• No results found

Water quality modeling: a Brazilian experience in water resource management for decision making in wastewater treatment plants

N/A
N/A
Protected

Academic year: 2020

Share "Water quality modeling: a Brazilian experience in water resource management for decision making in wastewater treatment plants"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Ribeirão das Botas Stream Location Map.
Figure 2. Single-line diagram of the Ribeirão das Botas Stream
Table 1. Water analysis results
Figure 3. DBO and DO profiles of the scenarios

References

Related documents

In addition, the disclosure of information on all liabilities, including government long-term liabilities (for example, pensions), prompts public sector employees to make

Vendor/Contractor further certifies that it will not enter into a contract with a subcontractor who fails to certify to Vendor/Contractor that the subcontractor shall not

On motion by Councilwoman McDonough, seconded by Councilman Barile, with all members of the Town Board present and voting “aye”, the minutes of the Town Board meeting held

It has been accepted for inclusion in Health Policy and Management Faculty Presentations by an authorized administrator of Digital Commons@Georgia Southern.. For more

The C.A.T (Cable Avoidance Tool) can detect signals naturally radiating from metallic services or the Genny can be used to apply a distinctive signal that the C.A.T can detect..

When you click the [Patient Info] button, the system will display a list of all patients in your trial, but not patients who have been withdrawn... 12 If you do not have permission

When combinations which do not include a power-law component are used, the range of ages that produce acceptable fits is 0. 1, with reddenings in