SPECIFICATION FOTOWARE
Phase Service Scope
Fasa 1 A. Data Storage Controller (1 Unit)
B. Data Storage Expansion and Accessories (2 Unit) (Data Storage C. Server Rack (1 Unit)
Procurement and Software
D. Uninterruptable Power Supply (1 Unit) License E. Software Scope
Renewal) Software Renewal for 24 Months Period (23.5.2014 — 22.5.2016) Coverage Existing Fotoware Software License at primary server
D Index Manager 7.0 Standard D Color Factory 7.0 Small Office D Fotoweb 7.0 Enterprise D Fotoware Connect
Existing Fotoware Software License at backup server D Index Manager 7.0 Standard
D Color Factory 7.0 Small Office D Fotoweb 7.0 Enterprise D Fotoware Connect Existing Fotoware client license
D 8 units Fotostation 7.0 Index version
Software upgrade from existing version to latest version as below :
D. Index Manager Standard D Color Factory Small Office D Fotoweb Enterprise D Fotoware Connect D Fotostation Client F. Training D. User Training D Administrator Training
Fasa 2 A. Hardware support and maintenance
(23.5.2014 — I. Preventive maintenance for Storage Controller,
22.9.2014) Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller,
Storage Enclosure and UPS.
y Support & Maintenance 8x5 Next Business Day
Onsite
D Remote Support 8x5
> Telephone Support 8x5
Ill. Check System performance
IV. Prepare assessment report for optimizing and fine
tuning.
V. Update hardware configuration and documentation
C. Professional Service (Upgrade — if any)
I. Software Upgrade from existing Fotoware System to
latest version ;
> Software Upgrade Exercise
➢ Testing of Software
➢ Documentation
➢ Training
➢ Installation/Customization
II. Patch the system to the latest Windows patch.
D. Onsite Support & Maintenance
➢
Onsite support & Maintenance 24/7/365
➢
Telephone Support 24/7/365
➢
Monthly System Backup & Troubleshoot
I. Backup on CD-ROM of the data and existing systemconfiguration to both main and mirror server II. Regular system checkup, trouble shooting plus
consultation on operational procedures performed.
➢
Pre-test of software upgrade & Update if
available
➢
Preventive Maintenance
➢
System Health Check
➢
Implementation of Software Upgrade &Update
if available
Fasa 3 A. Hardware support and maintenance (23.9.2014 —
22.1.15)
I. Preventive maintenance for Storage Controller, Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller,
Storage Enclosure and UPS.
➢
Support & Maintenance 8x5 Next Business Day
Onsite
➢
Remote Support 8x5
➢
Telephone Support 8x5
III. Check System performance
IV. Prepare assessment report for optimizing and fine tuning.
V. Update hardware configuration and documentation
C. Professional Service (Upgrade — if any)
I. Software Upgrade from existing Fotoware System to latest version ;
> Software Upgrade Exercise > Testing of Software
D Documentation
➢ Training
> Installation/Customization
II. Patch the system to the latest Windows patch. D. Onsite Support & Maintenance
> Onsite support & Maintenance 24/7/365 > Telephone Support 24/7/365
> Monthly System Backup & Troubleshoot I. Backup on CD-ROM of the data and existing system
configuration to both main and mirror server II. Regular system checkup, trouble shooting plus
consultation on operational procedures performed. ';- Pre-test of software upgrade & Update if
available
> Preventive Maintenance D System Health Check
> Implementation of Software Upgrade &Update if available
Fasa 4 A. Hardware support and maintenance (23.1.2015 —
22.5.2015)
I. Preventive maintenance for Storage Controller,
Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller,
Storage Enclosure and UPS.
> Support & Maintenance 8x5 Next Business Day Onsite
> Remote Support 8x5 > Telephone Support 8x5
III. Check System performance
IV. Prepare assessment report for optimizing and fine
tuning.
V. Update hardware configuration and documentation
C. Professional Service (Upgrade — if any)
I. Software Upgrade from existing Fotoware System to latest version ;
➢ Software Upgrade Exercise
➢ Testing of Software
➢ Documentation
➢ Training
➢ Installation/Customization
II. Patch the system to the latest Windows patch.
D. Onsite Support & Maintenance
> Onsite support & Maintenance 24/7/365
> Telephone Support 24/7/365
> Monthly System Backup & Troubleshoot
I. Backup on CD-ROM of the data and existing system
configuration to both main and mirror server
II. Regular system checkup, trouble shooting plus
consultation on operational procedures performed.
> Pre-test of software upgrade & Update if
available
> Preventive Maintenance
➢
System Health Check
➢
Implementation of Software Upgrade &Update
if available
Fasa 5 A. Hardware support and maintenance
(23.5.2015 — I. Preventive maintenance for Storage Controller,
22.9.2015) Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller,
Storage Enclosure and UPS.
> Support & Maintenance 8x5 Next Business Day
Onsite
> Remote Support 8x5
> Telephone Support 8x5
III. Check System performance
IV. Prepare assessment report for optimizing and fine
tuning.
C. Professional Service (Upgrade — if any)
I. Software Upgrade from existing Fotoware System to latest version ;
D Software Upgrade Exercise D Testing of Software
D Documentation D Training
D Installation/Customization
II. Patch the system to the latest Windows patch.
D. Onsite Support & Maintenance
D Onsite support & Maintenance 24/7/365
D Telephone Support 24/7/365
D Monthly System Backup & Troubleshoot
I. Backup on CD-ROM of the data and existing
system configuration to both main and mirror server
II. Regular system checkup, trouble shooting plus
consultation on operational procedures performed.
D Pre-test of software upgrade & Update if
available
D Preventive Maintenance
D System Health Check
➢
Implementation of Software Upgrade &Update
if available
Fasa 6 A. Hardware support and maintenance
(23.9.2015 — I. Preventive maintenance for Storage Controller,
22.1.2016) Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller, Storage Enclosure and UPS.
D Support & Maintenance 8x5 Next Business Day
Onsite
D Remote Support 8x5
D. Telephone Support 8x5
III. Check System performance
IV. Prepare assessment report for optimizing and fine
tuning.
V. Update hardware configuration and documentation
C. Professional Service (Upgrade - if any)
I. Software Upgrade from existing Fotoware System to latest version ;
D Testing of Software
➢ Documentation
➢ Training
➢ Installation/Customization
II. Patch the system to the latest Windows patch.
D. Onsite Support & Maintenance
D Onsite support & Maintenance 24/7/365
D Telephone Support 24/7/365
D Monthly System Backup & Troubleshoot
I. Backup on CD-ROM of the data and existing
system configuration to both main and mirror server
II. Regular system checkup, trouble shooting plus consultation on operational procedures performed.
D Pre-test of software upgrade & Update if
available
D Preventive Maintenance
D System Health Check
D Implementation of Software Upgrade &Update
if available
Fasa 7
A. Hardware support and maintenance(23.1.2016 — I. Preventive maintenance for Storage Controller,
22.5.2016) Storage Enclosure and UPS
(4 months) II. On-Site Corrective maintenance for Storage Controller,
Storage Enclosure and UPS.
D Support & Maintenance 8x5 Next Business Day
Onsite
D Remote Support 8x5
D Telephone Support 8x5
III. Check System performance
IV. Prepare assessment report for optimizing and fine
tuning.
V. Update hardware configuration and documentation
C. Professional Service (Upgrade
— if any)I. Software Upgrade from existing Fotoware System to latest version ;
➢ Software Upgrade Exercise
➢ Testing of Software
➢ Documentation
➢ Training
II. Patch the system to the latest Windows patch.
D. Onsite Support & Maintenance
➢ Onsite support & Maintenance 24/7/365
➢ Telephone Support 24/7/365
➢ Monthly System Backup & Troubleshoot
I. Backup on CD-ROM of the data and existing
system configuration to both main and mirror server
II. Regular system checkup, trouble shooting plus
consultation on operational procedures performed.
➢ Pre-test of software upgrade & Update if
available
➢ Preventive Maintenance
➢ System Health Check
➢ Implementation of Software Upgrade &Update
if available
Disemak: Disokong- 54Apk0 1,1 AQ,o(AL, kw-Nip
f oNck , , ff.NAIL„e\
AHMAD IZZUDDIN MAT SALM Panoiong
Babson's) T MMus* Tourism
o
—
0
—
si.)
1 .0 NO . R ack s u p port M ana gement sof twar e F ans and po wer su ppl ies R AID l ev el s M a xi m um 'ca paci ty su pport ed D ri ve type C ach e per cont roll er S in gl e/d ual cont roll er U ser i nt e rf ace H ost i nt erf ace R ack M ount U ni t: (P le ase S pecif y) S pace re qui red Th e st or a ge h ard wa re sol uti on pr o posed sh o uld com pl y with th e f ol lowi n g s peci fi cati on s: Q u anti ty B rand : M ak e/M od el : D at a S tor a ge C o nt roll er Mi ni mum S pecifi cati on S tand ard 19 -i nch rack -mo unt e ncl osure machi ne cod e (Pl ea se s pecif y) F ull y red und ant , h ot -swa p pabl e RAID 0 , 1 ,5 , 6 and 1 0 U p to 180 TB of ca pacit y D ual -port , h ot -sw a p pabl e 6 Gb SAS di sk d ri ve s 4 G B u p gr ad abl e t o 8 GB (8 GB C ach e per S tor a ge S yst em ) D ual cont roll er G ra phi cal user i nt erf ace F o ur 1 Gb ps iSCSI M ust b e 2U rack mo unt abl e C ont roll er f orm f act orta
cr)
—1
CO_.
a
a
7-1: aouell dwoo l o ei np ag os eJemp ieH,--- CO ,-...- ... 0 `---' CL 0 o in-
'
=
PO '-.. 5 7 Oth er R e qui rem ent s F eat ur e and B en efi ts CD 0 17 <_. 0 8 E, 3 7 --,-. 3 5 0 CO 7 ,--, RI. c o O pti onal ad va nc ed feat ur es A d vanc ed feat ur es incl ud ed wi th each s yst em Mi ni m um S pecifi cati on Th e pr o posed S an S tora ge must b e conf igu red b y c ertif ied h ard war e en gi ne er All oth er rel at ed soft ware , mat eri al , c om ponent s and cabli n g whi ch ar e re qui red t o en sure f ull i nt e grati on of th e i tem m ust b e provid ed . Pl ease s pecif y Ai r t em perat ure : O perati n g: 10° C - 3 5° C (50° F - 9 5° F ) at 3 0 .5 m b el o w to 3 ,00 0 m ab o ve sea l e vel (100 b el ow t o 9 ,840 f t ab ov e ) N o n-o per ati n g: -1 0° C - 50° C (1 4° F - 12 5° F ) R el ati v e h umi di ty: O perati n g: 20% - 80% N on-o perati n g: 10% -90 % E lect ri cal power : V ol ta ge ran ge: 1 00 - 24 0 V ac F re que nc y: 50 - 60 H z P ower: 358 watt s H ei gh t: 8 .7 cm (3 .4 in .) Wi dth : 4 8 .3 cm (19 .0 i n .) D e pth : 55 .6 cm (21 .9 i n .) F lashC o py u pgrad e and E as y Ti er Int ern al vi rt uali zati o n , thi n provi si oni n g , one-wa y d at a mi gr ati on a nd Fl ashC o py (u p t o 64 t ar get s) e dueli dumo J o ei np a il os eiemp JeHCL --- 0 •-_-- Cr ..-- CO N b _ , . . 7... , 0 Z
I
D ri v e type C ont roll er int erf ace R ack M o unt U ni t: (Pl ease S pe cif y) S pac e re quired Th e st ora ge ex pansi on encl osur e h a rd ware sol uti on pro posed sh ould com pl y wi th th e foll owi n g s peci fi cati o ns: Q ua nti ty B rand : M ak e/ M od el : D at a S tor a ge E x pan si on E n cl os ure B roch ures & Li ter at ur e S u p port and W arr ant y Mi ni mum S pe cifi c ati on D ual -port , h ot -swa ppabl e 6 Gb SA S di sk d ri v es M 0 Cr) M ust b e 2U rack mo unt abl e C ont roll er f o rm f act or co cr) —I CO iv c z .=,-.: All h ard ware ab ov e 3 -Y ea rs O n-Si te W arr ant y incl usi ve of P art s and L ab o ur eoueu dw ool o ei np ati os aiemp ieHS u pport and W ar rant y: Inst all ati on : P ower sourc e 0 0 el Ci) (J) 0 --, CD (i) Si z e/H ei gh t [Specifi cati on s: Q uanti ty B ra nd : M ak e/M od el : R a ck and A cc essori es M ini m um S pecif icati on 1 -Y e ar O n-S ite W arr ant y i ncl usi ve of P art s and L ab our V end or m ust i n st all th e rack and acc essori es i ncl usi ve of cabli n g 1 row power po int (10 S ock et s 13A m p) C abl e tra y C ast or wh eel 4 ad just abl e mo unti n g memb er s 2 d et ach abl e sid e panel wi th l ock 1 V ent ed t o p c ov er F ront gl ass d oor wi th l o ck 42U S tand ard R ack C abi net C rr = • adu eil dtuo0 j o emp ag os
H 'n) )7 1•1 "3d 0 0 Co 0 Cl) . CD 93 CD — — O. 0 Cs ill — O 41. Z 0 S u p port and W arr ant y: 0 (/) = tu _6. D B att eri es & R unti m e .6. -0 .--.. 0 C c S pecif ic ati on s: 0 C Ell D : . <, =. : B rand : M ak e/M od el : U ni nt err u pti bl e P ower S u ppl y Mi ni m um S pecif ic ati on 1 -Y ear O n -Si te W arr ant y i ncl usi v e of P art s and L ab our V end or m ust i n st all th e UPS and accessori es i n cl usi ve of cabli n g 1 5 mi n mi ni m um runti me at h alf l oad 3 h our (s) T ypi cal r ech ar ge ti me M ai nt enan ce-f ree seal ed L ead -A cid b att er y wi th sus pend ed el e ct rol yt e : l eak proof 2 08V , 2 30V N omi nal I n put V ol ta ge L ess th an 5% O ut put V ol ta ge Di st orti on 230V N omi nal O ut put V ol ta ge 3000VA M ax C onfi gur abl e P o wer 3000VA O ut put P ower C a paci ty C = ;-: ■ eou eu duloo f o ei np eti os eJ emp JeFi