• No results found

ISO 9001:2015 Revision overview

N/A
N/A
Protected

Academic year: 2021

Share "ISO 9001:2015 Revision overview"

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

(1)

ISO 9001:2015

Revision overview

December 2013

(2)

Purpose of presentation

To provide an overview of the revision of ISO 9001 which will be published in 2015

176/ S C 2/ W G 23 N063

(3)

Background to this presentation

 developed by the ISO sub-committee

responsible for communicating key information about the current revisions to ISO 9001

 this information will be updated as the revision progresses 176/ S C 2/ W G 23 N063

(4)

Disclaimers

 the presentation includes information related to the revision process up to and including

December 2013

 further changes are likely to occur as the revision process progresses

 you will want to consider the changes as these occur and plan accordingly

176/ S C 2/ W G 23 N063

(5)

Copyright for Draft Standards

Please note:

‘This ISO document is a Draft International Standard and is copyright-protected by ISO. Except as permitted under the applicable laws of the user’s country, neither this ISO draft nor any extract from it may be reproduced, stored in a retrieval system or transmitted in any form or by any

means, electronic, photocopying, recording or otherwise, without prior written permission being secured’ (ISO/TC 176/SC2/NXXXX 2013:XX). 176/ S C 2/ W G 23 N064

(6)

ISO facts

 ISO is the International Organization for Standardization

ISO is based in Switzerland, over 160 nations participate with approximately 20,000 standards

all ISO standards are based

 ISO standards are usually Committees (TCs) or their Project Committees

 ISO work involves experts national standards bodies

on consensus developed by Technical sub-committees, or by nominated by their 176/ S C 2/ W G 23 N063

(7)

ISO 9001:2015 development process

 an international ballot agreed the need for revision

 there are several distinct stages when developing an ISO standard; the key ones being:

1. 2. 3. 4. 5. Working Drafts (WDs) Committee Draft (CD)

Draft International Standard (DIS)

Final Draft International Standard (FDIS) International Standard (IS)

The standard is published after approval of the FDIS by

participating national standards bodies and is reviewed at regular intervals after then.

176/ S C 2/ W G 23 N063

(8)

Revision intent

ISO 9001 needs to:

  

maintain relevance

integrate with other management systems

provide an integrated approach to organizational management

provide a consistent foundation for the next 10 years reflect the increasingly complex environments in which organizations operate

ensure the new standard reflects the needs of all potential user groups

enhance an organization's ability to satisfy its customers

    176/ S C 2/ W G 23 N064

(9)

What was considered?

 the results of an extensive web-based user survey

 the increasing diversity of ISO 9001 users

 developments in knowledge and technologies

 broader user interests

 changes in industry 176/ S C 2/ W G 23 N063

(10)

High level structure

 a new common format has been developed for use in all management system standards

standardized standardized

core core

text and structure definitions

The high level structure and common text is public information and can be found in Annex SL of the

www.iso.org/directives 176/ S C 2/ W G 23

N063 Organizations implementing multiple

management systems (e.g. quality,

environmental, information security) can achieve better integration and easier implementation

(11)

Main changes

 an emphasis on risk-based thinking

 increased emphasis on achieving value for the organization and its customers

 increase flexibility on the use of documentation

 more readily applicable by “service” type organizations 176/ S C 2/ W G 23 N063

customers remain the

primary focus

(12)

Main changes

     

use of the High Level Structure (HLS) improved applicability for services fewer prescribed requirements

increased emphasis on organizational context boundaries of the QMS must

consideration of exclusions now be defined 176/ S C 2/ W G 23 N064

(13)

Main changes

risk-based thinking throughout the standard

supersedes a single clause on preventive action

the term ‘documented information’ replaces

‘documents and records’

the term ‘outsourcing’ is replaced by ‘external provision’

increased leadership requirements

no requirement for a management representative

     176/ S C 2/ W G 23 N064

(14)

Changes to requirements

     

objectives must include reference to who, what, planning of changes

explicit reference to knowledge management no need for a Quality Manual

operational planning includes addressing risks

when

greater emphasis on processes achieving requirements for goods or services and customer satisfaction

176/ S C 2/ W G 23 N064

(15)

Changes to requirements

control of changes

monitoring and measurement

 

 internal audits now require the consideration of

risks

related

 management review to take into consideration

strategic direction of the organization

176/ S C 2/ W G 23 N064

(16)

Structure

1/3 1 2 3 4 Scope Normative references Terms and definitions

Context of the organization context

interested parties scope of QMS

quality management system Leadership

general

management commitment policy

roles, responsibility and authority Planning

actions to address risks and opportunities objectives and plans to achieve them

planning of changes 5 6 176/ S C 2/ W G 23 N063

(17)

Structure

2/3 7 Support resources competence awareness communication documented information Operation

operational planning and

8

control

determination of market needs and interaction with customers operational planning process

control of external provisions of goods and services development of goods and services

production of goods and provision of services release of goods and services

non conforming goods and services

176/ S C 2/ W G 23 N063

(18)

Structure

3/3

9 Performance evaluation

monitoring, measurement, analysis and internal audit management review evaluation 10 Improvement Non-conformity improvement

and corrective action

176/ S C 2/ W G 23 N063

(19)

QMS Structure

PLAN DO CHECK ACT

and corrective of market improvement review of goods and 176/ S C 2/ W G 23 N064 Nonconformi ng goods and Release of goods and services Production of goods and provision of services Development services Documented information Control of external provision of goods and services Communication QMS Management Operational planning process Awareness Planning of changes Roles, responsibilities and authorities Scope of management system Continual Internal audit Determination needs and interactions with customers Competence Quality objectives Quality policy Expectations of interested parties Nonconformity action Monitoring, measurement, analysis and evaluation Operations of planning and control Resources Actions to address risk and opportunity Leadership and commitment Understanding of the organization and its context

10 Improvement 9 Performance and evaluation 8 Operation 7 Support 6 Planning 5 Leadership 4 Context of the organization

(20)

June 2013 CD

ISO 9001:2015 Timeline

2013 2014 2015 (Committee Draft) April 2014 DIS (Draft International Standard) July 2015 FDIS

(Final Draft International Standard) September Published 2015 International Standard 176/ S C 2/ W G 23 N063

(21)

ISO 9001:2015 Certification

Transition Timeline

2015 2016 2017 2018 September 2015 Published International Standard

September 2015 start of 3 years transition period to September 2018 176/ S C 2/ W G 23 N063

(22)

Supporting documents

 certification transition plan and timeframe

 guidance documents on specific topics, e.g. the process approach

 comparison of ISO 9001:2008 and 9001:2015

 frequently asked questions

 ISO website updates

176/ S C 2/ W G 23 N063

(23)

Other important Information

The revision of ISO 9001 will impact on

other related standards and documents.

Expect changes to:

-industry-specific standards

supporting documents

176/ S C 2/ W G 23 N063

(24)

Ensure your organization

knows about the key changes

. . .

 understands the key concepts

 plans to implement the new requirements

 stays informed as the revision proceeds

 takes full advantage of the revision of ISO 9001

176/ S C 2/ W G 23 N063

(25)

What is next?

Updates will be made available as

the revision proceeds

176/ S C 2/ W G 23 N063

References

Related documents

If nothing to the contrary emerges under Section 6 below further claims on the part of the Purchaser, irrespective of legal grounds (in particular claims arising from infringement of

To our mind, the companies Qseven and Toradex did right producing modules NVidia based on NVidia mobile solutions, thus, giving the opportunity for using the chip in

3. If the correct DC voltage is at the control circuit molded plug measure the unloader coil resistance. The solenoid coil should have continuity and not be grounded or have infi

Where a product is not necessarily defective, but is or could be dangerous, a product liability claim may be based on a failure to provide adequate warnings concerning the use

Percubaan untuk menghasilkan papan kenaf pelbagai lapis (MLKB) menggunakan bahagian batang kenaf yang berbeza: kulit, teras dan kombinasi gentian kulit dan teras telah

Prior to the bonding, all of the beech wood lamellas were planed in order to ensure Table 1 Adhesive mixtures made of liquefi ed wood with different wood/solvent ratios and

Each of the four countries is assumed to produce a homogeneous non-traded good and (some) varieties of the vertically differentiated good. Given our interest in international

Where, in accordance with the Emergency Alert Contracts (and/or as a result of other agreed arrangements between Victoria and the Participating Jurisdictions relating to