• No results found

AUTOMATIC SPRINKLER SYSTEMS

N/A
N/A
Protected

Academic year: 2021

Share "AUTOMATIC SPRINKLER SYSTEMS"

Copied!
26
0
0

Loading.... (view fulltext now)

Full text

(1)

POINT OF CONNECTION POINT OF DEMOLITION DRAWING NOTE

DRAWING NUMBER

FIRE PROTECTION SYMBOL LIST

PLAN NUMBER DEMOLITION NOTE

EQUIPMENT NUMBER EQUIPMENT TYPE 1

FP 1 FP0.01

? ?

NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT

FITTINGS

VALVES

FIRE PROTECTION SYMBOL LIST

DESIGNATION DESIGNATION

ANNOTATIONS ABBREVIATIONS FIRE PROTECTION GENERAL NOTES FIRE PROTECTION SPECIFICATIONS

PLUMBING DEMOLITION GENERAL NOTES

F

# FSP

# SP

#

M

S W

DIRECTION OF FLOW ARROW

OS&Y VALVE

TOP CONNECTION

VALVED CAPPED OUTLET

PIPE DROP UNLESS PIPE-UP UNLESS

WATER PROOF SLEEVE

SHUT OFF VALVE

REDUCED PRESSURE ZONE

FIRE STANDPIPE RISER DESIGNATION

COMBINED STANDPIPE AND

CHECK VALVE

STOP VALVE RPZ

HIGH

LOW DROP OR RISE

UNION

SPRINKLER RISER DESIGNATION

STRAINER

UNION CURB VALVE

MOTORIZED VALVE -

SOLENOID VALVE

(DROP) (RISE) ELECTRIC

PRESSURE REDUCING

QUICK CLOSE VALVE QUICK OPEN VALVE VALVE

VALVE IN VERTICAL VALVE IN VERTICAL

A AIR

ABD AUTOMATIC BALL DRIP ABV ABOVE

AD AREA DRAIN / ACCESS DOOR AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION AVG AVERAGE

BE BELOW EQUIPMENT BFF BELOW FINISHED FLOOR BFG BELOW FINISHED GRADE BFP BACK FLOW PREVENTER BLW BELOW

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR CI CAST IRON

CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CFS CUBIC FEET PER SECOND CLG CEILING

CO CLEANOUT COL COLUMN CV CURB VALVE CW COLD WATER COL COLUMN CONC CONCRETE CONT CONTINUATION CP CHROME PLATE DN DOWN

DP DEEP DIA DIAMETER DR DRAIN DWG DRAWING E EXISTING EA EACH

ED EJECTOR DISCHARGE EFF EFFICIENCY

EJ EJECTOR EL ELEVATION ELEC ELECTRICAL

ER EXISTING TO BE RELOCATED EQUIP EQUIPMENT

F FIRE LINE

FCA FLOOR CONTROL ASSEMBLY FD FLOOR DRAIN

FDV FIRE DEPARTMENT VALVE FFD FUNNEL FLOOR DRAIN FF EL FINISHED FLOOR ELEVATION FP FIRE PROTECTION

FPM FEET PER MINUTE FPS FEET PER SECOND FT FOOT, FEET FW FIRE WATER FUD FUNNEL DRAIN GAL GALLON GALV GALVANIZED GPD GALLONS PER DAY GPH GALLONS PER HOUR GPM GALLONS PER MINUTE HC HUNG CEILING HDS HEADS HOR HORIZONTAL HP HORSEPOWER HR HOUR

HT HEIGHT HTR HEATER

HVAC HEATING, VENTILATING & AIR CONDITIONING HZ HERTZ

ID INSIDE DIAMETER IE INVERT ELEVATION IN INCH

INCL. INCLUDING IW INDIRECT WASTE JC JANITORS CLOSET JS JANITOR SINK KW KILOWATT L LENGTH LB POUND(S) LPD LITERS PER DAY LPM LITERS PER MINUTE MAX MAXIMUM

MECH MECHANICAL

MER MECHANICAL EQUIPMENT ROOM MFR. MANUFACTURER

MH MANHOLE MIN MINIMUM MTD MOUNTED

N NEW

N/A NOT APPLICABLE NC NORMALLY CLOSED NFHB NON-FREEZE HOSE BIBB NIC NOT IN CONTRACT NS NO SCALE NTS NOT TO SCALE O.C. ON CENTER OD OUTSIDE DIAMETER PD PUMP DISCHARGE PG PRESSURE GAUGE PH PHASE

PLBG PLUMBING PRES PRESSURE

PRV PRESSURE REDUCING VALVE PS PRESSURE SWICH

PSI POUNDS PER SQUARE INCH R REMOVE

RCV RISER CONTROL VALVE RE RELOCATED EXISTING REC RECESSED

REV REVISED, REVISION RPM REVOLUTIONS PER MINUTE RM ROOM

RW RAIN WATER

RWC RAIN WATER CONDUCTOR RTU ROOF TOP UNIT

SCH SCHEDULE SPEC SPECIFICATIONS SP SPRINKLER

SF SQUARE FOOT, FEET SL SLEEVE

STD STANDARD STL STEEL

SQ. FT. SQUARE FEET (FOOT) TEMP TEMPERATURE

TS TAMPER SWITCH TYP TYPICAL

V VENT

VEL VELOCITY VERT VERTICAL

W WIDTH

W/ WITH

WFS WATER FLOW SWITCH WP WATER-PROOF WT WEIGHT PIPING END CAP

PIPE PITCH DESIGNATION .01

BOTTOM CONNECTION

SLOPE AT 1/8"/FT

OTHERWISE NOTED OTHERWISE NOTED NEW CONNECTION

NEW CONNECTION

NEW CONNECTION

(INSERTION)

NEW TOP CONNECTION (INSERTION)

(ANGLED) STRAINER REVISION CLOUD AND DELTA

#

FLOAT VALVE

POST INDICATOR P

SEISMIC GAS CONTROL VALVE (SGVC)

THROTTLING VALVE INSULATED AND FOAM FIRE FO

UNDERFLOOR FIRE U

IN INERGEN FIRE

FM200 FIRE FM

2 A

CO CARBON DIOXIDE

COMPRESSED AIR ASP ANTIFREEZE FILLED

SP F

PIPE GUIDE SPRINKLER PIPING

UNDERGROUND PIPING FIRE STANDPIPE

PIPE ANCHOR EXISTING PIPING

ECCENTRIC REDUCER CONCENTRIC REDUCER PIPE SLEEVE THRU WALL

FSP COMBINED STANDPIPE

DR SPRINKLER DRAIN

DRY FIRE STANDPIPE DF

DRY SPRINKLER PIPING DSP

PREACTION

DELUGE SPRINKLER PIPING DE

PSP

PRESSURE GAUGE

DOUBLE DETECTOR DDCVA

CHECK VALVE ASSEMBLY AUTOMATIC AIR VENT

SPRINKLER RISER DESIGNATION

FIRE SUPPRESSION PIPING SPRINKLER PIPING

AND SPRINKLER PIPING

HEAT TRACED PIPING SUPPRESSION PIPING

SUPPRESSION PIPING SUPPRESSION PIPING SUPPRESSION PIPING

SPRINKLER PIPING

VALVED CAPPED OUTLET

OS&Y VALVE WITH TAMPER SWITCH SPRINKLER FLOOR

WATER FLOW SWITCH CONTROL VALVE ASSEMBLY NEW PIPING

FIRE WATER FW

EXISTING SPRINKLER

NEW SPRINKLER

U UPRIGHT SPRINKLER

OFFSET EXISTING LOCATION WITH NEW SPRINKLER SIDE WALL SPRINKLER

B UPRIGHT SPRINKLER

EXTENDED SIDE WALL SPRINKLER EXISTING SIDE WALL SPRINKLER

BELOW OBSTRUCTION PENDANT/CONCEALED

FCA

AUTOMATIC SPRINKLER SYSTEMS

A. ALL MATERIALS, SPRINKLER DEVICES, PIPE, FITTINGS, VALVES, HANGERS, AND THE LIKE, USED IN THE SYSTEM, SHALL BE UL APPROVED OR ACCEPTABLE LIST OF THE CURRENT ISSUE OF INSPECTED FIRE PROTECTION EQUIPMENT AND MATERIALS AS PUBLISHED BY THE UNDERWRITERS' LABORATORIES INC., AND SHALL BE SUBJECT TO APPROVAL AND SHALL BE IN ACCORDANCE WITH THE OWNER'S STANDARDS.

B. THE WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF PAMPHLET NO. 13 & 14 OF THE NATIONAL FIRE PROTECTION ASSOCIATION & TO ALL APPLICABLE REQUIREMENTS OF THE BOCA BUILDING CODE.

C. ALL PIPING, EQUIPMENT AND OTHER WORK TO BE PERFORMED UNDER THIS SECTION SHALL BE LAID OUT AND INSTALLED WITH THE COMPLETE WORK OF ALL OTHER TRADES IN MIND. THE CONTRACTOR IS CAUTIONED THAT CLOSE COORDINATION BETWEEN TRADES WILL BE REQUIRED FOR THE SUCCESSFUL COMPLETION OF THIS WORK, AND IN CASE INTERFERENCE'S WITH THE WORK UNDER OTHER SECTIONS SHOULD DEVELOP, THE ENGINEER WILL DETERMINE WHICH WORK SHALL BE RELOCATED, REGARDLESS OF WHICH WAS FIRST INSTALLED, AT NO ADDITIONAL COST TO THE OWNER.

D. RELOCATE EXISTING PIPING AND PROVIDE NEW SPRINKLERS AS REQUIRED TO SUITE THE NEW LAYOUTS TO PROVIDE THE REQUIRED COVERAGE. REMOVE PIPING AROUND EXISTING AND NEW DUCT WORK, PIPING, AND UTILITIES TO MAKE THE SPRINKLER INSTALLATION POSSIBLE. THE USE OF EXISTING SPRINKLERS SHALL BE PROHIBITED.

E. THE CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AND SHOP DRAWINGS SHOWING THE SYSTEM AND ITS COMPLETE ARRANGEMENT. SUBMITTED DRAWINGS AND CALCULATIONS SHALL BEAR UNDERWRITER APPROVAL STAMP. SHOP DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED TO THE OWNERS INSURANCE COMPANY.

F. ALL GATE, GLOBE, AND CHECK VALVES SHALL BE PROVIDED AS REQUIRED. VALVES SHALL BE OF TYPES SUITABLE FOR THE INTENDED SERVICE, WITH UNDERWRITER'S APPROVAL, AND SHALL BE SUITABLE FOR NOT LESS THAN 175-PSI WATER WORKING PRESSURE. GATE AND GLOBE VALVES SHALL BE OF A TYPE THAT MAY BE REPACKED UNDER PRESSURE WHEN WIDE OPEN. DRAINAGE AND TEST VALVES SHALL BE ALL BRONZE, O.S. & Y. PATTERN, WITH THREADED ENDS.

G. ALL MATERIALS, SPRINKLER DEVICES, PIPE, FITTINGS, VALVES, HANGERS, AND THE LIKE, USED IN THE SYSTEM, SHALL BE ON THE APPROVED OR ACCEPTABLE LIST OF THE CURRENT ISSUE OF INSPECTED FIRE PROTECTION EQUIPMENT AND MATERIALS AS PUBLISHED BY THE UNDERWRITERS' LABORATORIES INC., AND SHALL BE APPROVED BY FMG.

H. THE EQUIPMENT, PIPING AND OTHER ITEMS SHALL BE SUBJECT TO INSPECTION AND APPROVAL. TESTS MAY BE PERFORMED AT ANY TIME DURING INSTALLATION, AND UPON COMPLETION OF THE INSTALLATION.

APPROVAL TESTS SHALL BE AS LISTED IN THE CURRENT ISSUE OF PAMPHLET NO. 13 OF NFPA AND SHALL MEET LOCAL CODE OFFICIALS REQUIREMENTS. TESTS SHALL BE PROPERLY PERFORMED IN THE PRESENCE OF THE ARCHITECTS AND IF NECESSARY, BE REPEATED UNTIL THE INSTALLATION IS APPROVED.

1. PIPE (AUTOMATIC WET SYSTEM):

1.1. 2 INCH DIAMETER AND SMALLER: UL LISTED FMG APPROVED SCHEDULE 40 ELECTRIC RESISTANCE WELDED (ASTM A135) OR SEAMLESS STEEL, BLACK; ASTM A53 GRADE B.

1.2. JOINTS: THREADED, WELDED OR GROOVED (ROLLED OR CUT).

1.3. FITTINGS: (1) CLASS 125 CAST IRON THREADED; ANSI B16.4. (2) CLASS 150 MALLEABLE IRON THREADED; ANSI B16.3.

1.4. 2 1/2 INCH THROUGH 5 INCH: UL LISTED FMG APPROVED LIGHT WALL, SCHEDULE 10 ELECTRIC RESISTANCE WELDED (ASTM A135) OR SEAMLESS STEEL, BLACK; ASTM A53.

1.5. 6 INCH: LIGHT WALL, 0.134 INCH WALL THICKNESS ELECTRIC RESISTANCE WELDED (ASTM A135) OR SEAMLESS STEEL, BLACK; ASTM A53.

1.6. 8 INCH THROUGH 10 INCH: LIGHT WALL, 0.188 INCH WALL THICKNESS ELECTRIC RESISTANCE WELDED (ASTM A135) OR SEAMLESS STEEL, BLACK; ASTM A53.

1.7. JOINTS: WELDED OR GROOVED (ROLLED ONLY).

1.8. FITTINGS: STEEL, WELDED ENDS, OR DUCTILE OR MALLEABLE IRON, MECHANICAL JOINT; ASTM A536/ASTM A47. FORGED STEEL THREADED OR GROOVED; ANSI B16.11. FORGED STEEL SOCKET WELDED. CAST IRON GROOVED; ASTM A536. MALLEABLE IRON GROOVED; ASTM A47.

1.9. COUPLINGS (VICTAULIC) 8 INCH AND SMALLER: DUCTILE IRON HOUSING, ASTM A536, GRADE E, EPDM TYPE A GASKET. VICTAULIC STYLE 005 FIRELOCK RIGID COUPLING FOR FIRE PROTECTION SERVICES.

1.10. COUPLINGS (VICTAULIC) 10 INCH AND LARGER: DUCTILE IRON HOUSING, ASTM A536, GRADE E, EPDM TYPE A GASKET. VICTAULIC ZERO-FLEX STYLE 07.

EXECUTION

A. PIPING, VALVES, FITTINGS AND ACCESSORIES:

1. MAKE NECESSARY ALTERATIONS TO EXISTING FIRE WATER SYSTEM AS REQUIRED FOR CONNECTING NEW SYSTEMS. NEW MATERIALS IN ALTERED SYSTEMS SHALL MATCH EXISTING MATERIALS UNLESS SHOWN OR SPECIFIED OTHERWISE. INSTALL BRANCH SHUT-OFF VALVES TO ALLOW CONSTRUCTION TO PROCEED WITH MINIMUM DRAIN DOWN TIME FOR EXISTING FIRE PROTECTION SYSTEM.

2. USE BALL TYPE VALVES FOR MAIN RISER DRAIN, AUXILIARY DRAINS AND INSPECTOR'S TEST CONNECTIONS.

3. PROVIDE DRAIN CONNECTION FOR SECTIONAL OR FLOOR CONTROL VALVES, PIPED TO A FLOOR DRAIN, MOP RECEPTOR OR AS INDICATED.

4. PIPE 3/4 INCH AND LARGER AUXILIARY DRAINS TO FLOOR DRAIN, SUMP, MOP RECEPTOR OR OTHER APPROVED DISCHARGE LOCATION. VERIFY LOCATION HAS SUFFICIENT CAPACITY TO HANDLE ANTICIPATED FLOW WITHOUT CREATING A NUISANCE

B. SPRINKLER SYSTEMS:

1. INCLUDE A 10 PSIG SAFETY FACTOR BETWEEN THE AVAILABLE PRESSURE AND THE REQUIRED PRESSURE AT THE REQUIRED FLOW IN THE HYDRAULIC CALCULATIONS SUBMITTED FOR APPROVAL.

2. WATER VELOCITIES SHALL BE SHOWN IN THE CALCULATIONS AND SHALL NOT EXCEED 20 FEET PER SECOND FOR INSIDE PIPING.

3. SPRINKLER PIPING LOAD SHALL INCLUDE AN ADDITIONAL 250 POUND LOAD APPLIED AT POINT OF HANGING AS REQUIRED BY NFPA.

4. PROVIDING MEANS OF DRAINING SPRINKLER SYSTEMS, FOLLOWING NFPA 13, AND AS SPECIFIED.

5. WHERE CHANGE IN PIPE DIRECTION PREVENTS DRAINAGE THROUGH MAIN DRAIN VALVE, PROVIDE AUXILIARY DRAINS FOLLOWING NFPA 13.

6. SIZE DRAIN PIPING FOLLOWING NFPA 13.

C. FLUSHING:

1. FLUSH UNDERGROUND MAINS AND LEAD-IN CONNECTIONS TO SYSTEM RISERS BEFORE MAKING CONNECTIONS SPRINKLER PIPING.

2. INSTALL DRAINAGE PLUGS, TAPS AND VALVES REQUIRED FOR FLUSHING.

3. DISPOSE OF FLUSHING WATER TO OWNER APPROVED LOCATIONS.

4. REPAIR DAMAGE CAUSED BY LEAKS, FLOODING OR DRAINING DURING FLUSHING.

5. SUBMIT NOTIFICATION OF FLUSHING OPERATIONS TWO WEEKS IN ADVANCE.

D. FIELD TESTING - GENERAL REQUIREMENTS:

1. TEST NEW WET SPRINKLER SYSTEMS. FOLLOW NFPA 13.

2. MEASURE HYDROSTATIC PRESSURE AT LOW POINT OF INDIVIDUAL SYSTEM, ZONE OR MAIN BEING TESTED.

3. SHOULD LEAKS OCCUR DURING TESTING, STOP TEST, REPAIR LEAKS, AND REPEAT ENTIRE TEST FROM BEGINNING.

4. REPAIR DAMAGE CAUSED BY LEAKS, FLOODING OR DRAINING DURING TESTING.

5. SUBMIT NOTIFICATION OF TESTING TWO WEEKS IN ADVANCE.

6. FOR NEW WET SPRINKLER SYSTEMS: HYDROSTATICALLY TEST NEW WET AND DRY SPRINKLER SYSTEMS AT NOT LESS THAN 200 PSI FOR 2 HOURS, OR AT 50 PSI FOR 2 HOURS ABOVE MAXIMUM STATIC PRESSURE WHEN MAXIMUM STATIC PRESSURE IS GREATER THAN 150 PSI. NO LEAKAGE ALLOWED.

1. DEMOLITION INFORMATION IS FOR REFERENCE ONLY. CONTRACTOR MUST FIELD VERIFY ALL EXISTING PIPING AND SERVICES TO BE REMOVED AS WELL AS THOSE WHICH SHALL REMAIN.

2. THE COMMENCEMENT OF ANY DEMOLITION IS PROHIBITED WITHOUT FIRST OBTAINING PROPER SAFETY AND UTILITY SHUTDOWN PERMITS AS REQUIRED FROM THE HOSPITAL.

3. THE CONTRACTOR SHALL NOT INTERRUPT ANY SERVICES IN THE EXISTING BUILDING NOR INTERFERE WITH SERVICES IN ANY WAY WITHOUT FIRST OBTAINING WRITTEN PERMISSION BY THE HOSPITAL; SUCH ACTIONS SHALL BE SCHEDULED IN ADVANCE WITH THE HOSPITAL. SHUTDOWN DURATION SHALL BE AS BRIEF AS POSSIBLE.

4. EXISTING SYSTEMS TO REMAIN, SHALL BE LEFT IN FULL OPERATION UPON COMPLETION OF ALL DEMOLITION WORK.

5. LOCATIONS AND SIZES OF EXISTING PIPING ARE APPROXIMATE. EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING SHALL BE VERIFIED BY THE PLUMBING CONTRACTOR AT THE PROJECT SITE.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE FACILITY'S REPRESENTATIVE ANY UTILITY SHUTDOWN, AS SOON AS POSSIBLE, IN ADVANCE OF EXECUTING SUCH ACTION.

7. THE RE-USE OF EXISTING PIPING FITTINGS, VALVES, FIXTURES, AND ETC. IS PROHIBITED UNLESS OTHERWISE APPROVED BY THE ENGINEER.

8. THE CONTRACTOR MUST MAKE ALLOWANCE FOR NECESSARY MODIFICATIONS, TO EXISTING CONDITIONS, TO PERFORM DEMOLITION WORK.

9. REMOVAL OF EXISTING EQUIPMENT SHALL BE COORDINATED WITH REMOVAL OF EXISTING CEILINGS AND PARTITIONS.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL DEBRIS, OFF THE PREMISES, RESULTING FROM THE EXISTING PLUMBING DEMOLITION SCOPE OF WORK.

11. DEMOLISH AND REMOVE ANY AND ALL ABANDONED PIPING ABOVE SLAB. ABANDONED PIPING SHALL NOT REMAIN.

12. "DEAD ENDS" SHALL NOT BE PERMITTED TO REMAIN ON ANY DRAINAGE PIPING UPON COMPLETION OF THE WORK.

13. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING MAIN STACKS, RISERS AND CONNECTIONS TO EXISTING FIXTURES.

14. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF PIPING BELOW GRADE PRIOR TO

COMMENCING WORK. NOTIFY THE ENGINEER OF ANY CONFLICTS THAT WOULD JEOPARDIZE THE PROGRESS OF CONSTRUCTION.

15. DISCONNECT, DEMOLISH, AND REMOVE PLUMBING SYSTEMS, EQUIPMENT, AND COMPONENTS INDICATED TO BE REMOVED.

15.1. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP OR PLUG REMAINING PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL.

15.2. PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP OR PLUG PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL.

15.3. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT.

15.4. EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES AND REMOVE, CLEAN, AND STORE EQUIPMENT; WHEN APPROPRIATE, REINSTALL, RECONNECT, AND MAKE EQUIPMENT

OPERATIONAL.

15.5. EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT AND DELIVER TO OWNER.

16. IF PIPE, INSULATION, OR EQUIPMENT TO REMAIN IS DAMAGED IN APPEARANCE OR IS UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE PORTIONS AND REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.

? ?

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE FIRE PROTECTION CONTRACTOR SHALL INCLUDE ALL OFFSETS, CHANGES IN DIRECTION, TRANSITIONS, ETC. AS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS

2. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE AND SUBMIT SHOP DRAWINGS AS FOLLOWS:

2.1. HYDRAULIC CALCULATIONS AND SPRINKLER LAYOUTS SHALL BE SIGNED AND SEALED BY A LICENSED, PROFESSIONAL ENGINEER REGISTERED IN THE STATE OFPENNSYLVANIA.

2.2. THE CONTRACTOR SHALL SUBMIT A COPY OF THE AFOREMENTIONED SHOP DRAWINGS TO THE FACILITY'S INSURANCE UNDERWRITER FOR APPROVAL.

2.3. THE CONTRACTOR SHALL SUBMIT A COPY OF THE SHOP DRAWINGS, APPROVED BY THE FACILITY'S INSURANCE UNDERWRITER, TO THE TO THE ENGINEER OF RECORD.

2.4. THE CONTRACTOR SHALL SUBMIT A REVIEWED COPY OF THE SHOP DRAWINGS, BY THE ENGINEER OF RECORD, TO DOH - STATE OFPENNSYLVANIA FOR REVIEW AND APPROVAL.

3. COMPLETE COORDINATION AND VERIFICATION OF ALL MEASUREMENTS AND CLEARANCES SHALL BE OBTAINED, AT THE PROJECT SITE, PRIOR TO ORDERING OR FABRICATING ANY EQUIPMENT OR MATERIAL.

4. ALL FIRE PROTECTION WORK SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS, AND UNDERWRITERS REQUIREMENTS INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL FIRE CODE (IFC), N.F.P.A., FMG APPROVAL, AND THE LOCAL AUTHORITIES HAVING JURISDICTION.

5. QUESTIONS REGARDING THESE DRAWINGS SHALL BE ADDRESSED TO THE ARCHITECT PRIOR TO THE CONTRACT BEING AWARDED, OTHERWISE THE ARCHITECT'S INTERPRETATION OF THE MEANING AND INTENT OF THE DRAWINGS SHALL BE FINAL.

6. THE CONTRACTOR SHALL THOROUGHLY COORDINATE PIPE ROUTING AND EQUIPMENT LOCATIONS WITH, BUT NOT BE LIMITED TO, THE CONSTRUCTION MANAGER, MECHANICAL CONTRACTOR, PLUMBING CONTRACTOR, ELECTRICAL CONTRACTOR AND MOST CURRENT DRAWINGS PRIOR TO COMMENCING FABRICATION AND

INSTALLATION OF THE SYSTEM. ADDITIONAL COST TO THE OWNER FOR FAILURE TO COORDINATE SHALL NOT BE PERMITTED.

7. SPRINKLER ESCUTCHEONS AND OR CONCEALED FIRE SPRINKLER COVER PLATES SHALL HAVE FACTORY APPLIED CUSTOM COLORS AND FINISHES AS SELECTED BY ARCHITECT.

8. THE CONTRACTOR SHALL PATCH AND FIRE STOP ALL OPENINGS IN FLOORS AND WALLS, RESULTING FROM THIS PROJECT, AS REQUIRED IN ACCORDANCE WITH NFPA REQUIREMENTS.

9. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS, WALL LOCATIONS, CEILING GRID, AND DIMENSIONS.

10. FIRE SPRINKLERS SHALL BE LOCATED IN THE CENTER OF CEILING TILES AND SHALL NOT BE LOCATED DIRECTLY OVER ELECTRICAL OR TELEPHONE EQUIPMENT.

11. ELECTRICAL AND TELEPHONE EQUIPMENT SHALL BE PROTECTED BY A SHIELD TO DEFLECT WATER AWAY FROM SUCH EQUIPMENT. SHIELDS SHALL BE GALVANIZED STEEL, ALUMINUM, OR BRASS.

12. THE CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE LAYOUT OF FIRE SPRINKLER PIPING INCLUDING SHOP DRAWING AND HYDRAULIC CALCULATION SUBMITTALS. REFER TO NOTE 2.

13. THE CONTRACTOR SHALL INSTALL ADDITIONAL FIRE SPRINKLERS TO ENSURE CODE COMPLIANT COVERAGE IN AREAS WHERE OBSTRUCTIONS ARE PREVALENT.

14. COORDINATE WORK WITH APPROVED HEALTHCARE EQUIPMENT DRAWINGS.

15. FOR WELDED PIPING AND PIPING WITH CUT HOLES THE CONTRACTOR SHALL CERTIFY THAT ALL CUTOUTS (COUPONS AND DISC) HAVE BEEN RETRIEVED AND ALL INTERNAL SLAG AND WELDING RESIDUE IS REMOVED.

16. ALL DROPS SERVING MORE THAN ONE FIRE SPRINKLER AND ALL CHANGES IN PIPING ELEVATIONS WHICH CREATE TRAPPED SECTIONS SHALL BE PROVIDED WITH AUXILIARY DRAINS IN ACCORDANCE WITH NFPA-13.

17. LOCATE FIRE SPRINKLERS WHERE DISCHARGE SHALL NOT BE OBSTRUCTED VERTICALLY AND HORIZONTALLY OR PROVIDE ADDITIONAL FIRE SPRINKLERS WHERE SUCH A CONDITION OCCURS.

18. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE EXISTING FIRE PROTECTION SYSTEM MAINS AND BRANCH PIPING WITH ALL TRADES AND NEW CEILING HEIGHTS. FIELD CONFIRM EXISTING FIRE PROTECTION DISTRIBUTION SYSTEM LOCATIONS. WHERE CONFLICTS OCCUR WITH NEW CEILING HEIGHTS AND OR OTHER TRADES, RELOCATE PIPING AS REQUIRED. THIS SHALL ALSO PREVAIL FOR UNFORESEEN EXISTING CONDITIONS WHICH HAVE NOT BEEN DOCUMENTED ON DRAWINGS.

19. EXISTING FIRE SPRINKLER SYSTEMS IN ADJACENT SPACES TO NEW SCOPE OF WORK AREAS SHALL BE MODIFIED OR RELOCATED AS NECESSARY FOR A COMPLETE, CODE COMPLIANT, FIRE PROTECTION SYSTEM INSTALLATION WHICH PROVIDES COVERAGE THROUGHOUT.

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

NOT TO

SCALE

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:14:13 PM

FP.001

05/07/2021

P3002.00

FIRE PROTECTION

COVER SHEET

RN

MW

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

(2)

7.

6.

5.

7.1

D.

D.

E.

E. F.

F.

C.

C.

7.

6.

5.

7.1

D. E.

F.

C.

MAMMO #2

(OUTPATIENT)

G156

MAMMO #3

(INPATIENT)

G157

MAMMO #1

(OUTPATIENT)

G155

ULTRASOUND #1

(INPATIENT)

G160

ULTRASOUND #2

(OUTPATIENT)

G161

ULTRASOUND #3

(OUTPATIENT)

G162

STEREOTACTIC

(INPATIENT)

G163

SCHEDULER

OFFICE

G168

MANAGER

OFFICE

G169

COORDINATOR

OFFICE

G166

OFFICE

G165

OFFICE

G159

PUBLIC TOILET

E0401A

SOILED

G164

CLEAN STOR

G152

?

?

WORK ROOM

G170

RECEPTION/REGISTRATION

G150A

RECEPTION AND

WAITING ROOM

G150

GOWNED

WAITING

G154

PATIENT TOILET

G154A

STAFF TOILET

G167

CHANGE

G153C CHANGE

G153B

CHANGE

G153A

?

?

PASSAGE

G151

?

?

?

?

CORRIDOR

E0401B

1 2 3 4

5

3

5

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

1/4" = 1'-0"

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:14:16 PM

FP.201

05/07/2021

P3002.00

FIRE PROTECTION - GROUND

FLOOR PLAN

RN

MW

1/4" = 1'-0"

1

FIRE PROTECTION - GROUND FLOOR

PLAN

REFER TO FIRE PROTECTION GENERAL NEW WORK NOTE 1; THIS DRAWING.

PROVIDE NEW FIRE SPRINKLERS THROUGHOUT SCOPE OF WORK AS SHOWN ON DRAWING.

THE LOCATION OF EXISTING FIRE SPRINKLERS SHALL BE REVISED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT AND CEILING HEIGHTS WITHIN THE SCOPE OF WORK. EXISTING FIRE SPRINKLERS INTENDED TO BE RELOCATED SHALL BE REPLACED WITH NEW. EXTEND NEW BRANCH PIPING TO THE NEAREST EXISTING SPRINKLER MAIN OF ADEQUATE SIZE AS NEEDED TO ACCOMMODATE NEW FIRE SPRINKLERS. REFER TO DETAILS FOR ADDITIONAL

INFORMATION. FIELD COORDINATE EXACT LOCATIONS OF EXISTING FIRE SPRINKLERS PRIOR TO COMMENCING WORK. PROVIDE ADDITIONAL FIRE SPRINKLERS AS NEEDED TO ASSURE PROPER FIRE PROTECTION COVERAGE THROUGHOUT SCOPE OF WORK. REFER TO THE SPRINKLER DESIGN SCHEDULE FOR DESIGN CRITERIA. ALL WORK SHALL BE NFPA 13 COMPLIANT.

RELOCATE ALL FIRE PROTECTION PIPING AS REQUIRED TO ACCOMMODATE NEW HIGHER CEILING HEIGHTS.

RELOCATE (E)SPRINKLER HEADS AND OR ADD NEW AS NEEDED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT.

1

FIRE PROTECTION KEYED NEW WORK NOTES

1. REFER TO FIRE PROTECTION COVER SHEET, FOR SYMBOLS, ABBREVIATIONS, GENERAL NOTES, AND SPECIFICATIONS.

2. THE CONTRACTOR SHALL PROVIDE ALL DEMOLITION WORK TO FIRE PROTECTION SYSTEMS WITHIN THE PROJECT AREA AS REQUIRED TO ACCOMMODATE AND

COMPLETE THE NEW WORK PHASE. THE DEMOLITION SCOPE OF WORK SHALL INCLUDE BUT NOT BE LIMITED TO FIRE SPRINKLERS, EQUIPMENT, TRIM, FITTINGS, HANGERS, SUPPORTS, PIPING NOT REQUIRED, ALL ASSOCIATED APPURTENANCES, AND ACTION ITEMS DESCRIBED BY THE KEYED NOTES. PIPING SHALL BE DEMOLISHED BACK TO THE NEAREST ACTIVE MAINS IN THE VICINITY AND CAPPED UNLESS OTHERWISE NOTED.

COORDINATE WITH DRAWINGS OF ALL DISCIPLINES INVOLVED TO DETERMINE THE EXTENT OF DEMOLITION WORK.

3. VERIFY ALL EXISTING CONDITIONS AND THE ENTIRE SCOPE OF WORK PRIOR TO COMMENCING WITH ANY DEMOLITION OR NEW WORK.

4. REFER TO ARCHITECTURAL DRAWINGS FOR PROJECT LIMITS AND ADDITIONAL INFORMATION.

5. THE CONTRACTOR SHALL MAINTAIN FIRE PROTECTION COVERAGE THROUGHOUT ALL CONSTRUCTION PHASES.

PLUMBING GENERAL NEW WORK NOTES

2 3

4

5

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

(3)

1

5

2 3

4 6

NO SCALE

TYPICAL DETAIL OF PIPE THRU NON-RATED WALL

NO SCALE

TYPICAL SPRINKLER RELOCATION DETAIL

NO SCALE

PIPE PENETRATION OF INTERIOR RATED WALL

NO SCALE

TYPICAL STEEL HANGER DETAIL

NO SCALE

TYPICAL CONC. HANGER DETAIL

NO SCALE

SPRINKLER CONVERSION FROM UPRIGHT TO PENDENT

SEALANT

SEAL BOTH SIDES WITH SERIES 100 INTUMESCENT

PIPE

1" to 1-1/2"

INTERIOR WALL DEPTH OF WALL

MINERAL WOOL INSULATION TIGHTLY PACKED FOR FULL

SLEEVE METAL PIPE

NOTE:

ALL PIPE PENETRATIONS SHALL CONFORM TO UL 1479 FOR THE SPECIFIC MATERIAL AND WALL CONSTRUCTION.

WALL SURFACES FLUSH WITH FINISHED TERMINATE SLEEVE

PIPING EXPOSED TO VIEW CONCEALED PIPING

ANNULAR SPACE

FINISHED ESCUTCHEON PLATE TO COMPLETELY COVER OPENING FLUSH AGAINST WALL AND OF SIZE STANDARD WEIGHT STEEL PIPE SLEEVE OF SIZE TO PASS PIPE

1/2" CLEAR MAXIMUM FINISHED WALL SURFACE.

SLEEVE.

BETWEEN PIPE AND

NOTES:

* CLEVIS HANGER REQUIRED ON PIPING LARGER THAN 1".

GENERAL PURPOSE HANGERS MAY BE USED ON 1" PIPING ONLY.

CONCRETE ANCHOR SAFETY BOLT

ROD

CLEVIS HANGER

PIPE

PIPING ONLY.

* CLEVIS HANGER REQUIRED ON PIPING LARGER THAN 1"

GENERAL PURPOSE HANGERS MAY BE USED ON 1"

STEEL

STEEL MEMBER

"C" CLAMP

RETAINING STRAP ROD (SIZE AS

REQUIRED)

CLEVIS HANGER

PIPE

NOTES:

(SIZE AS REQUIRED) EXISTING MAIN

OR BRANCH LINE

NEW EXISTING ELBOW

NEW FIRE NEW SPRINKLER PIPE

INSTALLATION

SPRINKLER (TYP) CONDITIONS WILL VARY IN

FIELD. MODIFY AS DETERMINED NECESSARY

TO BE REMOVED

EXISTING INSTALLATION

1"DROP NIPPLE

1"x 1/2" REDUCER

SEE SCHEDULE FOR SPRINKLER TYPE EXISTING INSTALLATION

NEW INSTALLATION

CEILING COVER PLATE

EXISTING MAIN OR BRANCH LINE

EXISTING MAIN OR BRANCH LINE REMOVE EXISTING UPRIGHT SPRINKLER HEAD AND 1"x1/2"

REDUCER AND REPLACE WITH NEW ELBOW AND PIPING SLEEVES AND ESCUTCHEONS

A. PIPE SLEEVES SHALL BE SCHEDULE 40, STANDARD GALVANIZED STEEL PIPE; FOR PIPING THROUGH MASONRY WALLS. IN FRAMED PARTITIONS SLEEVES SHALL BE 20 GAUGE SHEET METAL. THE SPACE BETWEEN THE PIPE AND ASSOCIATED SLEEVE SHALL NOT EXCEED ONE HALF INCH. THE SLEEVE SHALL BE OF SUFFICIENT LENGTH TO BE FLUSH WITH THE FINISHED WALL SURFACE.

B. EXPOSED PIPING PASSING THROUGH WALLS, FLOORS, OR CEILINGS SHALL BE FITTED WITH CHROMIUM PLATED, CAST BRASS ESCUTCHEONS WITH FASTENING SET SCREWS.

CUTTING AND PATCHING

A. PIPING PASSING THROUGH WALLS SHALL HAVE A TRIM OPENING CUT NO GREATER THAN NECESSARY FOR THE INSTALLATION OF A SLEEVE SECURED THEREIN.

B. PIPING PASSING THROUGH CONCRETE WALLS SHALL HAVE AN OPENING DRILLED SO THE SPACE BETWEEN THE OPENING AND THE PIPE SHALL NOT EXCEED ONE HALF INCH.

C. EXPOSED PIPING PASSING THROUGH WALLS, FLOORS, OR CEILINGS SHALL BE FITTED

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

NOT TO

SCALE

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:14:16 PM

FP.501

05/07/2021

P3002.00

FIRE PROTECTION DETAILS

RN

MW

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

(4)

POINT OF CONNECTION POINT OF DEMOLITION DRAWING NOTE

DRAWING NUMBER

PLUMBING SYMBOL LIST

PLAN NUMBER DEMOLITION NOTE

EQUIPMENT NUMBER EQUIPMENT TYPE 1

P 1 P0.01

? ?

? ?

NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT

CLEAN OUT WALL PLATE

SHOCK ABSORBER PRESSURE GAUGE

VACUUM BREAKER

AIR RELIEF VALVE

DIRECTION OF FLOW ARROW

NON FREEZE

INSULATED AND HEAT

ACCESS PANEL

GAS METER

GAS VALVE

OS&Y VALVE THERMOMETER EXISTING PIPING

EXISTING PIPING

HOT WATER RETURN COLD WATER PIPING HOT WATER PIPING

UNDERGROUND

INDIRECT WASTE PUMP DISCHARGE

TOP CONNECTION CLEANOUT DECK PLATE

VALVED CAPPED OUTLET VENT THROUGH ROOF PIPE DROP UNLESS PIPE-UP UNLESS

WATER PROOF SLEEVE

SHUT OFF VALVE BACKFLOW PREVENTER

TEMPERATURE &

AREA DRAIN, FLOOR DRAIN &

CHECK VALVE

STOP VALVE BFP

HOSE BIBB DRAIN W/ TRAP CLEANOUT

HIGH

LOW DROP OR RISE

FLANGED UNION IW

PD G

ST

FUEL GAS PIPING

STORM PIPING VENT PIPING

NEW PIPING

DOUBLE DETECTOR DDCVA

MIXING VALVE (HOLBY)

WATER HEATER CENTER LINE

WATER METER MOTOR CONTROLLER

SHOWER HEAD ASSEMBLY

BACKWATER VALVE (BWV)

REDUCER (CONCENTRIC) REDUCER (ECCENTRIC)

STRAINER

UNION ANGLED VALVE

CURB VALVE

ELECTRIC ACTUATED

SOLENOID VALVE

(DROP) (RISE) M

S

MOTORIZED VALVE AUTOMATIC CONTROL

BALANCING VALVE

FLOW CONTROL VALVE

LOCK SHIELD VALVE

NEEDLE VALVE

PLUG VALVE

PRESSURE REDUCING QUICK CLOSE VALVE QUICK OPEN VALVE VALVE - PNEUMATIC

VALVE IN VERTICAL VALVE

VALVE IN VERTICAL NFHB

HB

MEDICAL AIR PIPING

INSTRUMENT AIR

NON-FREEZE HOSE BIBB

HOSE BIBB

A

IA

CARBON DIOXIDE

NITROUS OXIDE C

VACUUM PIPING VAC

O2

N2O

EXPANSION LOOP

A AIR

IA INSTRUMENT AIR ABV ABOVE

AD AREA DRAIN / ACCESS DOOR AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AVG AVERAGE

BE BELOW EQUIPMENT BFF BELOW FINISHED FLOOR BFG BELOW FINISHED GRADE BFP BACK FLOW PREVENTER BLW BELOW

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR CA COMPRESSED AIR

CI CAST IRON

CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CFS CUBIC FEET PER SECOND CLG CEILING

CLS CLINICAL SINK CO CLEANOUT

CODP CLEAN OUT DECK PLATE COL COLUMN

COWP CLEANOUT WALL PLATE CYV CYLINDER VENT

CV CURB VALVE CW COLD WATER

CWVO COLD WATER VALVED OUTLET COL COLUMN

CONC. CONCRETE CP CHROME PLATE DB DIALYSIS BOX DN DOWN

DP DEEP DIA DIAMETER DR DRAIN DWG DRAWING E EXISTING EA EACH

ED EJECTOR DISCHARGE EFF EFFICIENCY

EJ EJECTOR

EOL END OF LINE VENT EL ELEVATION ELEC ELECTRICAL

ER EXISTING TO BE RELOCATED ES EMERGENCY SHOWER EW EYEWASH

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER FAI FRESH AIR INLET

FD FLOOR DRAIN

FDV FIRE DEPARTMENT VALVE FFD FUNNEL FLOOR DRAIN FF EL FINISHED FLOOR ELEVATION FP FIRE PROTECTION

FPM FEET PER MINUTE FPS FEET PER SECOND FT FOOT, FEET FU FIXTURE UNIT FUD FUNNEL DRAIN G GAS

GAL GALLON GALV GALVANIZED GPD GALLONS PER DAY GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GI GREASE INTERCEPTOR HB HOSE BIBB

HC HUNG CEILING HDC HANDICAPPED HDS HEADS

HOR HORIZONTAL HP HORSEPOWER HR HOUR

HT HEIGHT HTR HEATER

HTWR HIGH TEMPERATURE WATER RETURN HW HOT WATER

HWR HOT WATER RETURN HWS HOT WATER SUPPLY

HVAC HEATING, VENTILATING & AIR CONDITIONING

HZ HERTZ

FILTER - IN-LINE

ID INSIDE DIAMETER IE INVERT ELEVATION IN INCH

INCL. INCLUDING IW INDIRECT WASTE JC JANITORS CLOSET JS JANITOR SINK KW KILOWATT L LENGTH LAB LABORATORY LAV LAVATORY LB POUND(S)

LDR LEADER (LEADER) LPD LITERS PER DAY LPM LITERS PER MINUTE MA MEDICAL AIR MAX MAXIMUM MECH MECHANICAL

MER MECHANICAL EQUIPMENT ROOM MFR. MANUFACTURER

MGAP MEDICAL GAS ALARM PANEL MGO MEDICAL GAS OUTLET MH MANHOLE

MIN MINIMUM MTD MOUNTED MV MIXING VALVE N NEW

N/A NOT APPLICABLE NC NORMALLY CLOSED

NFFH NON-FREEZE FLOOR HYDRANT NFHB NON-FREEZE HOSE BIBB NIC NOT IN CONTRACT NPW NON-POTABLE WATER NTS NOT TO SCALE

O2 OXYGEN O.C. ON CENTER O.D. OVERFLOW DRAIN OD OUTSIDE DIAMETER PD PUMP DISCHARGE PH PHASE

PLBG PLUMBING

PO PLUGGED OUTLET PP POLYPROPYLENE PRES PRESSURE

PRV PRESSURE REDUCING VALVE PS PRESSURE SWICH

PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE R REMOVE

RE RELOCATED EXISTING REC RECESSED

REV REVISED, REVISION RD ROOF DRAIN

ROD ROOF OVERFLOW DRAIN RPM REVOLUTIONS PER MINUTE RM ROOM

RW RAIN WATER

RWC RAIN WATER CONDUCTOR RTU ROOF TOP UNIT

S SOIL

SA SHOCK ABSORBER SAN SANITARY

SCH SCHEDULE SPEC SPECIFICATIONS SF SQUARE FOOT, FEET SK SINK

SL SLEEVE ST STORM STD STANDARD STL STEEL

SQ. FT.SQUARE FEET (FOOT) TEMP TEMPERATURE TS TAMPER SWITCH TYP TYPICAL

UR URINAL V VENT VAC VACUUM VEL VELOCITY VERT VERTICAL

VTR VENT THROUGH ROOF W WASTE

W WIDTH W/ WITH

WC WATER CLOSET WH WALL HYDRANT WM WASHING MACHINE WP WATER-PROOF WT WEIGHT VB VALVE BOX ZVB MEDICAL GAS GM

PIPING END CAP PIPE PITCH DESIGNATION .01

SA BOTTOM CONNECTION

FITTINGS

VALVES

PLUMBING SYMBOL LIST

SLOPE AT 1/8"/FT

TO BE REMOVED

OTHERWISE NOTED OTHERWISE NOTED

PRESSURE RELIEF VALVE CHECK VALVE ASSEMBLY ROOF DRAIN

EXPANSION JOINT

NEW CONNECTION NEW CONNECTION

NEW CONNECTION (INSERTION)

NEW TOP CONNECTION (INSERTION)

STRAINER

(ANGLED)

DESIGNATION DESIGNATION

N NITROGEN

WASTE ANESTHESIA WAGD

GAS DISPOSAL AND DELTA

#

MEDICAL GAS ZONE MEDICAL GAS MGA

COMPRESSED AIR ZVB CA

OXYGEN PIPING O2

VALVE BOX

HUB DRAIN FRESH AIR INLET

RUNNING TRAP

TRAP

FLOAT VALVE

GLOBE VALVE

POST INDICATOR P

MASTER GAS CONTROL VALVE (MGVC)

SEISMIC GAS CONTROL VALVE (SGVC)

THROTTLING VALVE THERMOSTATIC AQUASTAT

BACK FLOW PREVENTER

FILTER

PRESSURE GAUGE A

THERMOMETER

WH MV

PRESSURE SWITCH

WH

WALL HYDRANT

SHOCK ARRESTOR SA

FLOW SWITCH FS

FIXED AIR GAP (AG)

VACUUM BREAKER SANITARY PIPING

(SAN) OR (STORM)

SAN

EJECTOR DISCHARGE EJD

PUMP DISCHARGE PD

120°F HOT WATER PIPING 140°F HOT WATER PIPING 180°F HOT WATER PIPING 120°

140°

180°

TW TEMPERED WATER

TRENCH DRAIN (TRD) BFP

RPZ REDUCED PRESSURE ZONE BACKFLOW PREVENTER CIRCULATOR PUMP (CIRC) C

MIXING VALVE PUMP

MEDICAL GAS SYMBOL LIST

ANNOTATIONS

AUTOMATIC THREE-WAY CONTROL VALVE CONTROL AUTOMATIC AIR VENT

ABBREVIATIONS

TRACED PIPING CW

HW

1. PLUMBING WORK SHALL BE GOVERNED BY AND IN COMPLIANCE WITH THE INTERNATIONAL PLUMBING CODE, LATEST ADOPTED VERSION BY THE STATE OF PENNSYLVANIA, AND LOCAL AUTHORITIES HAVING JURISDICTION.

2. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE PLUMBING CONTRACTOR SHALL INCLUDE ALL REQUIRED OFFSETS, CHANGES IN DIRECTION, TRANSITIONS, ETC. REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS.

3. PROVIDE NEW PLUMBING FIXTURES, TRIM, AND ALL ASSOCIATED APPURTENANCES PER THE PLUMBING FIXTURE SCHEDULE. CONNECT COLD WATER, HOT WATER, VENT, AND SANITARY PIPING TO EXISTING IN VICINITY. FIELD COORDINATE EXACT TIE IN POINTS PRIOR TO

COMMENCING NEW WORK.

4. ORDERING OR FABRICATING EQUIPMENT OR MATERIAL SHALL NOT COMMENCE PRIOR TO COMPLETELY COORDINATING AND VERIFYING ALL MEASUREMENTS AND CLEARANCES AT THE PROJECT SITE.

5. THE EXISTING MAIN SYSTEMS AT WET COLUMNS AND MAIN PIPE OFFSETS AT THE CEILING TO REMAIN, SHALL BE IN PERFECT WORKING ORDER UPON COMPLETION OF ALL WORK.

6. QUESTIONS REGARDING THESE DRAWINGS SHALL BE ADDRESSED TO THE ARCHITECT PRIOR TO THE CONTRACT BEING AWARDED, OTHERWISE THE ARCHITECT'S INTERPRETATION OF THE MEANING AND INTENT OF THE DRAWINGS SHALL BE FINAL.

7. THE PLUMBING CONTRACTOR SHALL THOROUGHLY COORDINATE PIPE ROUTING AND EQUIPMENT LOCATIONS WITH THE MOST CURRENT ARCHITECTURAL CONSTRUCTION

DOCUMENTS, GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR AND MEDICAL EQUIPMENT REQUIREMENTS PRIOR TO COMMENCING NEW WORK.

8. ALL PIPING PENETRATING CEILINGS AND WALLS SHALL BE INSTALLED WITH ESCUTCHEONS AT THE PENETRATION. ALL PIPING PENETRATING EXTERIOR WALLS AND ROOFS SHALL BE

FLASHED IN AN APPROVED MANNER AND SHALL BE SEALED WEATHERTIGHT. PIPING PENETRATING FIRE RATED PARTITIONS SHALL BE PROVIDED WITH FIRE RATED SEALS AS REQUIRED BY LOCAL CODE AUTHORITY. (SEE DETAILS)

9. THE PLUMBING CONTRACTOR SHALL PATCH AND FIRE STOP ALL FIRE RATED OPENINGS IN FLOORS AND WALLS AS REQUIRED IN ACCORDANCE WITH NFPA REQUIREMENTS.

10. REFER TO THE MOST CURRENT ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR ALL CEILING HEIGHTS, WALL LOCATIONS, AND DIMENSIONS.

11. THE EXISTING SYSTEMS SHALL BE LEFT IN FULL OPERATION UPON COMPLETION OF ALL NEW WORK.

12. THE PLUMBING CONTRACTOR SHALL FIELD VERIFY ALL AREAS OF THE FLOOR LEVEL BELOW THE NEW SCOPE OF WORK TO ASSURE ACCESSIBILITY TO THE LOCATIONS AFFECTED BY THE PROJECT.

13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE FACILITY'S

REPRESENTATIVE ANY UTILITY SHUTDOWN, AS SOON AS POSSIBLE, IN ADVANCE OF EXECUTING SUCH ACTION.

14. THE COMMENCEMENT OF ANY NEW WORK INSTALLATION IS PROHIBITED WITHOUT FIRST OBTAINING PROPER SAFETY AND UTILITY SHUTDOWN PERMITS AS REQUIRED FROM THE OWNER'S REPRESENTATIVE.

15. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE EXISTING PLUMBING SYSTEM MAINS WITH NEW CEILINGS HEIGHTS. FIELD CONFIRM EXISTING PLUMBING DISTRIBUTION SYSTEM LOCATIONS. WHERE CONFLICTS OCCUR WITH NEW CEILING HEIGHTS, RELOCATE PIPING TO ACCORDINGLY.

16. ALL POTABLE (DRINKABLE) WATER PLUMBING PRODUCTS SHALL COMPLY WITH THE REDUCTION OF LEAD IN DRINKING WATER ACT.

17. PROVIDE SHUTOFF VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLIES TO INDIVIDUAL FIXTURES AND EQUIPMENT. PROVIDE BALL VALVES ON ALL WATER MAIN BRANCHES IN CORRIDORS AND WHERE INDICATED ON DRAWINGS.

18. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.

19. PROVIDE VENTS AT HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT LOW POINTS.

20. PROVIDE GAUGE FITTINGS AND THERMOMETER WELLS AT HOT WATER SUPPLY AND RETURN BRANCHES AND AT PUMP INLETS AND OUTLETS.

21. PROVIDE ACCESS PANELS TO SYSTEM COMPONENTS THAT ARE CONCEALED AND REQUIRE PERIODIC SERVICE.

HWR

PLUMBING GENERAL NOTES

1. ALL MEDIAL GAS SYSTEM SHALL CONFORM TO NFPA-99, GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES (LATEST ADOPTED VERSIONS) AND SPECIFICATIONS.

2. TEST AND CERTIFY ALL MEDICAL GAS SYSTEM FOR THIS PROJECT IN ACCORDANCE WITH NFPA-99 GUIDELINES AND SPECIFICATIONS. TEST IN PART(S) WHERE CONSTRUCTION PHASING NECESSITATES ACTIVATION OF PARTS OF THE SYSTEM.

3. ALL MEDICAL GAS PIPING SYSTEM SHALL BE TYPE-K COPPER TUBING (ASTM B-819). FITTINGS SHALL BE WROUGHT COPPER SPECIALLY DESIGNED FOR BRAZING (ANSI B16.22). JOINTS SHALL BE BRAZED USING A COPPER-PHOSPHORUS OR COPPER-PHOSPHORUS-SILVER BRAZING FILLER METAL WITH HIGH MELTING POINT OF AT LEAST 1000°F COMPLYING WITH ANSI/AWS A5.8. FLUX SHALL NOT BE USED. PIPE AND FITTINGS SHALL BE SPECIALLY PREPARED FOR MEDICAL GAS PIPING AND SHALL BE SO MARKED AND WITH FLOW DIRECTIONAL ARROWS. SYSTEM,

INCLUDING ALARMS AND GAUGES SHALL BE INSTALLED IN ACCORDANCE WITH SECTION NFPA-99.

4. COORDINATE ALL MEDICAL GAS WORK WITH NEW AND EXISTING DUCTWORK, PIPING AND UTILITIES.

5. LABEL EACH ALARM PANEL AND ZONE VALVE WITH THE APPROPRIATE DESIGNATION.

6. EXTREME CARE SHALL BE EXERCISED FOR ALL EXISTING ITEMS THAT ARE TO REMAIN IN SERVICE UNTIL NEW ITEMS ARE INSTALLED FOR THE SAME SERVICE. ALL SHUTDOWNS OF ANY SYSTEM SHALL BE COORDINATED WITH THE OWNER.

7. MEDICAL GAS ALARM PANELS, PRESSURE SENSORS. WIRING AND ALL ASSOCIATED APPURTENANCES SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR.

8. WIRING BETWEEN ALARM PANELS, PRESSURE SENSORS, WIRING AND ALL ASSOCIATED APPURTENANCES SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR.

10. ALARM PANEL SHALL BE ON EMERGENCY POWER SYSTEM.

12. WIRING AND CONDUIT INSTALLATION SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE; LATEST ADDITION.

13. LABEL ALL MEDICAL GAS PIPING AND WITH FLOW DIRECTIONAL ARROWS EVERY 6'-0".

14. ALL PIPING PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, CEILING, AND AROUND ZONE VALVES, ZONE ALARMS, AND MASTER ALARM ROUGH-IN BOXES SHALL BE PROTECTED WITH AN APPROVED FIREPROOFING MATERIAL.

9. CONNECT ALL DESIGNATED ALARM PRESSURE SENSORS TO RESPECTIVE DESIGNATED ZONE ALARM PANELS.

15. CONTRACTOR SHALL INSTALL ISOLATION BALL VALVES LOCKED IN OPEN POSITION AND LABEL THE AREA SERVED.

16. LOCK ALL MAINTENANCE VALVES WITH PAD LOCK IN OPEN POSITION.

11. PROPERLY LABEL ALARM PANEL AND MODULES TO IDENTIFY SPECIFIC MEDICAL GAS AND AREA OF SERVICE.

MEDICAL GAS GENERAL NOTES

RISER DESIGNATION SYSTEM DESIGNATION

X

X-# DRAWING NUMBER

PLAN NUMBER

Filter S

#

.0773

.0313

REVISION CLOUD

ALARM PANEL

PIPING

ZONE VALVE BOX PIPING

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

NOT TO

SCALE

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:36:29 PM

P.001

05/07/2021

P3002.00

PLUMBING

COVER SHEET

RN

MW

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

(5)

7.

6.

5.

7.1

D.

D.

E.

E.

C.

C.

7.

6.

5.

7.1

D. E.

C.

4" SAN

(E)8" SAN (E)6" SAN

(E)6" SAN

3" SAN3" SAN

4" SAN

4" SAN

2" SAN-UP 2" SAN-UP

3" SAN-UP

4" SAN-UP

2" SAN-UP

2" SAN-UP

4" SAN-UP

4" SAN-UP

2" SAN-UP

2" SAN-UP

2" SAN-UP 2" SAN-UP

4" SAN-UP

3" SAN-UP 1-1/2" V-UP

2" SAN-UP

3" SAN (E)4" SAN

(E)4" SAN

(E)4" SAN

(E)4" SAN

(E)4" SAN 4" SAN-UP

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

1/4" = 1'-0"

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:36:30 PM

P.200

05/07/2021

P3002.00

PLUMBING - BELOW SLAB

FLOOR PLAN

RN

MW

1/4" = 1'-0"

1 PLUMBING - BELOW SLAB PLAN

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

(6)

7.

6.

5.

D.

D.

E.

E.

C.

C.

7.

6.

5.

D. E.

C.

MAMMO #2

(OUTPATIENT)

G156

MAMMO #3

(INPATIENT)

G157

MAMMO #1

(OUTPATIENT)

G155

ULTRASOUND #1

(INPATIENT)

G160

ULTRASOUND #2

(OUTPATIENT)

G161

ULTRASOUND #3

(OUTPATIENT)

G162

STEREOTACTIC

(INPATIENT)

G163

SCHEDULER

OFFICE

G168

MANAGER

OFFICE

G169

COORDINATOR

OFFICE

G166

OFFICE

G159

PUBLIC TOILET

E0401A

SOILED

G164

CLEAN STOR

G152

WORK ROOM

G170

RECEPTION/REGISTRATION

G150A

RECEPTION AND

WAITING ROOM

G150

GOWNED

WAITING

G154

PATIENT TOILET

G154A

STAFF TOILET

G167

CHANGE

G153C CHANGE

G153B

CHANGE

G153A

PASSAGE

G151

CORRIDOR

E0401B

L-1

WC-1 SK-1

SK-1

SK-1

SK-1

PASSAGE

G151

SK-2

SK-1 SK-1 SK-1

L-1 L-1

WC-1

WC-1

PASSAGE

G151

PASSAGE

G151

1" HWR 1 1/2" HW 1 1/2" MVAC 1 1/4" MA

MGA-1 ZVB-1

MGO-2 MGO-1

CAPPED & VALVED FOR FUTURE

1 2 3

4 5

7

3" V 3" V

2" V

ROUTE 3" VENT UP TO FLOOR ABOVE AND CONNECT TO EXISTING VENT IN VICINITY.

2" V

3" V3" V

3/4" MVAC 1/2" MA1/2" MO2

DT-1

PROVIDE CONNECTION FOR DISHWASHER.

CONNECT INTO (E)VALVE AND CAPPED OUTLET IN VICINITY.

1" HWR 3" CW1 1/2" HW

2" CW 1" HW

1/2" MO2

1/2" MO21/2" MO2 1" HWR 3" CW1 1/2" HW

1/2" MA 3/4" MVAC

1/2" MA 3/4" MO23/4" MVAC

1/2" MO2

3/4" MO2

3/4" MVAC 1/2" MA

1" HWR

3" CW 1 1/2" HW

REFER TO P.202

MR-1

2" V

MGA-2

ZVB-2 1/2" MO2

3/4" MVAC 1/2" MA

4

3/4" MVAC 1/2" MA1/2" MO2 3/4" HWR

HOT WATER BALANCING.

2" CW 1" HW

1" HW

2" CW 1" HW

2" CW

9

3/4" CW 1/2" HW

3/4" CW 3/4" HW 2" V

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

1/4" = 1'-0"

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:36:33 PM

P.201

05/07/2021

P3002.00

PLUMBING - GROUND FLOOR

PLAN

RN

MW

1/4" = 1'-0"

1 PLUMBING - GROUND FLOOR PLAN

PROVIDE NEW PLUMBING FIXTURES, TRIM, AND ALL ASSOCIATED APPURTENANCES AS INDICATED. EXTEND NEW COLD WATER, HOT WATER, VENT, AND SANITARY PIPING AS REQUIRED ABOVE AND BELOW SLAB BACK TO ACTIVE ADEQUATELY SIZED MAINS / RISERS / BRANCH PIPING IN THE VICINITY. VERIFY EXACT LOCATION OF EXISTING SANITARY AND VENT PIPING AS REQUIRED. ROUTE PIPING AS NECESSARY TO MAKE INSTALLATION OF THE NEW PLUMBING FIXTURES POSSIBLE. PROVIDE SHUT OFF VALVES AT BRANCH PIPING SERVING FIXTURES IN ACCESSIBLE LOCATIONS. FIELD COORDINATE EXACT TIE IN POINTS FOR ALL SERVICES PRIOR TO COMMENCING NEW WORK.

REFER TO THE FOLLOWING FOR ASSOCIATED PIPE SIZES AND CONNECTIONS TO FIXTURES.

UNLESS OTHERWISE NOTED:

WC-1: 4" SANITARY DN.; 2" VENT DROP; 1-1/2" COLD WATER DROP

L-1: 2" SANITARY DN.; 1-1/2" VENT DROP; 1/2"COLD WATER DROP; 1/2" HOT WATER DROP SK-1: 2" SANITARY DN.; 1-1/2" VENT DROP; 1/2"COLD WATER DROP; 1/2" HOT WATER DROP SK-2: 2" SANITARY DN.; 1-1/2" VENT DROP; 1/2" COLD WATER; 1/2" HOT WATER DROP TP-1 EXTEND 1/2" COLD WATER LINE TO TRAP PRIMER ASSEMBLY.

PROVIDE NEW MEDICAL GAS OUTLETS, TRIM, AND ALL ASSOCIATED APPURTENANCES AS INDICATED. EXTEND NEW MEDICAL GAS PIPING AS REQUIRED ABOVE CEILING BACK TO ACTIVE ADEQUATELY SIZED MAINS / RISERS / BRANCH PIPING IN THE VICINITY. ROUTE PIPING AS NECESSARY TO MAKE INSTALLATION POSSIBLE.

REFER TO THE FOLLOWING FOR ASSOCIATED PIPE SIZES AND CONNECTIONS TO MEDICAL GAS OUTLETS. UNLESS OTHERWISE NOTED:

MGO-1: 1/2"A-DROP, 1/2"O2-DROP, & 3/4"VAC-DROP.

MGO-2: 1/2"A-DROP, 1/2"O2-DROP, & 3/4"VAC-DROP.

PROVIDE NEW ZONE VALVE BOX, TRIM, AND ALL ASSOCIATED APPURTENANCES AS INDICATED.

EXTEND NEW MEDICAL GAS PIPING AS REQUIRED ABOVE CEILING BACK TO ACTIVE ADEQUATELY SIZED MAINS / RISERS / BRANCH PIPING IN THE VICINITY. ROUTE PIPING AS NECESSARY TO MAKE INSTALLATION POSSIBLE.

REFER TO THE FOLLOWING FOR ASSOCIATED PIPE SIZES AND CONNECTIONS TO MEDICAL GAS OUTLETS. UNLESS OTHERWISE NOTED ON PLAN:

ZVB-1: 1/2"A-DROP, 1/2"O2-DROP, & 1"VAC-DROP.

PROVIDE NEW MEDICAL GAS ALARM PANEL. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION.

MGA-1: AIR, OXYGEN, & VACUUM

PROVIDE BALANCING VALVE AT LOCATION SHOWN ON DRAWING AND BALANCE EXISTING SYSTEM AS NEEDED TO ASSURE PROPER FLOW THROUGHOUT SYSTEM.

REFER TO THE FOLLOWING FOR ADDITIONAL INFORMATION ASSOCIATED WITH THE DETAILS LOCATED ON THE PLUMBING DETAIL(S) SHEET(S). UNLESS OTHERWISE NOTED ON PLAN:

DT-1: TYPICAL WATER CONNECTION DETAIL.

EXTEND MEDICAL GAS SIGNALS FROM TRANSDUCERS BACK TO ASSOCIATED ALARM PANEL(S).

PROVIDE LOCKABLE BALL VALVE; LOCKED IN OPEN POSITION.

RELOCATE SANITARY PIPING AS NEEDED TO ACCOMMODATE NEW HVAC DUCT ROUTING.

1

2

3

4

5

6

7

PLUMBING KEYED NOTES

1. REFER TO PLUMBING COVER SHEET, FOR SYMBOLS, ABBREVIATIONS, PLUMBING GENERAL NOTES AND PLUMBING DEMOLITION NOTES.

2. CONTRACTOR SHALL PROVIDE ALL DEMOLITION WORK REQUIRED IN PREPARATION TO COMPLETE THE NEW WORK PHASE. THE DEMOLITION SCOPE OF WORK SHALL INCLUDE BUT NOT BE LIMITED TO ACTION ITEMS DESCRIBED BY THE PLUMBING KEYED

DEMOLITION NOTES; THIS DRAWING. COORDINATE WITH DRAWINGS OF ALL

DISCIPLINES INVOLVED TO DETERMINE THE EXTENT OF DEMOLITION WORK. ACCOUNT FOR AND INCLUDE DEMOLITION WORK IN CEILING SPACE OF THE FLOOR BELOW THE PROJECT LIMITS.

3. VERIFY ALL EXISTING CONDITIONS AND THE ENTIRE SCOPE PRIOR TO COMMENCING WITH ANY NEW WORK.

4. PROVIDE ALLOWANCE TO RELOCATE EXISTING SYSTEMS AS NEEDED TO ACCOMMODATE NEW WORK.

5. REFER TO ARCHITECTURAL DRAWINGS FOR PROJECT LIMITS AND ADDITIONAL INFORMATION.

PLUMBING GENERAL NEW WORK NOTES

8

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE 9

(7)

9'-4" 22'-8"

1'-4"

1'-4"

13 12

STAIR #2

10

B.1 B.1

9'-4"

2'-4" 1'-11 1/4" 11'-1 1/4"

9'-4"

2'-4" 1'-11 1/4" 11'-1 1/4"

FE

FE

FEC FEC

FE

FE FE

FE

FE

FE FE

E0104

E0103 E0108

E0107 E0106

E0109 E0908

E0105

E0401

E0403

E0404

E0112

MECH.

SHELL SUPPORT/

STORAGE

EMER.

ELEC.

NORMAL ELEC.

I.T.

ELEVATOR

ELEVATOR LOBBY ELEVATOR

GENERATORS

CORRIDOR

CORRIDOR

EXIT PASSAGEWAY

P-TUBE BLOWERS PUMPROOM

2-HOUR FIRE WALL

G-02

STAIR

F

H.4

16.9

G

H

B.1

B.1

STORAGE

MECH

SPD

F C.4

C C

A.8 D

11.1

16.9

16.9

8.3 8.3

9. 9.

B.1 9.1

17

B.2

10.

11.

12.

13.

14.

8.2

7.1 11.20

D.

D.

E.

E. F.

F.

G.

G. H.

H.

C.

C.

F

C.4

C

A.8

D

11.1

16.9

8.3

9.

B.1

9.1

17

B.2

10.

11.

12.

13.

14.

8.2

7.1

11.20

D. E.

F. G.

H.

C.

1" HWR 3" CW1 1/2" HW

1" HWR

1 1/2" HW 3" CW

REFER TO P.201

3" CW

1" HWR 1 1/2" HW

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

1/8" = 1'-0"

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:36:34 PM

P.202

05/07/2021

P3002.00

PLUMBING - GROUND FLOOR

MECH ROOM

Author

Checker

1/8" = 1'-0"

1

PLUMBING - GROUND FLOOR

MECHANICAL ROOM

05/07/2021 BID ISSUE

(8)

MR-1 MOP RECEPTOR 3 3 3/4" 3/4" 3" 1-1/2" FLOOR RECEPTOR MANUFACTURER

FCO FCO

MARK MODEL NO. SYSTEM REMARKS

4240 4020 4160

4023-Y

LOCATION UNFINISHED AREAS

HARD FINISHED FLOORS TILE OR SHEET

FLOORING CARPETED FLOORS ITEM

FLOOR CLEANOUT

CAST IRON BODY, WITH ROUND ADJUSTABLE NICKEL BRONZE SCORIATED TOP, TAPER THREAD BRONZE PLUG, AND CARPET MARKER TYPE.

CAST IRON BODY, ADJUSTABLE NICKLE BRONZE SQUARE TOP WITH 1/8" RECESS.

CAST IRON BODY WITH FLANGE, INSIDE CAULK, ADJUSTABLE HOUSING, AND SECURED NICKEL BRONZE SCORAIATED TOP.

CAST IRON BODY WITH ROUND ADJUSTABLE CAST IRON SCORAIATED MEDIUM LOAD TOP.

CAST IRON FERRULE WITH TAPERED THREADED BRONZE PLUG. PLUG TAPPED FOR CENTER SCREW. STAINLESS STEEL ACCESS COVER WITH HARDWARE WHERE REQUIRED.

CAST IRON CAULK FERRULE WITH LEAD SEAL PLUG

CLEANOUT SCHEDULE

FLOOR CLEANOUT

FCO FLOOR CLEANOUT

FCO FLOOR CLEANOUT

4400 ABOVE CEILING

CO CLEANOUT

4422 FINISHED WALLS

WCO WALL CLEANOUT

TAPER THREADED BRONZE PLUG WITH CENTER SCREW TAPPING. STAINLESS STEEL ACCESS COVER WITH HARDWARE WHERE REQUIRED.

4472 FINISHED WALLS

WCO WALL CLEANOUT

J.R.SMITH SANITARY / STORM

(P-X)

50' A B C D E F

25' A A B C D E

NOMINAL PIPE DIAMETER-INCHES PRESSURE UP TO 65 PSI.

FEET OF PIPE LENGTH

REMARKS

(SA)

SHOCK ARRESTER SCHEDULE

2-1/2"

1-1/2"

1/2" 3/4" 1" 2"

TOTAL WSFU

0.7 6

INTEGRAL / ADA COMPLIANT

PLUMBING FIXTURE CONNECTION SCHEDULE

* FIXTURE UNIT VALUES BASED ON THE LATEST ADOPTED VERSION OF THE INTERNATIONAL PLUMBING CODE.

1-1/4" x 1-1/2"

HAND WASHING SINK SK-1

WATER CLOSET

REMARKS VENT

DRAIN H.W.

PIPE DIAMETER C.W.

DFU FIXTURE UNIT

WALL HUNG / ADA COMPLIANT -

1/2"

1/2"

1 1-1/2"

3 1" 4" 2" FLOOR MOUNTED / ADA COMPLIANT

FIXTURE MARK

LAVATORY L-1

WC-1 LOCATION

MEDICAL GAS OUTLET ARRANGEMENT SCHEDULE

REQUIRED MEDICAL GAS OUTLETS MARK

-

MGO-1 2 1 2

OXYGEN AIR VACUUM

MEDICAL GAS OUTLET / INLET ARRANGEMENT

SEE ARCH. DWG'S FOR OUTLET LOCATIONS. PRE-PIPED BY MANUFACTURE SLIDE

1

(MGO-X)

SERVING

- -

N2O

NOTE: AREA/ROOM MEDICAL GAS OUTLET QUANTITIES SHALL MEET AND OR EXCEED THOSE RECOMMENDED BY THE LATEST VERSION OF THE HOSPITAL GUIDELINES.

-

WAGD CO2

-

N2 -

- -

MEDICAL GAS ZONE VALVE BOX SCHEDULE

MEDICAL GAS ALARM PANEL SCHEDULE

MODEL NO.

MANUFACTURER ALARM SIGNALS/

ZVB-1

MODEL NO.

MANUFACTURER SERVING SYSTEM

LOCATION

MGA-2

(MGA-X)

(ZVB-X)

SERVING

ALERT-3 SERIES, DIGITAL LCD AREA ALARM, REMOTE MOUNTED PRESSURE SENSORS, NFPA COMPLIANT. DIMENSIONS: 12" L X 10.25 H X 3.97"D. TO BE MOUNTED AT 5' - 6" MAX.

ELECTRICAL DATA:115 - 220 VOLTS AC - 50 - 60 HERTZ REMARKS LOCATION

SYSTEM

REMARKS MARK

MARK

NFPA COMPLIANT, 18 GAUGE STEEL, RECESSED VALVE BOX WITH GAUGES.

AMICO AMICO

- - OXYGEN,

-

0.7 1 1/2" 1/2" 1-1/4" x 1-1/2" 1-1/2"

-

- 1/2"O2, 1/2"A, & 1"VAC -

BASED ON FLOW VELOCITIES OF 10 FPS. OR LESS. J.R.SMITH HYDROTROL, FIG. NO. SELECT THE NEXT LARGER SIZE WHEN PSI. EXCEEDS 65. TYPE-A ARRESTER SHALL BE INSTALLED IN HORIZONTAL LINES FOR FIXTURES EQUIPPED WITH QUICK-CLOSING VALVES WITH 12 WSFU OR LESS.

SETTING SWITCHES.

LAMINAR FLOW, BATTERY POWERED WITH INTERNAL FLOW CONTROL

EC-3100 SINGLE HOLE DECK MOUNT ELECTRONIC SENSOR FAUCET; 5-1/2” RIGID GOOSENECK, 1 GPM

T & S BRASS

SERIES 700

J.R.SMITH CONCEALED LAVATORY LAVATORY CARRIER

102 TRUEBRO

CAST BRASS, 17 GAUGE, P-TRAP W/CLEANOUT PLUG 1-1/4" X 1-1/2" x12" W/ESCUTCHEON.

8902CBSAN McGUIRE

L-1

149SAN OPEN GRID STRAINER, 1-1/4" X 4" TAILPIECE, WROUGHT BRASS CHROME PLATED , 17 GAUGE McGUIRE

LFH2167LK CHROME PLATED, LOOSE KEY ANGLE STOP, 1/2" I.P.S. x 1/2" O.D., 12" RISER.

McGUIRE

"LUCERNE" WHITE VITREOUS CHINA, WALL MOUNTED, 8" CENTERS, ADA COMPLIANT, LESS OVERFLOW 0356.915

AMERICAN STANDARD

PROVIDE WITH (SG) SANIGUARD HANDLE AND SOCKET (B-73-A-SG).

111-1.6

SLOAN "ROYAL" FLUSH VALVE, 1.6 GPF, 1-1/2" TOP SPUD, VANDAL PROOF, ADA COMPLIANT.

"MADERA, FLOW WISE" FLOOR MOUNTED, 16-1/2" HEIGHT, ELONGATED BOWL, 1.6 GALLON PER FLUSH VITREOUS CHINA W/EVERCLEAN, 1-1/2" TOP SPUD, 10" OR 12" ROUGH-IN.

AMERICAN STANDARD WC-1

5905.110

AMERICAN STANDARD EXTRA HEAVY DUTY OPEN FRONT SEAT, LESS COVER.

(P-X)

LFH2167LK CHROME PLATED, LOOSE KEY ANGLE STOP, 1/2" I.P.S. x 1/2" O.D., 12" RISER.

McGUIRE

CAST BRASS, 17 GAUGE, P-TRAP W/CLEANOUT PLUG 1-1/2" X 1-1/2" x12" W/ESCUTCHEON & SANIGUARD.

8912CBSAN McGUIRE

SK-2

151ASAN S.S. BASKET STRAINER, 4-1/2" X 4 TAILPIECE", DIE CAST SLIP; LOCK NUT W/SANIGUARD.

McGUIRE

LRAD2219

FULLY UNDERCOATED, 3 PUNCHED HOLES, & 6-1/2" INCH DEPTH.

SINGLE, COUNTERTOP, TYPE 304 - 18 GAUGE STAINLESS STEEL, SELF-RIMMING, ELKAY

MARK MANUFACTURER MODEL NO. REMARKS

PLUMBING FIXTURE SCHEDULE

T & S BRASS

"LAV-GUARD KIT" HIGH IMPACT, STAIN-RESISTANT VINLY COVERS AT EXPOSED LOCATIONS

B-2867-04 CONCEALED DECK MOUNTED, 8” CENTERSET, 4” WRIST ACTION HANDLES, 1.5 GPM RIGID GOOSENECK 3461.001

T & S BRASS

POWERS CONTROLS LFLM495 THERMOSTATIC MIXING VALVE.

102 "LAV-GUARD " P-TRAP AND ANGLE VALVE RIGID HIGH IMPACT, STAIN-RESISTANT VINLY COVERS TRUEBRO

CAST BRASS, 17 GAUGE, P-TRAP W/CLEANOUT PLUG 1-1/4" X 1-1/2" x12" W/ESCUTCHEON.

8902CBSAN McGUIRE

SK-1

149SAN OPEN GRID STRAINER, 1-1/4" X 4" TAILPIECE, WROUGHT BRASS CHROME PLATED , 17 GAUGE McGUIRE

LFH2167LK CHROME PLATED, LOOSE KEY ANGLE STOP, 1/2" I.P.S. x 1/2" O.D., 12" RISER.

McGUIRE

SEE ARCHITECTURAL DRAWINGS FOR SINK SPECIFICATIONS.

B-2867-04-VF05 CONCEALED DECK MOUNTED, 8” CENTERSET, 4” WRIST ACTION HANDLES, 0.5 GPM RIGID GOOSENECK -

MGO-2 - 1 1 1 - - 1 - - SEE ARCH. DWG'S FOR OUTLET LOCATIONS. PRE-PIPED BY MANUFACTURE

AIR, VACUUM,

B-0657-01 WALL MOUNTED MIXING FAUCET WITH INTEGRAL STOPS, ATMOSPHERIC VACUUM BREAKER, THREADED GARDEN HOSE CONNECTION, POLISH CHROME FINISH, AND 6" WRIST ACTION.

T & S BRASS MR-1

FIAT FIAT FIAT FIAT

1453 BB FLAT STAINLESS STEEL STRAINER STAINLESS STEEL WALL GUARD MSG3624

VINYL BUMPERGUARD 889-CC

832-AA FIAT

FIAT

E-77-AA MSB-3624

MOP HANGER

FLOOR MOUNTED, MOLDED STONE SINK, 36" x 36" x 10" HIGH WITH STRAINER / DRAIN.

HOSE AND HOSE BRACKET

COUNTER MOUNTED/ ADA COMPLIANT PANTRY SINK

SK-2 0.7 1 1/2" 1/2" 1-1/4" x 1-1/2" 1-1/2"

AMICO O-DISWAL-U-OXY

MEDICAL GAS OUTLET SCHEDULE

O2

MODEL NO.

WALL

TPYE LOCATION

AMICO O-DISWAL-U-VAC WALL

AMICO O-WALSLIDE WALL

V SL

REMARKS

NFPA COMPLIANT, COMPLETE ASSEMBLY, INSTALLED 5'-0" A.F.F.

NFPA COMPLIANT, COMPLETE ASSEMBLY, INSTALLED 5'-0" A.F.F.

(X)

AMICO O-DISWAL-U-AIR

A WALL NFPA COMPLIANT, COMPLETE ASSEMBLY, INSTALLED 5'-0" A.F.F.

MARK

OXYGEN SYSTEM

VACUUM SLIDE BRAKET AIR

MANUFACTURER

D.I.S.S.

D.I.S.S.

SLIDE D.I.S.S.

MAINTAIN BLANK SPACE BETWEEN OUTLETS, INSTALLED 5'-0" A.F.F.

ZVB-2 AMICO - - - 1/2"O2, 1/2"A, & 3/4"VAC NFPA COMPLIANT, 18 GAUGE STEEL, RECESSED VALVE BOX WITH GAUGES.

MGA-1 ALERT-3 SERIES, DIGITAL LCD AREA ALARM, REMOTE MOUNTED PRESSURE SENSORS,

NFPA COMPLIANT. DIMENSIONS: 12" L X 10.25 H X 3.97"D. TO BE MOUNTED AT 5' - 6" MAX.

ELECTRICAL DATA:115 - 220 VOLTS AC - 50 - 60 HERTZ

AMICO - - - OXYGEN,

AIR, VACUUM,

Drawn

Checked

Date

Scale

Proj. Number

Drawing Number

5

4

3

2

1

A

B

C

D

E

Number Date Issued For

Women's

Diagnostic

Center

595 West State Street

Doylestown PA 18901

3" 1 1/2"

1" 3/4"

1/2" 3/8"

1/4"1/8"1/16" 3/16"3/32"

NOT TO

SCALE

BIM 360://21007 - Women's Diagnostic Center/RGV-MEP_P3002_Doylestown_Womens Center_Predesign_v20.rvt5/13/2021 3:36:35 PM

P.401

05/07/2021

P3002.00

PLUMBING

SCHEDULES

RN

MW

04/16/2021 DOH Preliminary 05/07/2021 BID ISSUE

References

Related documents

model at regular time intervals is not effective. On the other hand, EV battery’s SOC can change in few seconds when the power demand is very high. This may cause numerical

When automatic sprinkler systems or smoke detector systems are installed, such systems or detectors shall be connected to the facility, building, or structure fire alarm system,

Grab your booking forms more help but as other things; therefore we decree a word and it shall be established, and you speak the lord, and mind of the rolls, i am healed me.. You

"Specifications" shall mean a written description of needed supplies, equipment or services setting forth in a clear and concise manner the characteristics of the items

Remote sites without an ISDN line would require a bridge to connect their IP line to the Senate/HoC committee room’s ISDN line.. Date October 20, 2015 Date October

Tamper switches shall be provided on all automatic sprinkler systems (which have flow switches), and isolation valves installed are required to be centrally monitored

The Procedures of Appointment and Cessation of the Shariah Committee Member of the Islamic Banks and Takaful Companies in Malaysia: Legal Analysis.. Mohammad Azam Hussain 1 *,

a) Properties subject to these Sections shall be maintained in a secure manner so as not to be accessible to unauthorized persons. b) A "secure manner" shall include, but