• No results found

Reliability and Performance Evaluation of Fault-aware Routing Methods for Network-on-Chip Architectures (RESEARCH NOTE)

N/A
N/A
Protected

Academic year: 2020

Share "Reliability and Performance Evaluation of Fault-aware Routing Methods for Network-on-Chip Architectures (RESEARCH NOTE)"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. (a) The old paths (dashed lines) broken by a horizontal and vertical faulty link are restored by the new paths (solid lines) based on the previous work [1] and (b) the old paths and the new paths based on the work [2]
TABLE 1. Reliabilities obtained by different deterministic routing algorithms [1] for the path shown in Figure 3
TABLE 2. Reliabilities obtained by different adaptive routing algorithms [2,12] for the 3×4 NoC
Figure 5a. As depicted in Figure 5b, under low traffic
+2

References

Related documents

 Comprehensive assessment of the quality of services in ambulatory care facilities by validated quality indicators.  Including self-assessment, interviews with practice managers and

One-dimensional DEEP maps (measured open-circuit potential difference vs working electrode placement) from water:methanol (1:1) solution over: (a) the total range , (b) the

Thus, when the interdomain thiol-disulfide exchange reaction occurs between the reduced C 53 GHCQ motif of the a -domain and the oxidized C 397 GHCK motif of the

My goal for the current session is to introduce myself and the study, to get to know the youth, ask the youth to reflect upon their experience with using the workbook in their

One way to minimize or reduce insurance costs in rental properties is to require all tenants to have in place their own renter’s insurance policies or business

Information evaluating plans can empower cloud clients to check the uprightness of their remotely put away information without downloading them locally, which is

cement has been replaced by hypo sludge compression test of concrete with various mixes with different curing periods which are 7,14 and 28 days by partial replacement of cement