extraordinary” if it is greater than the annual guideline increase for the calendar year in

which the increase requested will take effect plus 50% of that guideline.

• The Guideline for 2016 is 2% so the tax portion paid by Parkbridge must have increased more than 3%

(10)

CAPITAL EXPENDITURES

• When deciding whether to allow a capital expenditure, the Board must consider:

• Whether the work meets the definition of a capital expenditure in the regulations to the Act

• When the work was done

• Whether the work is “eligible”

• If an item was replaced, whether it needed replacing.

(11)

CAPITAL EXPENDITURES

• A capital expenditure is an amount that was spent for an extraordinary or significant

renovation, repair, replacement or new addition that has an expected benefit of at least five years.

It does not include:

• Routine or ordinary work

• Regular maintenance work

• Work that is considered substantially cosmetic in nature

• Work that is designed to enhance the level of prestige or luxury offered by the complex

(12)

ELIGIBLE CAPITAL EXPENDITURES

• A capital expenditure is eligible if it:

• Is necessary to protect or restore the physical integrity of the complex

• Is necessary to maintain health, safety or housing standards

• Is necessary to maintain plumbing, heating,

mechanical, electrical, ventilation or air conditioning systems

• Provides access to persons with disabilities

• Promotes energy or water conservation

• Maintains or improves the security of the complex

(13)

PARKBRIDGE ARE REQUESTING FOR:

• Municipal Taxes

• Chair Lifts at the Wheel

• Replacement of failed equipment at our water pumping station

• Tree removal & trimming

• Road Work

(14)

MUNICIPAL TAXES

• The documentation provided by Parkbridge supports an “extraordinary” increase

• This is caused by a combination of increases in property tax rates and MPAC’s assessment of property value

• Certain information has not been provided due to privacy issues. We intend to explore this as it may reduce the amount claimed

(15)

WHEEL CHAIR LIFTS

• This is clearly an eligible capital expenditure and can not be challenged

(16)

WATER PUMPING STATION

• The failed equipment that was replaced is required by law as part of the water testing requirements

• As such it is a health issue and is, again, clearly eligible and can not be challenged

• In any event, the $ amount is insignificant

(17)

TREE REMOVAL & TRIMMING

• In the opinion of the Association this is NOT capital expenditure – for several reasons - but maintenance and will be challenged

(18)

ROAD WORK

• This is for work of the type that has been

recently carried out on Broadway and other areas.

• It would appear to covered by the “significant renovations, repairs or replacements”

definition and, if so, would be “eligible”

• There are potential arguments against this – however a legal opinion would be needed before considering a challenge

(19)

IN SUMMARY:

• The Association will challenge on the matter of tree removal & trimming

• We will seek a closer examination of the amount in regard to taxes

• We continue to examine the claims in respect of Road Work & will challenge if practical

• If you wish to challenge personally [in addition to the Association] you are entitled to so do

References

Related documents

By first analysing the image data in terms of the local image structures, such as lines or edges, and then controlling the filtering based on local information from the analysis

Main exclusion criteria were: botulinum toxin injections in the past 6 months, nerve stimulation therapy for OAB treatment except for successful PTNS treatment, obvious

Neosporno je da su graditelji hramova promišljeno odabrali najbolje lokacije te orijentaciju hrama, ali ono što neki autori, s pravom, zamjećuju, jest problem

Teachers do not become the giver knowledge or the controller, even the authority (Harmer, 2001). Students by themselves look for the knowledge from as many resources as

As emissions trading increas- es the production costs of the elec- tricity produced from fossil fuels, it will also raise the price of electricity in the wholesale market..

Our aim was to investigate the relationship between frequent internet use and patterns of health or social care resource use in primary care attendees who took part in a

Results indicated that the accuracy of the methods was comparable, but that the Lagrangian method was more computationally efficient for analysis of large water distribution

ASEAN-plus-one FTAs, it will reduce trade diversion effect at least among plus-one countries such as China, Korea and Japan, and will expand trade creation