I. SITEWORKS A. EXCAVATION for walls Perimeter = 50.00 m Depth = 1.50 m widt = 0.30 m VOLUME= 22.50 for footing footing 1 footing 2 length = 1.5 m length = 1.2 m width = 1 m width = 0.8 m depth = 2.4 m depth = 2.4 m number= 3 number= 20 VOLUME= 10.80 VOLUME= 46.08 footing 3 length = 1 m width = 1 m depth = 2.4 m number= 10 VOLUME= 24.00 total Volume = 46.08 B. BACKFILLING volume = 36.86 C. EARTHFILL MATERIALS area = 229.00 thickness = 0.25 m volume = 57.25

II. CONCRETE WORKS

A. FOR FOOTING

for footing 1 for footing 2

1. concrete 1. concrete length = 1.50 m length = 1.20 width = 1.00 m width = 0.80 depth = 0.40 m depth = 0.40 number = 4.00 number = 2.00 class A class A

cement = 21.60 bags cement = 6.91

sand = 1.20 sand = 0.38 gravel = 2.40 gravel = 0.77 m3 m3 m3 m3 m3 m3 m2 m3 m3 m3

(2)

2. rebars 2. rebars

spacing = 0.18 m spacing = 0.18

16mmθ = 22.32 pcs SAY 22 16 mmθ = 7.21

using 30 cm tie wire= 0.63 kg. using 30 cm tie wire= 0.25

for footing 3 for footing 4

1. concrete 1. concrete length = 1.00 m length = width = 1.00 m width = depth = 0.40 m depth = number = 24.00 number = class A class A

cement = 86.40 bags cement = 0.00

sand = 4.80 sand = 0.00

gravel = 9.60 gravel = 0.00

2. rebars 2. rebars

spacing = 0.18 m spacing = 0.18

16 mmθ = 88.99 pcs SAY 89 16 mmθ = 0.10

using 30 cm tie wire= 3.02 kg. using 30 cm tie wire= 0.00

TOTAL

cement = 114.91 bags

sand = 6.38

gravel = 12.77

16 mmθ = 118.52 pcs( 6m long)

using 30 cm tie wire= 3.90 kg.

B. FOR COLUMNS

for column 1(3rd level) for column 2 (3rd level)

1. concrete 1. concrete length = 0.30 m length = 0.20 width = 0.15 m width = 0.20 depth = 3.90 m depth = 3.90 # of RSB = 6.00 # of RSB = 6.00 number = 32.00 number = 2.00 class A class A

cement = 50.54 bags cement = 2.81

sand = 2.81 sand = 0.16 gravel = 5.62 gravel = 0.31 2. rebars 2. rebars spacing = 0.15 m spacing = 0.15 16mmθ = 124.80 pcs SAY 125 16mmθ = 7.80 12mmθ = 41.60 pcs SAY 42 12mmθ = 2.60 10mmθ = 62.40 pcs SAY 62 10mmθ = 3.47

using 30 cm tie wire= 28.26 kg. using 30 cm tie wire= 1.77

for column 3 (3rd level)

m3 m3 m3 m3 m3 m3

(3)

1. concrete length = m width = depth = m # of RSB = number = class A cement = 0.00 bags sand = 0.00 gravel = 0.00 2. rebars spacing = 0.15 m 16mmθ = 0.00 pcs SAY 0 12mmθ = 0.00 pcs SAY 0 10mmθ = 0.00 pcs SAY 0

using 30 cm tie wire= 0.00 kg.

for column 1(2nd level) for column 2 (2nd level)

1. concrete 1. concrete length = m length = width = m width = depth = m depth = # of RSB = # of RSB = number = number = class A class A

cement = 0.00 bags cement = 0.00

sand = 0.00 sand = 0.00 gravel = 0.00 gravel = 0.00 2. rebars 2. rebars spacing = 0.15 m spacing = 0.15 16mmθ = 0.00 pcs SAY 0 16mmθ = 0.00 12mmθ = 0.00 pcs SAY 0 12mmθ = 0.00 10mmθ = 0.00 pcs SAY 0 10mmθ = 0.00

using 30 cm tie wire= 0.00 kg. using 30 cm tie wire= 0.00

for column 3 (2nd level) 1. concrete length = m width = depth = m # of RSB = number = class A cement = 0.00 bags sand = 0.00 gravel = 0.00 m3 m3 m3 m3 m3 m3

(4)

2. rebars

spacing = 0.15 m

16mmθ = 0.00 pcs SAY 0

12mmθ = 0.00 pcs SAY 0

10mmθ = 0.00 pcs SAY 0

using 30 cm tie wire= 0.00 kg.

for column 1(1st level) for column 2 (1st level)

1. concrete 1. concrete length = m length = width = m width = depth = m depth = # of RSB = # of RSB = number = number = class A class A

cement = 0.00 bags cement = 0.00

sand = 0.00 sand = 0.00 gravel = 0.00 gravel = 0.00 2. rebars 2. rebars spacing = 0.15 m spacing = 0.15 16mmθ = 0.00 pcs SAY 0 16mmθ = 0.00 12mmθ = 0.00 pcs SAY 0 12mmθ = 0.00 10mmθ = 0.00 pcs SAY 0 10mmθ = 0.00

using 30 cm tie wire= 0.00 kg. using 30 cm tie wire= 0.00

for column 3 (1st level) 1. concrete length = m width = depth = m # of RSB = number = class A cement = 0.00 bags sand = 0.00 gravel = 0.00 2. rebars spacing = 0.15 m 16mmθ = 0.00 pcs SAY 0 12mmθ = 0.00 pcs SAY 0 10mmθ = 0.00 pcs SAY 0

using 30 cm tie wire= 0.00 kg.

TOTAL for Column

m3 m3

m3 m3

(5)

cement = 53.35 bags sand = 2.96 gravel = 5.93 16 mmθ = 132.60 pcs( 6m long) 12 mmθ = 44.20 10mmθ = 65.87 pcs( 6m long)

using 25 cm tie wire= 30.02 kg.

C. FOR BEAMS beam 1 (3rd level) 1. concrete length = 120.90 m width = 0.15 m depth = 0.40 m number = 1.00 class A cement = 65.29 bags sand = 3.63 gravel = 7.25 2. rebars main RSB= 8.00 spacing = 0.15 m 16 mmθ = 161.20 pcs( 6m long) 10 mmθ = 40.30 pcs( 6m long) 10 mmθ = 147.77 pcs( 6m long)

using 30 cm tie wire= 54.75 kg.

TOTAL cement = 65.29 bags sand = 3.63 gravel = 7.25 16 mmθ = 161.20 pcs( 6m long) 10 mmθ = 188.07 pcs( 6m long)

using 30 cm tie wire= 54.75 kg.

D. FOR FLOORING F1 1. concrete length = 10.00 m width = 14.00 m depth = 0.15 m number = 1.00 class B cement = 157.50 bags sand = 10.50 m3 m3 m3 m3 m3 m3 m3

(6)

gravel = 21.00 2. rebars

spacing = 0.80 m

12 mmθ = 58.33 pcs( 6m long)

using 25 cm tie wire= 1.03 kg.

TOTAL cement = 157.50 bags sand = 10.50 gravel = 21.00 12 mmθ = 58.33 10 mmθ = 58.33 pcs( 6m long)

using 30 cm tie wire= 1.03 kg.

E. FOR STAIRS 1. concrete length = 2.35 m width = 0.25 m depth = 0.20 m number = 1.00 landing length = 1.23 width = 1.00 depth = 0.20 class A cement = 10.44 bags sand = 0.58 gravel = 1.16 2. rebars spacing = 0.15 m 16 mmθ = 89.76 pcs( 6m long) 12 mmθ = 1.34 pcs( 6m long)

using 30 cm tie wire= 30.10 kg.

TOTAL cement = 10.44 bags sand = 0.58 gravel = 1.16 16 mmθ = 89.76 pcs( 6m long) 12 mmθ = 1.34 pcs( 6m long)

using 30 cm tie wire= 30.10 pcs( 6m long)

F. FOR PLUMBING WORKS

septic tank 1 septic tank 2

1. concrete 1. concrete m3 m3 m3 m3 m3 m3 m3

(7)

length = 3.00 m length =

width = 1.50 m width =

depth = 2.00 m depth =

thickness = 0.13 m thickness =

S.area = 18.00 S.area =

class B (using 10X20X40 CHB) class B (using 10X20X40 CHB)

cement = 13.67 bags cement = 0.00

sand = 1.07 sand = 0.00

2. rebars 2. rebars

spacing = 0.15 m spacing = 0.15

12 mmθ = 10.00 pcs( 6m long) 12 mmθ = 0.00

10 mmθ = 10.00 pcs( 6m long) 10 mmθ = 0.00

using 30 cm tie wire= 3.40 kg. using 30 cm tie wire= 0.00

TOTAL

cement = 13.67 bags

sand = 1.07

12 mmθ = 10.00 pcs( 6m long)

10 mmθ = 10.00 pcs( 6m long)

using 30 cm tie wire= 3.40 pcs( 6m long)

III. FORMWORKS

A. FOR COLUMN

COLUMN 1(2nd-3rd level) using flywood forms

total lateral width = 1.10 m

length or height of the form= 5.00 m

number of form = 33.00 pcs.

total area of forms = 181.50

order : 63 pcs. (1/4" X 4' X 8' plywood) 1870 bd. Ft. (2" X 2") wood frame m2 m3 m3 m2

(8)

TOTAL

32 pcs. (1/4" X 4' X 8' plywood) 935 bd. Ft. (2" X 2") wood frame B. FOR BEAM

BEAM 2

using flywood forms

total lateral width = 1.10 m

length or height of the form= 150.50 m

number of form = 1.00 pcs.

total area of forms = 165.55

order : 57 pcs. (1/4" X 4' X 8' plywood) 1441 bd. Ft. (2" X 2" wood frame) TOTAL 57 pcs. (1/4" X 4' X 8' plywood) 1441 bd. Ft. (2" X 2") wood frame FOR SLAB length = 16.7 m width = 10 m area = 167 58 pcs. (1/4" X 4' X 8' marine plywood) 1520 bd.ft.(2" X 3") support

C. FOR STAGING AND SCAFFOLDING

SCAFFOLDING FOR COLUMN 1

total length of column= 0.00 m

vertical support = 0.00 bd.ft.(2" X 3") horizontal support = 0.00 bd.ft.(2" X 2") diagonal braces = 0.00 bd.ft.(2" X 2") TOTAL 0.00 bd.ft.(2" X 3") 0.00 bd.ft.(2" X 2")

IV. MASONRY WORKS

A. FOR EXTERIOR WALLS

m2

(9)

length = 48.00 m height = 3.50 m area = 168.00 using 20X20X40 CHB; no. of CHB = 2100.00 pcs. for footing cement = 22.50 sand = 1.50 gravel = 3.00 for mortar cement = 88.20 bags sand = 7.36

for plastering(using 1" thich plaster)

cement = 151.20 bags

sand = 8.40

12 mmθ = 8.00 pcs.

10 mmθ = 81.67 pcs.

tie wire = 1.65 kgs.

B. FOR INTERIOR WALLS

length = 40.00 m height = 4.00 m area = 160.00 using 20X20X40 CHB; no. of CHB = 2000.00 pcs. for footing cement = 18.75 sand = 1.25 gravel = 2.50 for mortar cement = 84.00 bags sand = 7.01

for plastering(using 1" thich plaster)

cement = 144.00 bags

sand = 8.00

12 mmθ = 6.67 pcs.

10 mmθ = 77.78 pcs.

tie wire = 1.57 kgs.

B. FOR PLUMBING/SEPTIC TANK

length = 8.50 m height = 3.00 m area = 25.50 m2 m3 m3 m2 m3 m3 m2

(10)

using 20X20X40 CHB;

no. of CHB = 318.75 pcs.

for mortar

cement = 13.39 bags

sand = 1.12

for plastering(using 1" thich plaster)

cement = 23.32 bags sand = 1.30 10 mmθ = 12.40 pcs. tie wire = 0.25 kgs. V. CARPENTRY WORKS 1/4 " plywood ceiling area = 350.00 no. of plywood = 121.53 pcs.

using 2" x 2" ceiling joist at 40 X 40 cm spacing

qty. of wood = 2232.65 bd. Ft.

V. TILEWORKS

unglazed floor tiles using 20x20 cm tiles

length = 2.4 m

width = 2.5 m

number = 2

area = 6.00 5.33 5.98 1.5 12.8

no. of floor tiles = 300.00 pcs. glazed wall tiles

using 20x20 cm tiles length = 2 m width = 1.5 m number = 2 area = 10.50 no. of tiles = 262.50 pcs. cement mortar total area = 16.50

cement mortar = 1.49 bags

white cement filler = 8.66 bags

VI. DOORS & WINDOWS

m3 m3 m2 m2 m2 m2

(11)

D1 D2 height = 2.10 m height = 2.10 m width = 1.00 m width = 0.80 m number= 1.00 number= 2.00 D3 D4 height = 2.10 m height = 2.10 m width = 0.70 m width = 1.60 m number= 2.00 number= 2.00

W1a & W1b W1a'

height = 1.60 m height = 0.40 m width = 1.80 m width = 1.20 m number= 2.00 number= 2.00 0.06 lm W3 W4 height = 0.40 m height = 1.00 m width = 1.00 m width = 0.60 m number= 2.00 number= 2.00 W1 W2 height = 1.20 m height = 1.20 m width = 1.80 m width = 1.20 m number= 2.00 number= 2.00 W5 W6(bay) height = 1.00 m height = 1.00 m width = 1.20 m width = 1.80 m number= 2.00 number= 2.00

VII. METAL WORKS

metal stair railing

length 1 2.00 m

length 2 3.00 m

length 3 3.00 m

length 4 3.00 m

total = 11.00 lm

VIII. ROOFING WORKS

ROOF FRAMING 1-1/2 X 3/16" angle bar

commercial size 6.00 m

DESIGNATION TRUSS 1 LENGTH QTY. NO. OF PCS.

top bar 7.00 6.00 14.00

bottom bar 6.80 6.00 13.60

web member 1 1.20 6.00 2.40

(12)

web member 3 0.80 6.00 1.60 web member 4 0.60 6.00 1.20 web member 5 0.50 6.00 1.00 web member 6 0.30 6.00 0.60 web member 7 0.10 6.00 0.20 web member 8 1.40 12.00 5.60 web member 9 1.10 12.00 4.40 web member 10 1.00 12.00 4.00 SUMMARY

TOTAL 1-1/2 X 3/16" angle bar 51 pcs.

50 x 100 x C - purlins, Standard

commercial size 6 m

length width spacing quantity

7 8 0.8 11.67

2 7 0.8 2.92

Def bar, 10mmø sag rod

commercial size 6 m

length no. span quantity

7 6 4

Pre-fabricated Ridge roll

effective length = 2.5 m length = 8 m quantity = 3.2 pcs. 2.81 pcs. G.I. sheets Pre-fabricated Flushing effective length = 2.5 m length = 18 m quantity = 7.2 pcs. 1.25 pcs. G.I. sheets Rib type long span roof

effective area = 0.5 m roof 1 rise = 2 run = 7 m length = 14 m width = 8 m area = 112 quantity = 224 pcs. roof 2 rise = 1 run = 1.5 m length = 1.5 m width = 7 m area = 10.5 quantity = 21 pcs. m2 m2

(13)

total = 245 pcs. G.I. Rivets = 5390.00 pcs.

G.I. washers = 924.00 pcs.

plain G.I. Strap = 1.20 pc.

lead washer = 6.16 kgs.

tekscrew = 3430 pcs.

IX. PAINTING WORKS

A. Interior painting

effective area coated 30 sq.m./gallon

perimeter height area qty.

190 9 1710 57.00 gallon acrylic gloss latex paint

57.00 gallon acrylic latex primer B. exterior painting

effective area coated 30 sq.m./gallon

perimeter height area qty.

68 9 612 20.4 gallon acrylic gloss latex paint

20.4 gallon acrylic latex primer C. Ceiling Painting at Second Floor

effective area coated 30 sq.m./gallon

length width area qty.

20 7 322 9.2 gallon wood primer

10.73 gallon quick drying enamel

ELECTRICAL WORKS

PANEL "A" 220 V IPH 2W 60Hz

CRT. NO. DESCRIPTION CURRENT WATTS AMPERE PROTECTION

1 LIGHTING OUTLET 13 220 1300 5.91 15 AT 2 LIGHTING OUTLET 7 220 700 3.18 15 AT 3 LIGHTING OUTLET 14 220 1400 6.36 15 AT 4 CONVENIENCE OUTLET 9 220 900 4.09 15 AT 5 CONVENIENCE OUTLETwaterproof9 220 900 4.09 20 AT 6 CONVENIENCE OUTLETwaterproof1 220 1380 6.27 15 AT 7 CONVENIENCE OUTLETwaterproof1 220 1380 6.27 15 AT 8 CONVENIENCE OUTLETwaterproof1 220 1380 6.27 15 AT 9 CONVENIENCE OUTLETwaterproof1 220 1380 6.27 15 AT 10 SPARE - - - - 15 AT TOTALS 10720.00 48.73

PANEL "B" 220 V IPH 2W 60Hz(PANEL C,D,E,F,G)

1 LIGHTING OUTLET 4 220 400 1.82 15 AT

2 CONVENIENCE OUTLET 6 220 600 2.73 15 AT

3 SPARE - - - - 15 AT

4 SPARE - - - - 15 AT

TOTALS 1000.00 4.55

total current load = 20440 watts

first 10000 watts at 100% demand factor (df) = 10000 watts NO.OF

(14)

10440 watts + 4176 watts air conditioning unit at 100% demand factor = 900 watts

total = 15076 watts

total connected load plus 25% of the largest motor 220v

I = 69.55 amperes

(15)

CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

m AA 1:1 1/2:3 12 0.5 1 m A 1:2.0:4.0 9 0.5 1 m B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 bags m3 m3

(16)

m

pcs SAY 7 kg.

CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

m AA 1:1 1/2:3 12 0.5 1 m A 1:2.0:4.0 9 0.5 1 m B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 bags m pcs SAY 0 kg. m m m bags m pcs SAY 8 pcs SAY 3 pcs SAY 3 kg. m3 m3 m3 m3

(17)

CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

m AA 1:1 1/2:3 12 0.5 1 m A 1:2.0:4.0 9 0.5 1 m B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 bags m pcs SAY 0 pcs SAY 0 pcs SAY 0 kg. CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

AA 1:1 1/2:3 12 0.5 1 A 1:2.0:4.0 9 0.5 1 B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 m3 m3

(18)

CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

m AA 1:1 1/2:3 12 0.5 1 m A 1:2.0:4.0 9 0.5 1 m B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 bags m pcs SAY 0 pcs SAY 0 pcs SAY 0 kg. CONCRETE PROPORTION

CLASS MIXTURE CEMENT SAND GRAVEL

AA 1:1 1/2:3 12 0.5 1 A 1:2.0:4.0 9 0.5 1 B 1:2 1/2:5 7.5 0.5 1 C 1:3.0:6.0 6 0.5 1 m3 m3

(19)
(20)
(21)

m NUMBER PER SQ.M BAGS CEMENT m B C m 10X20X40 12.5 0.53 0.35 m 15X20X40 12.5 1.01 0.76 20X20X40 12.5 1.5 1.13 bags m pcs( 6m long) pcs( 6m long) kg. SIZE OF CHB m2 m3

(22)

STAGING

column Bd.Ft. per Meter Ht. Beam Bd. Ft./ M ht.

vert. hor. brace vert. hor.

2" X 2" 4.67 21.00 11.67 4.00 4.67

2" X 3" 7.00 31.67 17.50 6.00 7.00

2" X 4" 9.33 42.22 23.33 8.00 9.33

lumber size

(23)
(24)
(25)
(26)
(27)

15mm 15mm 15mm 15mm 15mm 15mm 15mm 15mm 15mm - -15mm 15mm - -- -= SIZES OF WIRES AND

CONDUIT 2pcs. 2.0mm2 2pcs. 2.0mm2 2pcs. 2.0mm2 2pcs. 2.0mm2 2pcs. 3.5mm2 2pcs. 3.5mm2 2pcs. 3.5mm2 2pcs. 2.0mm2 2pcs. 2.0mm2 2pcs. 2.0mm2 2pcs. 3.5mm1

(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)

BAGS CEMENT SAND D 0.33 0.04 0.63 0.08 0.94 0.13

(36)

6.10 9.10 12.10 flooring bd.ft/m ht

(37)
(38)
(39)
(40)
(41)
(42)
(43)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: SUMMARY OF COST ESTIMATE

No. DESCRIPTION AMOUNT

I SITEWORKS 9,175.00 II CONCRETE WORKS 132,945.22 III FORMWORKS 69,018.45 IV CARPENTRY WORKS 20,620.25 V MASONRY WORKS 92,801.00 VI TILEWORKS 18,490.00

VII DOORS AND WINDOWS 139,560.00

VIII HARDWARES 19,010.00

IX ROOFING WORKS 348,521.50

X PLUMBING WORKS 32,025.00

XI PAINTING WORKS 30,780.00

XII ELECTRICAL WORKS 65,152.00

XIII METAL WORKS 45,500.00

XIV PEST CONTROL 6,450.00

TOTAL MATERIAL COST Php 1,030,048.42 LABOR COST (35% OF MAT'L COST) Php 360,516.95 GRAND TOTAL Php 1,390,565.37

(44)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit Amount

I SITEWORKS Excavation 40.00 m3 - Backfilling 24.00 m3 - - Eartfill Material 25.00 m3 367.00 9,175.00 ### Sub Total "1" 9,175.00 ### II CONCRETE WORKS ### for footings ### concrete ###

Portland cement 87.00 bags 199.00 17,313.00

sand 4.81 cu m 500.00 2,405.00

gravel 9.62 cu m 776.00 7,465.12

rebars ###

16mmø 51.00 pcs. 248.00 12,648.00

# 16 Tie Wire 6.04 kilos 58.00 350.32

for columns ###

concrete ###

Portland cement 45.00 bags 199.00 8,955.00

sand 2.65 cu m 500.00 1,325.00 gravel 4.13 cu m 776.00 3,204.88 rebars ### 16mmø 93.00 pcs 248.00 23,064.00 12mmø pcs 140.00 - 10mmø 57.00 pcs 95.00 5,415.00

# 16 Tie Wire 15.73 kilos 58.00 912.34

for beams ###

concrete ###

Portland cement 21.00 bags 199.00 4,179.00

sand 1.23 cu m 500.00 615.00

gravel 1.87 cu m 776.00 1,451.12

rebars

16mmø 41.00 pcs. 248.00 10,168.00

10mmø 25.00 pcs. 95.00 2,375.00

# 16 Tie Wire 5.00 kilos 58.00 290.00

for slabs ###

concrete ###

Portland cement 52.00 bags 199.00 10,348.00

sand 4.95 cu m 500.00 2,475.00

gravel 5.76 cu m 776.00 4,469.76

10mmø 60.00 pcs. 95.00 5,700.00

# 16 Tie Wire 1.79 kilos 58.00 103.82

for stairs ###

concrete ###

Portland cement - bags 199.00 -

sand - cu m 500.00 -

gravel - cu m 776.00 -

16mmø - pcs. 248.00 -

Unit Cost (Material)

(45)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit (Material)Unit Cost Amount

12mmø - pcs. 140.00 -

# 16 Tie Wire - kilos 58.00 -

for plumbing works ###

concrete ###

Portland cement 18.00 bags 199.00 3,582.00

sand 0.98 cu m 500.00 490.00

12mmø pcs. 140.00 -

10mmø 37.00 pcs. 95.00 3,515.00

# 16 Tie Wire 2.17 kilos 58.00 125.86

others

Pozzolanic Fly Ash (Maximizer) - bags -

Sub Total "2" 132,945.22 ### III FORMWORKS ### for column 1/4" X 4' X 8' plywood 35.00 pcs. 255.00 8,925.00 2" X 2" wood frame 1,038.45 bft 15.00 15,576.75 for beam 1/4" X 4' X 8' plywood 13.00 pcs. 255.00 3,315.00 2" X 2" wood frame 325.78 bft 15.00 4,886.70 for slab 1/4" X 4' X 8' marine plywood - pcs. 281.00 - 2" X 3" wood frame - bft 15.00 - for staging and scafolding

2" X 3" wood frame 878.00 bft 15.00 13,170.00 2" X 2" wood frame 1,543.00 bft 15.00 23,145.00 ### Sub Total "3" 69,018.45 iV MASONRY WORKS ### 5" CHB 2,621.00 nos 7.00 18,347.00 for mortar

Portland cement mortar filler and plaster 263.00 bags 199.00 52,337.00

sand 21.54 cu m 500.00 10,770.00

gravel cu m 776.00 -

12mmø pcs. 140.00 -

10mmø 117.00 pcs. 95.00 11,115.00

tie wire 4.00 kilos 58.00 232.00

### Sub Total "4" 92,801.00 V CARPENTRY WORKS ### ceiling joist 2" X 2" good lumber 529.01 bd.ft. 25.00 13,225.25 1/4" X 4' X 8' flywood 29.00 pcs. 255.00 7,395.00

(46)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit (Material)Unit Cost Amount

Sub Total "5" 20,620.25

VI TILEWORKS ###

20 x 20 unglazed floor tiles 299.00 pcs 14.00 4,186.00

20 x 20 glazed wall tiles 237.00 pcs 14.00 3,318.00

30 x 30 floor tiles 95.00 pcs. 60.00 5,700.00

Portland cement mortar 4.00 bags 199.00 796.00

white cement filler 12.00 kilos 30.00 360.00

Sand (s-1) 2.00 cu.m 500.00 1,000.00

Tile grout 9.00 kilos 250.00 2,250.00

glass blocks (optional) - pcs. 250.00 -

tile adhesive 4.00 bags 220.00 880.00

###

Sub Total "6" 18,490.00

###

VII DOORS AND WINDOWS ###

D-1; Solid panel door w/ jamb

0.9 x 2.10m 1.00 sets 8,500.00 8,500.00

D-1a; Sliding door -

0.9 x 2.10m 1.00 sets 7500 7,500.00

D-2; solidn panel door -

0.8 x 2.10m 4.00 sets 8,500.00 34,000.00

D-3; panel door w/ jamb -

0.60 x 2.10m 2.00 sets 4,500.00 9,000.00

D-4; Solid panel door w/ jamb -

0.7 x 2.10m 1.00 sets 3,200.00 3,200.00

W-1; analoc window -

0.8x1.2m 7.00 sets 7,000.00 49,000.00

W-2;analoc window -

1.2x1.2m 2.00 sets 4,600.00 9,200.00

W-2a; analoc window -

0.8 x 1.2m 1.00 sets 3,360.00 3,360.00

w-3; analoc window -

0.6x0.6m 4.00 sets 3,000.00 12,000.00

w-4; analoc window -

2.4x1.4m 1.00 sets 1,500.00 1,500.00

W-4a; analoc window -

2.4x0.8m 1.00 sets 2,300.00 2,300.00

Sub Total "7" 139,560.00

###

VIII HARDWARES ###

Kwikset Door knob 9.00 unit 900.00 8,100.00

Yale Dead Bolt - unit - -

Loosepin type S/S Hinges 27.00 unit 180.00 4,860.00

Yale" Door Closer Heavy Duty type - unit 180.00 -

1' Finishing nails 11.00 kgs. 90.00 990.00

5.00 kgs. 90.00 450.00

2" common wire nails 13.00 kgs. 70.00 910.00

3"common nails 13.00 kgs. 70.00 910.00

(47)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit (Material)Unit Cost Amount

3"concrete nails 6.00 kgs. 90.00 540.00

4"common wire nails 25.00 kgs. 90.00 2,250.00

Sub Total "8" 19,010.00

###

IX ROOFING WORKS ###

Roof Framing ###

2" x 3/16" Angle Bar 66.00 nos 505.00 33,330.00

50 x 100 x C - purlins, Standard 71.00 nos 398.00 28,258.00

16mm dia. Turn Buckle - pc 85.00 -

tekscrew - pcs 1.00 -

Def bar, 10mmø sag rod 5.00 kgs 91.00 455.00

Plain G.I. Sheet 18.00 pc 392.00 7,056.00

Welding Rod 30.00 box 82.00 2,460.00

G.I. Rivets 1,575.00 pc 0.50 787.50

G.I. washers 3,150.00 pc 2.00 6,300.00

lead washer 1,575.00 kgs. 165.00 259,875.00

Rib type long span roof 226.00 sm -

blind rivets pc 0.50 - miscellaneous 10,000.00 ### Sub Total "9" 348,521.50 ### X PLUMBING WORKS ### T & B Accessories ###

Wall Hung Lavatory 2.00 pcs. 550.00 1,100.00

Watercloset 2.00 pcs. 500.00 1,000.00

Toilet paper holder 2.00 pcs. 180.00 360.00

Soap Holder 2.00 pcs. 180.00 360.00

Geisdorf Long neck Lavatory Faucet 1.00 pcs. 850.00 850.00

Gate Valve 2.00 pcs. 250.00 500.00 Faucet 6.00 pcs. 100.00 600.00 kitchen sink 1.00 pcs. 380.00 380.00 Roughing Ins ### G.I. Pipe, 1/2 9.00 pcs. 350.00 3,150.00 G.I. Elbow, 1/2 25.00 pcs. 10.00 250.00 G.I. Tee, 1/2 7.00 pcs. 15.00 105.00 Floor drain 3.00 pcs. 85.00 255.00

Clean out plug (3") 3.00 pcs. 50.00 150.00

P trap (3") 4.00 pcs. 1,850.00 7,400.00 PVC Elbow (3") 2.00 pcs. 60.00 120.00 PVC Elbow (4") 7.00 pcs. 95.00 665.00 PVC Wye (4") 5.00 pcs. 130.00 650.00 Reducer (4"/3") 4.00 pcs. 65.00 260.00 PVC Tee (4") 13.00 pcs. 110.00 1,430.00 PVC Tee (3") 6.00 pcs. 95.00 570.00 PVC Pipe 4" x 3.0m 20.00 pcs. 495.00 9,900.00 PVC Pipe 3" x 3.0m 5.00 pcs. 380.00 1,900.00 Teflon Tape 7.00 pcs. 10.00 70.00 ### Sub Total "10" 32,025.00 ###

(48)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit (Material)Unit Cost Amount

XI PAINTING WORKS ###

acrylic gloss latex paint 20.00 gal. 480.00 9,600.00 acrylic latex primer 24.00 gal. 420.00 10,080.00

Ceiling Painting ###

wood primer 6.00 gal. 340.00 2,040.00

quick drying enamel 6.00 gal. 510.00 3,060.00

miscelleneous - 6,000.00

###

Sub Total "11" 30,780.00

###

XII ELECTRICAL WORKS ###

pinlight assembly 28.00 nos 185.00 5,180.00

acrylic ceiling lamp (assembly) 6.00 nos 120.00 720.00

convineince outlets 18.00 nos 75.00 1,350.00

heavy duty C switch 6.00 nos 90.00 540.00

one-way switch 2.00 nos 55.00 110.00

two-gang switch 6.00 nos 90.00 540.00

three-gang switch 4.00 nos 120.00 480.00

panel circuit board 1.00 set 420.00 420.00

utility box 20.00 set 20.00 400.00

panel metering board 1.00 set 72.00 72.00

flexible hose 15mm dia 20.00 rolls 600.00 12,000.00

uPVC 15 mm dia. 10.00 pcs 55.00 550.00 PVC 25 mm dia. 4.00 pcs 75.00 300.00 1.00 box 2,000.00 2,000.00 1.00 box 2,600.00 2,600.00 2.00 box 8,400.00 16,800.00 3.00 box 2,000.00 6,000.00 3.00 box 3,200.00 9,600.00

100 A cuircuit breaker 2.00 sets 750.00 1,500.00

30 A cuircuit breaker 3.00 sets 250.00 750.00

20 A cuircuit breaker 6.00 sets 250.00 1,500.00

15 A cuircuit breaker 6.00 sets 250.00 1,500.00

entrance cap, PVC pipe, etc 2.00 lot 120.00 240.00

Sub Total "12" 65,152.00

XIII METAL WORKS ###

window grills 17.00 2,500.00 42,500.00

grills (balcony) 12.00 250.00 3,000.00

Sub Total "13" 45,500.00

###

XIV PEST CONTROL ###

Wood Treatment (Solignum, Natural) 5.00 gals 950.00 4,750.00

Soil Treatment (Lentrek II) 2.00 gals 850.00 1,700.00

### Sub Total "14" 6,450.00 30mm2 THW 14mm2 THW 8 mm2 ground wire 2 mm2 THHN 3.5 mm2 THHN ft2 ft2

(49)

PROJECT: THREE (3)-BEDROOM RESIDENTIAL BUILDING W/ ATTIC LOCATION: Bucot, Aliaga, Nueva Ecija

SUBJECT: Cost Estimate

Item No. Item Description Qty. Unit (Material)Unit Cost Amount

### SUMMARY:

TOTAL MATERIAL COST 1,030,048.42

LABOR COST (35% OF MAT'L COST) 360,516.95

Profit (2.5% of MAT'L CoST) 25,751.21

GRAND TOTAL Php 1,416,316.58

Prepared by:

JOSEPH M. DELA CRUZ BSCE 5

References

Related documents

W orking in E mbedded S ystem The project of this paper is to make a wireless GSM connection [1] in between user and embedded system of home - made devices (Television,

Most covenant theologians say the physical nation of Israel has no place in God’s future plans (though some say Israel’s bless- ings in the land will be experienced in

In this paper an insight into the current research in the field of Digital transformation is provided, in order to show the key initiatives, trends and technologies, that influence

AP25 Setup

• the average specific emissions of the new light commercial vehicles European fleet in 2013 was 173.3 g CO 2 /km, a reduction of 3.8 % compared..

(A) Changes in induced LFP power relative to power during presentation of a grey screen, during presentation of dot fields for contact points in the middle (n=281) and

• If a standard “2x”    or “Null”    attack modifier card was drawn from a specific modifier deck during the round, shuffle all the discards of that deck back into

YesID